Vous êtes sur la page 1sur 104

PSZ 19:16 (Pind.

1/07)

UNIVERSITI TEKNOLOGI MALAYSIA


DECLARATION OF THESIS / UNDERGRADUATE PROJECT PAPER AND COPYRIGHT

Authors full name : Date of birth Title : :

AHMAD FAISHAL BIN AHMAD RAZALI 24 OCTOBER 1986 LIFT CONTROL BY USING PROGRAMMABLE LOGIC CONTROLLER (PLC) FOR STUDENTS KITS

Academic Session:

2008/2009 2

I declare that this thesis is classified as :

CONFIDENTIAL RESTRICTED OPEN ACCESS

(Contains confidential information under the Official Secret Act 1972)* (Contains restricted information as specified by the organisation where research was done)* I agree that my thesis to be published as online open access (full text)

I acknowledged that Universiti Teknologi Malaysia reserves the right as follows : 1. The thesis is the property of Universiti Teknologi Malaysia. 2. The Library of Universiti Teknologi Malaysia has the right to make copies for the purpose of research only. 3. The Library has the right to make copies of the thesis for academic exchange. Certified by :

SIGNATURE (NEW IC NO. /PASSPORT NO.)

SIGNATURE OF SUPERVISOR NAME OF SUPERVISOR

861024-29-5443
Date :

ENCIK SHUKRI BIN ABD MANAF


Date :

12 MAY 2009

12 MAY 2009

NOTES :

If the thesis is CONFIDENTIAL or RESTRICTED, please attach with the letter from the organisation with period and reasons for confidentiality or restriction.

I declare that I have read this project report and in my opinion this project report is sufficient in terms of scope and quality for the award of Bachelors Degree of Electrical Engineering (Instrumentation & Control).

Signature Supervisor Date

: : :

.......................................................... ENCIK SHUKRI BIN ABD MANAF 12 MAY 2009

LIFT CONTROL BY USING PROGRAMMABLE LOGIC CONTROLLER (PLC) FOR STUDENTS KITS

AHMAD FAISHAL BIN AHMAD RAZALI

Submitted to the Faculty of Electrical Engineering in partial fulfillment of the requirement for the degree of Bachelor of Electrical Engineering (Instrumentation & Control) Faculty of Electrical Engineering Universiti Teknologi Malaysia

APRIL 2009

ii

Hereby, I declare that this thesis entitled LIFT CONTROL BY USING PLC FOR STUDENTS KITS is the results of my own research except as cited in the references. The project report has not been accepted for any degree and is not concurrently submitted in candidature of any other degree.

Signature Name Date

: : :

................................................ AHMAD FAISHAL BIN AHMAD RAZALI 12 MAY 2009

iii

Selawat dan Salam ke atas Rasul Junjungan

NABI MUHAMMAD S.A.W.

Untuk Ayah dan Ibu Tersayang

AHMAD RAZALI BIN YAACOB & SITI FATIMAH BINTI YAACOB


iv

ACKNOWLEDGEMENT

Assalamualaikum, greatfull to Allah because of His permission I can finish my final year project successfull. Special thanks to my committed supervisor, Encik Shukri Bin Abd Manaf for his guidance, ideas and help throughout this project progress.

My appreciation also goes to my family who just not give the contribution from their helps, but also to support me troughout this project progress. Also thanks for their encouragement, caring and spirit that has be given to me.

Besides, dont forget for my friends, Amer Hamzah who just not give an idea and helpess for me but also his support to finish this project. Also for Process Control Assistant, Encik Hazrul for his help to supply me with the equipment.

Nevertheless, my appreciation to my coursemate who are give me the information that I have to know and all the people who are involve for this project either directly or indirectly. Thank you so much..

ABSTRACT

Elevator is one of the system which can be controlled by programmable logic controller,PLC. Elevator was build to help the people to moving from one floor to another without consume a lot of people energy. Besides, its also are used to move the goods or even the car upward or downward in a few application. Its system have a few basic operation with a few extra operation to make the system more reliable, efficient and safe to used. There are two types of elevator depending on its application and its place installed which is hydraulic and cable lifted elevator. The programmable logic controller, PLC is the one of the best controller to handling this system operation due to its reliable system. The signal use in PLC is a digital signal and the in some system, it is a analog signal. So, the input of PLC will change the type of signal first to the suitable form of signal in PLC. It will implement some range of analog signal to logic one in digital form and implement the logic zero for the other range. In order to operate the system, the program that was entring by the user will execute when the instruction is obey by the system situation and send the signal output to operate some operation depending on the program installed. Therefore, all the system operation will be controlled according to the sequence of the program.

vi

TABLE OF CONTENT

CHAPTER

TITLE
DECLARATION OF THESIS DEDICATION ACKNOWLEDGMENT ABSTRACT TABLE OF CONTENT LIST OF TABLES LIST OF FIGURES LIST OF SYMBOLS LIST OF APPENDICES

PAGE
ii iii iv v vi x xi xiv xv

INTRODUCTION

1.1. History of Elevator

1.2. Elevator

1.3. Problems Statement

1.4. Objective of the Project

vii

1.5. Scope of Project

10

LITERATURE REVIEW

2.1. De-Lorenzo Model

12

2.2. Types of Elevator

14

2.2.1. Hydraulic Elevator

14

2.2.2. Cabled-Lifted Elevator

19

2.3. Balance

22

2.4. Safety

23

2.5. Lift Pulley system

25

2.6. Multiple Pulley

26

2.7. Power Flow Through Typical Elevator

27

2.8. Elevator Operation State

31

2.9. Elevator Motor Drive

32

2.10. AC vs Dc Drive efficiency

34

viii

2.11. Programmable Logic Controller, PLC

35

METHODOLOGY

3.1. Introduction

42

3.2. Hardware Implementation

43

3.2.1.

Pulley System

44

3.2.2.

Sensor

45

3.2.3.

Sliding Door

46

3.2.4.

DC Geared Motor

47

3.2.5.

Relay

51

3.2.6.

OMRON PLC

53

3.2.7.

Others Component

54

3.3. Softwae Implementation

3.3.1.

State Diagram

56

3.3.2.

Ladder Diagram

58

ix

RESULT AND DISCUSSION

4.1. Introduction

59

4.2. Result 4.2.1. Hardware Result

60 60

4.2.2.

Programming Result

63

4.2.2.1.

Up and Down operation 63

4.2.2.2. 4.3

Open and Close door

72 76

Discussion

5.

CONCLUSION

5.1. Conclusion 5.2. Problems 5.3. Recommendation

78 79 80

REFERENCE

APPENDICE A APPENDICE

LIST OF TABLE

TABLE

TITLE

PAGE

Table 3.2(a)

DC Geared Motor SPG 50 specification

48

Table 3.2(b)

DC Geared Motor SPG 20 specifcation

50

xi

LIST OF FIGURE

FIGURE

TITLE

PAGE

1.2(a) 2.2(a) 2.2(b) 2.3(a)

Elevator Hydraulic Rams Two Hydraulic Rams Empty Car Occupied Car Centrifugal Governor Multiple Pulley Force on Pulley Pulley system implementation PLC Design Ladder diagram input symbols Ladder diagram output symbols Sequental function chart PLC process diagram Pulley system Double side pulley Limit switch

4 16 17 23 23 24 27 29 30 36 38 39 40 43 44 45 45

2.3(b) 2.4(a) 2.6(a) 2.7(a) 2.7(b) 2.11(a) 2.11(b) 2.11(c) 2.11(d) 3.1(a) 3.2(a) 3.2(b)
3.2(c)

xii

3.2(d) 3.2(e) 3.2(f) 3.2(g) 3.2(h) 3.2(i) 3.2(j) 3.2(k) 3.2(l) 3.2(m) 3.3(a) 3.3(b) 4.2(a) 4.2(b) 4.2(c) 4.2(d) 4.2(e) 4.2(f) 4.2(g) 4.2(h) 4.2(i) 4.2(j) 4.2(k) 4.2(l)

