Mobily WiMAX-LTE Project Technical Site Survey Report

Site ID: Site name: Support-structure Type: Equipment Type:

4399 4399 7m RT 12m tower SHELTER

Prepared by Reviewed by Reviewed by Approved by

HAYAT COMM HUAWEI Tech., Co., Ltd.

Date Date Date Date

Jan. 18, 2011

12/8/2012

HUAWEI CONFIDENTIAL

Page 1 of 35

Mobily WiMAX-LTE Project Site Survey Report

Information of Site Surveyor Company* Surveyor* Approve Record Huawei MW Approver BTS Approver RF Approver CW Approver Astelit TNO RNO CPO CW Hayat Comm. Jitender Date* Jan. 18, 2011 Phone* 0569318474

Date Date Date Date

Approver Approver Approver Approver

Date Date Date Date

Huawei Technologies Co., Ltd.


All Rights Reserved

12/8/2012

HUAWEI CONFIDENTIAL

Page 2 of 35

Mobily WiMAX-LTE Project Site Survey Report

Table of Contents
1 Common Information ...................................................................................................... 4
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 Site Basic Information .......................................................................................... 5 Information of indoor site .................................................................................... 5 Information of outdoor site .................................................................................. 5 Site Access ........................................................................................................... 6 Road Access to the Site ........................................................................................ 6 Security Status of the Site .................................................................................... 6 Transmission Facility Available ........................................................................... 6 Power Available ................................................................................................... 7 Earth System ........................................................................................................ 8 Cable Tray/ladder ................................................................................................. 8 Length Of Cables Needed .................................................................................... 8 Civil Information .................................................................................................. 8 Existing Antenna System of Microwave .............................................................. 9 Existing IDU Information .................................................................................... 9 New Antenna System of Microwave .................................................................. 10 Microwave Link budget ..................................................................................... 11 Block Information .............................................................................................. 11 DCDB & HVAC Height Information................................................................. 11 Shelter Temperature ........................................................................................... 11

2 Site RF Survey ..................................................................................................................... 12


2.1 2.2 Environment Information ................................................................................... 12 Panorama Analysis ............................................................................................. 12

Evaluation of rooftop.............................................................................................................................. 21 2.3 2.4 2.5 RF parameters .................................................................................................... 21 Site Photos.......................................................................................................... 21 Drawings ............................................................................................................ 34

12/8/2012

HUAWEI CONFIDENTIAL

Page 3 of 35

Mobily WiMAX-LTE Project Site Survey Report

Common Information Fill the table according to the on-site conditions. Site ID* Site location* Survey Date* BS mode Site longitude (decimal) * Building height* Name of shared site/co-location name Name of shared site/co-location name Survey person* Customer contact person Property contact person Permission to access the site* Site survey implementation company* Site engineering implementation company Radio network planning company Note:- * Marks must be Filled N/A HAYAT HUAWEI 3G
Jitender

4399 Madina Jan. 18, 2011 SHELTAR


24.4866

Site name*

4399

Equipment room type BS configuration Site latitude (decimal) * Support structure height* Co-location operator Co-location operator Contact number* Contact number Contact number Time to access the site*

Shelter S111
39.668

7mRT

12m tower MOBIL Y MOBIL Y


0569318 474

Any Time

12/8/2012

HUAWEI CONFIDENTIAL

Page 4 of 35

Mobily WiMAX-LTE Project Site Survey Report

1.1 Site Basic Information


BTS+MW
Site Type*

BTS only

BTS+MW hub

MW Realy only

MW hub only

Others ____________________
Site Importance Site Location*

Normal Important Rooftop In Building Existing Water tower / chimney

Very Important Green Field Other

1.2 Information of indoor site


Wall Type
Equipment Room Type*

Concrete

Metal

Others ____________________

Floor type 2x2 Shelter

Concrete Metal Others ____________________ Antistatic Floor, Floor Height ______m 3x2 Shelter Others ____________________

Equipment Room Size* Equipment Fixing Method* Indoor Grounding Bar* Feeder Wiring Window*

On Floor On Wall Others ____________________ Hole Quantity of Inside Grounding Bar: ___2___ (In Use:_2_ Left:__) Hole Quantity of Feeder Wiring Window:__12____ (In Use:__7_ Left:__5_)

