SOUTHERN RAILWAY

DYCE/CN/I/MDU : Division

XEN/GC/MDU

Contract certificate No.CC-33/XEN/MDU/

Sub-dvision

Month of: 06.02.2012

Name of work:

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work:

2000/W1/GC/S/1 dt.9.1.2008.

Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
Quantity
executed since
executed
last certificate uptodate as per

Items

/ II /2012 DT.
Rate

.01.2012
Amount

Reference to
Since last certificate item number of
the schedule of

Upto date

In progress

8
Rs.

Rs.

Rs.

Annexure-A
10M3

0.000

1217.570 1) 102-b

326

39692.78

0.00

10M3

0.000

901.251 3) 103-b

358

32264.79

0.00

10M3

0.000

3895.806 4) 103-c

542

211152.69

0.00

10M3

0.000

231.379 7) 106

230

5321.72

0.00

10M3

0.000

4.980 8) 108

243

121.01

0.00

M3

0.000

398.900 11)201

190

75791.00

0.00

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

0.000

624.357 36)504-a

606

378360.34

0.00

M3

0.000

79.924 37)506-a

1064

85039.14

0.00

M3

0.000

250.000 38)507-a

1212

303000.00

0.00

M3

0.000

39) 509-a(I)

772

1305441.19

0.00

1690.986

Remarks

M3

0.000

150.032 40)511-a(I)

2798

419789.54

0.00

M3

0.000

3638.851 41)511-b(I)

3087

11233133.04

0.00

M3

0.000

24.870 42)511-c(I)

3337

82991.19

0.00

M3

0.000

2917.092 43)511(d)I

2537

7400662.40

0.00

M3

0.000

99.949 46)514i

1474

147324.83

0.00

M3

0.000

99.949 50)515(d)

235

23488.02

0.00

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

0.000

1700.557 56)527-b

674

114617.54

0.00

M3

0.000

173.985 58)602-d

912

158674.32

0.00

M3

0.000

4.850 59)617

31

150.35

0.00

M3

0.000

69.885 60)626-a

59

4123.22

0.00

M3

0.000

10.410 61)626-b

38

395.58

0.00

10M2

0.000

618.610 95)1002-a

217

13423.84

0.00

10M2

0.000

41.921 106)1106

187

783.92

0.00

10M2

0.000

15783.29

0.00

10M2

0.000

11756.40

0.00

10M2

0.000

59.025 115)1141(
2674
b)i
194.000 117)1217(
606
a)ii
194.000 118)1218(
1666
b)ii
Total of annexure-A

32320.40

0.00

23024073.24

0.00

Add (+)25.17

5795159.23

0.00

28819232.47

0.00

3400

18144916.00

0.00

6000

8487450.00

0.00

858000

4118400.00

0.00

Total of annexure-A

Annexue-B
Mtr.

0.000

5336.740

Mtr.

0.000

1414.575

Span

0.000

32.000

1)
Unaffected
2)
Unaffected
3) CN of
precast
concrete
superstructur
e with 'I'
girder of a
single track
etc. for a
span of
12.20m.
1)
Unaffected
(at 15%)

Span

0.000

32.000

2Unaffected @ 15%

858000

4118400.00

0.00

Span

0.000

28.000

3- On
procurement,
testing and
bringing to
site of appd
quality
neoprene
bearings (at
5%)

858000

1201200.00

0.00

Span

0.000

35.000

4Unaffected
(at 5%)

858000

1501500.00

0.00

Span

0.000

32.000

5Unaffected
(at 25%)

858000

6864000.00

0.00

Span

0.000

32.000

6)
Unaffected (
at 10%)

858000

2745600.00

0.00

Span

0.000

26.000

7) Casting of
diaphrams
reqd for one
span incl
deck slab,
RCC ballast
retaines,
wearing coat
etc. ( at 15%)

858000

3346200.00

0.00

Each

0.000

5.000

80000

400000.00

0.00

Each

0.00

1.00

1260

1260.00

0.00

Each

0.00

23.00

12)
Unaffected
13)
Unaffected
14)
Unaffected(A
t 75%)

13000

224250.00

0.00

M3

0.000

1106.983

3300

3653043.90

0.00

M3

0.000

1068.323

19)
Unaffected
20)
Launching
the precast
RCC box
segements
for clear
spans as
reqd in
convenient
lengths etc.

2500

2670807.50

0.00

Span

0.000

18.000

5000

90000.00

0.00

Span

0.000

12.000

21)
Unaffected
26)
Unaffected

30800

369600.00

0.00

57936627.40
24333383.51
82270010.91

0.00
0.00
0.00

Total of annexure-B
Add (+)42%
Total of annexure-B
Annexure-C

10M3

16400

131860

1) E.W. in
forming bank
for widening
the exg MG
formation o
both sides to
BG std incl
yard etc

1300

10M3

30000

10M3

5685.74

16000

2)
Unaffected
4) Supply &
spreading
moorum
/
gravel
for
widening &
regrading the
exg
MG
formation to
BG std with
contr or other
means incl
excavation
etc.

10M3

13304.43

6)
Unaffected

17141800.00

2132000.00

150

450000.00

0.00

3000

4800000.00

1705722.00

1300

1729575.90

0.00

24121375.90
10130977.88
34252353.78

3837722.00
1611843.24
5449565.24

0.00

0.00

30

609000.00

0.00

500

624750.00

0.00

Total of annexure-C
Add (+) 42%
Total of annexure-C
Annexure-D
Total of annexure-D
Annexure-E
Mtr.

0.000

20300

Ten cum

0.000 12495.000

18)
Unaffected
35)
Salavaging
an scooping
out the exg
old
stone
balast
available
with
muck
and dust in
MG
track
etc.

Ten cum

0.000

2201.310

37) Leading
of
50mm
size ballast
from
the
stacks
available
alonag side
the
alignment
with a max
lead
of
100mtr., lift ,
dumping the
same etc.

500

110065.50

0.00

Ten cum

0.000

2087.430

38)
Extra
over
item
above
for
lead beyond
100m
and
upto 1km.

150

31311.45

0.00

Ten cum

0.000

5236.470

39) Leading
of salvaged
stone ballast
from stacks
available
aongside the
alignment
etc.

350

183276.45

0.00

1558403.40

0.00

685697.50

0.00

2244100.90

0.00

76302.80

0.00

43601.60

0.00

Total Ann 'E'


Add (+)44%

Total of annexure-E
Annexure-F
Tonne

Tonnekilo
metre

0.000

0.00

218.008 1) Trans 350


of rails,
switches,
crossings,
tongue
rails etc.
by means
of contr
road
vehcles
etc. Upto
100km,
unloading
and
stacking
etc.
21800.80 2) Extra
2
over item
above (1)
for 100200km
lead

Mtr.

0.000

69585.00

Tonne

0.000

3166.483

Sleeper

0.000

51978

Sleerper
per km
Set

0.000

130306

0.000

4.000

Set

0.000

4.000

3)
Unaffected
4) Trans of
Cl-I & II rails
upto 13m
long
switches,
SEJs, Glued
joints etc. for
lead upto
50km.

3.30

229630.50

0.00

255.00

807453.17

0.00

80.00

4158240.00

0.00

0.46

59940.76

0.00

11) Trans of
PSC Pts &
Xing 1 in 8
1/2 - from
factory to
100km

12000

48000.00

0.00

15) Trans of
PSC Pts &
Xing 1 in 12 from factory
to 100km

18000

72000.00

0.00

5495168.83
2857487.79
8352656.62

0.00
0.00
0.00

0.00

0.00

10273977.00

0.00

346824.10

0.00

161324.10

0.00

20136228.00

0.00

7) Trans of
BG PSC
sleepers for
lead upto
100km
8)
Unaffected

Total of annexure-F
Add (+)52%

Annexure-G
Total of annexure-G

10M3

10M3

10M3

10M3

Annexure-H
1.Collecti
on
&
supply of
ballast at
yard
0.000 14677.110 a) 100% 7000
unaffecte
d
521.54 b)95%
7000
0.000
unaffecte
d
256.07 c)90%
7000
0.000
unaffecte
d
2. Along
side
collec-tion
& supply
of ballast
0.000

28766.04 a)100%

7000

10M3

0.000

10M3

0.000

0.000 b)95%
7000
unaffecte
d
0.000 c)90%
7000
unaffecte
d

0.00

0.00

0.00

0.00

30918353.20

0.00

2720815.08

0.00

33639168.28

0.00

0.00

0.00

27021174.40

0.00

27021174.40
5404234.88
32425409.28

0.00
0.00
0.00

36000

38894472.00

0.00

36000

12964824.00

0.00

36000

2869020.00

0.00

54728316.00
2736415.80

0.00
0.00

57464731.80

0.00

Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J
MT

0.000

6141.176

1) Supply of
ordy portland
cement
grade 43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%
Total of annexure-J
Annexure-K
MT

0.000

1440.536 02) Supply


of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

MT

0.000

0.000

1440.536 B) 25%
stage
payment
79.695 C) 100%
payment
Total
Add +5%
as per agt.

Total of annexure-K
Annexure-L & M
Total Annex. L & M
ABSTRACT
Total for Ann-A

5356956.00

0.00

28819232.47

0.00

Total for Ann-B

82270010.91

0.00

Total for Ann-C

34252353.78

5449565.24

Total for Ann-D

0.00

0.00

Total for Ann-E

2244100.90

0.00

Total for Ann-F

8352656.62

0.00

Total for Ann-G

0.00

0.00

Total for Ann-H

33639168.28

0.00

Total for Ann-I

0.00

0.00

Total for Ann-J

32425409.28

0.00

Total for Ann-K

57464731.80

0.00

Total for Ann-L

4755663.00

0.00

Total for Ann-M

601293.00

0.00

Grand total

284824620.04

5449565.24

or say

284824620.00

5449565.00

Unit

Qty. executed Qty. executed upsince


last to-date as per
certificate
M.Book

Items

Rate

Amount
Upto date

Grand total

Since last
Certificate

284824620.00

5449565.00

284824620.00

5449565.00

0.00

0.00

Total value of work done

284824620.00

5449565.00

Less value of work shown on last certificate vide CC-32

279375055.00

0.00

5449565.00

5449565.00

Total value of work done including


Deduct 10% on the schedule rates to become

Amount due

Refer.
To
item No. of
the SOR

Remarks.

(Rupees Fifty Four Lakhs Forty Nine Thousand Five Hundred and Sixty Five Only)

XEN/CN/MDU
The measurements were made by JE/CN/W/MDU on 15.07.2011 from 04 to 08 and 14 of M.B. No. 4760 and
on 06.07.2011 from 70 to 99 of M.B.No. 1732. (Restricted quantity now released)

Dated 06.02.2012

Contractor

XEN/CN/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by JE/CN/W/MDU on
15.07.2011 from 04 to 08 and 14 of M.B. No. 4760 and on 06.07.2011 from 70 to 99 of M.B.No. 1732 and
100% test check by me on 11.09.2011 vide page 88 and 97 of M.B. No. 1732 and on 7.10.2011 of M.B. No.
4760 and that the work has been satisfatorily performed. (Restricted quantity now released)
Dated 06.02.2012
Contractor
XEN/CN/ MDU
Certified that no materials the cost of which has not been recovered have been issued to the contractor except
such as are specifically provided for in the agreement.

Dated 06.02.2012

XEN/CN/ MDU

Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 105 14044 - 20 1431 03 Rs. 54,49,565 /- and to be included in the


accounts for the month of February-2012. Payment by EFT.

Sr.SO(A)/Dy.CE/CN/I/MDU

Dy.CE/CN/I/MDU

Memo of payments made

Rs. P.

Rs. P.
284824620.00

Total value of work done


Amount of previous payments from last 279375055.00
Certificate No. CC-32
Forwarded to Financial Adviser and Chief
0.00

Security deposit at 10% of bill

108991.00

Income tax at 2%

10899.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

3597.00
108991.00

Sales tax @2% (VAT)

0.00

Rec. towards hire charges

50.00

Bill copy
By Cheque

5217037.00

Grand total

284824620.00 284824620.00

Recvied Rs.54,49,565 /- Rupees Fifty Four Lakhs Forty Nine Thousand Five Hundred and Sixty Five
Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

5449565.00

5449565.00
5449565.00

SOUTHERN RAILWAY
DYCE/CN/I/MDU : Division

XEN/GC/MDU

Contract certificate No.CC-32/XEN/MDU/

Sub-dvision

Month of: 30.01.2012

Name of work:

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work:

2000/W1/GC/S/1 dt.9.1.2008.

Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
Quantity executed
executed since uptodate as per
last certificate measu- rement
book

Items

/ I /2012 DT.

.01.2012

Rate

Amount

Reference to
Since last certificate item number of
the schedule of
rates

Upto date

In progress

8
Rs.

Rs.

Rs.

Annexure-A
10M3

0.000

1217.570 1) 102-b

326

39692.78

0.00

10M3

0.000

901.251 3) 103-b

358

32264.79

0.00

10M3

0.000

3895.806 4) 103-c

542

211152.69

0.00

10M3

0.000

231.379 7) 106

230

5321.72

0.00

10M3

0.000

4.980 8) 108

243

121.01

0.00

M3

0.000

398.900 11)201

190

75791.00

0.00

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

0.000

624.357 36)504-a

606

378360.34

0.00

M3

0.000

79.924 37)506-a

1064

85039.14

0.00

Remarks

M3

0.000

250.000 38)507-a

1212

303000.00

0.00

M3

0.000

39) 509-a(I)

772

1305441.19

0.00

M3

0.000

150.032 40)511-a(I)

2798

419789.54

0.00

M3

0.000

3638.851 41)511-b(I)

3087

11233133.04

0.00

M3

0.000

24.870 42)511-c(I)

3337

82991.19

0.00

M3

0.000

2917.092 43)511(d)I

2537

7400662.40

0.00

M3

0.000

99.949 46)514i

1474

147324.83

0.00

M3

0.000

99.949 50)515(d)

235

23488.02

0.00

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

0.000

1700.557 56)527-b

674

114617.54

0.00

M3

0.000

173.985 58)602-d

912

158674.32

0.00

M3

0.000

4.850 59)617

31

150.35

0.00

M3

0.000

69.885 60)626-a

59

4123.22

0.00

M3

0.000

10.410 61)626-b

38

395.58

0.00

10M2

0.000

618.610 95)1002-a

217

13423.84

0.00

10M2

0.000

41.921 106)1106

187

783.92

0.00

10M2

0.000

15783.29

0.00

10M2

0.000

11756.40

0.00

10M2

0.000

59.025 115)1141(
2674
b)i
194.000 117)1217(
606
a)ii
194.000 118)1218(
1666
b)ii
Total of annexure-A

32320.40

0.00

23024073.24

0.00

Add (+)25.17

5795159.23

0.00

28819232.47

0.00

3400

18144916.00

0.00

6000

8487450.00

0.00

1690.986

Total of annexure-A

Annexue-B
Mtr.