Level sensor implementation Sliding door implementation DC Geared Motor SPG 50 Motor Up/Down implementation DC Geared Motor SPG 20 Open/Close door motor implementation Relay Relay circuit OMRON PLC Counterweight CX-Programmer software CX Progrmmer ladder diagram Transition State Final State Basement Level Request from level three State R3 operation State R4 detected Motor Up/Down off Motor down on State R14 detected Motor down off Door open operate Timer count

46 47 48 49 49 50 51 52 53 54 55 58 61 62 63 64 65 66 67 69 70 71 72 73

xiii

4.2(m) 4.2(n) 4.3(a) 4.3(b)

Door close operate Sensor Close detected Normally open Normally close

74 75 77 77

xiv

LIST OF SYMBOLS

P I V T

Power Current Voltage Torque Rotational Speed Force Weight Elevator Counterweight Door Open Sensor Open Open Stop Timer Door Close Sensor Close Close Stop Switch Up Switch Down Call Button State Door operation Motor Up Motor Down

F We Wc DO SO OS T DC SC CS SU SD CB R D MU MD

xv

LIST OF APPENDICES

APPENDIX

TITLE

PAGE

Elevator Motor from the Reuland company

83

The Project Model

86

CHAPTER 1

INTRODUCTION

1.1.

HISTORY OF ELEVATOR

The elevator was first developed during 1800s and relied on steam or hydraulic plungers for lifting capability. After that, the cab was affixed to a hollow plunger that lowered into an underground cylinder. Liquid, most commonly water, was injected into the cylinder to create pressure and make the plunger elevate the cab.

The power elevator debuted mid-19th century in the U.S as simple freight hoist operating between just two floor in a New York City building. By 1853, Elisha Graves Otis was at the New York Crystal Palace exposition, demonstrating an elevator with a safety to break the cabs fall in case of rope failure, a defining moment in elevator development. By 1857, the countrys first Otis passenger elevator was in operation at a New York City department store.

Later, in the 1800s, with the advent of electricity, the electric motor was integrated into elevator technology by German inventor Werner von Siemens. With the motor mounted at the bottom af the cab, this design employed a gearing scheme to climb shaft walls fitted with racks. In 1887, an electric elevator ws developed i n Baltimore, using a revolving drum to wind the hoisting rope, but these drums could not practically be made large enough to store the long hoisting ropes that would be required by skyscrapers. Motor technology and control methods evolved rapidly. In 1889 came the direct-connected geared electric elevator, allowing for the building of significantly taller structures. By 1903, this design had evolved into the gearless traction electric elevator, allowing hundred-plus story buildings to become possible and forever changing the urban landscape. Multi-speed motors replaced the original single-speed models to help with landing-leveling and smoother overall operation. Electromagnet technology replaced manual rope-driven switching and braking. Pushbutton controls and various complex signal systems modernized the elevator even further. Safety improvements have been continual, including a notable development by Charles Otis, son of original "safety" inventor Elisha, that engaged the "safety" at any excessive speed, even if the hoisting rope remained intact.

1.2.

ELEVATOR

A lift known throughout the world is known as an elevator in the United States. An elevator or lift is a transport device used to move goods or people vertically, from one floor to another. The elevator turns electrical power into

mechanical(rotational) power. The elevator must pick up and drop off passenger as efficiently as possible. If collection of elevator is used, a complex controller usually controls them. There are many type of elevator or lift depending on the uses of it but they all work in the same way. These are passenger elevator, freight elevator, vehicle elevator, boat elevator, aircraft elevator, dumbwaiter, paternoster and others.

A lift/ elevator is made up of 4 major components. The lift/elevator cab or platform, the shaft or hoistway, the drive system and the counterweight. The cab is moved vertically using either hydraulic piston or a pulley system. The weight of the cab is balanced by counterweights so that the drive system uses minimal energy.

The elevator must fit within the given space requirements of the building. It must be made large enough to deal with the normal daily traffic and to move the necessary objects within the building. It cannot be made too large and, therefore, affect the structure of the building itself. Possible restrictions on the weight carried within the elevator may be determined from the size of the motor and the other components within the elevator system. This weight limit must be large enough to handle daily usage.

Figure 1.2(a): Elevator

1.2.1.

USES OF ELEVATOR

a) Passenger Elevator

Designed to move the people between a buildings floors. Passenger elevators capacity is related to the available floor space. Generally, it capacities from 1,000 to 6,000 lb(455-2,727 kg) in 500 lb(230kg) increments.

Usually, for eight floors or less buildings, hydraulic or electric are used with speeds up to 200 ft/min(hydraulic) and up to 500 ft/min(electric). But for buildings up to ten floors, electric and gearless elevator are used with speeds up to 500 ft/min, and for ten floors above, speeds begin at 500 ft/min up to 2000 ft/min.

Sometimes, it is used as a city transport along with funiculars.

b) Freight Elevator

Designed to carry goods rahter than passengers. Often exempt from some code requirements anf from some of the requirements for fire service. Generally, it required to display a written notice in the car that the use by passengers is prohibited, though certain freight elevator allow dual use through the use of an inconspicious riser.

It is typically larger and capable of carrying heavier loads than a passenger elevator, generally from 2,300 to 4,500 kg.

c) Vehicle Elevators

It is installed where ramps are considered space-inconservative for smaller buildings(ususally in apartment building where frequent access is not an issue).

The car platforms are raised and lowered hydraulically and are connected to chained steel gears. The platform also can rotate about its vertical axis (up to 180 degrees) to ease driver access and accomodate building plans.

d) Boat Elevator

Used in some smaller canals. The boats and small ships can pass between different levels of a canals with a boat lift rather than through a canal lock.

e) Aircraft Elevator

It carry aircraft between the flight deck and the hangar deck for operations or repairs. It is designed for much greater capacity than any other elevator ever build, up to 200,000 pounds of aircraft and equipment. Smaller elevators lift munitions to the flight deck from magazines deep inside the ship.

f) Dumbwaiter

Often used for the moving of small items such as dishes in a 2-story kitchen or books in a multistory rack assembly Modern dumbwaiters are generally driven by a small electric motor with a counterweight and their capacity is limited to about 750 lb (340 kg).

Dumbwaiters are used extensively in the restaurant business (hence the name) and may also be used as book lifts in libraries, or to transport mail or similar items in an office tower.

Dumbwaiters, especially older ones, may also be hand operated using a roped pulley.

g) Paternoster

It is a constantly moving chain boxes. A similar concept moves only a small platform, which the rider mounts while using a handhold and was once seen in multi-story industrial plants.

1.3

PROBLEMS STATEMENT

1.

The existing model by De-Lorenzo use a lot of motor in order to operate the door. It is consist of outside door motor and inside door motor. Each level have its own motor to open and close the outside door. Therefore, if they have 3 level, they needs 3 motor just for operation of outside door without take calculation for other use. The other motor that they use is for inside door and for lift up and down the cab. So, they use 5 motor in that system which is take more cost.

2. The existing model also not implemented in suitable pulley system. They use simple types of combination pulley which is not having so much advantage. That pulley system needs more energy or power in order to lift up and down the cab.

3. Another problems is, the existing model have limiting level especially in De Lorenzo model. By this problems, we cant see the priority of the level in operation time. In case whenever the cab at the lowers level and there is signal or call at level 3 and level 5, we can see that it will stop at level 3 fist before continue to level 5. But for the model where having 3 level, there is limited to see the cab stop at differential level higher than one.

1.4.

OBJECTIVE OF THE PROJECT

There are two objective of my project which is:

1. To create the model lift controlled by Programmable Logic Control (PLC). This system is just one of any other system which is attend to be controlled by PLC to give the overview about what the PLC can do in any system which is related with our daily life. Automatically, we can see the important use of PLC in its operation.

