Académique Documents
Professionnel Documents
Culture Documents
Submisison Date:
S26 N/A
Li Wan Lu Yang
City: Dongguan Province: Guangdong Postal Code: 5823586 Country: P.R. Declaration: 1. Supplier affirms that the samples represented by this warrant are representative of normal production and process capabilities. Supplier also affirms parts have been made to the applicable customer drawings and specifications and are made from specified materials on regular production tooling with no operations other than the regular production process. 2. Parts meet Customer Cosmetic Specification Requirements where applicable. 3.Any deviations have been noted in the comment area below.
China
Supplier Comments
-----------------------------------------
---------------------------------------------Date:
Part Disposition:
Customer:
Date:
FMQAI-018-F3.01
FMQAI-018-F3.01
Submisison Date:
S26 N/A
Li Wan Lu Yang
City: Dongguan Province: Guangdong Postal Code: 5823586 Country: P.R. Declaration: 1. Supplier affirms that the samples represented by this warrant are representative of normal production and process capabilities. Supplier also affirms parts have been made to the applicable customer drawings and specifications and are made from specified materials on regular production tooling with no operations other than the regular production process. 2. Parts meet Customer Cosmetic Specification Requirements where applicable. 3.Any deviations have been noted in the comment area below.
China
Supplier Comments
-----------------------------------------
---------------------------------------------Date:
Part Disposition:
Customer:
Date:
FMQAI-018-F3.01
Rejected
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
FMQAI-018-F3.01
Submission No: FGN00004996-100-DGHM-001 Inspected By: Up No. / Tool #: N/A Inspection Date: Material Spec: 12L14 Reviewed By: INSPECTION RESULTS INSPECTION ANALYSIS
Sample Number Deviation from Nominal
1
caliper caliper caliper caliper shape gauge shape gauge
6.36 5.20 5.85 0.47 0.387 5.481 OK
2
6.37 5.19 5.85 0.48 0.386 5.478 OK
3
6.36 5.19 5.86 0.48 0.380 5.476 OK
1
0.010 0.000 -0.050 0.020 -0.013 -0.019
2
0.020 -0.010 -0.050 0.030 -0.014 -0.022
3
0.010 -0.010 -0.040 0.030 -0.020 -0.024
Mean
6.363 5.193 5.853 0.477 0.384 5.478
C3 B4 C4
B4
B3 B3 C3
NO GO thread gauge
No. 1 2 3
NOTES
HEAT TREATMENT SPECS CASE HARDEN .001/.003 DEEP SURFACE HARDNESS R/C 41 MAX CORE R/C 23 MAX FINISH: CLEAR ZINC MATERIAL: AISI 12L14 FREE CUTTING STEEL MINIMUM PUSH OUT FORCE 68 KGF (150 LBS) MINIMUM PULL OUT FORCE 63.5 KGF (140 LBS) MINIMUM TORQUE OUT 20 KGF-CM (17 LBS-IN) MINIMUM LATERAL LOAD FORCE 91KGF(200LBS) (FORCE EXERTED ON TOP EDGE) RECOMMENDED HOLE SIZE IN SHEET METAL IS 6.00.05MM
SAMPLE#1SAMPLE#2SAMPLE#3 COMPLIE COMPLIE COMPLIE S S S COMPLIE COMPLIE COMPLIE S S S COMPLIE COMPLIE COMPLIE S S S COMPLIE COMPLIE COMPLIE S S S
Supplier Remarks
Customer Disposition
FMQAI-018-F4.01
Page 15 of 32
02 1/10/2005 1/10/2005
