Task 01
Scenario 1 Tourism company X has proposed ten storey hotel building in Negombo which consists of a living area, dining area, kitchen ,stores, staff rest room and common bath room and toilet block, washing area ground floor and twenty rooms with attached bath room in each upper floor. Air conditioning will be provided to dining and living area in ground floor and all rooms in upper floor. It has been decided to provide hot water to all room other than cold water. Authority supplied main water supply is available but main sewer lines are not available. Extend of landing sufficient to provide internal roads, parking and other facilities. Company X has awarded the contract to consultant company Y for the necessary investigations and designing the building according to their requirements. Task 1.1
Describe the method of cold and hot water supply systems of the building. Evaluate all factors which are to be considered when designing cold and hot water supply system for this hotel building by considering the given information. Assess the requirement of cold and hot water supply for each floor the building and design the suitable system for ten storey hotel building along with detail sketches. (P2.1)
Water supply Water supply system receives water from sources such as lakes, rivers, reservoirs, wells or sea through desalination. Water is pumped from the source and then it is sent to the treatment plant for purification. After purifying, it is sent to the elevated tanks for distribution. Distribution network is used to distribute water to houses. Cold water systems
i.
In this system, water will be supplied under mains pressure. For efficient operation, a high pressure water supply is essential particularly at periods of peak demand. Pipe work is minimal and small storage cistern can be installed, if necessary, for the hot water supply. Drinking water is available at every draw off point and maintenance valves should be fitted to isolate each section of pipe work.
ii.
In the cistern feed system, water is supplied to a cistern (overhead tank) through a supply pipe. A cistern is a liquid storage container which is open to the air and in which the liquid is at normal atmospheric pressure. The water supply to the cistern is controlled by a ball valve that is fixed to the cistern, above the waterline, and connected to the cold supply through a valve. As water is drawn from the cistern the ball falls and the arm activates the ball valve that opens to let water in to the cistern. When water has risen to the water line, marked on the cistern wall, the ball and arm rise to close the valve. Cistern can be made of Galvanized steel, Stainless steel, Plastic, masonry or concrete.
Hot water system Hot water can be either be granted by central boiler plant and stored (centralized system), or produced close to the point of use (decentralized system). i. Centralized system (Storage water system)
Water is heated either directly in the storage cylinder, for example by an electric immersion heater or from a remote boiler. The two main types of system are the open vented and the unvented. a. Open vented (Indirect system) The open vented water system (indirect) relies on a large volume of stored water. The head of stored water is usually sufficient to push water down the pipe that feeds the water storage cylinder and back up to any tap or shower outlet, providing it is lower than the stored water level. b. Unvented (Direct system) The unvented (direct) stored water out of the cylinder or though the pipe circuit to the tap or shower outlet. ii. Instantaneous system
Tank less water heaters, also called instantaneous, continuous flow, inline, flash, on demand or instant on water heaters, instantly heat water as it flows though the device, and do not retain any internally expect for what is in the heat exchanger coil.
Therefore the maximum water consumption rate for all the hotel rooms
Assumed number of staff members = 50 Total amount of water consumption for staff members = 50x135 = 6750 liters Therefore the total amount of water consumption for the whole hotel building = 64800 + 6750 = 71550 liters
If it is assumed that thirteen rooms in each day in each floor are occupied with the hotel customers
Water consumption for staff members Therefore the minimum amount of water consumption for the proposed hotel
There should be some excess water in the storage of water tanks due to water cut by the water board Therefore the minimum amount of water which should be stored in water = 48870x2 tanks = 97740 liters According above considered details I am suggesting an indirect water storage system with a water sump for cold water and solar water system for hot water as the proposed hotel location is in Negombo area which has a hot weather condition.
Designed cold and hot water system diagrams for the hotel building
Task 1.2
It is known that waste water supply system is necessary for any building. Select suitable waste water systems for this ten story hotel building and compare their important features. Propose a suitable system for waste water and soil water disposal for this hotel block. Provide necessary sketches to show the proposal. (P2.2)
There are four main drainage systems used in buildings. A. Single stack system B. One pipe system C. One pipe partially ventilated system D. Two pipe system Single stack system In this system, only one vertical soil pipe is used. The wastes from baths, sinks, etc. as well as foul matter from the WC are discharged in one single pipe, called the soil and waste pipe. There is no separate pipe for ventilation purposes. This system proves economical as only one pipe to be provided. The effectiveness of the system totally depends on the depth of water seal. No
One pipe system In this system, a vent pipe is provided and traps of all water closets, basins, etc. are completely ventilated. Waste connections from sinks, baths, wash basins and the soil pipe branches from W.C.s and urinals are all connected in to one main pipe. Since all the traps are ventilated by separated vent pipe, this method proves to be more effective than the single stack system.