2. The other one objective of this project is to create the training kits for students to give the overview about the real lift operation. Besides, its just not give them overview about the lift operation, but they also can learn about PLC, how to setup the system with PLC, how to programming the PLC and others. Therefore, the students can get a lot of benefits for their knowledge with this training kits.

10

1.5.

SCOPE OF THE PROJECT

The scope of this project involve a mechanical systems, electrical systems and some programming. There is a lot of combination of electrical and mechanical parts that are involved compare to the programming because this project is about create the hardware. The scope of this projects are:

1) Build the lift/ elevator prototypes. The mechanical systems play the important role in order to build the frame/ body for this project. This body must have the suitable measurement so that it will have the stability and strong supporting base. It cant be very high or low because it will effect its stability and the supporting base must be breadth enough to support the lift structure. Besides, this base also will provide the space for system connection with PLC and the system circuit.

2) Implement the suitable system. The suitable system is focusing on its pulley system in order to lift up and down the cab so that it will reduce the energy and power consumed for that system.

11

3) Controlling the lift operation by PLC programming. The brand of PLC that will be used for this is project is OMRON PLC. This PLC can be programmed by CX-programming software. All the lift/ elevator operation will be depend on this programe and the error of its operation will be adjust in this programming. Automatically, the students will get the knowledge about PLC programming whenever they use this system kits.

4) Make the circuit connection for the components in the system with PLC device. The components of this systems would be all the sensor use, motor, LED indicator, switch and others. By this scope, it involve understanding of power consumed for each components use and the method for connection with PLC.

CHAPTER 2

LITERATURE REVIEW

2.1

DE-LORENZO MODEL

13

The De-Lorenzo model [12] consist of real three-stop scaled down lift and allows an innovative approach to PLC control and management. The model includes:

Lift car up-down and position visual signalling at each floor Booking to be effected through buttons with flashing signaling, on priority basis and indepedently from the lift car position. Lift car geared motor, hoist and electromagnetic brake floor, safety and lift car deceleration limit switch. Lift car and floor door open-shut motors. Motor protection thermal relays simulated by buttons Lift car deceleration, either up and down, near the stop floor Reproduction of the inside lift car switch panel Installation graph on the panel Connection to PLC through terminals or connection Fault simulator through microswitch Power supply, single phase from mains Complete with connection cables

14

2.2.

TYPES OF ELEVATOR

There are two main types of elevator which is hyraulic elevator and cable lifted elevator. One of the different between these two types is the method which it is lifted and the system that it is used. For the hydraulic elevator, it is lifted from below by a long metal shaft but for the cable lifted elevator, it is pulled up from above by a long metal cable. The detail about these types of elevator are:

2.2.1. Hydraulic Elevators

The car/ cab of this types of elevator is lifted from below by a hydraulic ram which is a long piston that is driven into or out of a hollow cylinder by pressure in a hydraulic fluid as shown in figure 2.2(a) below. Usually, this fluid is oil or water, exerts a force on any surface it touches including the base of piston. According to John Willey & Sons [1],Whenever the pressure in this hydraulic fluid is high enough, the force it exerts on the base of the piston will exceed the weight of the piston and elevator car. Then, it will make the car elevator accelerate upward. As the piston rises, the hydraulic fluid has more space to fill and its pressure drops. In order to keep this piston moving upward, there must be something to continuously add high pressure hydraulic fluid to the cylinder. This necessity is usually an electrical powered pump.

15

It will draws low pressure hydraulic fluid from a reservoir and pumps it into the cylinder. This pump will work on the fluid and make the elevator car lift.

When the elevator car has reached certain height, the pump stops and the piston rests on the high pressure hydraulic fluid beneath it. As long as the amount of this fluid is doesnt change, the piston and car will stay where the passenger gettin gon and off. In order to descend, the elevator opens a valve and permits the heigh pressure hydraulic flu id to return to the low pressure reservoir. The fluid in the cylinder has considerable pressure potential energy and that energy must go somewhere. As it flows through the valve, the fluid accelerates and it rushes into the reservoir at high speed. But its kinetic energy soon becomes thermal energy as the fluid swirls around randomly. When the swirling has stopped, the fluid in the reservoir will be warmer than it was before the elevator made its trip up and down. The hydraulic elevator is naturally safe. Even if the cylinder springs a leak, the hydraulic fluid will probably not flow out of the cylinder fast enough for the car to descend at dengeroud speed. a hydraulic ram encounters very little friction and wear, so its piston can move in or out of the cylinder rapidly.

16

Figure 2.2(a): Hydraulic rams

To see how this mechanical advantage works, suppose that you have two hydraulic rams connected by a hose so that hydraulic fluid can flow freely from one cylinder to the other, figure 2.2(b). One hydraulic ram is much wider than the other. Since fluid accelerates toward lower pressure, the pressures in the two cylinders will tend to equalize. This pressure exerts an upward force on each piston equal to the pressure times the surface area of that piston. As a result, the upward force on the wide piston is enough to support the weight of an elevator car while the upward force on the narrow piston is only enough to support the weight of your hand. As things stand, neither the elevator nor your hand move because each is supported by pressure in the hydraulic fluid.

17

Now imagine that we begin to push down a little harder on the narrow piston. The pressure inside that cylinder rises in order to exert an equal but oppositely directed force on our hand. Because of the pressure imbalance, fluid begins to flow out of the narrow cylinder and into the wide cylinder. With less fluid in the narrow cylinder, its piston descends and our hand moves downward.

With more fluid in the wide cylinder, its piston rises and the elevator car move upward. We are raising a heavy elevator with a hand pump. Pushing the narrow piston inward a long distance only squeezes a modest amount of fluid into the wide cylinder. The wide piston moves upward only a very short distance. We have produced a huge upward force on the elevator and lifted it a short distance by exerting a modest downward force on the narrow piston and moving it downward a very long distance. The work we do on the fluid is equal to the work the fluid does on the elevator car. Energy is conserved, as it must be.

Figure 2.2(b): Two Hydraulic rams

18

The piston of the narrow cylinder will reach the bottom long before the elevator reaches the second floor. To make a more practical hand-powered elevator, we would need to add several one-way valves and a fluid reservoir to the narrow cylinder and convert it into a proper pump. That way we could slowly raise the elevator upward, with ever so many cycles of the pump, fill the narrow cylinder with fluid and then squeeze it into the wide cylinder, fill the narrow cylinder with fluid, and so on. To return the wide piston to its original position and lower the elevator, a bypass valve should allow the hydraulic fluid to flow back into the fluid reservoir. Eventhough the hydraulic elevators are wonderful in many situations, they do have at least two drawbacks which is stated by John Willey & Sons[1]. First, a hydraulic elevator is only as tall as its piston and cylinder. The piston has to reach all the way to the top floor and the equally tall cylinder must be hidden below the ground. Burying the cylinder is quite a procedure in a tall build. A deep hole must be drilled and the cylinder must be lowered into the hole with a crane. The difficulties involved in manufacturing the cylinder and piston and in assembling the completed hydraulic ram limit itsheight. However, some hydraulic elevators are over 30 stories tall.The other deficiency of hydraulic elevators is that there is no mechanism forstoring energy between trips. The energy expended in lifting people up 30 floors is not saved as those people descend. It becomes thermal energy in the hydraulic fluid as the hydraulic fluid returns to the reservoir. For a tall building with lots of up and down traffic, the elevator can turn a lot of electric energy into thermal energy in the hydraulic fluid.

