The presentation is made solely for the purpose of this event and is not intended to be and should not be used by any other person or entity. The contents may contain copyright and/or legally privileged information and the reader must therefore not use, copy, disclose or take any action based on this presentation material or any information herein. PT Nusantara Regas (or by any of their respective officers, employees or agents) will not in any manner whatsoever be deemed or construed to implicitly or explicitly represent or warrant the accuracy or completeness of the information or the contents of this presentation material. All consequences and/or liabilities (including without limitation, those arising from negligence) to other parties for the utilization of the documents are specifically disclaimed.
.4
JAVA GAS SUPPLY-DEMAND
Proposed pipeline Existing pipeline SSWJ Cilegon Jakarta (Haurgeulis, Pamanukan, Jatibarang) ONWJ Muriah Cirebon Semarang (Pangkah, W Madura, Ketapang, Poleng)
2.4
Gas production Planned location for LNG regas terminal
Cepu Gresik (Tiung Biru/Jambaran, Madura Strait Madura offshore Cepu, Gundih) Surabaya Wortel Tuban Sampang Brantas Central Java 2020 2350 400 500600 1350-1450 400-500 2012 200 150 2015 220 200 0 20 2020 250 150 0 100 East Java 2012 670 850 2015 650750 600 0 50-150 -
Kangean
Mmscfd West Java 2012 2015 Demand1 Local production SSWJ imports2 Shortfall Shortfall after FSRU Infrastructure needed 1800 600 700900 300-500 0-50 LNG terminal 1 2050 600 700980 470-750 20-300 2020 700800 700 0 0-100 -
0
50
0
N/A -
Potential for additional FSRU Source: Wood Mackenzie; Pertamina Team Analysis
LNG SUPPLY
MTPA 3.5 3.5
3.5
Domestic Supply? US LNG Additional Supply? Demand Additional Mahakam PSC Supply? Mahakam PSC
Demand
Demand
0.5 0.5 0.5 0.0 0.0 0.0 2012 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2012 2013 2013 2014 2014 2015 2015 2016 2016 2017 2017 2018 2018 2019 2019 2020 2020 2021 2021 2022 2022
Contract Year ACQ in MT 2012 1.50 2013 1.25 2014 1.25 2015 1.25 2016 1.00 2017 1.00 2018 1.00 2019 1.00 2020 1.00 2021 0.75 2022 0.75
300 590
10 120
-290 -470
FSRU LOCATION
LOCATION: 5o 58 28,920 LS dan 106o 47 57,96 BT RADIUS : 2 KM , WATER DEPTH: 22 23 M PIPING LENGTH FROM SHORE: 15 KM
Rekayasa Indsutri
PROGRESS UPDATE
FSRU Conversion Progress December 2011: 88.29%
PROGRESS UPDATE
CLOSING REMARK LNG supply for domestic gas consumption could be realized by operation of West Java FSRT. This project as the 1st Indonesian floating LNG receiving terminal is a milestone on gas infrastructure, and is expected to be commissioned in the 1st quarter or early 2nd quarter 2012. Fast track project has caused the project becomes very challenging. Additional LNG supply to fulfill FSRU capacity will be beneficial to West Javas gas consumers.