Fig One pipe system One pipe partially ventilated system This is modified form of the single stack system and one pipe system. In this system, the waste from W.C., basins, sinks, etc. is discharged in to one common soil and waste pipe. However in addition, a relief vent pipe is also provided which provides ventilation to the traps of water closets. The traps of basins etc are not directly connected to the vent pipe. Two pipe system In this system, separate soil pipe and waste pipe are provided. The discharge from W.C. is connected to the soil pipe while the discharge from baths, sinks, lavatory basins, etc. is connected to the waste pipe. The entire traps are completely ventilated by providing separate ventilating pipes. Soil pipes and waste pipes are provided with separate vent pipes. The system thus requires from pipes and hence proves very costly.
Fig Two pipe system According to the details of each waste water system I would suggest the TWO PIPE WASTE WATRE SYSTEM as the best waste water system for the proposed hotel building. Reason for choosing the two pipe waste water system Even though this pipe system is a costly design, in case of any maintenance, maintaining process will be easier in this pipe system. Since this is a hotel building with twenty hotel rooms in each floor and all the pipes are connecting to the waste water system and the laying of pipes are bit advance two pipes waste water system will reduce the complexity and it will be the best waste water system for this proposed hotel building in Negombo area.
Task 1.3
Company Y has indentified the requirement of electrical installation for this hotel building. Explain how main electricity is provided to the building by naming all essential components. (P2.3)
Main electricity supply starts from a hydro power plant or a thermal power plant and transmitted to power towers through transmission lines then the alternative current is transmitted to electrical poles through transmission lines finally alternative current comes to the building through distribution lines. In Sri Lanka we use 230V/50Hz in single phase and 440V/50Hz in
Power plant
Power towers
Electrical poles
Building
A consumers electrical installation begins at the connection of the meter. From the meter 230V supply is run to the consumers installation, which includes consumers unit (main switch, circuit breakers, distribution of supply to the various circuits) and the necessary separate circuits for lighting, heating and power. Main components in Electrical installation 1. Isolated main switch
Main switch effectively cuts off all voltages to the whole of an electrical installation. 2. Distribution
Three distribution conductors housed in the consumers unit are connected separately to the 3. Main earthling thermal
This provides the necessary earth connection to the various circuit protective conductors, commonly called earth, to protect the insulation against the damage and danger of fire shock to persons.
4. Over current protective device In the live conductor to each circuit cable run from the distribution conductor, is a fuse or circuit breaker as protection against current greater than that which the circuit tolerate. The purpose of this device is to course a break in a circuit as protection against damage to conductors and insulation by overheating coursed by excessive currents.
5. Fuse
Miniature Circuit Breaker (MCB) A circuit breaker is an automatically operated electrical switch designed to protect and electrical circuit from damage cause by all overload or short circuit. Its basic function is to detect a fault condition and by interrupting continually, to immediately discontinue electrical flow. Unlike a fuse, which operates once and then has to be reputed a circuit breaker can be reset (either manually or automatically) to resume normal operation.
Task 1.4
What are the types of Air Conditioning systems and active fire systems company Y can select for the building? (P2.4), (P2.5) Types of air conditioning systems
1. Window air conditioner
Fig Window type air conditioning units 2. Split air conditioner The split type unit is comprised of two parts Outdoor unit fitted outside the room, houses components like the compressor, condenser and expansion valve. Indoor unit comprised with the evaporator or cooling coil and the cooling fan. Further, the present day split units have aesthetic looks and add to the beauty of the room. This system can be used to cool 1 or 2 rooms.
Fig Split type air conditioner unit 3. Central air conditioning system Central air conditioning system is used for cooling big buildings, houses, offices, entire hotels, gyms, cinema halls, factories, etc. If the whole building is to be air conditioned, HAVC engineers find that putting individual units in each of the rooms is very expensive initially as well in the long run. The central air conditioning system is comprised of a huge compressor that has the capacity to produce hundreds of tons of air conditioning. Cooling big halls, malls, huge spaces, galleries, etc. is usually feasible with central conditioning units only.
Task 2
Scenario 2
10 km major road projects is propose to contact between to main town in North Central province. Main features of the road structure are given blow.
Task 2.1
What are the basic components of a road and draw the cross section of the road of indicting them clearly. When designing the road stretch it is necessary to specify the materials of each components of the road. Assess suitable materials sub-base and bass course construction of the road and select one method with justification for base course of the above road. (P3.1)
In road construction Aggregates, Bitumen and the Soil are the major construction materials. Main component of a road
i.
Embankment Whenever it is required to raise the grade line of a highway above the ground level from considerations of topography, vertical alignment, ground water depth and drainage, etc. an embankment is needed.
ii.
Sub grade Sub grade the layer immediately below the embankment and it will be the main load bearing layer of pavement structure. The material using to construct base is usually crushed aggregate.
iii.
Sub base
iv.
v.
Shoulders The portion of the roadway continuous to the traveled way for the accommodation of stopped vehicles, for emergency use, for lateral support of base and surface courses
vi.