PART DESCRIPTION: S26 FAN FIX BRKT STANDOFF SUBMISSION NO: FGN00004996-100-DGHM-001 CAV/TOOL#: N/A
Target
LSL
Avg.5.185
Cpk. 2.29
K1
Avg.5.855
K1 Tool 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 CAPLIER 5.1900 5.1900 5.1800 5.1900 5.1800 5.1800 5.1900 5.1800 5.1900 5.1800 5.1800 5.1800 5.1900 5.1800 5.1900 5.1900 5.1900 5.1800 5.1900 5.1800 5.1800 5.1900 5.1800 5.1900 5.1800 5.1800 5.1900 5.1800 5.1900 5.1900 Variable 1 0.0051286 -0.3000000
K2 CAPLIER 5.8600 5.8500 5.8500 5.8600 5.8600 5.8600 5.8500 5.8500 5.8500 5.8600 5.8600 5.8600 5.8500 5.8600 5.8500 5.8500 5.8500 5.8600 5.8600 5.8600 5.8500 5.8600 5.8500 5.8500 5.8500 5.8600 5.8600 5.8500 5.8500 5.8500 Variable 2 -0.7527711 -1.1333333
K3
K4
K5
K6
FMAQI-018-F5.01
-0.6051286
-1.5138955
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
FMAQI-018-F5.01
Part Number:
FGN00004996-100
Description: S26 FAN FIX BRKT STANDOFF Submission No: FGN00004996-100-DGHM-001 TTL Tolerance: 0.1 Analysis Supervised by: LUYANG Date Inspected: 01/10/2005 Date Inspected: 01/10/2005 Date Inspected:
Up No./Tool#: N/A
Location: B4 Specification: 5.2 Supplier Name: XXX Inspector Name: LIWAN Inspector Name: ZHANGLIQUN Inspector Name:
Measurement Unit: MM
2 3
OPERATOR 1 Sample 1 2 3 4 5 6 7 8 9 10 TTLS Trial 1 Trial 2 Trial 3 Range 0.0100 0.0100 0.0100 0.0100 0.0100 0.0000 0.0000 0.0000 0.0000 0.0100 0.0600 0.0060 Sum 155.5400 XA 5.1847 Trial 1
OPERATOR 2 Trial 2 Trial 3 Range 0.0000 0.0100 0.0100 0.0100 0.0100 0.0000 0.0100 0.0100 0.0100 0.0100 0.0800 0.0080 Sum 155.5300 XB 5.1843 Sum XC 0.0000 Trial 1
OPERATOR 3 Trial 2 Trial 3 Range 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
5.1900 5.1900 5.1800 5.1900 5.1800 5.1800 5.1900 5.1800 5.1900 5.1800
51.8500
5.1800 5.1800 5.1900 5.1800 5.1900 5.1800 5.1900 5.1800 5.1900 5.1800
51.8400
5.1800 5.1900 5.1800 5.1900 5.1800 5.1800 5.1900 5.1800 5.1900 5.1900
51.8500
5.1800 5.1900 5.1900 5.1800 5.1800 5.1800 5.1800 5.1900 5.1800 5.1900
51.8400
5.1800 5.1800 5.1900 5.1800 5.1900 5.1800 5.1900 5.1800 5.1900 5.1800
51.8400
5.1800 5.1900 5.1800 5.1900 5.1800 5.1800 5.1900 5.1800 5.1900 5.1900
51.8500
TEST FOR CONTROL Upper Control Limit, UCLr = D4R = 2.57000 x 0.00467 = 0.0120
If any individual range exceeds this limit, the measurement or reading should be reviewed, repeated, corrected, or discarded asappropriate, and new averages and ranges should be computed
Factors
# Trials K1 D4 2 4.56 3.27 3 3.05 2.57 # Oprs K2 2 3.65 3 2.70
% Tolerance
14.2%
0.00467
0.01423
% Tolerance 0%
0.00000
% Tolerance 14.2%
Notes: ACCEPTABLE
FMQAI-018-F6.01
Part Number:
FGN00004996-100
Description:S26 FAN FIX BRKT STANDOFF Submission No: FGN00004996-100-DGHM-001 TTL Tolerance: 0.08 Analysis Supervised by: LUYANG Date Inspected: 01/10/2005 Date Inspected: 01/10/2005 Date Inspected:
Up No./Tool#: N/A
Location: C4 Specification: 5.9 Supplier Name: HUA MAO Inspector Name: LIWAN Inspector Name: ZHANGLIQUN Inspector Name:
Measurement Unit: MM
2 3