19

2.2.2. Cabled-Lifted Elevator

In further imrpovement for the safety, the ropes used to lift early elevators were replaced with metal cables which were less prone to wear and aging and make cable failure a rare event. With the safety no longer an issue, cable-lifted elevator soon became the dominant form of elevator. True cable-lifted elevators resemble the hand-powered one we have just discussed, except that machines pull the cables. In early cable-lifted elevators, the cables were pulled by steam-powered hydraulic rams. Steam was used to pump fluid into or out of the ram and the rams movement was used to pull the cables. Usually, the ram was used to separate the two halves of a multiplepulley. The cable coming out of this multiple pulley ran over a pulley at the top of the elevator shaft and down to the elevator car itself. As the two halves of the multiple pulleys were drawn apart, they drew in more cable and lifted the elevator car. As fluid was released from the hydraulic ram, the multiple pulley released cable and the elevator car descended. The first improvement that appeared in cable-lifted elevators was the counterweight. Lifting the elevator car by itself requires a considerable amount of work because the cars gravitational potential energy increases as it rises. It would be nice to get back this stored energy when the car descends. Unfortunately, its hard to turn gravitational potential energy back into highpressure steam. However, its possible to use that energy to lift a counterweight. The counterweight in an elevator descends when the car rises and rises when the car descends. Because the two objects have similar masses, the total amount of mass that is rising or falling as the elevator moves is almost zero. The overall gravitational potential energy of the elevator is not changing very much; its simply moving around between the various parts of the machine.

20

The counterweight balances the car so that it takes very little power to move the system. The elevator and counterweight resemble a balanced seesaw, which requires only a tiny push to make it move. The counterweight on most elevators hangs from its own cable attached to the elevator car. That cable travels from the car, over pulleys at the top of the elevator shaft, and down to the counterweight. As stated by John Willey and Sons [1], the counterweight is usually equalto the mass of the empty elevator car plus about 40% of the elevators rated load. Thus, when the elevator is 40% filled, the counterweight will exactly balance thecar and very little work will be done in raising or lowering the car. Most modern elevators are driven by electric motors. The advantages of electric motors are their variable speeds of rotation, high torque, and reliability. While we will save our discussion of electric motors for a later chapter, we will note here that electric motors can be made to operate efficiently at many rotational speeds, torques, and overall power-levels. The output power of an electric motor is frequently rated in horsepower and the motors used in elevators may be as large as several hundred horsepower. Because early electric motors could not deliver so much mechanical power, the first electric elevators used winches to lift their elevator cars. The cable from the elevator car was actually wound up on a drum at the top of the elevator shaft. The counterweight was attached to a cable that was also wound on the drum. The two cables were arranged so that the counterweight cable unwound as the car cable wound up. An electric motor used gears to turn the drum. This winch mechanism had a number of disadvantages. It raised or lowered the car relatively slowly because the gearing limited the rate at which the drum could be turned. The

21

overall height of the elevator was limited because the drum had to be able to hold all of the cable when the elevator was at the top of its travel. The diameter of the drum was constrained by the need to keep torques low and only about 100 m of cable could be accommodated. Instead of winding and unwinding cable from a drum, most modern elevators use traction to draw a cable over a drum. The cable rises from the elevator car, travels over the traction drive drum and then descends into the elevator shaft where its attached to the counterweight. An electric motor turns the traction drive drum. When high speed is not important, the drum can be turned by a small motor through the use of gears. However, in tall buildings, the drum is usually turned directly by a large motor. Elevators of this type can run at speeds as high as 10 m/s (22 mph) in buildings of any height. The mechanical power required from the drive motor depends on how well balanced the car and counterweight are. If the elevator car is loaded to 40% of capacity so that the two weights are balanced, the motor will have little difficulty in moving the car up or down. If the car is particularly empty or particularly full, the motor will have to provide considerable mechanical power when lifting the heavy side of the system and various brakes will have to absorb energy released by the elevator when the heavy side descends. The motors maximum mechanical power, together with the strength of the cables, limits how much weight the elevator can lift. In many freight elevators, the car is lifted by a multiple pulley so that a single segment of cable doesnt have to support the entire load. Even when a single pulley is used, several separate cables support the car, both for safety and to reduce cable stretching. Cable stretching is a serious problem in tall elevators. Tension always tends to pull things apart, so a cable becomes longer. Like most objects, a cable behaves as a spring when its subject to tension. Its length increases by an amount

22

proportional to the tension it experiences. As people enter the elevator car and its total weight increases, the tension on its support cable increases and that cable stretches slightly. Modern elevators are equipped with automatic leveling systems that turn the traction drum to make up for the stretching of the cables. The passengers are unaware of this careful adjustment taking place as they step on or off the elevator. Nonetheless, we may be able to feel the cable stretch if you bounce up and down on a cable-lifted elevator.

2.3.

BALANCE

According to John Willey & Sons [1], the elevator cars must remain level no matter where the passengers choose to stand. The only way to keep the car level is to make it run along a vertical track. To see why the track is necessary, consider the case of an empty car, figure 2.3(a). The lifting force on the car is exerted at the middle of the elevator car, at either its top or its bottom. The center of mass of the empty car is also at the middle of the elevator car so the lifting force exerts no torque on the car about its center of mass. The car remains level. Now consider what happens when passengers enter the car and begin to walk around inside, figure 2.3(b). The center of mass of the car moves with the people inside. Now the lifting force exerts a torque on the car about its new center of mass and it tends to rotate. The best way to prevent the car from tilting is to confine the car on a track. The rails of the track exert the torques needed to keep the car level.

23

Figure 2.3(a): Empty car

Figure 2.3(b): Occupied car

2.4.

SAFETY

All cable-lifted elevators have safety devices to keep them from falling if their cables break. Most modern elevators have more than one lifting cable, but they still require mechanisms to ensure that there are no accidents. The original safety device that Otis developed for his first elevators had jaws that would grab onto the rails of the elevator track if there were a loss of tension in the supporting cable. If the cable broke and its tension vanished, springs would force the jaws into the track. Modern elevators use mechanisms that monitor the vertical speed of the elevator. If the speed exceeds a certain permissible value, brakes on the car grab the tracks. This speed control prevents a nearly empty elevator from moving

24

upward too quickly just as it prevents a full elevator from falling. One such speed-sensing device is the centrifugal governor, a mechanism that senses how quickly a shaft is turning. This is shown in figure 2.4(a) below. When its used with an elevator, the shaft is turned by a pulley on a special cable attached to the elevator car. The faster the elevator moves, the faster the shaft turns. The centrifugal governor swings several masses around in a circle. Since the masses travel in uniform circular motion, they need some centripetal force to accelerate them toward the center of the circle. In the centrifugal governor, this centripetal force is exerted by several rods that are held apart by a spring. As long as the shaft is turning slowly, the spring can keep the rods from moving together. But when the shaft is turning quickly, the centripetal force becomes very large and the rods compress the spring. As the rods move, they push on a lever. In the case of the elevator, this lever activates brakes that slow the elevator down.

Figure 2.4(a): Centrifugal governor

25

A centrifugal governer uses the principle that a central force is required to accelerate masses around in a circle. As long as the shaft is stopped or spinning slowly, the spring can keep the upper and lower rods apart. But once the shaft spins too quickly, the masses swing outward and the sense lever is shifted.

2.5. LIFT PULLEY SYSTEM There are many ways to lift an object by using the pulley system. But, each method use have their own advantage compare with others. There are three types of pulleys which is a fixed pulley, a movable pulley and a combined(compound) pulley.

Fixed Pulley

Movable Pulley

Combined Pulley Combined Pulley

26

2.6.