1.3 Information of outdoor site


Fence* Base Frame Type* Is There Extension Place for Huawei Mini Shelter?*

No use In use. Length_____4 _____ m Width_____3____ m Concrete Foundation Concrete Foundation + Steel Frame Steel Frame Others ____________________ No Yes. How many cabinets can be installed in advance? 1 Configuration Dimension (W x D x H) 1 unit(1 Cabinet) 905mm x 1,085mm x 2,155mm 2 Unit(2 Cabinet) 1,755mm x 1,085mm x 2,155mm 2.5 unit (2.5 Cabinet) 3 unit (3 Cabinet) 2,640mm x 1,085mm x 2,155mm 2,610mm x 1,085mm x 2,155mm 2 Enough Space? Yes No Yes No Yes Yes No No

Mini Shelter Size * (mm)

Outdoor Grounding Bar*

Hole Quantity of Outside Grounding Bar:__15___ (In Use: _10__ Left:_5__)

12/8/2012

HUAWEI CONFIDENTIAL

Page 5 of 35

Mobily WiMAX-LTE Project Site Survey Report

1.4 Site Access


Access : Key's :

Free Regulated Elec. Key

Combination key
Other :

Specific Procedure :

Normal shelter key

1.5 Road Access to the Site


Access to the Site: * Small truck Truck - 3,5 t Good Close Easy Difficult Free Off Charge To Pay 4x4 Car

State of the Road : Parking :

* *

Parking for Delivery :

Far Away Easy Difficult Arrange With the Local Police

Notes :

1.6 Security Status of the Site


Site OK * Security Problem * Earth cable connected to main bar * Electric Socket Available * Enough light available * NOTES : Yes Yes Yes Yes Yes No No No No No

1.7 Transmission Facility Available


Optic Fibre for Transmission Available : Ethernet port for Transmission Available : Notes : Yes Yes No No

12/8/2012

HUAWEI CONFIDENTIAL

Page 6 of 35

Mobily WiMAX-LTE Project Site Survey Report

1.8 Power Available


DC Power (-48V) Rectifier Available : Type : POWER WAER Sys. Other : Current -48V DC Power Consumption : Number of Free Rectifier's Position : * 10,11 Fuse Holder/MCB Breaker Available : Fuse Type in the Holder 32.5A Total rectifiers Available, not in use: 7

Yes

No

Rectifier Operational :

Yes

No

Yes

No

Notes :

There is no DCDP. Proposed in Rectifier. Proposed at 63A

GENERATOR DUAL: GENERATOR SINGLE: No GENERATOR: SCECO POWER: DC Power - 48V Ampere
Fuse holder/MCB Breaker: Fuse holder/MCB Breaker: Fuse holder/MCB Breaker: Fuse holder/MCB Breaker: Fuse holder/MCB Breaker: Fuse holder/MCB Breaker:

Yes Yes Yes Yes Type :

No No No No Quantity : 1 Used/7 Spare 0 Used/7 Spare 1 Used/3 spare 2 Used/1 Spare 0 Used/1 Spare

63A 50A 10A 32A 6A

GE GE GE GE GE

Power Cable (BTS -48V) : Portable Power Supply needed: Notes: CB 63A available Yes No

12/8/2012

HUAWEI CONFIDENTIAL

Page 7 of 35

Mobily WiMAX-LTE Project Site Survey Report

1.9 Earth System


Earth Cable :

* *

Type MKEM y/g

Needed Length

Bus Bar indoor/outdoor: Notes :

Yes New Grounding cable required.

No

1.10Cable Tray/ladder
TYPE Yes Cable Tray: * Yes Cable ladder indoor: * Yes Feeder Gantry * Re-use the existing cable Tray: * Yes Re-use the existing cable Ladder: * Yes Re-use the existing feeder gantry: * Yes Notes : No No No No No No Required Length

1.11 Length Of Cables Needed


Cable Type Power Cable from DC-Bar to DCDP * Power Cable from DC-Bar to DCDU* Transmission Cable Length (Optical) : Grounding Cable Length: * CPRI Cable Length (6 RRUs x 1 CPRI Per RRU): DC Power Cable Length: (6 RRUs) * Grounding Cable Length: (6 RRUs) * GPS Feeder Length: * RRU Feeder Length: (12 Feeders ) * Notes : Other Cables info Equipment DC-Bar DCDU BBU DC-BOX BU-RRU RRU RRU GPS RRU Length (m) 5 7 11 3 8x6cpri 20 3 5 150

1.12 Civil Information


Is there enough space for New RRUs RACK * Is there enough space for the new Mini Shelter* Is there enough space on existing tower for New Antenna * Is there enough space on rooftop for new tower base * Is there space for the wall mount on the parapet of the building Are there enough holes available on the Roxtec frame * Is there enough space available for the New Roxtec frame * Circumference of the ring to be installed on monopole tower base. Notes : Other info Yes/No Yes YES YES YES YES Yes Yes No Requirements 2M*2M 800mm x 400mm 6m*6m 1.5m-2m At least 7 holes For Green Field sites

