Vous êtes sur la page 1sur 4

Resume

Sanjiv Kasar

Mobile : 0091-9370334481 e mail : sanjiv_kasar@rediffmail.com .

Address : Flat No.14 ,B Wing ,Ashwini co. op. sty., Survey No.54 ,Mahatma sty.,Kothrud
,Pune ,411038.

JOB OBJECTIVE: To be a member of a professionally managed, dynamic


organization of repute and contribute to its growth.
SYNOPSIS

• Sanjiv is an incisive professional with 20 years of experience in textile manufacturing industries, out of which
14 years at managerial posts. Experience with Polyester and Nylon yarn Texturising, Draw twisting, TFO,
dyeing /coning, Circular knitting, Warp knitting and narrow width fabrics (elastic tapes).
• Experienced in commissioning of new projects, converting non performing units into profit making units and
further expanding the capacity. Has worked with leaders in textiles such as Century Enca , Garware Wall
ropes ltd.
• Lead an organization 150 metric tons capacity per month as Works Manager for 4 years. Responsible for
production, utilities, labor matters, excise matters, liaison, administration and CTS.
• Has handled work group of 400 people. Has worked in a group with 1400 workers and 350 staff.
• Strives to achieve planned growth with strategic approach towards process mapping, capacity planning,
manufacturing quality improvement and cost reduction.
• A team builder. Act to develop multi skill working environment and culture. Attitude towards learning and
orientation.
• Adept at preparing project reports for procuring new equipments and materials with cost and benefit analysis,
pay back period estimations. Generating reports for AVP / MD with recommendations and cost saving
proposals.
• Has manufactured products for international market confirming to the required standards and norms.

WORK EXPERIENCE

Current job description: Nov.07 Onwards


Manager Operations : Spica Elastic Pvt. Ltd. Pune : ISO 9001:2000 group, Turnover of 110 crore per year.
Hierarchy: Reporting to Managing Director.
• Initiated proper utilization of machine capacity. Improvements to increase the efficiency, waste reduction and
WIP. Achieved increase in efficiency by 6 %. Achieved reduction in overall wastage by 50 % and WIP from 3
days to 2 shifts.
• Coordinating with Maintenance, QA, Purchase and Sales. Planning of activities to meet the committed
deliveries.
• Accomplished restructuring of the organization by identifying key roles and persons. Redefined the jobs and
responsibilities for smooth functioning. Defining of quality norms.
• Initiated spares cost reduction.
• Reporting Structure :
MD :
 Manager Operations (Self)
-- Deputy Manger Operations
-- Production Manager, Production supervisors (9)
-- PPC (Three Executives)
-- Sampling and R&D (dotted line)
 Personnel Manager
 Manager QA.
 Manager Maintenance

i
 General Manager

Last job description:


Dec’05 till Nov.07.
Deputy Manager : Garware Wall Ropes Ltd, Wai, Satara, India, a well known textile ISO 9000 group. Turnover
of 480 crore per year . Assigned to work on 100% EOU Project .
Hierarchy: Reporting to Associate Vice-President. (AVP).

Career Path :

Deputy Manager Raschel Warp knitting (Dec 05-May 07).


Deputy Manager Product development and Projects (till Nov 07).

Project completed: Production of Nylon Fish netting and Industrial fabrics .

The Key Result Areas

New Product Development


• Headed the entire product development including requirement analysis, finalizing specifications, designing,
samples development and testing.
• Developed the designs successfully meeting international standards and parameters and acquired new
business for the organization.
• Defining and Standardization of process parameters for production.
• Improvement in existing products based on market trends, requirements and feedback.

Cost Saving Initiatives/ MIS


• Efficiently using inventory management system and procedure and inventory control for ensuring ready
availability of materials.
• Implementing inventory control measures to reduce obsolete stock , keep tab on slow-moving items and
achieve reduction in inventory management cost.
• Developments of components and spares as replacement for costly imported spares.
• Formulating MIS reports relating to material management, cost savings / vendor Quality Assurance
operations & submitting them to the top management for facilitating the decision making process
• Exposure to ISO, Kaizen and JH activities.

Production planning and control


• Determination of Machine capacities, construction wise, group wise.
• Laying down yearly plan by coordinating with Marketing. Advance distribution for the excess and under
utilization of machine capacity.
• Imported raw material planning, scheduling, stock monitoring and deciding product mix.
• Preparation of Contract Review, Indents, Indent Tracking Cards, Month wise production Plan.
• Exposure on In house software for planning, as an end user.

The Attainments
• Achieved reduction in WIP from 6 days to total 2.5 days.
• Achieved increase in machine utilization by 15 %.
• Achieved cost reduction by reduction of final product weight by 15 % with the same physical properties. This
additionally helped the organization to bag export contract of 240 MT per year.
• Achieved cost reduction by developing indigenous moulds for fabrication of spares .This brought down the
cost of spares from Rs.3.5 per Kg to Rs.1.5 per Kg. (average daily production of 2000 Kgs.)
• Achieved 11 % cost reduction in vendor cost by negotiations and planning.
• Lead the department towards further expansion by 35 % of the present capacity.

ii
PREVIOUS JOBS :
Since June 2004 till Dec2005 :
Production Manager : worked as in Ginza Industries Ltd. Daman
Fast growing textile group with wide range of upholstery, knitted fabric ranges and laces.
Hierarchy: Reporting to Director.

Brief Job Profile:


• Headed UNIT II erection, commissioning .New products design and development on newly introduced flat
bed COMEZ knitting machines with state of the art technologies.
• Production experience of Polyester and Nylon and Ply yarns.
• Machines modification to increase product versatility and production.
• Customer Technical Services.

Since May1996 till Sept.1999


Works Manager : Midas Yarn Processors Ltd. Ahmedabad .

Hierarchy : Reporting to M.D.

Brief Job Profile:


• Head of the total plant.
• Responsible for Production, utilities, labor matters, excise matters, liaison, administration, CTS .
• Solely handled successful completion of new Projects of DT 200 and Twisting machines viz. Construction of
new buildings, AC, Ducting, Compressors selection, Design layout, commissioning, Machine erection &
commissioning,
• Coordinated with Government authorities and Gram Panchayat to fetch exemption from Octroi which benefited
the plant to save about 2 % of the material cost per year.

o Since Sept.1994 till April 1996 as Production Manager in Enkay Texofood Industries, Silvassa D.N.H.
reporting to Works Manager.
o Since July 1988 till Aug.1994 worked as Sr. Engineer in Konkan Synthetic Fibre, (Prop. CENTURY ENCA
,Pune)
o Since May 2000 till 2004 worked as Head for Educational Institutes.

ACADEMIA

• B.Text.(Textile)from VJTI, University of Mumbai -1988 .


• Dual Diploma In Multimedia & Web Designing from ARENA Multimedia a div. of APTECH - 2001.
• Advance Diploma In Computers from Chh.Shahu Central Inst. of Business Education & research , kolhapur -
2000
• Textile Diploma from D.K.T.E. Textile Institute of Ichalkaranji - 1986.

PERSONAL DETAILS

• Date of Birth: 2 nd July 1964


• Status: Married.
• Languages Known: Marathi, Hindi, English, and Gujrathi( Can Read only)
• Passport valid up to: 21-01-2012
• Interests: Photography, Music.
• Awards: Awarded "BEST STUDENT OF YEAR".
• Member of Winner Volley ball team at District level intercollegiate games.

iii
iv

Vous aimerez peut-être aussi