0.000

5336.740

Mtr.

0.000

1414.575

1)
Unaffected
2)
Unaffected
3) CN of
precast
concrete
superstructur
e with 'I'
girder of a
single track
etc. for a
span of
12.20m.

Span

0.000

32.000

1)
Unaffected
(at 15%)

858000

4118400.00

0.00

Span

0.000

32.000

2Unaffected @ 15%

858000

4118400.00

0.00

Span

0.000

28.000

3- On
procurement,
testing and
bringing to
site of appd
quality
neoprene
bearings (at
5%)

858000

1201200.00

0.00

Span

0.000

35.000

4Unaffected
(at 5%)

858000

1501500.00

0.00

Span

0.000

32.000

5Unaffected
(at 25%)

858000

6864000.00

0.00

Span

0.000

32.000

6)
Unaffected (
at 10%)

858000

2745600.00

0.00

Span

0.000

26.000

7) Casting of
diaphrams
reqd for one
span incl
deck slab,
RCC ballast
retaines,
wearing coat
etc. ( at 15%)

858000

3346200.00

0.00

Each

0.000

5.000

80000

400000.00

0.00

Each

0.00

1.00

1260

1260.00

0.00

Each

0.00

23.00

12)
Unaffected
13)
Unaffected
14)
Unaffected(A
t 75%)

13000

224250.00

0.00

M3

0.000

1106.983

3300

3653043.90

0.00

M3

0.000

1068.323

19)
Unaffected
20)
Launching
the precast
RCC box
segements
for clear
spans as
reqd in
convenient
lengths etc.

2500

2670807.50

0.00

Span

0.000

18.000

5000

90000.00

0.00

Span

0.000

12.000

21)
Unaffected
26)
Unaffected

30800

369600.00

0.00

57936627.40
24333383.51
82270010.91

0.00
0.00
0.00

Total of annexure-B
Add (+)42%
Total of annexure-B
Annexure-C

10M3

115460

10M3

30000

10M3

10314.26

10M3

13304.43

1)
Unaffected
2)
Unaffected
4)
Unaffected
6)
Unaffected

1300

15009800.00

0.00

150

450000.00

0.00

3000

3094278.00

0.00

1300

1729575.90

0.00

20283653.90
8519134.64
28802788.54

0.00
0.00
0.00

0.00

0.00

Total of annexure-C
Add (+) 42%
Total of annexure-C
Annexure-D
Total of annexure-D
Annexure-E
18)
Unaffected
35)
Salavaging
an scooping
out the exg
old
stone
balast
available
with
muck
and dust in
MG
track
etc.

30

609000.00

0.00

500

624750.00

0.00

2201.310

37) Leading
of
50mm
size ballast
from
the
stacks
available
alonag side
the
alignment
with a max
lead
of
100mtr., lift ,
dumping the
same etc.

500

110065.50

0.00

0.000

2087.430

38)
Extra
over
item
above
for
lead beyond
100m
and
upto 1km.

150

31311.45

0.00

0.000

5236.470

39) Leading
of salvaged
stone ballast
from stacks
available
aongside the
alignment
etc.

350

183276.45

0.00

Mtr.

0.000

20300

Ten cum

0.000

12495.000

Ten cum

0.000

Ten cum

Ten cum

Total Ann 'E'

1558403.40

0.00

685697.50

0.00

2244100.90

0.00

76302.80

0.00

43601.60

0.00

3.30

229630.50

0.00

255.00

807453.17

0.00

80.00

4158240.00

0.00

0.46

59940.76

0.00

Add (+)44%

Total of annexure-E
Annexure-F
Tonne

Tonnekilo
metre

Mtr.

0.000

0.00

0.000

218.008 1) Trans 350


of rails,
switches,
crossings,
tongue
rails etc.
by means
of contr
road
vehcles
etc. Upto
100km,
unloading
and
stacking
etc.
21800.80 2) Extra
2
over item
above (1)
for 100200km
lead
69585.00 3)
Unaffected
4) Trans of
Cl-I & II rails
upto 13m
long
switches,
SEJs, Glued
joints etc. for
lead upto
50km.

Tonne

0.000

3166.483

Sleeper

0.000

51978

Sleerper
per km
Set

0.000

130306

0.000

4.000

11) Trans of
PSC Pts &
Xing 1 in 8
1/2 - from
factory to
100km

12000

48000.00

0.00

Set

0.000

4.000

15) Trans of
PSC Pts &
Xing 1 in 12 from factory
to 100km

18000

72000.00

0.00

7) Trans of
BG PSC
sleepers for
lead upto
100km
8)
Unaffected

Total of annexure-F
Add (+)52%

5495168.83
2857487.79
8352656.62

0.00
0.00
0.00

0.00

0.00

10273977.00

0.00

346824.10

0.00

161324.10

0.00

20136228.00
0.00

692286.00
0.00

0.00

0.00

30918353.20

692286.00

2720815.08

60921.17

33639168.28

753207.17

0.00

0.00

27021174.40

0.00

27021174.40
5404234.88
32425409.28

0.00
0.00
0.00

Annexure-G
Total of annexure-G

10M3

0.000

10M3

0.000

10M3

0.000

10M3
10M3

988.980
0.000

10M3

0.000

Annexure-H
1.Collecti
on
&
supply of
ballast at
yard
14677.110 a) 100% 7000
unaffecte
d
521.54 b)95%
7000
unaffecte
d
256.07 c)90%
7000
unaffecte
d
2. Along
side
collec-tion
& supply
of ballast
28766.04 a)100%
7000
0.000 b)95%
7000
unaffecte
d
0.000 c)90%
7000
unaffecte
d
Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J

MT

0.000

6141.176

1) Supply of
ordy portland
cement
grade 43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%
Total of annexure-J

Annexure-K
MT

0.000

1440.536 02) Supply

36000

38894472.00

0.00

36000

12964824.00

0.00

36000

2869020.00

0.00

54728316.00
2736415.80

0.00
0.00

57464731.80

0.00

of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

MT

0.000

0.000

1440.536 B) 25%
stage
payment
79.695 C) 100%
payment
Total
Add +5%
as per agt.

Total of annexure-K
Annexure-L & M
Total Annex. L & M
ABSTRACT
Total for Ann-A

5356956.00

0.00

28819232.47

0.00

Total for Ann-B

82270010.91

0.00

Total for Ann-C

28802788.54

0.00

Total for Ann-D

0.00

0.00

Total for Ann-E

2244100.90

0.00

Total for Ann-F

8352656.62

0.00

Total for Ann-G

0.00

0.00

Total for Ann-H

33639168.28

753207.17

Total for Ann-I

0.00

0.00

Total for Ann-J

32425409.28

0.00

Total for Ann-K

57464731.80

0.00

Total for Ann-L

4755663.00

0.00

Total for Ann-M

601293.00

0.00

Grand total

279375054.80

753207.17

or say

279375055.00

753207.00

Unit

Qty. executed Qty. executed upsince


last to-date as per
certificate
M.Book

Items

Rate

Amount
Upto date

Since last
Certificate

Grand total

279375055.00

753207.00

Total value of work done including prospective


payment to 10% deductions.

279375055.00

753207.00

0.00

0.00

Total value of work done

279375055.00

753207.00

Less value of work shown on last certificate vide CC-31

278621848.00

0.00

753207.00

753207.00

Deduct 10% on the schedule rates to become

Amount due

Refer.
To
item No. of
the SOR

Remarks.

(Rupees Seven Lakhs Fifty Three Thousand Two Hundred and Seven Only)

XEN/CN/MDU
The measurements were made by XEN/CN on 09.01.12 from 46 to 49 of M.B.No. 7051.

Dated 30.01.2012

Contractor

XEN/CN/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by me on 09.01.12
from 46 to 49 of M.B.No. 7051 and test check by DYCE on 10.01.2012 and that the work has been satisfatorily
performed.

CNGC/ MDU
Certified that on materials the cost of which has not been recovered have been issued to the contractor except
such as are specifically provided for in the agreement.

Dated 30.01.2012

XEN/CN/ MDU

Test checked by me10.01.12 at 47 of MB. No. 705100

Dy.CE / CN-I / MDU


Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 105 14044 - 20 1444 03 Rs. 7,53,207 /- and to be included in the


accounts for the month of January-2012. Payment by EFT.

Sr.SO(A)/Dy.CE/CN/I/MDU

Dy.CE/CN/I/MDU

Memo of payments made

Rs. P.

Rs. P.
279375055.00

Total value of work done


Amount of previous payments from last 278621848.00
Certificate No. CC-31
Forwarded to Financial Adviser and Chief
0.00

Security deposit at 10% of bill

15064.00

Income tax at 2%

1506.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

497.00

Sales tax @2% (VAT)


S.T at 4% - ballast - 7,53,207 /Rec. towards hire charges

30128.00
0.00
50.00

Bill copy
By Cheque

705962.00

Grand total

279375055.00 279375055.00

Recvied Rs.7,53,207 /- Rupees Seven Lakhs Fifty Three Thousand Two Hundred and Seven Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

1854.63

753207.00

SOUTHERN RAILWAY
DYCE/CN/I/MDU : Division

XEN/GC/MDU

Contract certificate No.CC-31/XEN/MDU/

Sub-dvision

Month of: 25.01.2012

Name of work:

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work:

2000/W1/GC/S/1 dt.9.1.2008.

Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
executed since
last certificate

Quantity
executed
uptodate as per
measu- rement
book

Items

/ I /2012 DT.

In progress

.01.2012

Rate

Amount

Reference to
Since last certificate item number of
the schedule of
rates

Upto date

8
Rs.

Rs.

Rs.

Annexure-A
10M3

0.000

1217.570 1) 102-b

326

39692.78

0.00

10M3

0.000

901.251 3) 103-b

358

32264.79

0.00

10M3

0.000

3895.806 4) 103-c

542

211152.69

0.00

10M3

0.000

231.379 7) 106

230

5321.72

0.00

10M3

0.000

4.980 8) 108

243

121.01

0.00

M3

0.000

398.900 11)201

190

75791.00

0.00

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

0.000

624.357 36)504-a

606

378360.34

0.00

M3

0.000

79.924 37)506-a

1064

85039.14

0.00

Remarks

M3

0.000

250.000 38)507-a

1212

303000.00

0.00

M3

0.000

39) 509-a(I)

772

1305441.19

0.00

M3

0.000

150.032 40)511-a(I)

2798

419789.54

0.00

M3

133.601

3638.851 41)511-b(I)

3087 11233133.04

412426.29

M3

24.870

24.870 42)511-c(I)

3337

82991.19

82991.19

M3

41.141

2917.092 43)511(d)I

2537

7400662.40

104374.72

M3

0.000

99.949 46)514i

1474

147324.83

0.00

M3

0.000

99.949 50)515(d)

235

23488.02

0.00

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

0.000

1700.557 56)527-b

674

114617.54

0.00

M3

0.000

173.985 58)602-d

912

158674.32

0.00

M3

0.000

4.850 59)617

31

150.35

0.00

M3

0.000

69.885 60)626-a

59

4123.22

0.00

M3

0.000

10.410 61)626-b

38

395.58

0.00

10M2

0.000

618.610 95)1002-a

217

13423.84

0.00

10M2

0.000

41.921 106)1106

187

783.92

0.00

10M2

0.000

0.00

10M2

0.000

10M2

0.000

59.025 115)1141(
2674
15783.29
b)i
194.000 117)1217(
606
11756.40
a)ii
194.000 118)1218(
1666
32320.40
b)ii
23024073.24
Total of annexure-A

599792.20

5795159.23

150967.70

28819232.47

750759.90

3400

18144916.00

0.00

6000

8487450.00

0.00

1690.986

Add (+)25.17
Total of annexure-A

0.00
0.00

Annexue-B
Mtr.

0.000

5336.740

Mtr.

0.000

1414.575

1)
Unaffected
2)
Unaffected
3) CN of
precast
concrete
superstructur
e with 'I'
girder of a
single track
etc. for a
span of
12.20m.

Span

0.000

32.000

1)
Unaffected
(at 15%)

858000

4118400.00

0.00

Span

0.000

32.000

2Unaffected @ 15%

858000

4118400.00

0.00

Span

13.000

28.000

3- On
procurement,
testing and
bringing to
site of appd
quality
neoprene
bearings (at
5%)

858000

1201200.00

557700.00

Span

0.000

35.000

4Unaffected
(at 5%)

858000

1501500.00

0.00

Span

0.000

32.000

5Unaffected
(at 25%)

858000

6864000.00

0.00

Span

0.000

32.000

6)
Unaffected (
at 10%)

858000

2745600.00

0.00

Span

16.000

26.000

7) Casting of
diaphrams
reqd for one
span incl
deck slab,
RCC ballast
retaines,
wearing coat
etc. ( at 15%)

858000

3346200.00

2059200.00

Each

0.000

5.000

80000

400000.00

0.00

Each

0.00

1.00

1260

1260.00

0.00

Each

0.00

23.00

12)
Unaffected
13)
Unaffected
14)
Unaffected(A
t 75%)

13000

224250.00

0.00

M3

0.000

1106.983

3300

3653043.90

0.00

M3

448.023

1068.323

19)
Unaffected
20)
Launching
the precast
RCC box
segements
for clear
spans as
reqd in
convenient
lengths etc.

