ID 1 1.1 1.1.1 1.1.2 1.2 1.2.1 1.2.2 1.2.2.1 1.2.2.2 1.2.2.3 1.2.3 1.2.3.1 1.2.3.2 1.2.3.3 1.2.3.4 1.2.

TASK NAME ARENA SPORS TOURNMENT Software life cycle model process Identify software life cycle model Select project model Project initiation Map activities to the software life cycle model Allocate project resources Identifying staffing requirements Acquire commitment from the required staff Allocate identified activities to the staff Establish project environment Identify tool requirements Acquire required tools Establish documentation repository Establish software engineering work spaces Plan project management

RESOURCE NAME

DURATION 2 days 1 day 1 day 30 days 2 days 10 days 2 days 2days 6 days 20 days 10 days 6 days 2 days 2 days 10 days

Project manager Project manager Project manager Project manager Project manager Project manager Project manager Project manager, hardware purchaser Project manager Project manager project manager, software architect, verification engineer Project manager Project manager Project manager Project manager Project manager Project manager Project manager Project manager Project manager Configuration manager Configuration manager Configuration manager

1.2.4.1 1.2.4.2 1.2.4.3 1.2.4.4 1.2.4.5 1.2.4.6 1.2.4.7 1.3 1.3.1 1.3.2 1.4 1.4.1 1.4.2 1.5 1.5.1 1.5.2 1.5.3 1.5.4 1.5.5 1.6 1.6.1

Creat SPMP Sub plans Create start up plan Create work plan Create control plan Create risk management plan Create technical process plan Create process improvement plan Project monitoring and control Analyze risks Perform contingency planning Configuration management Plan configuration management Create software configuration project management plan Software quality management Plan software quality software management plan Create software quality assurance plan Define metrics Manage software quality Identify quality improvement methods System allocation Analyze functions

3 days 3 days 3 days 3 days 3 days 3 days 3 days 5 days 5 days

Quality analyst Quality analyst Quality analyst Quality analyst Quality analyst System architect

1.6.2 1.6.2.1 1.6.2.2 1.7 1.7.1 1.7.2 1.7.3 1.7.4 1.8 1.8.1 1.8.2 1.8.3 1.8.4 1.9 1.9.1 1.9.2 1.9.3 1.9.3 1.9.4 1.9.5 1.10 1.10.1 1.10.2 1.11 1.11.1 1.11.2 1.11.3 1.11.4 1.12 1.12.1 1.12.2 1.12.3 1.12.4 1.13 1.13.1 1.13.2 1.13.3 1.13.4

Develop system architecture Identify hardware functions Identify software functions Requirements Define and develop software requirements Define interface requirements Prioritize and integrate requirements Create software requirements specification Design Create formal architecture of design Design the database Design interfaces Perform detailed design Verification and validation Plan requirements verification and validation Plan verification and validate architecture design Plan interface verification and validation Create database design verification and validation Create software verification and validation plan Plan testing Documentation development Implement documentation Distribute documentation Training Plan the training program Develop training materials Validate the training program Implement the training program Implementation Create source code Create object code Plan integration Perform integration Installation Plan installation Distribute software Install software Accept software in operational environment

System architect System architect System architect

Verification engineer, validation engineer Verification engineer, validation engineer Verification engineer, validation engineer Verification engineer, validation engineer Verification engineer, validation engineer Technical writer Technical writer Technical writer

1.14 1.15

Operation and support Maintenance