MULTIPLE PULLEY

In a multiple-pulley, the cord goes back and forth between a fixed set of pulleys and a moving set of pulleys as shown in figure 2.6 (a). The far end is tied to one of the pulley sets. Its important that the cord pass easily over the pulleys. Now when you create tension in the cord, that same tension appears on every segment of cord between the two sets of pulleys. If you exert 500 N of force on the cord, each cord segment will have 500 N of tension. As a result, the two sets of pulleys will be pulled together with 500 N of force for each segment of cord connecting them. If there are 4 cord segments attached between the top of the elevator and the fifth floor, then the total lifting force on the elevator and bathtub will be 2000 N. Since the bathtub and elevator only weigh 1800 N, they will experience a net upward force and will accelerate upward. While it takes less force on the cord to lift the bathtub and elevator with a multiple pulley than with a single pulley, you dont get something for nothing. To lift the elevator 1 m, you must shorten each segment of cord by 1 m. Since there are 4 segments, you will have to pull 4 m of cord through the system of pulleys. You are obtaining mechanical advantage, using a modest force exerted over a long distance to obtain a larger force exerted over a shorter distance. The amount of work required to lift the bathtub and elevator to your apartment is the same, whether you use a single or multiple pulley. The multiple pulley merely allows you to do this work more gradually, with a smaller force exerted over a longer distance.

27

Figure 2.6(a): Multiple Pulley

2.7. POWER FLOW THROUGH A TYPCAL ELEVATOR:

The simplest theory of operation for pulley system assumes that the pulleys and lines are weightless and that there is no energy loss due to friction. Its also assumed that the lines do not stretch. In equilibrium, the total force on the pulley must be zero which is meana that the force on the axle of the pulley is shared equally by the two lines looping through the pulley.

28

The product of the weight lifted times the distance it is moved is equal to the product of the lifting force (the tension in the lifting line) times the distance the lifting line is moved. The advantage of the pulley system is defined as the weight lifted divided by the lifting force. There is a transfer of power throughout the elevator system. Electrical power put into the motor is equal to: (for an AC motor) (2.71)

This power is then transferred through the output of the motor shaft, (2.72) . Where T is the torque and is the rotational speed. Once the power is transferred through the gear reducer the output speed will be reduced and the torque will be greater. The overall power will be slightly lower as the system is not 100% efficient. Tension on the rope from the elevator pulley is equal to the weight of the elevator, We. The tension on the rope from the counter weight is Wc.

29

Figure 2.7(a): Force on Pulley

By refering to the figure 2.7(a), the analysis has been done by Rhonda Salzmon that conclude the force on the driving pulley is equal to the difference of the two exerted tensions on each side [2]. On one side, this force is equal to We and on the other side, it is Wc. Therefore, the net force exerted on pulley 1 (the drive pulley) is:

F = (We Wc) / 2

(2.73)

In order to find the power required for elevator movement, either the rotational speed of the drive shaft (attached to pulley 1) or the velocity of the elevator must be known. The output power is (assumming 100% efficiency),

30

(2.74)

where r is the radius of the pulley (pulley 1).

Figure 2.7(b): Pulley system implementation A roping system is used to attach the motor/gear reducer, the elevator car and the counter weight. There are many different kinds of arrangements that can be used. In one possible arrangement, such as shown in figure 2.7(b), both ends of the elevator rope are anchored to the overhead beam. Both the elevator car and the counter weight are attached to free moving pulleys. The traction drive is attached to a stationary pulley. The traction drive is the method of converting the input mechanical power (in this case the turning of a shaft) into useable mechanical power in the system (the vertical movement of the elevator). The friction between the ropes and the sheave grooves, which are cut on the pulley, initiates the traction force between the traction drive and the rope.

31

When the traction drive, rotated power is transferred from the traction drive to the elevator car and counter weight. Power is only needed to move the unbalanced load between the elevator and the counterweight.

2.8.

ELEVATOR OPERATION STATE

2.8.1 Single Elevator The elevator have three operation states generally. This states are normal mode, fire-protection mode anf maintenance mode. The most priority is depend on maintenance mode which have the ability to cancel all the operation. The second priority is considered to fire-protection mode where it will return to bottom floor or base immediately in case there is a fire accident. It will goes to normal mode when the fire switch for the fire-protection mode is reset. The basic task for the elevator control system as stated by X.Ying, Q.Zhu & H.Xu [3] is to command the elevator to move up or down, to stop or start operation, and to open or close the door. However, for a few case it have some constraints for example in the case where there is a calling/requests from users in different level. The cab will visit the corresponding floor and the illumination is canceled when the corresponding floor is visited by the cab elevator. The common elevator has two buttons on the floor control panel except the first and the top floor to request either to go up or down level. The elevator cannot stop at a floor unless there is a request from the user. If there is no request, it will remains at its current floor with the close door.

32

2.8.2 Two Parallel Elevator

For this system, the basic operation is the same as the system for the single elevator, but it has the extra operation cause by the related operation of two elevator. The elevator will test if the stop is required or not depending on the request from the user. According to X.Ying,Q.Zhu & H.Xu [3], to balance the number of stops, the operation of two elevator will follow a certain dispatching principle. An elevator will not to stop at a floor if the another elevator was readily stop. In order word, it must be at least one elevator operate when the another elevator is at the stop operation. Besides, the first elevator will not to stop at the floor where the second elevator has been stopped. This level request will make the second elevator to be operate.

2.9.

ELEVATOR MOTOR DRIVE

The types of motor drive used in real elevator system is depend on its application. For the one to six storey buildings its often use hydraulic elevators. In this system, it have A/C motors connected to hydraulic pump and work similar to car lift at service station. For the low and mid rise buildings, it is most often use geared traction elevator systems. In this system, the motor drive used is either A/C motor or D/C motor that is connected to gearbox and then to a drive sheave that moves the cables.

33

2.9.1 D/C geared motor

For the geared D/C machine, it will typically use either Silicon Control Rectifier,SCR drive or Motor Generator Set,MGS. The MGS is the older technology used adn seldomto seen on new installation.

2.9.2 A/C geared motor

In other side, the geared A/C machine will use a Variable Voltage Variable Frequency,VVVF which can give precise elevator control. The example model of VVVF A/C geared motor can be refer to the Appendix A. The model is from Reuland Electric company. The Variable Frequency A/C drives can be divided into two categories which is inverter drives and flux vector drives. Inverter drives typically used for low speed and open loop application. The simplest types of this drives are non-regenerate, where it dont have teh ability to return regenerated energy back to the A/C line when overhauling. Regenerated energy must be dissipated across resistor in the form of heat. For the Flux vectoe drives, it is typically used for high performance and closed loop applications with speeds above 150 fpm. The standard os Flux vector drives is also non-regenerative. The resistor is required for dissipating regenerated energy. The gearless A/C or D/C machine is used on the most mid to high rise buildings. For this system, the motor has the drive sheave attached directly to the motors shaft. The drive systems used for this gearless machine is the same types as used in the geared machines. According to Motion Control Engineering Incorporated [4], in the most gearless applications, the best choice is D/C machine. However, if the D/C motor is damaged or defective, the replacing with an A/C motor will not result in improved performance.

34

For the A/C gearless applications, there are two major concern to drives the decision making process which is heat and cost.

2.10.

A/C vs D/C DRIVE EFFICIENCY

Generally, the A/C regenerated drives is the most efficient drive system. This is because the A/C regenerated drives has unity power factor under all operation conditions. For a non-regenerative A/C drive, it cannot return regenerated enery back to the A/C line when overhauling. Instead, this regenerated energy must be dissipared across resistor in the form of heat. As stated by Motion Control Engineering Incorporated [4], the D/C drives is more efficient compare to the A/C non regenerated due to the fact that all elevator D/C drives are regenerative which is capable of returning power back to the power line. Besides, the A/C non-regenerative drives dissipates regenerated energy in the form of heat into machine room environment. If the air conditioning equipment is needed to dissipate this energy, it will provide to the loss in efficiency. However, if it is seen by the issue of power factor, the A/C non-regenerative drive have a closer to the unity rather than D/C drive which is highly variable for the power factor. The amount of energy returned during regeneration increses in proportion to the machine efficiency whether it is a geared or gearless system. For a 30 Horse Power(30 HP) geared machine regenerated power amount, it could reach 9KW or more regenerative power in the form of heat at 64% efficiency. In other side, for the gearless machines, heat dissipation can easily exceed 16KW of regenerative power for 30 HP motor at 80-90 % efficiency.