OPERATOR 1 Sample 1 2 3 4 5 6 7 8 9 10 TTLS Trial 1 Trial 2 Trial 3 Range 0.0100 0.0000 0.0000 0.0000 0.0100 0.0100 0.0000 0.0100 0.0100 0.0100 0.0600 0.0060 Sum 175.5900 XA 5.8530 Trial 1
OPERATOR 2 Trial 2 Trial 3 Range 0.0100 0.0000 0.0000 0.0000 0.0100 0.0000 0.0000 0.0100 0.0000 0.0100 0.0400 0.0040 Sum 175.6100 XB 5.8537 Sum XC 0.0000 Trial 1
OPERATOR 3 Trial 2 Trial 3 Range 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
5.8600 5.8500 5.8500 5.8500 5.8600 5.8600 5.8500 5.8500 5.8500 5.8600
58.5400
5.8600 5.8500 5.8500 5.8500 5.8500 5.8500 5.8500 5.8600 5.8600 5.8600
58.5400
5.8500 5.8500 5.8500 5.8500 5.8500 5.8600 5.8500 5.8500 5.8500 5.8500
58.5100
5.8500 5.8500 5.8500 5.8500 5.8600 5.8600 5.8500 5.8500 5.8600 5.8600
58.5400
5.8600 5.8500 5.8500 5.8500 5.8500 5.8600 5.8500 5.8600 5.8600 5.8600
58.5500
5.8500 5.8500 5.8500 5.8500 5.8500 5.8600 5.8500 5.8500 5.8600 5.8500
58.5200
TEST FOR CONTROL Upper Control Limit, UCLr = D4R = 2.57000 x 0.00333 = 0.0086
If any individual range exceeds this limit, the measurement or reading should be reviewed, repeated, corrected, or discarded asappropriate, and new averages and ranges should be computed
Factors
# Trials K1 D4 2 4.56 3.27 3 3.05 2.57 # Oprs K2 2 3.65 3 2.70
% Tolerance
12.7%
0.00333
0.01017
% Tolerance 2%
0.00157
% Tolerance 12.9%
Notes: ACCEPTABLE
FMQAI-018-F6.01
PFD-S26-00101
FGN00004996-100 Li Wan CUSTOMER: PREPARED DATE: flextronics 1/10/2005 DIAGRAM REVISION: DESCRIPTION: 01 S26 FAN FIX BRKT STANDOFF
CHANGE SUMMARY: A=ORIGINAL Process Step Documentation Package slip Process Flow Offline Process Risk Assessment
001
Low Risk
Receive inspection
Fail
Request raw material supplier to perform on-site investigation; if still failed, return to suuplier this this batch ,and issue SCAR report to supplier for immediate action(Q-2-011)
Pass Stock
002
Meddium Risk
Fail
Adjust machine
Pass
003
Fail
Meddium Risk
004
Fail
Meddium Risk
Pass
005
Inspection instruction
Fail
scrap/sort(Q-2-011)
Meddium Risk
Pass
100% insepction
006
Fail
Meddium Risk
Pass
007
Packing
Low Risk
008
Stock
Low Risk
LEGEND
Action Stock
Inspection Plan Material Review Action In-Process Quality Control Production Non-Conformance
Page 20 of 32
Documents
FMQAI-019-F1.01
Page 21 of 32
Prepared by Li Wan
Building XXX Customer S.Q.E. Hardy wu Revision Date Q.A. Production Program
Approvals
Name zheng Hong chao Lian You yi Liu yue Jin Revision Number Date 1/10/05 1/10/05 1/10/05 Eff. Date A. Rec Insp
Control Location
F. Final Inspection G. Out of Box Audit H. Tool B. Material Receipt C. Setup Approval D. In Process E. Last Piece Notes Methods Analysis Methods
Abbreviations
RI - Receiving Inspection OBA - Out of Box Audit OBE - Out of Box Experience DMR - Defective Material Report 2X/S - Two Times per Shift 1X/S - One Time per Shift 1X/H - One Time per Hour Reaction If Out of Control Control Location
3/8/2004
Process Parameters Characteristics Product Characteristic Loc. / Desig.