12/8/2012

HUAWEI CONFIDENTIAL

Page 8 of 35

Mobily WiMAX-LTE Project Site Survey Report

1.13 Existing Antenna System of Microwave


Quantity of Existing MW Antennas *

1 0.3 19 125

5
Antenna 3

Others:_______________
Antenna 4 Antenna 5 Antenna 6

Antenna 1 Diameter/Polarization * Height(m) * Azimuth from Magnetic North(deg) * Link Capacity * Hop Distance (km) * Far End Site ID *

Antenna 2

Note:-

1.14 Existing IDU Information


Service Interface * The Label is available or not Fiber Yes FE No GE E1

Existing IDU pictures

12/8/2012

HUAWEI CONFIDENTIAL

Page 9 of 35

Mobily WiMAX-LTE Project Site Survey Report

1.15 New Antenna System of Microwave


Huawei IDU Type Quantity of New MW Antennas New MW Antennas Enough space for new antenna Enough cable tray for new IF cable Diameter/Polarization Height (m) Antenna mounting type Azimuth from Magnetic North(deg) Frequency Band (GHz) Link Capacity Hop Distance (km) Far End Site ID Planned RX level Fade Margin Annual Availability IF Cable Length (m) Protection Type Enough Space for new IDU

RTN910 1 2 3

RTN950 4 Antenna 2
Yes No Yes No Yes

Others:_______________ 5 6 Antenna 3
Yes No No

Antenna 1
Yes Yes No No

Others:_______________ Antenna Antenna 4 5


Yes Yes No No Yes Yes No No

Antenna 6

1.2 18 233.48

2.17 6480

Yes

No

Transmission Rack Type(attach the picture)

Note:12/8/2012 HUAWEI CONFIDENTIAL Page 10 of 35

Mobily WiMAX-LTE Project Site Survey Report

1.16 Microwave Link budget


We will submit separately with LOS

Note:- Attach Pathloss result. 1.17 Block Information(Exchange Site)


Blocks Space 1 Available 2 Available 3 Available 4 Available 5 Available 6 Available 7 Available 8 Available Note:- Block 8 is available. Is there enough space for New TRM RACK(EN3B19inch2m) Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No

1.18 DCDB & HVAC Height Information


DCDB To Floor Height HVAC To Floor Height HVAC To Rack Distance (Block # 8 or 7 or 6) 1.75m 1.2m 2m

1.19 Shelter Temperature


Shelter Temperature 32.1 C

12/8/2012

HUAWEI CONFIDENTIAL

Page 11 of 35

Mobily WiMAX-LTE Project Site Survey Report

2 Site RF Survey

2.1 Environment Information 2.2 Panorama Analysis


Table2-1 Photo of 4399 site and entironment 4399

Tower location

Sector 1 0 deg.

12/8/2012

HUAWEI CONFIDENTIAL

Page 12 of 35

Mobily WiMAX-LTE Project Site Survey Report

Sector 2 120 deg.

Sector 3 240 deg.

12/8/2012

HUAWEI CONFIDENTIAL

Page 13 of 35

Mobily WiMAX-LTE Project Site Survey Report

Sector 1 antenna installation environment

Sector 2 antenna installation environment

12/8/2012

HUAWEI CONFIDENTIAL

Page 14 of 35

Mobily WiMAX-LTE Project Site Survey Report

Sector 3 antenna installation environment

0 deg.

12/8/2012

HUAWEI CONFIDENTIAL

Page 15 of 35

Mobily WiMAX-LTE Project Site Survey Report

30 deg.

60 deg.

12/8/2012

HUAWEI CONFIDENTIAL

Page 16 of 35

Mobily WiMAX-LTE Project Site Survey Report

90 deg.

120 deg.

12/8/2012

HUAWEI CONFIDENTIAL

Page 17 of 35

Mobily WiMAX-LTE Project Site Survey Report

150 deg.

180 deg.

12/8/2012

HUAWEI CONFIDENTIAL

Page 18 of 35

Mobily WiMAX-LTE Project Site Survey Report

210 deg.

240 deg.

12/8/2012

HUAWEI CONFIDENTIAL

Page 19 of 35

Mobily WiMAX-LTE Project Site Survey Report

270 deg.

300 deg.

330 deg.