35

2.11.

PROGRAMMABLE LOGIC CONTROLLER (PLC)

2.11.1.

Introduction

The first Programmable Logic Controller, PLC was developed by a group of engineers at General Motors in 1968. It was developed when that company were looking for an alternative to replace complex relay control system. The term programmable logic controller is defined by EN 61131-1 as a digitally operating electronic system which uses a programmable memory for the inernal storage of user-oriented instructions for implementing specific functions such as logic, sequencing, timing, counting and arithmetic to control through digital or analogue inputs and outputs, various machines or process. PLCs have been gaining popularity on the factory floor and will probably remain predominant for some time to come. The advantage of PLC as stated by Dr. Hisham El-Sherif [5] are: I. II. III. IV. V. Effective cost for controlling complex systems. Flexible and can be reapplied to control other systems quickly and easily. Computational ability allow more sophisticated control. Trouble shooting aids make programming easier and reduce downtime. Reliable components make these likely to operate for years before failure.

36

The PLC which is stated by Festo Didactic [5], is represents such a universal controller where it can be used for different applications and via the program installed in its memory, provides the user with a simple means of changing, extending and optimising control process.

The PLC has sizing into three categories which is small, medium, and large. The small PLC covers units with up to 128 inputs outputs, I/O and memories up to 2 Kbytes. This PLCs are capable of providing simple to advance levels or machine controls. The medium size have up to 2048 I/Os and memories up to 32 Kbytes. The larger PLC is the most sophisticated units of the PLC family. They have up to 8192 I/Os and memories up to 750 Kbytes. It can control individual production processes or entire plant.

2.11.2. Basic Design of PLC

Figure 2.11(a): PLC design

37

By refering to the programmaable logic controller, PLC design as shown in figure 2.11(a) above. The function of each components are:

Function: 1. Input Module Convert incoming signals into signal which can be processed by PLC and pass it to central control unit. 2. Output Module Perform a reverse task of input module. It converts the PLC signal into signal suitable for the actuators.

3. Central Control Unit -Process the signal accordiing to the program stored in memory. Its also provides intelligence to command and govern the activities of thenentire PLC systems. 4. PLC Program The desired program of sequence of operation and control instruction which is entered by programmer.

2.11.3. PLC Programming Language

The program of PLC can be created in various ways which is via assembler type commands in statement list (higher level), problems-oriented languages such as structured text or in the form of flow chart which represented by sequential function chart. The other programming language that be used are function block diagram based on function charts with graphic symbols and ladder diagram.

38

The function block diagrams is widely used in Europe and the ladder diagram is preferred language by users in America.

Ladder Diagram: Ladder diagram is the main programming method for PLC. It has been developed to mimic the relay logic. A relay is a simple device that use magnetic field to control a switch. When the voltage is supplied to input coil the resulting current will create a magnetic field. This magnetic field will attract a metal switch toward it and make it to contact the other part. This programming language is a computer program where the user can enter and change. For the logic input, there were three types of input. There are normally open, normally close and immediate input fuction,IIT. The IIT function allow inputs to be read after the input scan while the ladder logic is being scanned. The example of these ladder diagram is shown in the figure 2.11(b) below.

Figure 2.11(b): Ladder diagram input symbols

39

For the Ladder Logic Output, there are multiple types of outputs but there are not consistently available on all PLCs. Some of these output will externally connected to devices outside PLC but its also possible to use internal memory locations in the PLC. The figure 2.11(c) shows the six type of output which are normal output, normally on, one short relay (OSR), latch (L), unlatch (U) and the Immediate output (IOT).

Figure 2.11(c): Ladder diagram output symbols

40

Sequential Function Chart (SFC):

SFC have been developed to accomodate the programming of more advanced systems. It is similar to flowcharts but much more powerful. By referring to the instruction show by the figure 2.11(d), to read the chart, start at the top by says start. Below this, there is the double horizontal line that says follow both paths. The result for this instruction will make the PLC start to follow the branch on the left and right hand sides separately and simultaneously. For the left, there are two functions where the first is power up function and the second is power down. On the right hand side is the flash function that will be run until it is done. This method is different from flowcharts because it does not have to follow a single path through the flowchart.

Figure 2.11(d): Sequental function chart

41

Structured Text (ST):

Structure text programming has been developed as another modern programming language. It is quite similar to BASIC language. The example of this programming language is shown below. In this example, i is used as a PLC memory location for an integer. The RETURN is used to recall the value in location i. Then it will add by 1 and returns it to the same location. The next line will check to see if the loop should quit. If i is greater than or equal to 10, the loop will quit but otherwiae the program will go back to the REPEAT statement. Everytime the program goes through this loop, i will increase by 1 untill it reach the value of 10.

CHAPTER 3

METHODOLOGY

3.1

Introduction

Programmable Logic Controller (PLC) play an important function for this project to control its overall operation. These operation include the instruction for lift up/down and open/close door. Input from calling button and level sensor(limit switch) will feed into PLC input module. These input will be send to Central Processing Unit(CPU) inside PLC to process as required by instruction program. The instuction program will determine the sequence of operation. After being process by CPU, it will send the signal as the output to be feed to actuator like motor for this case. The process diagram is shown in figure 3.1(a) below.

43

Figure 3 3.1(a): PLC process dia C agram

3.2

Hardw ware Imple ementation

LIFT SR RUCTURE E

SENSO OR

PULLEY

SLIDING DOO OR

LEVEL SENSOR

COMBINE DPULL LEY

44

3.2.1

Pulley System

The types of pulley used is combined pulley. For this types, the two end joint will be hanging or fixed so that it will reduced the power or energy consumed to lift the cab. The figure and general mathematical model for this system is shown in figure 3.2(a) below:

Figure 3.2(a): Pulley system

Double side pulley was used for this project to provide stronger tied so that it can avoid the cab falling down when there is broke up on the rope. The second side pulley will cover the cab from falling down when the first side has the rope broken. The example is shown in figure 3(b) below.

45

Figure 3.2(b): Double side pulley

3.2.2

Sensor Level sensor was used for this project to detect the level arrived. This

sensor also functioning as the system input to tell the programmable logic controller(PLC) about the current situation of the system(cab position). The type of level sensor used for this purpose is limit switch. This is shown in figure 3.2(c) and the implementation of it is shown in figure 3.2(d) below.

Figure 3.2(c): Limit switch

46

Specification: a) Long lever with roller b) Lever length: 27.5mm c) Size: 10mm x 28mm x 16mm

Figure 3.2(d): Level sensor implementation 3.2.3 Sliding Door There are a several components used for this part. The component used for real sliding door is not provided for prototype uses. Therefore the implementation for this part come from my creativity that i have so that it will operate like real sliding door operation. The components used are nilon rope, holding metal, roller, dc geared motor,limit switch and others. The system implement is shown in figure 3.2(e) below.

47

Figure 3.2(e): Sliding door implementation

Limit switch also used for this system to get the information of door position. When holding metal touch the first limit switch during open door operation, it will send the signal as the input for programmable logic controller(PLC) to tell that the door is fully open so that the PLC will give the command according to the instruction that was programmed. Usually, the instruction for this case is to stop the motor so that it will not pull the door anymore.

3.2.4

DC Geared Motor There are two DC Geared Motor used for this project which is for lift

up/down and open/close door. Even this two motor have same voltage capacity (12 volt), but it is different from the the torque and load capacity.

48

3.2.4.1 DC Geared Motor SPG 50 (12 Volt)

For lift up/down motor, 12 volt DC Geared Motor SPG 50 model from Cytron company was used. The model is shown below in figure 3.2(f). The implementation of it is shown in figure 3.2(g).