2500

2670807.50

1120057.50

Span

0.000

18.000

5000

90000.00

0.00

Span

0.000

12.000

21)
Unaffected
26)
Unaffected

30800

369600.00

0.00

Total of annexure-B
Add (+)42%
Total of annexure-B
Annexure-C

57936627.40
24333383.51
82270010.91

3736957.50
1569522.15
5306479.65

1)
Unaffected

15009800.00

0.00

10M3

115460

1300

10M3

30000

10M3

10314.26

10M3

13304.43

2)
Unaffected
4)
Unaffected
6)
Unaffected

150

450000.00

0.00

3000

3094278.00

0.00

1300

1729575.90

0.00

20283653.90
8519134.64
28802788.54

0.00
0.00
0.00

0.00

0.00

Total of annexure-C
Add (+) 42%
Total of annexure-C
Annexure-D
Total of annexure-D
Annexure-E
Mtr.

18)
Unaffected
35)
Salavaging
an scooping
out the exg
old
stone
balast
available
with
muck
and dust in
MG
track
etc.

30

609000.00

0.00

500

624750.00

111631.50

2201.310

37) Leading
of
50mm
size ballast
from
the
stacks
available
alonag side
the
alignment
with a max
lead
of
100mtr., lift ,
dumping the
same etc.

500

110065.50

110065.50

2087.430

2087.430

38)
Extra
over
item
above
for
lead beyond
100m
and
upto 1km.

150

31311.45

31311.45

5236.470

5236.470

39) Leading
of salvaged
stone ballast
from stacks
available
aongside the
alignment
etc.

350

183276.45

183276.45

Add (+)44%

1558403.40
685697.50

436284.90
191965.36

Total of annexure-E

2244100.90

628250.26

0.000

20300

Ten cum

2232.630

12495.000

Ten cum

2201.310

Ten cum

Ten cum

Total Ann 'E'

Annexure-F
Tonne

Tonnekilo
metre

Mtr.
Tonne

29.800

2980.00

0.000

218.008 1) Trans 350


of rails,
switches,
crossings,
tongue
rails etc.
by means
of contr
road
vehcles
etc. Upto
100km,
unloading
and
stacking
etc.
21800.80 2) Extra
2
over item
above (1)
for 100200km
lead
69585.00 3)
Unaffected
4) Trans of
Cl-I & II rails
upto 13m
long
switches,
SEJs, Glued
joints etc. for
lead upto
50km.

76302.80

10430.00

43601.60

5960.00

3.30

229630.50

0.00

255.00

807453.17

169937.87

80.00

4158240.00

94240.00

0.46

59940.76

0.00

666.423

3166.483

1178.000

51978

Sleerper
per km
Set

0.000

130306

4.000

4.000

11) Trans of
PSC Pts &
Xing 1 in 8
1/2 - from
factory to
100km

12000

48000.00

48000.00

Set

4.000

4.000

15) Trans of
PSC Pts &
Xing 1 in 12 from factory
to 100km

18000

72000.00

72000.00

5495168.83
2857487.79
8352656.62

400567.87
208295.29
608863.16

Sleeper

7) Trans of
BG PSC
sleepers for
lead upto
100km
8)
Unaffected

Total of annexure-F
Add (+)52%

Annexure-G

Total of annexure-G

10M3

0.000

10M3

0.000

10M3

0.000

10M3

1860.770

10M3

0.000

10M3

0.000

0.00

0.00

10273977.00

0.00

346824.10

0.00

161324.10

0.00

7000

19443942.00

1302539.00

0.000 b)95%
7000
unaffecte
0.000 d
c)90%
7000
unaffecte
d

0.00

0.00

0.00

0.00

30226067.20

1302539.00

2659893.91

114623.43

32885961.11

1417162.43

0.00

0.00

27021174.40

368500.00

27021174.40
5404234.88
32425409.28

368500.00
73700.00
442200.00

Annexure-H
1.Collecti
on
&
supply of
ballast at
yard
14677.110 a) 100% 7000
unaffecte
521.54 d
b)95%
7000
unaffecte
256.07 d
c)90%
7000
unaffecte
d
2.
Along
side
collec-tion
& supply
of ballast
27777.06 a)100%

Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J
MT

83.750

6141.176

1) Supply of
ordy portland
cement
grade 43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%
Total of annexure-J
Annexure-K

MT

0.000

1440.536 02) Supply

36000 38894472.00

0.00

36000 12964824.00

0.00

of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

MT

0.000

13.643

1440.536 B) 25%
stage
payment
79.695 C) 100%
payment
Total
Add +5%
as per agt.

36000

Total of annexure-K

2869020.00

491148.00

54728316.00
2736415.80

491148.00
24557.40

57464731.80

515705.40

Annexure-L & M
Total Annex. L & M
ABSTRACT
Total for Ann-A

5356956.00

0.00

28819232.47

750759.90

Total for Ann-B

82270010.91

5306479.65

Total for Ann-C

28802788.54

0.00

Total for Ann-D

0.00

0.00

Total for Ann-E

2244100.90

628250.26

Total for Ann-F

8352656.62

608863.16

Total for Ann-G

0.00

0.00

Total for Ann-H

32885961.11

1417162.43

Total for Ann-I

0.00

0.00

Total for Ann-J

32425409.28

442200.00

Total for Ann-K

57464731.80

515705.40

Total for Ann-L

4755663.00

0.00

Total for Ann-M

601293.00

0.00

Grand total

278621847.63

9669420.80

or say

278621848.00

9669421.00

Unit

Qty. executed Qty. executed upsince


last to-date as per
certificate
M.Book

Items

Rate

Amount
Upto date

Grand total

Since last
Certificate

278621848.00

9669421.00

Total value of work done including prospective

278621848.00

9669421.00

Deduct 10% on the schedule rates to become

0.00

0.00

Total value of work done

278621848.00

9669421.00

Less value of work shown on last certificate vide CC-30

268952427.00

0.00

9669421.00

9669421.00

Amount due

Refer.
To
item No. of
the SOR

Remarks.

(Rupees Ninety Six Lakhs Sixty Nine Thousand Four Hundred and Twenty One Only)

XEN/GC/MDU
The measurements were made by SE/JE/Works on 10.10, 08.11, 13.12., 12.12, 19.12, 28.12, 29.12, 31.12.11,
02.01, 04.01, 05.01, 07.01.12 from 86 to 93 of M.B. No. 7057, 56 & 57 of M.B. No. 7061, 46 to 48 of M.B.
o.7070, 25 & 26 of M.B. No.7053, 38 of M.BNo.1614, SE/P.Way on 13.12, 24.12, 28.12.11, 11.1.12 from 51 to
62 of M.B.No.7072, and by XEN/CN on 09.01.12 from 46 to 49 of M.B.No. 7051.
Dated 25.01.2012

Contractor

XEN/GC/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by SE/JE/Works on
10.10, 08.11, 13.12., 12.12, 19.12, 28.12, 29.12, 31.12.11, 02.01, 04.01, 05.01, 07.01.12 from 86 to 93 of M.B.
No. 7057, 56 & 57 of M.B. No. 7061, 46 to 48 of M.B. o.7070, 25 & 26 of M.B. No.7053, 38 of M.BNo.1614,
SE/P.Way on 13.12, 24.12, 28.12.11, 11.1.12 from 51 to 62 of M.B.No.7072, and by me on 09.01.12 from 46 to
49 of M.B.No. 7051 and 100% test check by me on 13.12.11, 22.12, 27.12, 28.12.11, 04.01., 14.01.12 and that
the work has been satisfatorily performed.
Dated 25.1.2012
Contractor
XEN/GC/ MDU
Certified that on materials the cost of which has not been recovered have been issued to the contractor except
such as are specifically provided for in the agreement.
Test checked by me10.01.12 and 23.01.1247 and 49 of MB. No. 705100
Dated 25.01.2012
Dy.CE/CN-I/ MDU
Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 105 14044 - 20 1444 03 Rs. 20,45,412 /- , 105-14044-20-1495 Rs.6,08,863/- and 105 - 14044 - 20 - 1452 - 03 - Rs.70,15,146 /- and to be included in the
accounts for the month of January-2012. Payment by EFT.

Sr.SO(A)/Dy.CE/CN/I/MDU

Dy.CE/CN/I/MDU

Memo of payments made

Rs. P.

Rs. P.
278621848.00

Total value of work done


Amount of previous payments from last 268952427.00
Certificate No. CC-30
Forwarded to Financial Adviser and Chief
0.00

Security deposit at 10% of bill

193388.00

Income tax at 2%

19339.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

6382.00
165045.00
56686.00
0.00

Sales tax @2% (VAT)- Rs.82,52,259 /S.T at 4% - ballast - 14,17,162 /Rec. towards hire charges

50.00

Bill copy
By Cheque

9228531.00

Grand total

278621848.00 278621848.00

Recvied Rs.96,69,421 /- Rupees Ninety Six Lakhs Sixty Nine Thousand Four Hundred and Twenty
One Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

28068472.58

76963531.26

28802788.54

1615850.64

7743793.46

31468798.68

83.75

66.052
1520.231

268952427.00

9669421.00

SOUTHERN RAILWAY
DYCE/CN/II/MDU : Division

XEN/GC/MDU

Contract certificate No.CC-29/XEN/MDU/

Sub-dvision

Month of: 23.12.2011

Name of work:

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work:

2000/W1/GC/S/1 dt.9.1.2008.

Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
executed since
last certificate

Quantity
executed
uptodate as per
measu- rement
book

Items

/ XII /2011 DT.


Rate

In progress

.12.2011
Amount

Reference to
Since last certificate item number
of the
schedule of
rates

Upto date

8
Rs.

Rs.

Rs.

Annexure-A
10M3

0.000

1217.570 1) 102-b

326

39692.78

0.00

10M3

0.000

901.251 3) 103-b

358

32264.79

0.00

10M3

0.000

3895.806 4) 103-c

542

211152.69

0.00

10M3

0.000

231.379 7) 106

230

5321.72

0.00

10M3

0.000

4.980 8) 108

243

121.01

0.00

M3

0.000

398.900 11)201

190

75791.00

0.00

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

0.000

624.357 36)504-a

606

378360.34

0.00

M3

0.000

79.924 37)506-a

1064

85039.14

0.00

M3

0.000

250.000 38)507-a

1212

303000.00

0.00

M3

0.000

39) 509-a(I)

772

1305441.19

0.00

M3

0.000

2798

419789.54

0.00

1690.986

150.032 40)511-a(I)

Remarks

M3

567.636

3505.250 41)511-b(I)

3087

10820706.75

1752292.33

M3

510.271

2875.951 43)511(d)I

2537

7296287.69

1294557.53

M3

0.000

99.949 46)514i

1474

147324.83

0.00

M3

0.000

99.949 50)515(d)

235

23488.02

0.00

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

156.765

1700.557 56)527-b

674

114617.54

10565.96

M3

0.000

173.985 58)602-d

912

158674.32

0.00

M3

0.000

4.850 59)617

31

150.35

0.00

M3

0.000

69.885 60)626-a

59

4123.22

0.00

M3

0.000

10.410 61)626-b

38

395.58

0.00

10M2

0.000

618.610 95)1002-a

217

13423.84

0.00

10M2

0.000

41.921 106)1106

187

783.92

0.00

10M2

0.000

15783.29

0.00

10M2

0.000

11756.40

0.00

10M2

0.000

59.025 115)1141(
2674
b)i
194.000 117)1217(
606
a)ii
194.000 118)1218(
1666
b)ii
Total of annexure-A

32320.40

0.00

22424281.05

3057415.82

Add (+)25.17

5644191.54

769551.56

28068472.59

3826967.38

Total of annexure-A
Annexue-B
Mtr.

0.000

5336.740

1)Providing
cast-in-situ
bored piles
1000mm dia
for reqd
depth with
RCC of M35
or higher
specified mix
with 12mm to
20mm.

3400

18144916.00

0.00

Mtr.

0.000

1414.575

2) Supply,
fabrication &
placing in
position MS
liners incl
cutting and
bending with
contr.'s 6mm
thick MS
sheets as
necy for
RCC pile of
1000mm dia.

6000

8487450.00

0.00

3) CN of
precast
concrete
superstructur
e with 'I'
girder of a
single track
etc. for a
span of
12.20m.

Span

0.000

32.000

1)
Unaffected
(at 15%)

858000

4118400.00

0.00

Span

0.000

32.000

2Unaffected @ 15%

858000

4118400.00

0.00

Span

0.000

15.000

3Unaffected
(at 5%)

858000

643500.00

0.00

Span

0.000

35.000

4Unaffected
(at 5%)

858000

1501500.00

0.00

Span

0.000

32.000

5Unaffected
(at 25%)

858000

6864000.00

0.00

Span

0.000

32.000

6)
Unaffected (
at 10%)

858000

2745600.00

0.00

Span

0.000

10.000

7)
Unaffected (
at 15%)

858000

1287000.00

0.00

Each

0.000

5.000

80000

400000.00

0.00

Each

0.00

1.00

1260

1260.00

0.00

Each

0.00

23.00

12)
Unaffected
13)
Unaffected
14)
Removing
the exg MG
girder during
Final Traffic
cloure ,
slewing
aside,
leading away
from the
abutment
etc.(At 75%)

13000

224250.00

0.00

M3

0.000

1106.983

3300

3653043.90

0.00

M3

0.000

620.300

2500

1550750.00

0.00

Span

0.000

18.000

5000

90000.00

0.00

Span

0.000

12.000

19)
Unaffected
20)
Unaffected
21)
Unaffected
26)Lifting the
exg MG/RCC
/ PSC slabs
from exg Br
by providing
a staging
consisting of
Rly steel grip
etc.

30800

369600.00

0.00

Total of annexure-B
Add (+)42%
Total of annexure-B
Annexure-C
10M3

115460 1) E.W. in

1300

54199669.90
22763861.36
76963531.26

0.00
0.00
0.00

15009800.00

0.00

forming
bank for
widening
the exg MG
formation
on both
sides to BG
std incl
yard with
etc.

