Académique Documents
Professionnel Documents
Culture Documents
Enter the vendor excise / non excisable invoice no. And select the excise group as per LOV. Enter the business area i.e.1022 for GGN HPDC
You can also view the purchase document and excise entry. Check the document by clicking the check button. Entry will be generated automatically and Doc..NO. Will be generated.
Note: - You enter the material with ref. to the following Document:i. ii. iii. iv. Purchase order Stock Transport Order: - For Plant to Plant Transfer i.e. Scheduling Agreement. Without Purchase order: - For FOC material & cash purchase .
Write the Purchase Order Number in the relevant column & press enter. All the items of PO appear in the item overview. Write vendor bill no. in Delivery Note, LR number in Bill of Lading & Gate Entry number in Header text fields. Check the quantities from the bill & physical verification correct the quantity if required, enter the storage locations for each line item and put tick mark in the OK check box and select to continue.
Pl. also enter Deliver note & Bill lading no as challan /bill no and Bill of entry no. incase of Import. You can also write the special remarks in the Header Text.
Enter the Storage location where you want to keep the material and also can view the current stocks in the plant. Enter the qty which is received physically. It is also mandatory to enter the Challan Qty. System will not enter more then the Gate In Qty but can be accept less qty as per physical receipt qty. You can view the Purchasing Doc. and excise detail also.
Check & post the Goods Receipt. Goods Receipt Material Document number appears at the status bar given at the bottom.
You can also check the entry by clicking simulate Cenvat. If it is Ok Post the same and the excise register will be updated automatically.
3. Enter the currency INR here before entering any other things.
5. Select Planned delivery cost for import other otherwise select goods/service item + planned delivery cost and press enter.
Pl. enter Diff. amount here if arising. Enter Plant i.e. 1011, 1022
1. Click the Calculate tax & enter the amount as shown in balance field.
1. After Simulation above screen will appear which show you the accounting entries.
Return delivery (MIGO) i.e. Line Rejection, MRR Rejection & Stock Rejection. It is mandatory to process the same though any material Doc. and all the data will be captured including the vendor from the same.
1. Always select Return Delivery
4. Enter vendor code & Business Area then click execute button then next screen will be appear
Please note that Invoice is related only for Excise Duty purpose & it will not Debited vendor for full rejected amount. For debiting the vendor you have to create the credit memo.
Check the Qty Value, BED & ECess as per excise invoice posted if O.K then click the save Button.
7. Click Calculate Tax 4. Select P.O/Schedule agreement 6. Enter Qty & Value as per Return delivery & IV. Always Select Line item if Multiple item in P.O.
2. If the entries are OK then post the Credit Memo. It Will Debit Vendor & Credit to RICO.
After Simulation above screen will appear and you can see the accounting entries.
Note: - Credit Memo will open the Purchase Order for returned Qty. and Subsequent Credit Will not open P.O. If Wants to close the P.O. Pl. make and Subsequent Credit if wants to material in again in the same P.O. Pl. make Credit Memo only.
Enter the requirement date as the baseline date, movement type i.e. 201 for issue to Cost center and the relevant plant and press
Enter.
4. Enter material, quantity, plant, storage location, etc. as required and select to save the reservation. System will generate the Reservation Number.
Create Reservation (MB21) MVT TYPE- 311(For transfer posting storage location)
Enter the requirement date as the baseline date, movement type i.e. 311(for transfer posting storage location) and the relevant plant and press Enter.
1. Enter the Store Code where material has to be transfer all others field will remain same as MB21 MVT type 201
2. Enter the valuation class if the material is subject to split valuation. Which you want to withdraw from stores.
Enter the valuation type. It is mandatory if If the material is subject to split valuation
For changing a reservation execute transaction MB22 and for displaying a reservation execute MB23 and proceed as required.
Reservation
2. Enter Reservation No. All the information related to issue will reflect from the reservation only.
Transfer Posting (Storage location to Storage location with-in Plant) - MIGO (Against Reservation)
A stock transfer from storage location to storage location takes place within a plant. It is usually posted without value, since the transferred material is managed in the same plant and therefore has the same valuation data as before. If the material is subject to split valuation, and the valuation type of the material changes due to the stock transfer, the system also creates an accounting document during the stock transfer. This stock transfer procedure reduces the corresponding stock type at the issuing storage location and increases the same stock type at the receiving storage location. At plant level, the stock level does not change, except that the stock is distributed differently among the storage locations in the plant. The system does not create an accounting document for the material document. Choose the relevant movement type to enter the transfer posting, for example, 311 (Transfer posting of unrestricted use stocks from one storage location to another). Maintain the data as required and save the document.