Figure 3.2(f): DC Geared Motor SPG 50

Specification: Rated Voltage(V) No Load Current mA 12 200 Speed r/min 225 Current A 1.1 Rated Speed r/min 170 Torque kgf. cm 2.0 mN. m 196 3.4 280 Output Power W g Weight

Table 3.2(a): DC Geared Motor SPG 50 specification

49

Figure 3.2(g): Motor Up/Down implementation

3.2.4.2 DC Geared Motor SPG 20 (12 Volt)

This motor is used to open and close the cab door. It have same rated voltage as the motor Up/Down but it have its own criteria especially on torque, speed it is shown in figure 3.2(i). and output power. This model is shown in figure 3.2(h) below and the implementation of

Figure 3.2(h): DC Geared Motor SPG 20

50

Specification: Rated No Load mA 12 30 r/min 150 A 200 Rated Torque kgf.cm mN.m 0.6 58.8 r/min 130 Output Weight Power W 0.6 60 g

Voltage(V) Current Speed Current Speed

Table 3.2(b): DC Geared Motor SPG 20 specifcation

Figure 3.2(i): Open/Close door motor implementation.

51

3.2.5

Relay

Relays play an important role for most operation. It will determined the direction of DC Geared motor for both operation (up/down and open/close). Two relays was used for up/down operation circuit and two for open/close door. When relay one is turn on by the PLC according to instruction, it will change the polarity so that the motor will have potential different to make it running in one direction. This operation also the same when relay two was turning on by PLC in other situation to make it run in other direction. Single pole double through types of relay was used for this project with relay voltage of 24 volt. This component is shown by figure 3.2(j) below.

Figure 3.2(j): Relay

52

3.2.5.1

RELAY CIRCUIT

Figure 3.2(k): Relay circuit

The circuit in figure 3.2(k) show the relay circuit for up/down cab and open/close door operation. There are two voltage supply which is from external supply and from PLC. The external voltage will supply 9 volt fixed voltage for open/close door motor and 12 volt fixed for up/down motor. In normal situation, the motor doesnt have voltage different and will stay until one of the relay change its polarity to provide voltage different.

53

3.2.6

OMRON PROGRAMMABLE LOGIC CONTROLLER (PLC)

The programmable logic controller(PLC) is used to control the whole operation of the system according to the instruction given by the programmer/user. It is the main part which is give the figure of the electrical controller in that mechanical system. Without PLC, the system is just a mechanical system which is not operates. The OMRON SYSMAC CPM2A model PLC is used for this project which is have 22 input and 14 output modul. This PLC is programmed by using Ladder Diagram(LD) method. The PLC used is shown in figure 3.2(l) below.

Figure 3.2(l): OMRON PLC

54

There are two PLC used for this project according to limited input output. Therefore the operation of the system is separate by two part which is lift up/down for PLC 1 and open/close door operation for PLC 2. To synchronize this two operation, some of the output from PLC 1 is feed to the input of PLC 2. The output of PLC 1 is used to give the information to PLC 2 about the current situation so that PLC 2 will operate as the information given is matching to the instruction that is programmed.

3.2.7

OTHERS COMPONENTS

3.2.6.1 Counterweight Counterweight is used to balanced the cab and support drive system so that the motor will used minimal energy to pull the load. The example is shown in figure 3.29(m) below.

Figure 3.2(m): Counterweight

55

3.3

Software Implementation

The software used for programming the programmable logic controller(PLC). The name of the software used for this project is CXProgrammer which is used to make the program for OMRON PLC. It implement the program in the form of Ladder Diagram(LD). The software used is shown in figure 3.3(a) below.

Figure 3.3(a): CX-Programmer software

Before build the Ladder Diagram, the overall operation is implement in the state diagram. State diagram will make the operation easily to form in Ladder Diagram. We cannot easily build Ladder Diagram for the whole operation before simplify it with state diagram.

56

3.3.7

State Diagram

For this system, there are two general operation to be controlled by programmable logic controller,PLC. That operations are lift up/down and open/close door operation. There is other operation which is on/off indicator but it was included to up/down operation by using PLC 1. The state diagram for both operation is shown in the diagram below. The symbols used in this diagram can be refer to list of symbols in page ?.

Open/Close Door Operation

57

Lift Up/Down Operation

START

SU1.SD1

Ro
R15.SD1 (CB2 + CB3 + CB4 + CB5).R0.D.CB1

R15
R14.CB1.CB2. D R15. MU
R14.CB1.(CB3+CB4+CB5)

R1

R1.SU2

R14

R2
(CB3+CB4+CB5).

R1.MD

R13. MU

R13.SD2

CB1. R2. CB3. CB4. CB5

CB2. D. R2

MD

R13
(CB1+CB2). R12. D. CB3 R12. CB2. CB1.(CB4+CB5)

R3
R3.SU3

MU

R3.MD

R12
R11. MU R11.SD3
R4.CB4.CB5(CB1+CB2)

R4
(CB4+CB5).CB3. D. R4

R5.MD

R11
CB1+CB2+CB3). R10. D. CB4 R10.CB2.CB1.CB3.CB5

R5
R5.SU

R7.MD

R10
R9. MU R9. SD4
R6. CB5. (CB3+CB2+CB1)

R6
R6.CB5.CB4.D

R9

R7

(CB1+CB2+CB3+CB4). R8. D. CB5

R7.SU5

R8

58

3.3.8

Ladder Diagram CX-Programmer software will implement the instruction program in

the form of Ladder Diagram. The figure 3.3(b) below shown the example of Ladder Diagram by using the CX-Programmer software.

Figure 3.3(b): CX Progrmmer ladder diagram

CHAPTER 4

RESULT AND DISCUSSION

4.1

Introduction

This project involve hardware and software for support the operation. Mostly, the focus is given to build the system hardware. The software is used to program the Programmable Logic Controller, PLC to govern the operation for elevator. Besides, this programming also can be used to monitor the operation of the system as it is programmed. The programming used for this project is Ladder Diagram provided by CX-Programmer software for OMRON PLC. Therefore, the result will be take for the hardware operation and the programming simulation.

60

4.2

Result

4.2.1

Hardware Result

Eventhough this project result will be seen for the system operation, its operation generally just involved lift up down and open close door. The other operations like the priority of the calling button or user request cannot be seen by picture. It will limit our hardware result to showed and can be represented by the basic operation of the elevator for the request to move up or down and to open or close the door. For the lift up and down, the result can be observed that, when the cab have arrived at certain level, it will touch the sensor level (limit switch for this case). At this time the sensor will close the circuit and make a current to flow. The current will be feed to the PLC input as a input signal so that the processor will matching the information with instruction program to take the action. As a result, the lift motor will be stopped and turn on the indicator. This result is shown in figure 4.2(a) and figure 4.2(b) below for transition state and final state operation.

61

Lift Up/Down operation:


Figure 4.2(a): Transition State

The PLC will execute the program after receive the input signal and then send the output signal to the motor. The cab will be moved upward or downward according to request from or to other level. the transition state operation is shown in figure 4.2(a) above.

62

Figure 4.2(b): Final State

After the cab arrive at certain level (request level), it will touch the level sensor and feed the signal to the PLC as input signal. The processor wil execute the program and send the output signal to motor and indicator. If the level is requested by the user, the PLC will sent the output signal to the motor to make it stop the operation and to turn on the indicator. The result is shown in figure 4.2(b) above.

63

4.2.2

Programming Result

For the CX-programmer ladder diagram, the operation state is shown by the green highlighting colour. It can provide the monitoring operation without connecting the PLC with the system hardware to observe the operation. We can easily simulate the program by using the indicator output in OMRON PLC before connecting it to the system hardware.

4.2.2.1. Up and Down operation CASE 1 : The cab at the base level. When there is a calling button from level three, the instruction will turn ON the motor up,MU and make the cab going upward. The simulation will show the program running by green highlight.