10M3

30000

2) Extra for
compacting
the
earth
mech
with
contr
compacting
equipment
such as road
roller as per
relevant
clause of spl
condition of
contract etc.

150

450000.00

0.00

10M3

10314.26

4) Supply &
spreading
moorum
/
gravel
for
widening &
regarding the
exg
MG
formation to
BG std with
contr or other
means incl
excavation
etc.

3000

3094278.00

0.00

10M3

13304.43

6)E.W.
in
filling
for
new/ exg PF
by
contr
vehicles or
other means
incl
excavation
from
earth
quarries
outside the
rly limit, appd
by the Eng.in-charge
etc.

1300

1729575.90

0.00

20283653.90
8519134.64
28802788.54

0.00
0.00
0.00

Total of annexure-C
Add (+) 42%
Total of annexure-C

Annexure-D
Total of annexure-D

0.00

0.00

30

609000.00

0.00

500

513118.50

513118.50

1122118.50

513118.50

493732.14

225772.14

1615850.64

738890.64

65872.80

65872.80

37641.60

37641.60

3.30

229630.50

0.00

255.00

637515.30

0.00

80.00

4064000.00

0.00

0.46

59940.76

0.00

5094600.96

103514.40

Annexure-E
Mtr.
Ten cum

0.000

20300

10262.370

10262.370

18)
Unaffected
35)
Salavaging
an scooping
out the exg
old
stone
balast
available
with
muck
and dust in
MG
track
etc.

Total Ann 'E'


Add (+)44%

Total of annexure-E
Annexure-F
Tonne

Tonnekilo
metre

Mtr.

188.208

18820.80

0.000

188.208 1) Trans 350


of rails,
switches,
crossings,
tongue
rails etc.
by means
of contr
road
vehcles
etc. Upto
100km,
unloading
and
stacking
etc.
18820.80 2) Extra
2
over item
above (1)
for 100200km
lead
69585.00 3)

Tonne

0.000

2500.06

Sleeper

0.000

50800

Sleerper
per km

0.000

130306

Unaffected
4)
Unaffected
7)
Unaffected
8)
Unaffected

Total of annexure-F

Add (+)52%

2649192.50
7743793.46

53827.49
157341.89

0.00

0.00

10273977.00

0.00

346824.10

0.00

161324.10

0.00

18141403.00

1460137.00

0.00

0.00

0.00

0.00

28923528.20

1460137.00

2545270.48

128492.06

31468798.68

1588629.06

0.00

0.00

26652674.40

2237532.00

26652674.40
5330534.88

2237532.00
447506.40

Annexure-G
Total of annexure-G

10M3

0.000

10M3

0.000

10M3

0.000

10M3

2085.910

10M3

0.000

10M3

0.000

Annexure-H
1.Collecti
on
&
supply of
ballast at
yard
14677.110 a) 100% 7000
unaffecte
d
521.54 b)95%
7000
unaffecte
d
256.07 c)90%
7000
unaffecte
d
2. Along
side
collec-tion
& supply
of ballast
25916.29 a)100%
7000
unaffecte
d
0.000 b)95%
7000
unaffecte
d
0.000 c)90%
7000
unaffecte
d
Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J

MT

508.530

6057.426

1) Supply of
ordy portland
cement
grade 43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%

Total of annexure-J

31983209.28

2685038.40

36000

38894472.00

0.00

36000

12964824.00

340668.00

36000

2377872.00

2377872.00

54237168.00
2711858.40

2718540.00
135927.00

56949026.40

2854467.00

Annexure-K
MT

0.000

1440.536 02) Supply


of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

MT

37.852

66.052

1440.536 B) 25%
stage
payment
66.052 C) 100%
payment
Total
Add +5%
as per agt.

Total of annexure-K
Annexure-L
Total Annex. L
ABSTRACT
Total for Ann-A

4890412.00

0.00

28068472.59

3826967.38

Total for Ann-B

76963531.26

0.00

Total for Ann-C

28802788.54

0.00

Total for Ann-D

0.00

0.00

Total for Ann-E

1615850.64

738890.64

Total for Ann-F

7743793.46

157341.89

Total for Ann-G

0.00

0.00

Total for Ann-H

31468798.68

1588629.06

Total for Ann-I

0.00

0.00

Total for Ann-J

31983209.28

2685038.40

Total for Ann-K

56949026.40

2854467.00

Total for Ann-L

4890412.00

0.00

Grand total

268485882.85 11851334.37

or say

268485883.00 11851334.00

Unit

Qty. executed Qty. executed upsince


last to-date as per
certificate
M.Book

Items

Rate

Amount
Upto date

Grand total

Total value of work done including prospective

Since last
Certificate

Remarks.

268485883.00 11851334.00

268485883.00 11851334.00

Deduct 10% on the schedule rates to become

0.00

0.00

Total value of work done

268485883.00 11851334.00

Less value of work shown on last certificate vide CC-28.

256634548.00

Amount due

Refer.
To
item No. of
the SOR

1.00

11851335.00 11851335.00

(Rupees One Crore Eighteen Lakhs Fifty One Thousand Three Hundred and Thirty Five Only)

XEN/GC/MDU
The measurements were made by SE/JE/Works on 26.07, 10.8, 20.8, 29.8, 8.9, 14.9, 22.9, 3.10, 7.10,13.10,
15.11.11 from 24 to 46 of M.B. No. 7070, SE/P.Way on 08.09.10, 09.08, 21.9, 01.11, 3.12.11 from 21 to 51 of
M.B.No.7072, JE/W on 24.9, 30.9,01.10,07.10, 22.10, 3.11, 14.11, 27.11, 04.12.11 from 55 to 85 of M.B. 7057,
17.6, 19.7, 22.8, 5.9.11 from 23 to 26 M.B.No. 1698, and by XEN/CN on 29.11 & 10.12.11 from 40 to 46 of
M.B.No. 7051 and abstract pagr from 91 to 95 of M.B. 3209.
Dated 23.12.2011

Contractor

XEN/GC/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by SE/JE/Works on
26.07, 10.8, 20.8, 29.8, 8.9, 14.9, 22.9, 3.10, 7.10,13.10, 15.11.11 from 24 to 46 of M.B. No. 7070, SE/P.Way
on 08.09.10, 09.08, 21.9, 01.11, 3.12.11 from 21 to 51 of M.B.No.7072, JE/W on 24.9, 30.9,01.10,07.10, 22.10,
3.11, 14.11, 27.11, 04.12.11 from 55 to 85 of M.B. 7057, 17.6, 19.7, 22.8, 5.9.11 from 23 to 26 M.B.No. 1698,
and by me on 29.11 & 10.12.11 from 40 to 46 of M.B.No. 7051 and 100% test check by me on 14.03, 9.8,
01.11, 8.8, 18.8, 26.8, 30.8, 5.9, 24.9, 30.9, 7.10, 8.10, 11.10, 22.10, 12.11, 14.11, 18.11, 29.11, 3.12, 8.12.11
and that the work has been satisfatorily performed.
Dated 23.12.2011
Contractor
XEN/GC/ MDU
Certified that on materials the cost of which has not been recovered have been issued to the contractor except
such as are specifically provided for in the agreement.
Test checked by then Dy.CE/CN-I/MDU on 06.12.11 and 19.12.11 on page no. 41 & 42 of MB. No. 705100
Dated 23.12.2011
Dy.CE/CN-I/ MDU
Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 105 14044 - 20 1444 03 Rs. 15,88,629 /- , 105-14044-20-1495 Rs.1,57,342/- and 105 - 14044 - 20 - 1452 - 03 - Rs.1,01,05,364 /- and to be included in
the accounts for the month of December-2011. The cheque to be sent by post to M/s
Larsen & Toubro Limited, No.1257-A,Rajeev Nagar. Sempatti post, Aruppukkottai626 101, Virudhunagar District.

Sr.SO(A)/Dy.CE/CN/I/MDU

Dy.CE/CN/I/MDU

Memo of payments made

Rs. P.

Rs. P.
###########

Total value of work done


Amount of previous payments from last 256634548.00
Certificate No. CC-28
Forwarded to Financial Adviser and Chief
0.00

Security deposit at 10% of bill

237027.00

Income tax at 2%

23703.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

7822.00

Sales tax @2% (VAT)- Rs.1,02,62,706/S.T at 4% - ballast - 15,88,629/Rec. towards hire charges

205254.00
63545.00
0.00
50.00

Bill copy
By Cheque

11313934.00

Grand total

268485883.00 ###########

Recvied Rs.1,18,51,335 /- Rupees One Crore Eighteen Lakhs Fifty One Thousand Three Hundred
and Thirty Five Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

11851335.00

SOUTHERN RAILWAY
DYCE/CN/II/MDU : Division

XEN/GC/MDU

Contract certificate No.CC-28/XEN/MDU/

Sub-dvision

Month of: 23.11.2011

Name of work:

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work:

2000/W1/GC/S/1 dt.9.1.2008.

Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
Quantity
executed since
executed
last certificate uptodate as per
measu- rement
book

Items

/ 11 /2011 DT.
Rate

.11.2011
Amount

Reference to
Since last certificate item number of
the schedule of
rates

Upto date

In progress

8
Rs.

Rs.

Rs.

Annexure-A
10M3

0.000

1217.570 1) 102-b

326

39692.78

0.00

10M3

0.000

901.251 3) 103-b

358

32264.79

0.00

10M3

0.000

3895.806 4) 103-c

542

211152.69

0.00

10M3

0.000

231.379 7) 106

230

5321.72

0.00

10M3

0.000

4.980 8) 108

243

121.01

0.00

M3

0.000

398.900 11)201

190

75791.00

0.00

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

0.000

624.357 36)504-a

606

378360.34

0.00

M3

0.000

79.924 37)506-a

1064

85039.14

0.00

Remarks

M3

0.000

250.000 38)507-a

1212

303000.00

0.00

M3

0.000

39) 509-a(I)

772

1305441.19

0.00

M3

0.000

150.032 40)511-a(I)

2798

419789.54

0.00

M3

0.000

2937.614 41)511-b(I)

3087

9068414.42

0.00

M3

0.000

2365.680 43)511(d)I

2537

6001730.16

0.00

M3

0.000

99.949 46)514i

1474

147324.83

0.00

M3

0.000

99.949 50)515(d)

235

23488.02

0.00

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

0.000

1543.792 56)527-b

674

104051.58

0.00

M3

0.000

173.985 58)602-d

912

158674.32

0.00

M3

0.000

4.850 59)617

31

150.35

0.00

M3

0.000

69.885 60)626-a

59

4123.22

0.00

M3

0.000

10.410 61)626-b

38

395.58

0.00

10M2

0.000

618.610 95)1002-a

217

13423.84

0.00

10M2

0.000

41.921 106)1106

187

783.92

0.00

10M2

0.000

15783.29

0.00

10M2

0.000

11756.40

0.00

10M2

0.000

59.025 115)1141(
2674
b)i
194.000 117)1217(
606
a)ii
194.000 118)1218(
1666
b)ii
Total of annexure-A

32320.40

0.00

19366865.23

0.00

Add (+)25.17

4874639.98

0.00

24241505.21

0.00

18144916.00

0.00

1690.986

Total of annexure-A

Annexue-B
Mtr.

0.000

5336.740

1)Providing
cast-in-situ
bored piles
1000mm dia
for reqd
depth with
RCC of M35
or higher
specified mix
with 12mm to
20mm.

3400

Mtr.

0.000

1414.575

2) Supply,
fabrication &
placing in
position MS
liners incl
cutting and
bending with
contr.'s 6mm
thick MS
sheets as
necy for
RCC pile of
1000mm dia.

6000

8487450.00

0.00

3) CN of
precast
concrete
superstructur
e with 'I'
girder of a
single track
etc. for a
span of
12.20m.

Span

0.000

32.000

1)
Unaffected
(at 15%)

858000

4118400.00

0.00

Span

0.000

32.000

2Unaffected @ 15%

858000

4118400.00

0.00

Span

0.000

15.000

3Unaffected
(at 5%)

858000

643500.00

0.00

Span

0.000

35.000

4Unaffected
(at 5%)

858000

1501500.00

0.00

Span

0.000

32.000

5Unaffected
(at 25%)

858000

6864000.00

0.00

Span

0.000

32.000

6)
Unaffected (
at 10%)

858000

2745600.00

0.00

Span

0.000

10.000

7)
Unaffected (
at 15%)

858000

1287000.00

0.00

Each

0.000

5.000

80000

400000.00

0.00

Each

0.00

1.00

1260

1260.00

0.00

Each

0.00

23.00

13000

224250.00

0.00

0.000

1106.983

3300

3653043.90

0.00

M3

12)
Unaffected
13)
Unaffected
14)
Removing
the exg MG
girder during
Final Traffic
cloure ,
slewing
aside,
leading away
from the
abutment
etc.(At 75%)

19)
Unaffected

M3

0.000

620.300

Span

0.000

18.000

Span

0.000

12.000

20)
Unaffected
21)
Unaffected
26)Lifting the
exg MG/RCC
/ PSC slabs
from exg Br
by providing
a staging
consisting of
Rly steel grip
etc.

2500

1550750.00

0.00

5000

90000.00

0.00

30800

369600.00

0.00

54199669.90
22763861.36
76963531.26

0.00
0.00
0.00

15009800.00

4290000.00

Total of annexure-B
Add (+)42%
Total of annexure-B
Annexure-C
10M3

33000

115460 1) E.W. in

1300

forming
bank for
widening
the exg MG
formation
on both
sides to BG
std incl
yard with
etc.

10M3

30000

2) Extra for
compacting
the
earth
mech
with
contr
compacting
equipment
such as road
roller as per
relevant
clause of spl
condition of
contract etc.

150

450000.00

0.00

10M3

1458.26

10314.26

4) Supply &
spreading
moorum
/
gravel
for
widening &
regarding the
exg
MG
formation to
BG std with
contr or other
means incl
excavation
etc.

3000

3094278.00

437478.00

10M3

-1895.57

13304.43

6)E.W.
in
filling
for
new/ exg PF
by
contr
vehicles or
other means
incl
excavation
from
earth
quarries
outside the
rly limit, appd
by the Eng.in-charge
etc.