Side drains Side drains are one of the important parts in road construction and it is used to drain out the rain water on the surface of the road which can cause weak spots on the road way.
Suitable materials for sub base construction Aggregates Nominal sizes used 50mm (2), 37.5mm (11/2), 19mm (3/4), 12.5mm (1/2)
Suitable materials for sub base construction The materials using for sub base should be a permeable material. The commonly using material for sub base is gravel. Even it can crushed rock or stabilized sub graded material also can be used. According to RDA general specifications construction materials for sub base Sub base type 1 California Bearing Ratio value should be greater than 20 The Plasticity Index and LL of the soil should be less than 15% and 40% respectively.
Justification for base course of proposed major road project The sub base or sub base surface should be prepared to the required lines and levels (thickness of sub base is 250mm) and should be cleaned. Prior to spreading the aggregate will be spread evenly on the aggregate base, a partial width of the shoulder will be constructed to the elevation of the top of each compacted layer of base. The selected aggregate will spread evenly on the prepared surface. The aggregate will be compacted using a steel wheeled roller and rolling will be done by a series of overlapping longitudinal passes of the roller working from the edge towards center. The 19mm or 12.5mm choker stones will be spread evenly and rolled to ensure that the stones are well embedded in the surface interstices of the base course. While the rolling is being done, the surface shall be wetted and lightly brushed so as to ensure that the finer aggregate are worked in to the interstices.
Hot bitumen application over the single size aggregate base There will be application of two coats over the single size aggregate base First coat at the rate of 2 Ltrs/Sqm Second/subsequent coat 1 Ltrs/Sqm Each coat will be blinded with sand Application of the blinder can be done manually or using mechanically sprayer
Task 2.2
BTEC HND in Quantity Surveying & Construction Economics
If the discharge is low, concrete drains can be constructed across the road to provide drainage and these drains will be covered with concrete slabs having enough strength to bear traffic loads. ii. Culverts A culvert is a closed conduit used to convey water from one area to another, usually from onside of a road to the other side.
A bridge is a structure built to cross over an obstacle. Obstacles can be streams, rivers, valleys or any other physical obstacles.
Task 2.3
BTEC HND in Quantity Surveying & Construction Economics
Gabion walls
Gravity Walls
Crib Walls
Cantilever Walls.
Cantilever walls are built of reinforced concrete and are typically composed of a horizontal footing and a vertical stem wall. The weight of the soil mass above the heel helps keep wall stable. Cantilever walls are economical for heights up to 10 m (32 feet).
Sheet Pile Walls Used to build continuous walls for waterfront structures and for temporary construction wall heights > 6 m if used with anchors, can be made of steel, plastics, wood, pre-cast concrete. The advantages of using steel sheet-piling: o o o o o o Provides higher resistance to driving stresses; Is of an overall lighter weight; Can be reused on several projects; Provides a long service life above or below the water table; Easy to adapt the pile length by either welding or bolting Their joints are less apt to deform during driving.
Soil nailing (In-Situ Walls) These walls do not rely on their mass to retain the soil. Rather, they rely on their flexural strengths to retain the soil. They are supported by penetration into the soil or by anchoring systems. For example, soil nailing.
Fig Concrete Block Walls, Factors to be consider when deciding a retaining wall
Types of bridges i. Beam or girder bridges A beam bridge is the most common and most basic type of a bridge. A beam bridge consists of a horizontal beam that is supported at each end with abutments and in the middle by piers. A beam bridge usually built with concrete, steel or combination of both. Beam Bridge is most economical type of the bridge with a limited span about 250m. ii. Arch bridge Arch bridge is the one of oldest type bridges in bridge construction. The specialty in arch bridge is that the load and weight are carried outward along the curve of the arch to the support at each end, instead of pushing straight down. These supports carry the load and the ends of the bridge from spreading out. The materials such as stone and bricks are strong in compression but not in tension. Old arch bridges are designed in such that nowhere in structure tension is developed. iii. Truss bridge Truss bridge also one of the oldest types of bridge. The truss is a simple skeletal structure. A truss bridge is a bridge composed of connected elements (typically straight) which may be stressed from tension, compression, or sometimes both in response to dynamic loads. It contains of many small members but they together can support a large amount of weight and span great distances. In most cases the design, fabrication, and erection of trusses is relatively simple. Typical span length of a truss bridge is 40 500m. iv. Cantilever bridge The cantilever bridge consists of two spans projecting toward each other and joined at their ends by a suspended simple span. The projecting spans are known as cantilever arms, and these, plus the suspended span, constitute the main span. The cantilever arms also extend
To keep the intensity of pressure within the safe limits of the bearing capacity
The choice of type of the foundation depend primary on the followings factors. Type of the bridge Nature of the soil strata Magnitude of the loads to be carried Site conditions Economy Availability of construction techniques Maximum likely scour depth
1. Shallow foundation
2. Deep foundation