Académique Documents
Professionnel Documents
Culture Documents
1 (5)
No.
Approved
Checked
Date
Rev
ETOEOL
2001-10-24
Reference
Analysis of IMSI
1
General ......................................................................................................................................... 2
1.1 Purpose ................................................................................................................................. 2
1.2 Description ............................................................................................................................ 2
1.3 Scope .................................................................................................................................... 2
1.4 Revision History..................................................................................................................... 2
1.5 References ............................................................................................................................ 3
1.6 Glossary ................................................................................................................................ 3
Flow Description ............................................................................................................................ 4
2.1 Flow Chart ............................................................................................................................. 4
2.2 Pre-conditions........................................................................................................................ 4
2.3 Main Flow .............................................................................................................................. 4
2.4 Alternative Flow(s) ................................................................................................................. 5
2.5 Exceptional Flow(s) ............................................................................................................... 5
2.6 Post-conditions ...................................................................................................................... 5
Parameters and Constraints .......................................................................................................... 5
REQUIREMENT SPECIFICATION
Prepared (also subject responsible if other)
Approved
Checked
Date
Rev
ETOEOL
2001-10-24
GENERAL
1.1
PURPOSE
2 (5)
No.
Reference
This use case covers the analysis of the International Mobile Subscriber Identity (IMSI)
of an MS in order to obtain preliminary addressing information for the HLR and other
parameters needed for traffic control purposes.
1.2
DESCRIPTION
The SGSN determines the IMSI number series to which the IMSI belongs when a base
use case request IMSI analysis. The parameters associated with the IMSI number
series are used to obtain a preliminary HLR address and for subsequent traffic control
activities.
1.3
SCOPE
This abstract use case describes the analysis of the IMSI.
This use case starts when a base use case requests an IMSI analysis and ends when
the analysis is performed.
Handle MS Mobility
<<include>>
REVISION HISTORY
Rev.
Date
Prepared
Description
2001-10-10
L. Bakkeby
First version
2001-10-24
L. Bakkeby
REQUIREMENT SPECIFICATION
Prepared (also subject responsible if other)
Approved
Checked
Date
Rev
ETOEOL
2001-10-24
1.5
1.6
3 (5)
No.
Reference
REFERENCES
[1]
ETSI TS 03.03
[2]
[3]
[4]
GLOSSARY
This chapter describes concepts that are specific for this document. Please see
reference [4] for GPRS related acronyms and concepts.
1
2
Ref. [1]
Ref. [2]
IMSI
Numbering plan
Roaming status
REQUIREMENT SPECIFICATION
Prepared (also subject responsible if other)
No.
Approved
Checked
Date
Rev
ETOEOL
2001-10-24
FLOW DESCRIPTION
2.1
FLOW CHART
Reference
Start
M1 IMSI
number series
M2 Roaming
status
A2 HLR address
= IMSI
M3 HLR
addresss = MGT
A1 Unknown IMSI
number series
End
PRE-CONDITIONS
-
2.3
MAIN FLOW
The use case is initiated when a base use case request IMSI analysis.
Step M1: IMSI number series
1. SGSN verifies that the IMSI belongs to an existing IMSI number series.
Step M2: Roaming status
2. SGSN determines the roaming status of the MS.
4 (5)
REQUIREMENT SPECIFICATION
Prepared (also subject responsible if other)
5 (5)
No.
Approved
Checked
Date
Rev
ETOEOL
2001-10-24
Reference
ALTERNATIVE FLOW(S)
2.4.1
2.4.2
2.5
EXCEPTIONAL FLOW(S)
-
2.6
POST-CONDITIONS
-