01
Product Critical Characteristics
3/8/2004
Measurement Method Sample Size(pcs) Frequency Cpk
No.
Phase of Production
Chart No.
OPERATION:RAW MATERIAL RECEIVING INSPECTION 1 Drawing note #3 Material type C12L14 low carbon steel 2500~2520MM 6.35 +0.1/-0.1MM 84~93HRB No rust or damage Certs requireed Certificates N/A Sampling plan Sampling plan Sampling plan Sampling plan N/A Each lot Visual N/A Request raw material supplier to perform on-site investigation; if still failed, RTV this batch, and Issue SCAR report to supplier for immediate action. B
2 3 4 5 6
Coil length Material thickness Material hardness Rust and visual Certificates
Each lot Each lot Each lot Each lot Each lot
B B B B B
Receive inspection
Caliper,micrometer,hardness tester
OPERATION:AUTO LATHE SET-UP AND IN-PROCESS INSPECTION 1 2 3 Progressive auto lathe setup/run produce 4 G-1515 auto lathe 5 6 7 8 Drawing Drawing Drawing Drawing Diameter Dimension Dimension Thread 5.9-0.02/-0.08MM 0.45+0.05/-0MM 5.5+0.02/-0.05 #6-32 Caliper Micrometer Projector Thread Guage ( GO OR NO GO) 30 pcs Refer to SOP First piece inspection Cosmetic Drawing N/A N/A Cosmetic Length N/A Per in-process inspection items No gloss,burr ,scratch 5.2+0.02/-0.05MM Visual Fixture/Visual/HG Visual Caliper one time 1 SHOT Per Shift Each set-up Once per 2 hous Once per 2 hous Once per 2 hous Once per 2 hous Once per 2 hous Once per 2 hous PER SOP PER SOP Visual Measure Measure Measure Measure Measure N/A N/A N/A N/A N/A N/A N/A N/A If defect occur,technician must adjust the lathe or stop lathe running then operator 100% inspection , Advise lathe setter correct and audit parts C,D C,D C,D C,D C,D C,D C,D C,D
OPERATION:HEAT TREATMENT 1 let oil out of standoff, after cleanup about 10 minutes by kerosene Cleanout N/A N/A N/A N/A N/A N/A N/A A,D
FMQAI-019-F2.01
Page 22 of 32
No.
Phase of Production
Chart No.