1300

1729575.90

-246424.10

20283653.90
8519134.64
28802788.54

4481053.90
1882042.64
6363096.54

0.00

0.00

609000.00

0.00

609000.00

0.00

Add (+)44%

267960.00

0.00

Total of annexure-E

876960.00

0.00

3.30

229630.50

0.00

255.00

637515.30

0.00

80.00

4064000.00

0.00

0.46

59940.76

0.00

4991086.56
2595365.01
7586451.57

0.00
0.00
0.00

0.00

0.00

10273977.00

770063.00

Total of annexure-C
Add (+) 42%
Total of annexure-C
Annexure-D
Total of annexure-D
Annexure-E
Mtr.

0.000

20300

18)
Unaffected
Total Ann 'E'

30

Annexure-F
Mtr.

0.000

69585.00

Tonne

0.000

2500.06

Sleeper

0.000

50800

Sleerper
per km

0.000

130306

3)
Unaffected
4)
Unaffected
7)
Unaffected
8)
Unaffected

Total of annexure-F
Add (+)52%

Annexure-G
Total of annexure-G

10M3

Annexure-H
1.Collecti
on
&
supply of
ballast at
yard
1100.090 14677.110 a) 100% 7000
unaffecte
d

10M3

0.000

10M3

0.000

10M3

0.000

10M3

0.000

10M3

0.000

521.54 b)95%
7000
unaffecte
d
256.07 c)90%
7000
unaffecte
d
2. Along
side
collec-tion
& supply
of ballast

346824.10

0.00

161324.10

0.00

23830.38 a)100%
7000
unaffecte
d
0.000 b)95%
7000
unaffecte
d
0.000 c)90%
7000
unaffecte
d

16681266.00

0.00

0.00

0.00

0.00

0.00

27463391.20

770063.00

2416778.43

67765.54

29880169.63

837828.54

0.00

0.00

24415142.40

0.00

24415142.40
4883028.48
29298170.88

0.00
0.00
0.00

36000

38894472.00

0.00

36000

12624156.00

0.00

Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J
MT

0.000

5548.896

1) Supply of
ordy portland
cement
grade 43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%
Total of annexure-J
Annexure-K
MT

0.000

1440.536 02) Supply


of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

0.000

1402.684 B) 25%
stage
payment

Total
Add +5%
as per agt.

51518628.00
2575931.40

0.00
0.00

Total of annexure-K

54094559.40

0.00

Annexure-L
Total Annex. L
ABSTRACT
Total for Ann-A

4890412.00

0.00

24241505.21

0.00

Total for Ann-B

76963531.26

0.00

Total for Ann-C

28802788.54

6363096.54

Total for Ann-D

0.00

0.00

Total for Ann-E

876960.00

0.00

Total for Ann-F

7586451.57

0.00

Total for Ann-G

0.00

0.00

Total for Ann-H

29880169.63

837828.54

Total for Ann-I

0.00

0.00

Total for Ann-J

29298170.88

0.00

Total for Ann-K

54094559.40

0.00

Total for Ann-L

4890412.00

0.00

Grand total

256634548.48

7200925.08

or say

256634548.00

7200925.00

Unit

Qty. executed Qty. executed


since
last up-to-date
as
certificate
per M.Book

Items

Rate

Amount
Upto date

Grand total

Since last
Certificate

256634548.00

7200925.00

256634548.00

7200925.00

0.00

0.00

Total value of work done

256634548.00

7200925.00

Less value of work shown on last certificate vide CC-27.

249433623.00

0.00

7200925.00

7200925.00

Total value of work done including


Deduct 10% on the schedule rates to

Amount due

Refer.
To
item No. of
the SOR

Remarks.

(Rupees Seventy Two Lakhs Nine Hundred and Twenty Five Only)

XEN/GC/MDU
The measurements were made by SE/JE/Works on 06.07, 08.07, 10.07, 15.07, 18.07 69 to 99 of M.B. No.
1732 and at page 00 to 17 of M.B.4760 and measurement made by XEN on 22.07.11at page 38 to 39 of M.B.
No. 7051 and abstract at page No. 83 to 85 of M.B. 3209.

Dated 23.11.2011

Contractor

XEN/GC/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by SE/JE/Works on
06.07, 08.07, 10.07, 15.07, 18.07 at page 69 to 99 of M.B. No. 1732 and at page 00 to 17 of M.B. 4760 and
measurement made by me on 22.07.11 at page 38 to 39 of M.B. No. 7051 and 100% test checked by me on
07.07.11 at page 88 , at page 97 of M.B. 1732, on 07.10.11 at page 14 of M.B.No.4760 and test check by
Dy.CE on 07.09.11 at page 39 of M.B. 7051 for ballast and that the work has been satisfatorily performed.

Dated 23.11.2011
Contractor
XEN/GC/ MDU
Certified that on materials the cost of which has not been recovered have been issued to the contractor except
such as are specifically provided for in the agreement.

Dated 23.11.2011
XEN/GC/ MDU
Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 105 14044 - 20 1431 03 Rs. 63,63,097 /- and 105 - 14044 - 20 1444 - 03 - Rs.8,37,828 /- and to be included in the accounts for the month of
November-2011. The cheque to be sent by post to M/s Larsen & Toubro Limited,
No.1257-A,Rajeev Nagar. Sempatti post, Aruppukkottai626 101, Virudhunagar
District.

Sr.SO(A)/Dy.CE/CN/I/MDU

Dy.CE/CN/I/MDU

Memo of payments made

Rs. P.

Rs. P.
256634548.00

Total value of work done


Amount of previous payments from last
Forwarded to Financial Adviser and Chief

249433623.00

0.00

Security deposit at 10% of bill

144019.00

Income tax at 2%

14402.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

4753.00
127262.00

Sales tax @2% (VAT)-E.W Rs.63,63,097/S.T at 4% - ballast - 8,37,828/-

33513.00
0.00

Rec. towards hire charges

50.00

Bill copy
By Cheque

6876926.00

Grand total

256634548.00 256634548.00

Recvied Rs.72,00,925 /- Rupees Seventy Two Lakhs Nine Hundred and Twenty Five Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

22439692.00

7200925

249433623.00
7200925.00
256634548.00

SOUTHERN RAILWAY
DYCE/CN/II/MDU : Division

XEN/GC/MDU

Contract certificate No.CC-23/XEN/MDU/1776

Sub-dvision

Month of: 25.03.2011

Name of work:

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work:

2000/W1/GC/S/1 dt.9.1.2008.

Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
Quantity
executed since
executed
last certificate uptodate as per
measu- rement
book

Items

/ III /2010 DT.


Rate

.03.2011
Amount

Reference to
Since last certificate item number of
the schedule of
rates

Upto date

In progress

8
Rs.

Rs.

Rs.

Annexure-A
10M3

0.000

1217.570 1) 102-b

326

39692.78

0.00

10M3

0.000

448.108 3) 103-b

358

16042.27

0.00

10M3

0.000

3895.806 4) 103-c

542

211152.69

0.00

10M3

0.000

231.379 7) 106

230

5321.72

0.00

10M3

0.000

4.980 8) 108

243

121.01

0.00

M3

0.000

398.900 11)201

190

75791.00

0.00

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

0.000

624.357 36)504-a

606

378360.34

0.00

M3

0.000

79.924 37)506-a

1064

85039.14

0.00

M3

0.000

98.810 38)507-a

1212

119757.72

0.00

M3

0.000

1690.986 39) 509-a(I)

772

1305441.19

0.00

Remarks

M3

0.000

144.522 40)511-a(I)

2798

404372.56

0.00

M3

0.000

2715.340 41)511-b(I)

3087

8382254.58

0.00

M3

0.000

2133.630 43)511(d)I

2537

5413019.31

0.00

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

0.000

1387.687 56)527-b

674

93530.10

0.00

M3

0.000

81.800 58)602-d

912

74601.60

0.00

M3

0.000

2.190 59)617

31

67.89

0.00

M3

0.000

60.500 60)626-a

59

3569.50

0.00

M3

0.000

10.410 61)626-b

38

395.58

0.00

17537001.68

0.00

4414063.32

0.00

21951065.00

0.00

Total of annexure-A
Add (+)25.17
Total of annexure-A
Annexue-B
Mtr.

0.000

5336.740

1)Providing
cast-in-situ
bored piles
1000mm dia
for reqd
depth with
RCC of M35
or higher
specified mix
with 12mm to
20mm.

3400

18144916.00

0.00

Mtr.

0.000

1414.575

2) Supply,
fabrication &
placing in
position MS
liners incl
cutting and
bending with
contr.'s 6mm
thick MS
sheets as
necy for
RCC pile of
1000mm dia.

6000

8487450.00

0.00

3) CN of
precast
concrete
superstructur
e with 'I'
girder of a
single track
etc. for a
span of
12.20m.

Span

0.000

32.000

1)
Procurement
and bringing
to the site
reinforcemen
t steel reqd
(at 15%)

858000

4118400.00

0.00

Span

0.000

32.000

2Unaffected @ 15%

858000

4118400.00

0.00

Span

0.000

15.000

3- On
procurement
of
neoprenebea
rings (at 5%)

858000

643500.00

0.00

Span

0.000

35.000

4Procurement
and bringing
to the site
appd quality
metallic
flexible
sheeting and
read
anchroge
cones (at
5%)

858000

1501500.00

0.00

Span

0.000

32.000

5- On
casting of
PSC 'I' girder
in all
respects
reqd for one
span in
casting yard
(at 25%)

858000

6864000.00

0.00

Span

0.000

32.000

6) On
leading to
the site
launching for
erectin PSC
'I' girder in
position ( at
10%)

858000

2745600.00

0.00

Span

0.000

10.000

7) Casting of
diaphragms
reqd for one
span incl
deck slab
etc. ( at 15%)

858000

1287000.00

0.00

Each

0.000

5.000

12) Vertical
load testing
of single
bored pile for
bridges

80000

400000.00

0.00

Each

0.00

1.00

1260

1260.00

0.00

13)
Unaffected

M3

0.000

1106.983

M3

0.000

620.300

Span

0.000

18.000

19)
Unaffected
20)
Unaffected
21)
Unaffected

3300

3653043.90

0.00

2500

1550750.00

0.00

5000

90000.00

0.00

53605819.90
22514444.36
76120264.26

0.00
0.00
0.00

10719800.00

3380000.00

Total of annexure-B
Add (+)42%
Total of annexure-B
Annexure-C
10M3

26000

82460 1) E.W. in

1300

forming
bank for
widening
the exg MG
formation
on both
sides to BG
std incl
yard with
etc.

10M3

30000

30000

2) Extra for
compacting
the
earth
mech
with
contr
compacting
equipment
such as road
roller as per
relevant
clause of spl
condition of
contract etc.

150

450000.00

450000.00

10M3

8856

8856

4) Supply &
spreading
moorum
/
gravel
for
widening &
regarding the
exg
MG
formation to
BG std with
contr or other
means incl
excavation
etc.

3000

2656800.00

2656800.00

10M3

15200

15200

6)E.W.
in
filling
for
new/ exg PF
by
contr
vehicles or
other means
incl
excavation
from
earth
quarries
outside the
rly limit, appd
by the Eng.in-charge
etc.

1300

1976000.00

1976000.00

15802600.00
6637092.00
22439692.00

8462800.00
3554376.00
12017176.00

0.00

0.00

609000.00

0.00

609000.00

0.00

Add (+)44%

267960.00

0.00

Total of annexure-E

876960.00

0.00

3.30

229630.50

0.00

255.00

637515.30

0.00

80.00

4064000.00

0.00

0.46

59940.76

0.00

4991086.56
2595365.01
7586451.57

0.00
0.00
0.00

0.00

0.00

Total of annexure-C
Add (+) 42%
Total of annexure-C
Annexure-D
Total of annexure-D
Annexure-E
Mtr.

0.000 20300

18)
Unaffected
Total Ann 'E'

30

Annexure-F
Mtr.

0.000

69585.00

Tonne

0.000

2500.06

Sleeper

0.000

50800

Sleerper
per km

0.000

130306

3)
Unaffected
4)
Unaffected
7)
Unaffected
8)
Unaffected

Total of annexure-F
Add (+)52%

Annexure-G
Total of annexure-G
Annexure-H
1.Collecti
on
&
supply of
ballast at
yard

10M3

0.000

10M3

0.000

10M3

0.000

10M3

0.000

10M3

0.000

10M3

0.000

13577.020 a) 100% 7000


unaffecte
d
521.54 b)95%
7000
unaffecte
d
256.07 c)90%
7000
unaffecte
d
2. Along
side
collec-tion
& supply
of ballast

9503914.00

0.00

346824.10

0.00

161324.10

0.00

19211.64 a)100%
7000
unaffecte
d
0.000 b)95%
7000
unaffecte
d
0.000 c)90%
7000
unaffecte
d

13448148.00

0.00

0.00

0.00

0.00

0.00

23460210.20

0.00

2064498.50

0.00

25524708.70

0.00

0.00

0.00

22833267.60

0.00

22833267.60
4566653.52
27399921.12

0.00
0.00
0.00

Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J
MT

0.000

5189.379

1) Supply of
ordy portland
cement
grade 43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%
Total of annexure-J
Annexure-K

MT

0.000

1440.536 02) Supply

36000

38894472.00

0.00

36000

12196647.00

0.00

51091119.00
2554555.95

0.00
0.00

53645674.95

0.00

of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

0.000

1355.183 B) 25%
stage
payment
Total
Add +5%
as per agt.

Total of annexure-K
Annexure-L
Total Annex. L
ABSTRACT
Total for Ann-A

2429006.00

0.00

21951065.00

0.00

Total for Ann-B

76120264.26

0.00

Total for Ann-C

22439692.00

12017176.00

Total for Ann-D

0.00

0.00

Total for Ann-E

876960.00

0.00

Total for Ann-F

7586451.57

0.00

Total for Ann-G

0.00

0.00

Total for Ann-H

25524708.70

0.00

Total for Ann-I

0.00

0.00

Total for Ann-J

27399921.12

0.00

Total for Ann-K

53645674.95

0.00

Total for Ann-L

2429006.00

0.00

Grand total

237973743.60

12017176.00

or say

237973744.00

12017176.00

Unit

Qty. executed Qty. executed upsince


last to-date as per
certificate
M.Book

Items

Rate

Amount
Upto date

Grand total

Since last
Certificate

237973744.00

12017176.00

237973744.00

12017176.00

0.00

0.00

Total value of work done

237973744.00

12017176.00

Less value of work shown on last certificate vide CC-22.