2. Enter Reservation No. All the information related to transfer of material will reflect from the reservation only.
Enter the valuation type in the receiving location. If the material is subject to split valuation
Enter the issuing and receiving plants, storage locations in the sections From and Dest in the item details in the Transfer tab. Enter Header text, check and Save. The system creates a material document without any FI document, as there is no change in valuation when transfer posting takes place between storage locations to storage location within the same plant.
Transfer Posting to Subcontractor MB1B with Ref. to Purchase Order. For transfer Posting of material to subcontracting run T-Code MBIB and fill up all the details. Post the document with reference to Purchase order
Select MVT 541, Plant Code, Storage Location and press To Purchase Order
Pl. select the P.O. No. and click the adopt details.
Enter the Store loc. Code from where you want to send the material
Click save button. The document no. will be generated automatically & will appear as blow
Note: - No FI entry will be generated at the time of Transfer posting to Subcontractor. Returnable Gate Pass ZRGP
You can create the RGP with Ref. to Transfer Posting or without Ref to Transfer Posting. But it is mandatory to prepare RGP if any transfer posting is being done. Click the icon to cancel the RGP (With or Without Reference to Material Doc.
Click the icon to prepare the RGP with ref. to material Doc.
Click the icon to Display the RGP. Click the icon to reconcile the RGP.
Click the icon to prepare the RGP without ref. to material Doc.
Enter the Expected date of Return Enter the Plant & Material Doc. no. on which the RGP is prepared
All the detail with reference to Material Doc. i.e. vendor, material and qty will reflect automatically.
Enter the Send through, Vehicle no, Header Text .Select the line item and click the save button to save the RGP.
1. Enter the Excise group, series group as defined in the system (LOV) and Plant then click the execute button.
automatically.
1. Enter RGP NO. And all other entries will comes automatically from transfer posting.
Pl. De-selects the Base line item scrap for reconciliation of vendor generated scrap and save the document.
Select the line item scrap and put the scrap qty which you are receiving physically.
Click the OK button & Post the same. Document no. will be
generated automatically
Click the Create button. The entry will be created Click the line item & Simulate Green Light will appear on the screen
You can view the entry by clicking RG1 & Execute. The given screen will appear.
Enter Excise Group as per defined plant wise. Enter from date to date.
You can display the challan to see the reconciliation By T.Code J1IF02
See that 5000 pcs have been reconciled as per GR qty. & 5000 pcs is balance.
You can view the material Document showing the Entry of Reconciliation.
You can see the Challan qty., Receipt qty as well as balance qty respectively.
2. Always select MVT Type 303 3. Enter material, Plant & Storage location with Qty.
4. Enter plant in
Destination & Save
the same
View the document by Selecting Display & Enter the Material document no.
You can also view the FI document by clicking the FI document button
After clicking the FI document Button the given screen will appear which shows you the FI entry.
credited
You can also view the detail document by clicking the same as shown in next screen
3. Material Doc. no which is generated in the dispatch plant & Maintain header Text.
2. You can also view the FI document by clicking the FI document button 1. View the document by Selecting Display & Enter the Material document no.
Note: - No FI Entry will be generated in receiving Plant as it has already generated at issuing Plant. Goods Receipt against RTP Materials
T.Code - MIGO M.Type - 501-M The following activity should be done while receiving of RTP material from Supplier.
4. Click Ok then
3. Enter Item Code, Qty, Plant Code, Storage Location and Vendor code
You can view the stocks after receiving the same in Plant
3. Enter Item Code, Qty, Plant Code, Storage Location and Vendor code 4. Click Ok then
Returning 20 pcs to supplier which is greater then receipt of 10 Pcs from the vendor
System will not allow excess dispatch to vendor It will show the error
Now stocks of the same is goes down by 10 pcs from the main stores and only 50 pcs is available in stock.
View the Accounting Document. Pipeline Credit & Power Consumption Debit.
1. Enter Plant 2. Click pipeline 3. First select the Display & Enter then next screen will appear
Click to go back
You can view the created document. Click to View the document
2. Specify the maximum number of items that a physical inventory document will contain. If you enter a maximum number of items here, the system creates a new document for the remaining items when this number is reached, until all material has been recorded in physical inventory document.
The System creates a new session and the screen is displayed as under:
1. Select the processing mode. If large nos. of items is to be counted it is always advisable to process in the background. After selecting the processing mode, press process button. If not processed in background, select display error only option
The Following Screen appears with auto generated numbers of the Physical inventory:-
1. Select Printer
2. If wants to view the document then Click Preview & If wants to take print Click Print
After giving the Printout The following Sheet Will Generate:1. Do the physical and enter the qty. as per location where it is lying physically.
Enter physical count in the shown space. If it is in store pl. enter the quantity in the 1st column & if it in QA inspection enter in 2nd column and if it is in blocked stock pl. enter in the 3rd column.
You can give the reason of Diff by clicking above column & select the reason. And save the document