Process Parameters
Measurement Method
Analysis Methods
Cpk
Control Location
1.temperature between 870880, permeate carbon time is about 45~50 minutes; 2.Adjust the steel band`s rotate speed,request the rotate speed is 550 rorates/1 hour 3.toluene flux 0.61ml/minute
permeate carbon
hardness HV 500~600
Hardness tester
2 pcs
each lot
PER SOP
N/A
A,D
Heat equipment 3
Quench
Visual
Once
each lot
N/A
A,D
backfire
Case hardness meet sepc. HV:250-350 and core hardness: HRC 23 MAX
Hardness tester
5 pcs
each lot
Ref SOP
N/A
A,D
hardness
Hardness tester
5 pcs
each lot
Ref SOP
N/A
A,D
OPERATION: PLATING
1 Include: 1. Rubbing degrease: natural temperature, time 20~25 minutes 2. Electrolysis degrease: temperature between 50~60, time 15~20 minute; water Hydrochloric acid concentration is about 30% water NOTE #9 temperature 80, more than 2 hours temperature 190, 3 hours within 4 hours after plating N/A N/A white temperature 60-80, 5-10 minutes temperature 80, more than 2 hours N/A Receiving inspection NO BURR,SCRATCH Visual
Sampling plan
Visual
N/A
return to supplier
A,D
Degrease
Visual
once
each lot
Visual
N/A
ADJUST MACHINE
A,D
once once once 100% 100% once once once 100% 100% Sampling plan
each lot each lot each lot EVERY PIECE EVERY PIECE each lot each lot each lot EVERY PIECE EVERY PIECE AQL 0.65
Visual Visual Visual Visual Visual Visual Visual Visual Visual Visual Visual /Measure
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
rework rework rework rework Rwork Rework N/A rework rework N/A N/A
A,D A,D A,D A,D A,D A,D A,D A,D A,D A,D A,D
no smudginess, Second Cleanout inclusion natural temperature Plating 45 minutes temperature and time First baking control Hydrogen enbrittlement temperature and time relief control refrigeration Second Activation Pigmentation Second drying Comstic and film thickness inspection N/A N/A
No Visual Discoloration,Gloss temperature and time Visual control No Discoloration,Gloss Visual /Film film thickness 3~5m thickness tester
FMQAI-019-F2.01
Page 23 of 32
No. 5
Chart No. 2
Cpk
Reaction If Out of Control If GO or NO GO test fail, then inspector 100% inspection. If defected rate out of AQL, return to plating supplier, if defect rate within AQL,sorting out defective parts If defected rate out of AQL, return to plating supplier, if defect rate within AQL,sorting out defective parts If defected occur, inspector must 100% inspection If defected occur, then inspector must 100% inspection If defected occur, then inspector must 100% inspection If hardness out of spec second, the lot must scrap immediate. If defected occur first, the lot return to supplier to rework. If hardness out of spec second, the lot must scrap immediate. If defected occur first, the lot return to supplier to rework. Scrap If GO or NO GO test fail, then inspector 100% inspection. Retrain operator on packaing procedure Retrain operator on packaing procedure Retrain operator on packaing procedure Retrain operator on transfer procedure
Control Location F
N/A
White Zinc
Color
No Discolortion,Gloss
Visual
Every piece
Visual
N/A
drawing
Length
5.2+0.05/-0.05MM
Caliper
AQL 0.65
Measure
N/A
drawing
Diameter
5.9+0/-0.08MM
Caliper
AQL 0.65
Measure
N/A
drawing
Diameter
0.45+0.05/-0MM
Micrometer
AQL 0.65
Measure
N/A
Drawing notes #1
Case Hardness
HV:250-350
Hardness tester
5 PCS
each lot
Measure
N/A
Drawing notes #1
Core Hardness
HRC 23 MAX
Hardness tester
5 PCS
each lot
Measure
N/A
8 9
Measure Measure
N/A N/A
F F
OPERATION: PACKAGING
1 7 Packaging N/A 2 3 Quantity Material Methods Quantity Material Methods PER SOP PER SOP PER SOP Visual Visual Visual 100% 100% 100% Every piece Every piece Every piece Pack inspection Pack inspection Pack inspection N/A N/A N/A D D D
OPERATION:STOCK
8 Move next process or stock 1 Handling Handling PER SOP Visual one time/per shift Each lot PER SOP N/A D
END
FMQAI-019-F2.01
Page 24 of 32
Part Number: FGN00004996-100 Part Description: S26 FAN FIX BRKT STANDOFF Part Revision: 02
1/10/2005 N/A
7 3
25 of 32
Part Number: FGN00004996-100 Part Description: S26 FAN FIX BRKT STANDOFF Part Revision: 02
1/10/2005 N/A
26 of 32
27 of 32
Part Number: FGN00004996-100 Part Description: S26 FAN FIX BRKT STANDOFF Part Revision: 02
1/10/2005 N/A
1 of 1
1 of 1