225956568.00

0.00

12017176.00

12017176.00

Refer.
To
item No. of
the SOR

Remarks.

Certified that not less than the quantities paid


for has actually been done at site and the
quantity are approximately arrived as per
plans and cross sections of item No.1,2, 4 & 6
of Annex 'C'.

XEN/GC/MDU
Total value of work done including
Deduct 10% on the schedule rates to become

Amount due

(Rupees One Crore Twenty Lakhs Seventeen Thousand One Hundred and Seventy Six Only)

XEN/GC/MDU
The measurements were made by SE/JE/Works on 11.02.11, 12.02.11, 01.03.11, 04.03.11, 08.03.11,
11.03.11, 16.03.11 at page No. 15 to 68 of MB No. 173200 and on 22.03.11 at page No.50 to 56 of M.B. No.
320900

Dated 25.03.2011

Contractor

XEN/GC/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by SE/JE/Works on
11.02.11, 12.02.11, 01.03.11, 04.03.11, 08.03.11, 11.03.11, 16.03.11 at page No. 15 to 68 of MB No. 173200
and on 22.03.11 at page No.50 to 56 of M.B. No. 320900 and test checked by me on 22.03.11 at page 51 to 56
of M.B. 320900 and
.03.11 at page 15 to 68 of M.B. No. 173200 and that the work has been satisfatorily
performed.
Dated 25.03.2011
Contractor
XEN/GC/ MDU
Certified that on materials the cost of which has not been recovered have been issued to the contractor except
such as are specifically provided for in the agreement.

Dated 25.03.2011
XEN/GC/ MDU
Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 146 14044 - 20 1431 03 Rs. 1,20,17,176 /- and to be included in


the accounts for the month of March-2011. The cheque to be sent by post to M/s Larsen
& Toubro Limited, No.1257-A,Rajeev Nagar. Sempatti post, Aruppukkottai626
101, Virudhunagar District.

Sr.SO(A)/Dy.CE/CN/II/MDU

Dy.CE/CN/II/MDU

Memo of payments made

Rs. P.

Rs. P.
237973744.00

Total value of work done


Amount of previous payments from last
Forwarded to Financial Adviser and Chief

225956568.00

0.00

Security deposit at 10% of bill

240344.00

Income tax at 2%

24034.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

7931.00

Sales tax @2% (VAT)

0.00

Rec. towards hire charges

0.00
50.00

Bill copy
By Cheque

11744817.00

Grand total

237973744.00 237973744.00

Recvied Rs.1,20,17,176 /- Rupees One Crore Twenty Lakhs Seventeen Thousand One Hundred Seventy Six
Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

12017176.00

SOUTHERN RAILWAY
DYCE/CN/II/MDU : Division

XEN/GC/MDU

Contract certificate No.CC-22/XEN/MDU/1770


Name of work:

Sub-dvision

Month of: 24.02.2011

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.


Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
Quantity
executed since
executed
last certificate uptodate as per
measu- rement
book

Items

/ II /2010 DT.

.02.2011

Rate

Amount

Reference to
Since last certificate item number
of the
schedule of
rates

Upto date

In progress

8
Rs.

Rs.

Rs.

Annexure-A
10M3

1217.570

1217.570 1) 102-b

326

39692.78

39692.78

10M3

26.480

448.108 3) 103-b

358

16042.27

947.98

10M3

666.030

3895.806 4) 103-c

542

211152.69

36098.83

10M3

0.000

231.379 7) 106

230

5321.72

0.00

10M3

4.980

4.980 8) 108

243

121.01

121.01

M3

4.980

398.900 11)201

190

75791.00

946.20

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

11.738

624.357 36)504-a

606

378360.34

7113.23

M3

0.000

79.924 37)506-a

1064

85039.14

0.00

M3

0.000

98.810 38)507-a

1212

119757.72

0.00

M3

170.350

1690.986 39) 509-a(I)

772

1305441.19

131510.20

Remarks

M3

11.921

144.522 40)511-a(I)

2798

404372.56

33354.96

M3

131.833

2715.340 41)511-b(I)

3087

8382254.58

406968.47

M3

65.208

2133.630 43)511(d)I

2537

5413019.31

165432.70

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

516.560

1387.687 56)527-b

674

93530.10

34816.14

M3

0.000

81.800 58)602-d

912

74601.60

0.00

M3

0.000

2.190 59)617

31

67.89

0.00

M3

0.000

60.500 60)626-a

59

3569.50

0.00

M3

0.000

10.410 61)626-b

38

395.58

0.00

17537001.68

857002.50

4414063.32

215707.53

21951065.00

1072710.03

Total of annexure-A
Add (+)25.17
Total of annexure-A
Annexue-B
Mtr.

0.000

5336.740

1)Providing
cast-in-situ
bored piles
1000mm dia
for reqd depth
with RCC of
M35 or higher
specified mix
with 12mm to
20mm.

3400

18144916.00

0.00

Mtr.

0.000

1414.575

2) Supply,
fabrication &
placing in
position MS
liners incl
cutting and
bending with
contr.'s 6mm
thick MS
sheets as
necy for RCC
pile of
1000mm dia.

6000

8487450.00

0.00

3) CN of
precast
concrete
superstructure
with 'I' girder
of a single
track etc. for a
span of
12.20m.

Span

3.000

32.000

1)
Procurement
and bringing
to the site
reinforcement
steel reqd (at
15%)

858000

4118400.00

386100.00

Span

6.000

32.000

2- Unaffected @ 15%

858000

4118400.00

772200.00

Span

0.000

15.000

3- On
procurement
of
neoprenebear
ings (at 5%)

858000

643500.00

0.00

Span

0.000

35.000

4Procurement
and bringing
to the site
appd quality
metallic
flexible
sheeting and
read
anchroge
cones (at 5%)

858000

1501500.00

0.00

Span

9.000

32.000

5- On casting
of PSC 'I'
girder in all
respects reqd
for one span
in casting
yard (at 25%)

858000

6864000.00

1930500.00

Span

24.000

32.000

6) On leading
to the site
launching for
erectin PSC 'I'
girder in
position ( at
10%)

858000

2745600.00

2059200.00

Span

10.000

10.000

7) Casting of
diaphragms
reqd for one
span incl deck
slab etc. ( at
15%)

858000

1287000.00

1287000.00

Each

0.000

5.000

12) Vertical
load testing of
single bored
pile for
bridges

80000

400000.00

0.00

Each

0.00

1.00

13)
Unaffected

1260

1260.00

0.00

M3

0.000

1106.983

19)
Unaffected

3300

3653043.90

0.00

M3

0.000

620.300

20)
Unaffected

2500

1550750.00

0.00

Span

0.000

18.000

21)
Unaffected

90000.00

0.00

53605819.90
22514444.36
76120264.26

6435000.00
2702700.00
9137700.00

7339800.00

0.00

7339800.00
3082716.00
10422516.00

0.00
0.00
0.00

0.00

0.00

609000.00

0.00

Add (+)44%

609000.00
267960.00

0.00
0.00

Total of annexure-E

876960.00

0.00

5000

Total of annexure-B
Add (+)42%
Total of annexure-B
Annexure-C
10M3

56460 1) E.W. in

1300

forming
bank for
widening the
exg MG
formation on
both sides to
BG std incl
yard with
etc.

Total of annexure-C
Add (+) 42%
Total of annexure-C
Annexure-D
Total of annexure-D
Annexure-E
Mtr.

0 20300

18)
Unaffected

30

Total Ann 'E'

Annexure-F
0.00

69585.00

3) Unaffected

3.30

229630.50

0.00

Tonne

2500.06

4) Unaffected

255.00

637515.30

0.00

Sleep
er

50800

7) Unaffected

80.00

4064000.00

0.00

Sleerp
er per
km

130306

8) Unaffected

0.46

59940.76

0.00

4991086.56
2595365.01
7586451.57

0.00
0.00
0.00

0.00

0.00

Mtr.

Total of annexure-F
Add (+)52%

Annexure-G
Total of annexure-G

Annexure-H
1.Collectio
n & supply
of ballast
at yard
10M3

7000
0.000 13577.020 a) 100%
unaffected

9503914.00

0.00

10M3

0.000

521.54 b)95%
7000
unaffected

346824.10

0.00

10M3

0.000

256.07 c)90%
7000
unaffected

161324.10

0.00

13448148.00

0.00

2.
Along
side collection
&
supply of
ballast
19211.64 a)100%
7000
unaffected

10M3

0.000

10M3

0.000

0.000 b)95%
7000
unaffected

0.00

0.00

10M3

0.000

0.000 c)90%
7000
unaffected

0.00

0.00

23460210.20

0.00

2064498.50

0.00

25524708.70

0.00

0.00

0.00

22833267.60

663313.20

22833267.60
4566653.52
27399921.12

663313.20
132662.64
795975.84

36000 38894472.00

0.00

36000 12196647.00

323244.00

Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J
MT

150.753

5189.379

1) Supply of
ordy portland
cement grade
43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%
Total of annexure-J
Annexure-K
MT

0.000

1440.536 02) Supply


of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

35.916

1355.183 B) 25%
stage
payment

Total
Add +5% as
per agt.

Total of annexure-K

51091119.00

323244.00

2554555.95

16162.20

53645674.95

339406.20

Annexure-L
Total Annex. L
ABSTRACT
Total for Ann-A

2429006.00

0.00

21951065.00

1072710.03

Total for Ann-B

76120264.26

9137700.00

Total for Ann-C

10422516.00

0.00

Total for Ann-D

0.00

0.00

Total for Ann-E

876960.00

0.00

Total for Ann-F

7586451.57

0.00

Total for Ann-G

0.00

0.00

Total for Ann-H

25524708.70

0.00

Total for Ann-I

0.00

0.00

Total for Ann-J

27399921.12

795975.84

Total for Ann-K

53645674.95

339406.20

Total for Ann-L

2429006.00

0.00

Grand total

225956567.60 11345792.07

or say

225956568.00 11345792.00

Unit

Qty. executed Qty.


executed
since
last up-to-date
as
certificate
per M.Book

Items

Rate

Amount
Upto date

Grand total

Since last
Certificate

Refer. To
item No. of
the SOR

Remarks.

225956568.00 11345792.00

Certified that not less than the quantities


paid for has actually been done at site and
the quantity are approximately arrived as
per plans and cross sections of item No.1
of Annex 'C'.

Total value of work done including

225956568.00 11345792.00

Deduct 10% on the schedule rates to


become due to the contractor on the
satisfactory completion of the work
Total value of work done

225956568.00 11345792.00

Less value of work shown on last certificate vide CC-21.

214610776.00

Amount due

0.00

0.00

0.00

11345792.00 11345792.00

(Rupees One Crore Thirteen Lakhs Forty Five Thousnad Seven Hundred and Nienty Two Only)

XEN/GC/MDU
The measurements were made by SE/Works on 13.01.11 at page No. 71 to 52 of MB No. 705600 and on
19.01.11 at page No.40 to 44 of M.B. No. 705700, on abstract at page No. 42 to 46 of M.B. No. 320900,
and by JE/W on 25.11.10 at page No.53 to 57 of M.B.No.161300, on and on 13.01.11 at page No.15 to
21 of M.B.No. 169800, on 20.10.10 at page .22 to 24 of M.B No.707000 and on 29.01.11at page 35 to 37
of M.B.161400.

Dated 24.02.2011

Contractor

XEN/GC/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by SE/Works on
13.01.11 at page No. 71 to 52 of MB No. 705600 and on 19.01.11 at page No.40 to 44 of M.B. No.
705700, on abstract at page No. 42 to 46 of M.B. No. 320900, and by JE/W on 25.11.10 at page No.53 to
57 of M.B.No.161300, on and on 13.01.11 at page No.15 to 21 of M.B.No. 169800, on 20.10.10 at page
.22 to 24 of M.B No.707000 and on 29.01.11at page 35 to 37 of M.B.161400 and test checked by me on
21.02.11,
.02.11, 25.11.10, 22.02.11, .02.11 and 31.01.11 and that the work has been satisfatorily
performed.

Dated 24.02.2011
Contractor
XEN/GC/ MDU
Certified that on materials the cost of which has not been recovered have been issued to the contractor
except such as are specifically provided for in the agreement.

Dated 24.02.2011
XEN/GC/ MDU
Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 146 14044 - 20 1452 03 Rs. 1,13,45,792 /- and to be included in


the accounts for the month of February-2011. The cheque to be sent by post to M/s
Larsen & Toubro Limited, No.1257-A,Rajeev Nagar. Sempatti post, Aruppukkottai626 101, Virudhunagar District.
Credit allocation : 146 - 14044 - 20 - 1452 - 03 - Rs.156500-00

Sr.SO(A)/Dy.CE/CN/II/MDU

Dy.CE/CN/II/MDU

Memo of payments made

Rs. P.

Rs. P.
225956568.00

Total value of work done


Amount of previous payments from last 214610776.00
Certificate No. CC-21
Forwarded to Financial Adviser and Chief
Accounts Officer on
0.00

Security deposit at 10% of bill

226916.00

Income tax at 2%

22692.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

7488.00
0.00

Sales tax @2% (VAT)

156500.00

Rec. towards hire charges

50.00

Bill copy
By Cheque

10932146.00

Grand total

225956568.00 225956568.00

Recvied Rs.1,13,45,792 /- Rupees One Crore Thirteen Lakhs Forty Five Thousand Seven Hundred and
Ninety Two Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

16679999.18

20878354.97

18144916.00

8487450.00

0.00

3732300.00

3346200.00

643500.00

1501500.00

4933500.00

686400.00

400000.00
1260.00
3653043.90
1550750.00

90000.00
47170819.90

42732419.90 ########

66982564.26

2431.38

7586451.57

25524708.70

26603945.28

26603945.28

90000

53306268.75

214610776.00

53306268.75

0.00
11345792

11345792

11345792.00
11345792.00

SOUTHERN RAILWAY
DYCE/CN/II/MDU : Division

XEN/GC/MDU

Contract certificate No.CC-21/XEN/MDU/


Name of work:

Sub-dvision

Month of: 04.12.2010

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.


Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
Quantity
executed since
executed
last certificate uptodate as per
measu- rement
book

Items

/ XII /2010 DT.


Rate

.12.2010
Amount

Reference to
Since last certificate item number
of the
schedule of
rates

Upto date

In progress

8
Rs.

Rs.

Rs.

Annexure-A
10M3

0.000

421.628 3) 103-b

358

15094.28

0.00

10M3

40.724

3229.776 4) 103-c

542

175053.86

2207.24

10M3

0.000

231.379 7) 106

230

5321.72

0.00

M3

0.000

393.920 11)201

190

74844.80

0.00

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

5.270

612.619 36)504-a

606

371247.11

3193.62

M3

4.444

79.924 37)506-a

1064

85039.14

4728.42

M3

0.000

98.810 38)507-a

1212

119757.72

0.00

M3

285.473

1520.636 39) 509-a(I)

772

1173930.99

220385.16

M3

25.925

132.601 40)511-a(I)

2798

371017.60

72538.15

Remarks

M3

112.519

2583.507 41)511-b(I)

3087

7975286.11

347346.15

M3

120.672

2068.422 43)511(d)I

2537

5247586.61

306144.86

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

128.260

871.127 56)527-b

674

58713.96

8644.72

M3

50.090

81.800 58)602-d

912

74601.60

45682.08

M3

2.190

2.190 59)617

31

67.89

67.89

M3

50.090

60.500 60)626-a

59

3569.50

2955.31

M3

0.000

10.410 61)626-b

38

395.58

0.00

16679999.17

1013893.60

4198355.79

255197.02

20878354.96

1269090.62

Total of annexure-A
Add (+)25.17
Total of annexure-A
Annexue-B
Mtr.

0.000

5336.740

1)Providing
cast-in-situ
bored piles
1000mm dia
for reqd depth
with RCC of
M35 or higher
specified mix
with 12mm to
20mm.

3400

18144916.00

0.00

Mtr.

0.000

1414.575

2) Supply,
fabrication &
placing in
position MS
liners incl
cutting and
bending with
contr.'s 6mm
thick MS
sheets as
necy for RCC
pile of
1000mm dia.

6000

8487450.00

0.00

858000

3732300.00

0.00

3) CN of
precast
concrete
superstructure
with 'I' girder
of a single
track etc. for a
span of
12.20m.

Span

0.000

29.000

1)
Procurement
and bringing
to the site
reinforcement
steel reqd (at
15%)

Span

0.000

26.000

2- Unaffected @ 15%

858000

3346200.00

0.00

Span

0.000

15.000

3- On
procurement
of
neoprenebear
ings (at 5%)

858000

643500.00

0.00

Span

0.000

35.000

4Procurement
and bringing
to the site
appd quality
metallic
flexible
sheeting and
read
anchroge
cones (at 5%)

858000

1501500.00

0.00

Span

6.000

23.000

5- On casting
of PSC 'I'
girder in all
respects reqd
for one span
in casting
yard (at 25%)

858000

4933500.00

1287000.00

Span

3.000

8.000

6) On leading
to the site
launching for
erectin PSC 'I'
girder in
position ( at
10%)

858000

686400.00

257400.00

Each

0.000

5.000

12) Vertical
load testing of
single bored
pile for
bridges

80000

400000.00

0.00

Each

0.00

1.00

13)
Unaffected

1260

1260.00

0.00

M3

0.000

1106.983

19)
Unaffected

3300

3653043.90

0.00

M3

0.000

620.300

20)
Unaffected

2500

1550750.00

0.00

Span

0.000

18.000

21)
Unaffected

5000

90000.00

0.00

47170819.90
19811744.36
66982564.26

1544400.00
648648.00
2193048.00

Total of annexure-B
Add (+)42%
Total of annexure-B
Annexure-C

10M3

21260

56460 1) E.W. in

1300

7339800.00

2763800.00

7339800.00
3082716.00
10422516.00

2763800.00
1160796.00
3924596.00

0.00

0.00

609000.00

0.00

Add (+)44%

609000.00
267960.00

0.00
0.00

Total of annexure-E

876960.00

0.00

forming
bank for
widening the
exg MG
formation on
both sides to
BG std incl
yard with
etc.

Total of annexure-C
Add (+) 42%
Total of annexure-C
Annexure-D
Total of annexure-D
Annexure-E
Mtr.

0 20300

18)
Unaffected

30

Total Ann 'E'

Annexure-F
0.00

69585.00

3) Unaffected

3.30

229630.50

0.00

Tonne

2500.06

4) Unaffected

255.00

637515.30

0.00

Sleep
er

50800

7) Unaffected

80.00

4064000.00

0.00

Sleerp
er per
km

130306

8) Unaffected

0.46

59940.76

0.00

4991086.56
2595365.01
7586451.57

0.00
0.00
0.00

0.00

0.00

9503914.00

0.00

Mtr.

Total of annexure-F
Add (+)52%

Annexure-G
Total of annexure-G
Annexure-H
1.Collectio
n & supply
of ballast
at yard
10M3

7000
0.000 13577.020 a) 100%
unaffected

10M3

0.000

521.54 b)95%
7000
unaffected

346824.10

0.00

10M3

0.000

256.07 c)90%
7000
unaffected

161324.10

0.00

13448148.00

0.00

2.
Along
side collection
&
supply of
ballast
19211.64 a)100%
7000
unaffected

10M3

0.000

10M3

0.000

0.000 b)95%
7000
unaffected

0.00

0.00

10M3

0.000

0.000 c)90%
7000
unaffected

0.00

0.00

23460210.20

0.00

2064498.50

0.00

25524708.70

0.00

0.00

0.00

22169954.40

948129.60

22169954.40
4433990.88
26603945.28

948129.60
189625.92
1137755.52

36000 38894472.00

0.00

36000 11873403.00

294372.00

50767875.00

294372.00

2538393.75

14718.60

53306268.75

309090.60

Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J
MT

215.484

5038.626

1) Supply of
ordy portland
cement grade
43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%
Total of annexure-J
Annexure-K
MT

0.000

1440.536 02) Supply


of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

32.708

1319.267 B) 25%
stage
payment
Total
Add +5% as
per agt.

Total of annexure-K
Annexure-L

Total Annex. L
ABSTRACT
Total for Ann-A

2429006.00

0.00

20878354.96

1269090.62

Total for Ann-B

66982564.26

2193048.00

Total for Ann-C

10422516.00

3924596.00

Total for Ann-D

0.00

0.00

Total for Ann-E

876960.00

0.00

Total for Ann-F

7586451.57

0.00

Total for Ann-G

0.00

0.00

Total for Ann-H

25524708.70

0.00

Total for Ann-I

0.00

0.00

Total for Ann-J

26603945.28

1137755.52

Total for Ann-K

53306268.75

309090.60

Total for Ann-L

2429006.00

0.00

Grand total

214610775.52

8833580.74

or say

214610776.00

8833581.00

Unit

Qty. executed Qty.


executed
since
last up-to-date
as
certificate
per M.Book

Items

Rate

Amount
Upto date

Grand total

Since last
Certificate

214610776.00

8833581.00

214610776.00

8833581.00

Refer. To
item No. of
the SOR

Remarks.

Certified that not less than the quantities


paid for has actually been done at site and
the quantity are approximately arrived as
per plans and cross sections of item No.1
of Annex 'C'.

Total value of work done including


Deduct 10% on the schedule rates to
become due to the contractor on the
satisfactory completion of the work
Total value of work done

0.00

0.00

214610776.00

8833581.00

Less value of work shown on last certificate vide CC-20.

205777195.00

0.00

8833581.00

8833581.00

Amount due

(Rupees Eighty Eight Lakhs Thirty Three Thousand Five Hundred and Eighty One Only)

XEN/GC/MDU
The measurements were made by Shri Y.Ramesh, SE/Works on 16.11.2010 at page No. 68 to 70 of MB
No. 705600 and on 16.11.2010 at page No.36 to 39 of M.B. No. 705700, on abstract at page No. 30 to 33
of M.B. No. 320900, and by Shri.R.Anbazhagan, JE/W on 18.10.2010 at page No. 50 to 52 of
M.B.No.161300, on and on 14.09.10 at page No.14 to 20 of M.B.No. 161500, by Shri M.Rajakumar, SE/W
on 03.12.10 at page 13 of M.B No.173200.

Dated 04.12.2010

Contractor

XEN/GC/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by the Shri
Y.Ramesh, SE/Works on 16.11.2010 at page No. 68 to 70 of MB No. 705600 and on 16.11.2010 at page
No.36 to 39 of M.B. No. 705700, on abstract at page No. 30 to 33 of M.B. No. 320900, and by
Shri.R.Anbazhagan, JE/W on 18.10.2010 at page No. 50 to 52 of M.B.No.161300, on and on 14.09.10 at
page No.14 to 20 of M.B.No. 161500 and checked by XEN/GC/MDU on 25.11.10 at page No. 68 to 71 of
M.B. No. 705600, on 25.11.10 at page No. 36 to 39 of M.B. No. 705700, 25.11.10 at page No. 51 to 53 of
M.B. No. 161300, 25.11.10 at page No. 18 to 20 of M.B. No. 161500 and that the work has been
satisfatorily performed.

Dated 04.12.2010
Contractor
XEN/GC/ MDU
Certified that on materials the cost of which has not been recovered have been issued to the contractor
except such as are specifically provided for in the agreement.

Dated 04.12.2010
XEN/GCI/ MDU
Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 146 14044 - 20 1452 03 Rs. 49,08,985 /-, 1431 - 03 Rs.39,24,596/- and to be included in the accounts for the month of December- 2010.
The cheque to be sent by post to M/s Larsen & Toubro Limited, No.1257-A,Rajeev
Nagar. Sempatti post, Aruppukkottai626 101, Virudhunagar District.
Credit allocation : 146 - 14044 - 20 - 1452 - 03 : Rs.33,560

Sr.SO(A)/Dy.CE/CN/II/MDU

Dy.CE/CN/II/MDU

Memo of payments made

Rs. P.

Rs. P.
214610776.00

Total value of work done


Amount of previous payments from last 205777195.00
Certificate No. CC-16
Forwarded to Financial Adviser and Chief
Accounts Officer on
0.00

Security deposit at 10% of bill

176672.00

Income tax at 2%

17667.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

5830.00
0.00

Sales tax @2% (VAT)

50.00

Bill copy
By Cheque

8633362.00

Grand total

214610776.00 214610776.00

(Rs.88,33,581 /- Rupees Eighty Eight Lakhs Thirty Three Thousand Five Hundred and Eighty One Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

15666105.57

19609264.34

18144916.00

8487450.00

0.00

3732300.00

3346200.00

643500.00

1501500.00

3646500.00

429000.00

400000.00
1260.00
3653043.90
1550750.00
90000.00
45626419.90
64789516.26

42732419.90 ########

2431.38

7586451.57

25524708.70

25466189.76

25466189.76

52997178.15

52997178.15

205777195.00

0.00

8833581.00
8833581.00

SOUTHERN RAILWAY
DYCE/CN/II/MDU : Division

XEN/GC/MNM@MDU

Contract certificate No.CC-19/XEN/MDU/1730


Name of work:

Sub-dvision

Month of: 20.08.2010

Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli


(Excluding) - Proposed construction of Bridges, station buildings, earth work, level
crossings, platform shelters, circulating area, track linking, welding, supply of ballast,
signal and telecommunication works and electrical works.(Reach-I)

Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.


Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam, chennai-89
W.Order No.and date:

Contract Agt.No.and date:

Agt. No. 49/CN/2008 dt. 01.07.2008


Date of commencement of work: 05.03.2008

Date of completion:

Voucher No. MDU / GC/ MDU - VPT /


Unit

Quantity
Quantity
executed since
executed
last certificate uptodate as per
measu- rement
book

Items

/VIII/2010 DT.
Rate

.08.2010
Amount

Reference to
Since last certificate item number
of the
schedule of
rates

Upto date

In progress

8
Rs.

Rs.

Rs.

Annexure-A
10M3

0.000

421.628 3) 103-b

358

15094.28

0.00

10M3

124.330

3042.062 4) 103-c

542

164879.76

6738.69

10M3

0.000

221.335 7) 106

230

5090.71

0.00

M3

0.000

393.920 11)201

190

74844.80

0.00

M3

0.000

1901.027 16) 401

103

195805.78

0.00

M3

0.000

3129.920 17) 402

209

654153.28

0.00

M3

0.000

66.724 19) 404

64

4270.34

0.00

M3

0.000

472.514 20) 405

60

28350.84

0.00

M3

0.000

303.866 21) 406

125

37983.25

0.00

M3

0.000

49.845 25) 412

157

7825.67

0.00

M3

29.151

494.672 36)504-a

606

299771.23

17665.51

M3

0.000

63.114 37)506-a

1064

67153.30

0.00

M3

195.330

812.095 39) 509-a(I)

772

626937.34

150794.76

M3

13.940

69.774 40)511-a(I)

2798

195227.65

39004.12

M3

140.285

1948.973 41)511-b(I)

3087

6016479.65

433059.80

Remarks

M3

91.050

1835.592 43)511(d)I

2537

4656896.90

230993.85

10m2

0.000

1.155 55)527-a

706

81.54

0.00

10m2

475.570

475.570 56)527-b

674

32053.42

32053.42

M3

10.410

31.710 58)602-d

912

28919.52

9493.92

M3

10.410

10.410 60)626-a

59

614.19

614.19

M3

10.410

10.410 61)626-b

38

395.58

395.58

13112829.03

920813.84

3300499.07

231768.84

16413328.10

1152582.68

Total of annexure-A
Add (+)25.17
Total of annexure-A
Annexue-B
Mtr.