12/8/2012

HUAWEI CONFIDENTIAL

Page 20 of 35

Mobily WiMAX-LTE Project Site Survey Report

Evaluation of Greenfield 2.3 RF parameters


Table2-2 Table of RF parameters

Sector 1
Cell ID 4399 Manufactory Type of antenna Width of level lobe Gain of antenna Height of ant (midpoint of ant) Azimuth (deg) Electrical downtilt Mechanical downtilt Length of feeder(m) Type of feeder(inch) Supporting method of ant Type of fixing Supporting structure of ant TMA(Y/N) Height(m)

Sector 2 Kathrein 742265 65 18 dBi 19m 120 0 1 50m 7/8 9M TOWER RT 19m N

Sector 3 Kathrein 742265 65 18 dBi 19m 240 0 1 50m 7/8 9M TOWER RT 19m N

Kathrein 742265 65 18 dBi 19m 0 0 1 50m 7/8 9M TOWER RT 19m N

2.4 Site Photos

12/8/2012

HUAWEI CONFIDENTIAL

Page 21 of 35

Mobily WiMAX-LTE Project Site Survey Report

Door label

Existing equipments pictures

12/8/2012

HUAWEI CONFIDENTIAL

Page 22 of 35

Mobily WiMAX-LTE Project Site Survey Report

4 sides of shelter

12/8/2012

HUAWEI CONFIDENTIAL

Page 23 of 35

Mobily WiMAX-LTE Project Site Survey Report

DDF

Indoor Grounding Bus Bar

12/8/2012

HUAWEI CONFIDENTIAL

Page 24 of 35

Mobily WiMAX-LTE Project Site Survey Report

Out Door Grounding

Tower Feeder System / Tray / Ladder

12/8/2012

HUAWEI CONFIDENTIAL

Page 25 of 35

Mobily WiMAX-LTE Project Site Survey Report

Access Road

Site Access

12/8/2012

HUAWEI CONFIDENTIAL

Page 26 of 35

Mobily WiMAX-LTE Project Site Survey Report

Cable ladder Indoor

Cable ladder Outdoor

12/8/2012

HUAWEI CONFIDENTIAL

Page 27 of 35

Mobily WiMAX-LTE Project Site Survey Report

Roxtec from Outdoors

Roxtec from Indoors

12/8/2012

HUAWEI CONFIDENTIAL

Page 28 of 35

Mobily WiMAX-LTE Project Site Survey Report

Existing DC Power system

Proposed breaker picture

63A Available

12/8/2012

HUAWEI CONFIDENTIAL

Page 29 of 35

Mobily WiMAX-LTE Project Site Survey Report

Space available for New wimax antenna.


No space in Existing Tower for new Wimax Antenna Sector 1

Existing 2G&3G Antenna

Existing Tower for new Antenna Sector 2

Existing 2G&3G Antenna

12/8/2012

HUAWEI CONFIDENTIAL

Page 30 of 35

Mobily WiMAX-LTE Project Site Survey Report

Existing Tower for new Antenna Sector 3

Existing 2G&3G Antenna

Proposed RRU RACK Location

PROPOSED RRU RACK LOCATION

12/8/2012

HUAWEI CONFIDENTIAL

Page 31 of 35

Mobily WiMAX-LTE Project Site Survey Report

Feeder Window Location Existing or Proposed

Existing Feeder Window Location

Space for new TRM Rack

Space Available

12/8/2012

HUAWEI CONFIDENTIAL

Page 32 of 35

Mobily WiMAX-LTE Project Site Survey Report

Proposed BBU Location

Space Available for BBU and IDU

Existing MW Antenna picture

MW Size: 0.3m Az: 125 Ht:19m

12/8/2012

HUAWEI CONFIDENTIAL

Page 33 of 35

Mobily WiMAX-LTE Project Site Survey Report

Proposed New Micro Wave

MW Size: 1.2m Az: 233.48 Ht: 18m

2.5 Drawings
Site layout with outdoor proposed requirement like gantry, cable tray, Bus bar, new opening, new equipment Etc. Existing and Proposed floor layout Existing and proposed Antenna drawings Existing and Proposed cable ladder drawings. Existing and proposed Dc connection drawings.

12/8/2012

HUAWEI CONFIDENTIAL

Page 34 of 35

Mobily WiMAX-LTE Project Site Survey Report

Proposed New Wimax Antenna Proposed new Tower 9m

Space Available for 9m Tower

Proposed New Wimax Antenna Sector A Azi 60 Degree HT: 16m

Proposed New Wimax Antenna Sector B Azi 180 Degree HT: 16m

Proposed New Wimax Antenna Sector C Azi 300 Degree HT: 16m