Figure 4.2(c): Basement Level

64

Transition State R1:

When there is a call button from level three, the program will run the state

R1. This state will turn the motor up, MU to move the cab. The program running is shown in figure 4.3(b) below.

Figure 4.2(d): Request from level three


65

Level 2 (state R2):

The cab will touch sensor at level two/ state R2. The program will identify either there is request from this level. If there is no request from this level, the program will run the next state R3 to turn on motor up, MU to continue the operation. This running program is shown in figure 4.3(c) below.

Figure 4.2(e): State R3 operation


66

Level 3(state R4):

When the cab touch the sensor at level three, the program will detect the request and turn off the motor as shown in figure 4.3(d).

Figure 4.2(f): State R4 detected

67

If the level is the same as requested by the user, the program will give the instruction to off the motor. The motor up off is shown by figure 4.3(e) below.

Figure 4.2(g): Motor Up/Down off

68

CASE 2:

The cab is in stop operation at level three. When there is request from level 1 by the user, the program will run and make the system to operate.

Request from level 1(CB1)


69

Transition state, R12: For this state, the program will turn on the motor down to move the cab downward. The simulation result is shown in figure 4.3(f) below.

Figure 4.2(h): Motor down on


70

Level 2(state R14):

The cab will touch the sensor down for the level two and the program will identify any request from this level. If there is no request, the program will execute the next state, R15 to continue motor down, MD on. The simulation is shown in figure 4.2(i) below.

Figure 4.2(i): State R14 detected


71

Final state, R0:

When the cab touch the sensor down at level one, the program will turn the motor down, MD off as shown on figure 4.3(j) below.

Figure 4.2(j): Motor down off


72

4.2.3. Open and Close door operation

CASE 1: Open door operation

When the cab arrive at level 1 and there is request for this level, the program will turn on the state for door open, DO. The simulation program is shown in figure 4.3(i) below.

Figure 4.2(k): Door open operate


73

Fully Open : When the door touch the sensor open, SO the motor open will turn off and turn on the timer for a few second (10 second for this case) before close the door. The simulation program is shown in figure 4.3(j) below.

Figure 4.2(l): Timer count


74

Door Close:

When the timer is off, the program will turn on motor to close the door as shown in figure 4.3(k) below.

Figure 4.2(m): Door close operate


75

Fully Close: When the door touch the sensor close, the program will turn off the motor to indicate that the system is fully close now. The simulation is show in figure 4.3(n) below.

Figure 4.2(n): Sensor Close detected

76

4.3 Discussion

Besides the operation result, its also can be observed that there is other information that can be find out from the operation. This information will discussed by the topic below.

4.3.1

Sensor level circuit

The limit switch which is used as a sensor level will initially at normally open position. After the cab arrive at certain level and touch the limit switch, it will make the switch to be close and make the current flowing in the circuit. From the finding, the current flow to the circuit is about 0.08 Amps with 12 Volt supply voltage. The resistor, R is used to limit the current flow to the circuit. The resistor value used is 100 ohm.

Power dissipating in resistor, P = I2R = (0.08)2(100) = 0.64 Watt

77

4.3.2

Relay action

The relay with the 24 volt action voltage is used for this project in up/down and close door motor operation circuit. After doing some test to this relay, when the voltage is varried from 0 volt to 24 volt voltage supply, the relay turn on when it is supplied by plus minus 15 volt supply voltage. The relay will be in normally open as shown in figure 4.3(a) for 0 14 volt supply voltage and will be close for the voltage above 15 volt as shown in figure 4.3(b) below.

Figure 4.3(a): Normally open

Figure 4.3(b): Normally close

CHAPTER 5

CONCLUSION

5.1

CONCLUSION

From the objective of this project, we can see that the knowledge and skills will combined together in order to complete this task. For this project, the knowledge and skills that involve is not depending to electrical system but its also involve the mechanical system. Without relation of each part, the system will having the problems and this project cannot completely finished.

Besides, in this project, its also will give the challenges to students for having the knowledge and understanding in other field besides the electrical knowledge. Automatically, it will train the students in solving the problems eventhough it is outside of their field of study.

79

From the objective of this project also, it will give a lot of knowledge which is involved especially in PLC control system. Indirectly, from this project, the students just not learn in controlling the system, but they also can learn about programming the PLC in order to running the system. The students also can get the creativity skills in programming the PLC so that it will running with their own way operation.

5.2

Problems

Eventhough the system use two programmable logic controller, PLC because of its limited input output, I/O, its still have the problem to communicate the first PLC with the second PLC. This communication of these PLC is needed to ensure that the system operate synchronously between the open close door operation and up down operation. Besides, there are over current from the sensor level circuit that make the resistor burn after the current flow for long time. After that the signal from the sensor cannot be detected and cannot sense the current position of the cab anymore. When the sensor cant be detected, the program cannot run the operation because it is depend on the position of the cab. The design also is the one problems that limited the space to installed extra component like IR sensor to used as the safety. It should have the sensor to detect the user that want to enter or go out to from tthe cab as a safety equipment so that the user cant be hitted by the door. ` There is no breaking system installed for this prototype due to limited time

for finishing the project. The breaking system is used as a safety in case the cable is broken to avoid the cab falling down with the high speed.

80

5.3

Recommendation

The efficient operation can be achieve when there is enough Input Output for all the component used in this system. We can use the medium size of PLc to provide enough input output, I/O.

There is a sensor that can use as a safety in the sytem so that the user will not hitted by the door during the entering and out of the cab. The Infrared sensor can be used as the one of the suitable sensor that can detect the movement through the cab.

We can used the fius in the circuit to avoid the the current overflow and make resistor burn. The fius can be instaled in each circuit so that when there is a overload current flow, it will shot the fius without effectinh other equipment.

The breaking system should be installed for one of the safety requirement to avoid the excident when there are problems with the cable used in drive system. Besides, for this case we can overcome the excident by make the program to give the instruction to either stop the operation at close level to the current position.

81

REFERENCE

1) John Willey (2001). Elevator. London: John Willy & Sons. 1-8

2) Rhonda Salzmon (1998 & 1999). How Elevator Works: Martin L. Culpepper. 1-3

3) X.Ying, Q.Zhu, H.Xu (2008). Design and Practice of an Elevator Control System Based on PLC: IEEE, DOI 10.1109/PEITS: 94-96 4) Motion Control Engineering Incorporated (March 1999). AC Motor Controls for Elevators: Motion Control Engineering Incorporated. 5) FESTO Didactic (2002). Programmable Logic Controller Basic Level. (TP 301). 6) Dr. Hisham El-Sherif. Basic PLC. Industrial Park: GUC. 5-33; 2001 7) G.C Barney (1986) Elevator Technology, Chister : Elis Honwood.

8) G.C Barney (1935) Elevator Traffic Handbook , London : Taylor &


Francis, 2003

9) Janovsky, Lubomir Elevator Mechanical Design 2nd Edition, New York :


Ellis Horwood, 1993

10) Lemony Snicket The Ersatz Elevator , HarperChildrens Audio, August


1st 2003.

82

11) http://en.wikipedia.org/wiki/Elevator(10/9/2008:2130) 12) http://www.delorenzo.it/dl/eng/prodotti-en/automazione-en.htm


(15/9/2008:2200).

13) http://howthingswork.virginia.edu/supplements/elevators.pdf
(15/9/2008:2230).

14) http://www.columbia-elevator.com/info/history.html
(15/9/2008:2245).

83

APPENDIX A

Elevator motor from the Reuland company

VVVF A/C motor by Reulend Electric Company:

84

Single Speed A/C Elevator Motor (Reuland Electric company):

Specification

85

Two Speed A/C Elevator Motor (Reuland Electric company):

Specification

86

APPENDIX B

THE PROJECT MODEL

87

CONTROL PANEL

ELEVATOR CAB

Vous aimerez peut-être aussi