Refractories & Chimneys Construction Company Ltd

RCC
GT P.O. #. DATE CLIENT 7 6 7 6 6 SA/SPP2/SC/063/06 1.157 1145-PO-1-020-S 6000753 OS SC-560-SC-02 111 2473 3 - 2 6 7 6 SA/IWPP/SC/04-07 OK 88901079 B-4508-9-10/30 6 114631 6 6 6 113/MAT/04/MAR/08 7500001921 530-SC-06 6 6 9 7500003241 CCC/WO/MIS/002 SA/SPP3/SC/009/08 7 6 7 3477 YSPO/420 AAB/08/163 6 7 237/08 IAA910011 7 MD-0505 6 15/02/09 Litwin Italia 16/12/08 CR International Srl 23/01/09 Enel Power S.p.A 09/10/08 Cape 24/10/08 Enel Power S.p.A 23/11/08 Abdul Azizi Abu Bushait 05/07/08 Tecnimont SPA 15/07/08 City Cement Company 15/09/08 Saudi Archirodon Co. Ltd 11/03/08 Tabuk Cement Co. 30/04/08 Tecnimont SPA 03/02/08 Al Rushaid Construction Co. Ltd. 13/02/08 Nasser S. Al Hajri Corp. 15/03/07 Saudi Archirodon Co. Ltd 17/10/07 Tecnimont SPA 22/01/08 Kirchner Italia SPA 21/03/06 Saudi Archirodon Co. Ltd 02/11/06 CR International Srl 01/04/06 Saudi Archirodon Co.Ltd. 27/04/06 Ciria - Thermal Ceramics Italiana 01/08/06 Al Rushaid Construction Co. Ltd. 19/03/07 Linarco Ltd Saudi Arabia

PROJECT REFERENCE LIST


WORK DESCRIPTION Construction of no. 1 Chimney H=160m - Shoaiba Power Plant stage 2 phase II including acid resistant lining with organic membrane and borosilicate blocks Refractory installation of no. 8 Catofin reactors APPC PDH/PP Project Upgrading of no. 2 Chimneys - FGD Project Jeddah Plant Stage IV including acid resistant lining with organic membrane and borosilicate blocks Refractory installation of no. 8 Cracking furnaces (Convenction Sections) Sharq Project 3rd Expansion Refractory installation of no. 8 Cracking furnaces (Radiant sections breechings, ducts & stacks) Sharq Project 3rd Expansion Refractory installation of no.7 Cracking furnaces (Radiant sections) & Refractory inst. of no.2 incineration systems Tasnee Petrochemical Construction of no. 1 Chimney H=150m Shoaiba IWPP project including acid resistant lining with vinylestere coating Refractory Field construction Supervision Services at Al Karafi Aromatic Project Refractory Field construction supervision services for Charge Heaters at Al Waha PDH/PP Project Surface preparation and installation of radiant arch referactory sealing radiant tube coils in Tasnee Petrochemical Ethylene Plant Project. Refractory Field construction Services during shutdown at Tabuk Cement Plant Refractory Field construction Supervision Services at Al Karafi Aromatic Project Installation of refractory lining for two spent caustic Incineration System Refractory Field construction Supervision Services at Al Karafi Aromatic Project Refractory field construction supervision services at City Cement Plant. Construction of no. 1 Chimney H=160m - Shoaiba Power Plant Extension Stage III including acid resistant lining with organic membrane and borosilicate blocks Refractory Field construction Service s at Petrochemiya Furnace Rewamping. Video inspection Steel Liner H=90 and acid resistant lining with organic membrane and borosilicate blocks Refractory Field construction Supervision Services for TAM 2009 at Tasnee Catofin Reactors. Chimney Field construction Supervision Services at South Pars Power Projects Refurbishment work of internal acid protive lining 100 m Chimney Liner , Marafiq Water & Power Plant Acid Protective Lining works of Storage Tanks & Reactors at Ma'aden Phophate Plant Project. Job Site CONTRACT AMOUNT (in CURRENCY) 1,860,000.00 1,964,400.00 12,478,428.00 2,001,537.00 6,599,758.00 8,068,360.00 2,096,327.00 136,350.00 3,937.00 SAR SAR SAR SAR SAR SAR SAR SAR SAR Start Date 01/11/05 01/11/06 01/07/06 26/03/06 01/09/06 15/05/07 31/03/07 15/10/07 03/02/08 Finish Date 11/01/07 31/06/07 30/04/08 28/02/07 31/09/07 31/12/07 31/03/08 15/12/07 06/02/08

Shoaiba Al-Jubail Jeddah Bahrain Al-Jubail Al-Jubail Shoaiba Kuwait Al-Jubail

Al-Jubail Tabuk Kuwait Al-Jubail Kuwait Riyadh Shoaiba Al-Jubail Yanbu Al-Jubail Iran Yanbu Ras Al Zawr TOTAL

88,268.00 350,000.00 25,000.00 468,000.00 195,000.00 34,400.00 9,325,000.00 301,000.00 170,000.00 110,000.00 110,000.00 2,287,500.00

SAR SAR SAR SAR SAR SAR SAR SAR SAR SAR SAR SAR

05/01/08 15/03/08 10/04/08 15/03/08 15/10/07 15/07/08 01/01/09 19/10/08 16/11/08 02/01/09 16/12/08 07/03/09

05/02/08 13/04/08 24/04/08 15/05/08 15/12/07 22/07/08 15/03/10 31/01/09 20/11/08 20/01/09 13/01/09 15/05/09

3,588,750.00 52,262,015.00

SAR SAR

25/02/09

15/07/09