Roger Preston Limited Design and construction of TAMAR development project Central, Hong Kong Loading Estimation for General Power and Lighting at Common Facilities Sheet 1 of 2 Normal (no genset backup) Loading (kVA) 0.63 1.57 0.78 1.96 0.22 0.54 1.01 2.53 0.20 0.05 7.03 17.57 18.25 4.56 Essential (with genset backup) Loading (kVA) 0.16 0.00 0.20 0.00 0.05 0.00 0.25 0.00 0.05 0.00 1.76 0.00 4.56 0.00

Floor Usage B/F Street Hydrant pump room Street Hydrant water room Service duct room L/F Water pump room Communal Area (e.g Corridor) G/F Plant Room (Transformer Block) Communal Area (e.g Corridor, Vehicular access)

Area (m2) Loading description 157 Lighting Small power 196 Lighting Small power 54 Lighting Small power 253 Lighting Small power 51 Lighting Small power 1757 Lighting Small power 4562 Lighting Small power

Total Normal Power Total Essential Power

Lighting 28.12 7.03

Small power 28.78 0.00 Total Load

Remark : No requirement of ER for about the dedicated LV switchboard and transformer for Common facilities. It shall be shared with Open space

J. Roger Preston Limited Design and construction of TAMAR development project Central, Hong Kong Summary of Loading Estimation for Tamar - Common Facilities ITEM 1.1 1.2 Loading (kVA) per unit Quantity General / Office lighting and small power Lighting Installation 35.15 1 General Power and other fixed equipment 28.78 1 Description Diversity factor 0.85 0.80 Loading (kVA) 29.88 23.03 1.1 1.2 Sheet 2 of 2 ITEM Tx. 18 29.88 23.03

3.1 3.2
3.3 3.4 3.5 3.6 3.7 3.8 3.9 4 4.1

Cleansing Water Booster Pump for Podium Flushing Water Booster Pump for Podium
Sump Pit Pump Subsoil Sump Pump Waste Water Sump Pump Carpark Waste Water Sump Pump Cleansing Water Booster Pump for Podium Flushing Water Booster Pump for Podium Refuse Collection Ventilation Fan Loading & unloading Ventilation Fan Ventilation Fan for Genset Room CCP

Mechanical Services 2 - Water Pumps 0.50 1 0.50 1


18.00 2.00 2.00 4.00 0.50 2.35 8.90 8.90 13.00 11 16 14 20 1 2 2 2 2

0.80 0.80
0.80 0.80 0.80 0.80 0.80 0.80 1.00 1.00 0.00

0.40 0.40
158.40 25.60 22.40 64.00 0.40 3.76 17.80 17.80 0.00

3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 4 4.1

0.40 0.40 158.40 25.60 22.40 64.00 0.40 3.76 17.80 17.80 0.00

Mechanical Services 3 - MVAC

4.2 4.3 4.4 4.5

Mechanical Services 4 - Fire Services Installations Street Hydrant pump 1duty and standby 155.00 1 Street F.H.Jockey 1 duty 8.90 1 H.R.1 duty and standby 5.00 1 H.R.1 duty 3.50 1 Automatic Refurse Collection System 396.00 1

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

4.2 4.3 4.4 4.5

0.00 0.00 0.00 0.00

Automatic Refuse Collection System

0.80 Total Load Demand

316.80 680.67

5 Sub-Total Percentage

316.80 680.67 45%

Remark : No requirement of ER for about the dedicated LV switchboard and transformer for Common facilities. It shall be shared with Open space