ANNEX B

BSS CHECKLIST
OK N.OK

Outdoor/Indoor installation
Proper Feeder Cable Routing

COMMENT

2 4 6 7 8 9 10 11 12 13 14 15

Antennas ( support, mounts and tightening) Standard Groundings Separation of AC Main from Feeders Route Position of Indoor Cooling System Space for Inlet of Feeder Window (roxtic) Band Sector Number of Antennas Number of TRXs Antenna Orientation (deg.)
Antenna Height (m) 900 MHz 1800MHz

Other information:

OK

N.OK

BOQ verification

COMMENT

1 2 3 4 5 6 7 8 9 10 11

Equipment condition (Old/New) All Boards as per BOQ Total No. of Slots for Dual Transceiver Cards(GSM 900) No. of Dual Transceiver Cards Installed(GSM 900) No. of empty Slots for Dual Transceiver Cards(GSM 900) Total No. of Slots for Dual Transceiver Cards(DCS 1800) No. of Dual Transceiver Cards Installed(DCS 1800) No. of empty Slots for Dual Transceiver Cards(DCS 1800) E1 signal transfer cable Space in Rectifier for additional equipment Site Configuration

Capacity Calculation:

* Each Dual Transceiver Card(DTRU) has two Transceivers(TRXs).

* Each TRX has 8 TDMA timeslots and each time slot support one user Hence each TRX supports 8 users.

* In every Sector there is an BCCH TRX in which one time slot is used for transmitting BCCH. Hence a BCCH TRX supports 7 Users.

S.No

Capacity Calculation

Formulae

No of users Supported at a time

Physical Capacity of GSM 900 (No. of installed TRXs * 8) No. of Sectors (No. of installed TRXs * 8) No. of Sectors

2 Physical Capacity of DCS 1800

** This is the physical capacity, and is calculated without considering other capacity increasing RF Techniques such as Half Rate TCH, EFR, AMR or any other technique to increase capacity.

ANNEX C

TRANSMISSION CHECKLIST
OK N.OK

BOQ Verification
Equipment Status(New/Used)

COMMENT

2 3 4 6 7 8 9

Type of the Site (Simple/Hub/Sub hub) Number of MW Antennas Installed Azimuths of MW Antennas Heights of MW Antennas Standard Antenna Assembly ODU Fastening and Grounding IF Cable Layout at Structure

10 11 12 13

Standard IF Cable Grounding IDU Fixing IDU grounding PSU and Battery Connections

ANNEX D RF CHECKLIST

OK

N.OK

Drive Test Results

COMMENT

1 Antenna Azimuth

2 Antenna Down tilts

3 Swapped Feeders/cells

4 BCCH as per plan

5 Cell CI as per plan

6 Location area as per plan

7 Route Area as per plan 8 During stationary test, voice calls can be initiated in each cell, if not, provide details During stationary test, GPRS/EDGE FTP download successful, if not, provide details Intra site Handover Performance Inter site Handover Performance

9 10 11

OK

N.OK

Abnormal Events
Call Drops analysis

COMMENT

2 3 4

Handover Failure Analysis Blocked Call Analysis RxLev Analysis