0.000

5336.740

1)Providing
cast-in-situ
bored piles
1000mm dia
for reqd depth
with RCC of
M35 or higher
specified mix
with 12mm to
20mm.

3400

18144916.00

0.00

Mtr.

0.000

1414.575

2) Supply,
fabrication &
placing in
position MS
liners incl
cutting and
bending with
contr.'s 6mm
thick MS
sheets as
necy for RCC
pile of
1000mm dia.

6000

8487450.00

0.00

3) CN of
precast
concrete
superstructure
with 'I' girder
of a single
track etc. for a
span of
12.20m.

Span

5.000

24.000

1)
Procurement
and bringing
to the site
reinforcement
steel reqd (at
15%)

858000

3088800.00

643500.00

Span

0.000

26.000

2- Unaffected @ 15%

858000

3346200.00

0.00

Span

0.000

15.000

3- On
procurement
of
neoprenebear
ings (at 7%)

858000

900900.00

0.00

Span

-15.000

-15.000

3 (1)
procurement
of neoprene
bearings (at
7%) to be
deleted for
PSC slabalready
claimed as
per page No.
202 of Annex.

858000

-900900.00

-900900.00

Span

15.000

15.000

3 (2)
procurement
of neoprene
bearings (at
5%) to be
claimed for
PSC 'I' girder
as per page
No. 124 of
spl. Condition
of contract

858000

643500.00

643500.00

Span

4.000

35.000

4Procurement
and bringing
to the site
appd quality
metallic
flexible
sheeting and
read
anchroge
cones (at 5%)

858000

1501500.00

171600.00

Span

10.000

10.000

5- On casting
of PSC 'I'
girder in all
respects reqd
for one span
in casting
yard (at 25%)

858000

2145000.00

2145000.00

Each

1.000

1.000

12) Vertical
load testing of
single bored
pile for
bridges

80000

80000.00

80000.00

Each

0.00

1.00

13)
Unaffected

1260

1260.00

0.00

M3

0.000

1106.983

19)
Unaffected

3300

3653043.90

0.00

M3

0.000

620.300

20)
Unaffected

2500

1550750.00

0.00

Span

0.000

18.000

21)
Unaffected

5000

90000.00

0.00

42732419.90
17947616.36

2782700.00
1168734.00

Total of annexure-B
Add (+)42%

Total of annexure-B

60680036.26

3951434.00

0.00

0.00

0.00

0.00

609000.00

0.00

Add (+)44%

609000.00
267960.00

0.00
0.00

Total of annexure-E

876960.00

0.00

Annexure-C
Total of annexure-C
Annexure-D
Total of annexure-D
Annexure-E
Mtr.

0 20300

18)
Unaffected

30

Total Ann 'E'

Annexure-F
0.00

69585.00

3) Unaffected

3.30

229630.50

0.00

Tonne

2500.06

4) Unaffected

255.00

637515.30

0.00

Sleep
er

50800

7) Unaffected

80.00

4064000.00

0.00

Sleerp
er per
km

130306

8) Unaffected

0.46

59940.76

0.00

4991086.56
2595365.01
7586451.57

0.00
0.00
0.00

0.00

0.00

10652537.00

0.00

Mtr.

Total of annexure-F
Add (+)52%

Annexure-G
Total of annexure-G
Annexure-H
1.Collectio
n & supply
of ballast
at yard
10M3
10M3

0.000 15217.910 a-1)100% 7000


unaffected
-15217.910

-15217.910

a-2)100% 7000
unaffected

10M3 12078.290 12078.290 a-3)100% 7000


unaffected

-10652537.00 -10652537.00
8454803.00

8454803.00

10M3

0.000

521.54 b)95%
7000
unaffected

346824.10

0.00

10M3

256.070

256.07 c)90%
7000
unaffected

161324.10

161324.10

10M3 14075.520

2.
Along
side collection
&
supply of
ballast
14075.52 a)100%
7000
unaffected

9852864.00

9852864.00

10M3

0.000

0.000 b)95%
7000
unaffected

0.00

0.00

10M3

0.000

0.000 c)90%
7000
unaffected

0.00

0.00

18815815.20

7816454.10

1655791.74

687847.96

20471606.94

8504302.06

0.00

0.00

19137210.40

788744.00

19137210.40
3827442.08
22964652.48

788744.00
157748.80
946492.80

36000 38894472.00

0.00

36000 10710027.00

296136.00

49604499.00

296136.00

2480224.95

14806.80

52084723.95

310942.80

2429006.00

0.00

16413328.10

1152582.68

Total of annexure-H
Add (+) 8.80%
Total
Annexure-I
Total of annexure-I
Annexure-J
MT

179.260

4349.366

1) Supply of
ordy portland
cement grade
43/53
confirming to
IS 8112 etc.

4400

Total of annexure-J
Add (+)20%
Total of annexure-J
Annexure-K
MT

0.000

1440.536 02) Supply


of MS/TMTFe-415
grade steel
rods of
various dia.
A)
75%stage
payment

MT

32.904

1190.003 B) 25%
stage
payment
Total
Add +5% as
per agt.

Total of annexure-K
Annexure-L
Total Annex. L
Total for Ann-A

Total for Ann-B

60680036.26

3951434.00

Total for Ann-C

0.00

0.00

Total for Ann-D

0.00

0.00

Total for Ann-E

876960.00

0.00

Total for Ann-F

7586451.57

0.00

Total for Ann-G

0.00

0.00

Total for Ann-H

20471606.94

8504302.06

Total for Ann-I

0.00

0.00

Total for Ann-J

22964652.48

946492.80

Total for Ann-K

52084723.95

310942.80

Total for Ann-L

2429006.00

0.00

Grand total

183506765.29 14865754.34

or say

183506765.00 14865754.00

Unit

Qty. executed Qty.


executed
since
last up-to-date
as
certificate
per M.Book

Items

Rate

Amount
Upto date

Grand total

Since last
Certificate

Refer. To
item No. of
the SOR

Remarks.

183506765.00 14865754.00

We agree to execute the extra quantity of


work at the agreed rate during the
extended period also and we are willing to
execute a rider agreement as and when
required by the Railway Administration.

Total value of work done including

183506765.00 14865754.00

Deduct 10% on the schedule rates to


become due to the contractor on the
satisfactory completion of the work
Total value of work done

183506765.00 14865754.00

Less value of work shown on last certificate vide CC-18.

168641011.00

Amount due

0.00

0.00

14865754.00 14865754.00

(Rupees One Crore Forty Eight Lakhs Sixty Five Thousand Seven Hundred and Fifty Four Only)

XEN/GC/MDU
The measurements were made by Shri Y.Ramesh, SE/Works on 29.07.2010 at page No. 48 to 53 of MB
No. 705600 and on 29.07.10 at page No. 28 of M.B. No. 705700, abstract at page No. 05 to 11 of M.B. No.
320900, and by Shri.R.Anbazhagan, JE/W on 13.07.2010 at page No. 34 to 42 of M.B.No.161300, on
13.07.2010 at page No. 32 to 33 of M.B. No. 161400 and on 16.07.10 at page No.11 to 13 of M.B.No.
161500, by XEN/GC/MDU on 08.07.10, 13.07.10, 16.07.10, 27.07.10 at page No. 19 to 25 of M.B. No.
705100.

Dated 20.08.2010

Contractor

XEN/GC/ MDU

Certified that the foregoing claim is correct that the necessary measurements were taken by the
XEN/GC/MDU on 8.07, 13.07, 16.07 and 27.07.10 at page No. 19 to 25 of M.B. No. 705100 and test
checked by DYCE on 6.08.10 and measurements taken by SE/JE/Works/GC/MDU as mentioned above
and checked by XEN/GC/MDU on 02.08.10 at page No. 34 to 42 of MB No. 161300, on
.10 at page
32 to 33 of M.B.No.161400, 17.07.10 at page No. 11 to 13 of M.B. No. 161500, on 29.07.10 at page No.

Certified that the foregoing claim is correct that the necessary measurements were taken by the
XEN/GC/MDU on 8.07, 13.07, 16.07 and 27.07.10 at page No. 19 to 25 of M.B. No. 705100 and test
checked by DYCE on 6.08.10 and measurements taken by SE/JE/Works/GC/MDU as mentioned above
and checked by XEN/GC/MDU on 02.08.10 at page No. 34 to 42 of MB No. 161300, on
.10 at page
32 to 33 of M.B.No.161400, 17.07.10 at page No. 11 to 13 of M.B. No. 161500, on 29.07.10 at page No.
48 to 53 of M.B. No. 705600, 11.08.10 at page No. 28 of M.B. No. 705700 and that the work has been
satisfatorily performed.
Dated 20.08.2010

Contractor

XEN/GC/ MDU

Certified that on materials the cost of which has not been recovered have been issued to the contractor
except such as are specifically provided for in the agreement.

Dated 20.08.2010

XEN/GC/ MDU

Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

Chargeable to 146 14044 - 25 1452 03 Rs. 63,61,452 /- and 146 - 14044 - 25 1444 - 03 - Rs. 85,04,302 /- -and to be included in the accounts for the month of
August- 2010. The cheque to be sent by post to M/s Larsen & Toubro Limited, No.1257A,Rajeev Nagar. Sempatti post, Aruppukkottai626 101, Virudhunagar District.

Sr.SO(A)/Dy.CE/CN/II/MDU

Memo of payments made

Dy.CE/CN/II/MDU

Rs. P.

Rs. P.
183506765.00

Total value of work done


Amount of previous payments from last 168641011.00
Certificate No. CC-16
Forwarded to Financial Adviser and Chief
Accounts Officer on
Security deposit at 10% of bill (fully)

539179.00

Income tax at 2%

297315.00

Sur charge at 10% on IT


Educational cess 3% on IT & SC

29732.00
9811.00

Sales tax @2% (VAT)

0.00

Hire charges

0.00

Bill copy
By Cheque
Grand total

50.00
13989667.00
183506765.00 183506765.00

(Rupees One Crore Forty Eight Lakhs Sixty Five Thousand Seven Hundred and Fifty Four Only)

(Rupees One Crore Forty Eight Lakhs Sixty Five Thousand Seven Hundred and Fifty Four Only)

STAMP
Signature of Contractor
Paid in my presence.

Signature and Designation of Witnessing Officer.


Dated :
Note: The Payees acknowledgement should be for the gross amount paid

12192015.19

15260745.41

39949719.90

56728602.26

2431.38

7586451.57

11967304.88

22018159.68

22018159.68

51773781.15

51773781.15

168641011.00

0.00

14865754.00
14865754.00

Month of:
Name of work:

NOV.2012

Manamadurai - Virudhunagar Gauge


Conversion project : Manamadurai - Tiruchchuli
(Excluding) - Proposed construction of Bridges,
station buildings, earth work, level crossings,
platform shelters, circulating area, track linking,
welding, supply of ballast, signal and
telecommunication works and electrical
works.(Reach-I)

Name of Contractor:

M/s. Larsen and Toubro Ltd., ECC Division,


P.O.Box No. 979,
Mount Poonamallee Road, Manapakkam,
chennai-89

Agt. No. 49/CN/2008 dt. 01.07.2008


Unit

Quantity executed
since last
certificate

Items

Rate
Since last certificate

5
Rs.

Rs.

Annexure-A
M3

8.080 36)504-a

606

4896.48

M3

245.840 38)507-a

1212

297958.08

M3

37.700 39) 509-a(I)

772

29104.40

M3

50.530 41)511-b(I)

3087

155986.11

3277.800 55)527-a

706

231412.68

5.265 87)923a1

1142

6012.63

28

51670.36

10m2
M2
Kg

Each

M3

1845.370 89)929

18.00

Total of annexure-A

777040.74

Add (+)25.17

195581.15

Total of annexure-A

972621.89

Annexure-D
25) Construction of 3300
Platform benches
in platform

125.87 30) Paving platform 2650


surface 20mm thick
with plain cement
concrete of M20
mix

59400.00

333555.50

Total of annexure-D
Add (+) 34%
Total of annexure-D

set

392955.50
133604.87
526560.37

Annexure-E
2 2) Assembling linking 18500

37000.00

and insertion of BG
1 in 8 1/2 points and
crossings

set

2 3) Assembling linking 20500

41000.00

and insertion of BG 1
in 12 points and
crossings

Mtr
Length of
Track

100 5) Manufacturing and 250

Mtr
Length of
Track

500 6) Assembling,

set

25000.00

fixing of check rails in


BG LC / trolley path

150

75000.00

24 8) Provision of glued 500

12000.00

Linking track, fixing,


running and guard
rail
joint(G3L or G3S)

525.000 47)Fabrication of 90R 170

89250.00

/52Kg Guard Rail and


fixing in Position of
bridge location
Total Ann 'E'

279250.00
122870.00
402120.00

Add (+)44%

Total of annexure-E
Annexure-H

10m3

10m3

11000.00 3.Transporting of
50mm railway
stone by means
of contractors
own rail lorry
2021.40 4) transporting of

1200.00

1320000.00

300.00

60642.00

50mm railway
stone ballast by
means of
contractors own rail
lorry
Total

1380642.00

Add (+) 8.80%

121496.50

Total of annexure-H

MT

Annexure-J
125.090 1) Supply of ordy

1502138.50

4400

550396.00

portland cement grade


43/53 confirming to IS
8112 etc.

Total of annexure-J
Add (+)20%

550396.00
110079.20

Total of annexure-J

MT

Annexure-K
3.000 02) Supply of

660475.20

36000

108000.00

MS/TMT-Fe-415
grade steel rods of
various dia. A) 100%
payment
Total
Add +5% as per agt.

108000.00
5400.00

Total of annexure-K

113400.00

ABSTRACT
Total for Ann-A

972621.89

Total for Ann-D

526560.37

Total for Ann-E

402120.00

Total for Ann-H

1502138.50

Total for Ann-J

660475.20

Total for Ann-K

113400.00

Grand total

4177315.96

or say

4177316.00