Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff
>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE
A,

PHASE

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le Id> =8 7B

P h a se L 1 M od u le

P h a se L 2 M od u le Id> =8 7B

2000/5

=8 7B

L3 N

L3 N

Id>

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Id>

=8 7B

L2

2000/5

L2

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc1/24

P h a se L 3 M od u le Id> =8 7B

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff
>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE
A,

PHASE

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le Id> =8 7B

P h a se L 1 M od u le

P h a se L 2 M od u le Id> =8 7B

2000/5

=8 7B

L3 N

L3 N

Id>

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Id>

=8 7B

L2

2000/5

L2

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc2/24

P h a se L 3 M od u le Id> =8 7B

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST PHASE

A,

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff


>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le =8 7B Id>

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le =8 7B Id>

2000/5

=8 7B

L2 L3 N

2000/5

L2 L3 N

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc3/24

P h a se L 3 M od u le Id> =8 7B

Id>

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST PHASE

A,

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff


>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le =8 7B Id>

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le =8 7B Id>

2000/5

=8 7B

L2 L3 N

2000/5

L2 L3 N

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc4/24

P h a se L 3 M od u le Id> =8 7B

Id>

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST PHASE

A,

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff


>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le =8 7B Id>

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le =8 7B Id>

2000/5

=8 7B

L2 L3 N

2000/5

L2 L3 N

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc5/24

P h a se L 3 M od u le Id> =8 7B

Id>

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST PHASE

A,

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff


>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le =8 7B Id>

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le =8 7B Id>

2000/5

=8 7B

L2 L3 N

2000/5

L2 L3 N

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc6/24

P h a se L 3 M od u le Id> =8 7B

Id>

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST PHASE

A,

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff


>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le =8 7B Id>

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le =8 7B Id>

2000/5

=8 7B

L2 L3 N

2000/5

L2 L3 N

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc7/24

P h a se L 3 M od u le Id> =8 7B

Id>

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST PHASE

A,

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff


>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le =8 7B Id>

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le =8 7B Id>

2000/5

=8 7B

L2 L3 N

2000/5

L2 L3 N

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc8/24

P h a se L 3 M od u le Id> =8 7B

Id>

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST PHASE

A,

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff


>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le =8 7B Id>

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le =8 7B Id>

2000/5

=8 7B

L2 L3 N

2000/5

L2 L3 N

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc9/24

P h a se L 3 M od u le Id> =8 7B

Id>

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION INJECTED R VIA BB 1 Y B R VIA BB 2 Y B BAYS UNDER TEST PHASE

A,

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff


>20 PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection BB1 BB2


QB1 QB 2 QB1 QB 2

QA1

QA1

L1

REB 670 L1 REB 670 L2 REB 670 L3

L1

REB 670 L1 REB 670 L2REB 670 L3

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le =8 7B Id>

P h a se L 1 M od u le Id> =8 7B

P h a se L 2 M od u le

P h a se L 3 M od u le =8 7B Id>

2000/5

=8 7B

L2 L3 N

2000/5

L2 L3 N

Ref. BAY
Step-dow n injection transform er L1 L2 L3 L1 L2 L3

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications.

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc10/24

P h a se L 3 M od u le Id> =8 7B

Id>

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

SITE TEST RECORD SHEET


INJECTION

BUSBAR PROTECTION PRIMARY CURRENT


A,

IED: REB 670 PRIMARY INJECTED CURRENT: INJECTION BB1 TO BB2 VIA BUS COUPLER BB2 TO BB1 VIA BUS COUPLER BAYS UNDER TEST INJECTED R Y B R Y B PHASE

SECONDARY CURRENTS READING REF. BAY TESTED BAY -

NOTE

In discrimination zones Z1&Z2 restraining and differential currents recorded:Ratio Irestr/Idiff >20
PROTECTION STABILITY: OK NO TRIP STATUS AND OVERALL TEST ESULTS: POSITIVE

Arrangement of Busbar Protection Testing by Primary Current Injection


B.Coupler BAY QB1 QB 2 QB1 QB 2 QB1

BB1 BB2
QB 2

QA1 QA1
L1
REB 6 0 L REB 6 0 L REB 6 0 L 7 1 7 2 7 3

QA1

L1

REB 6 0 L REB 6 0 L REB 6 0 L 7 1 7 2 7 3

L1

REB 6 0 L REB 6 0 L REB 6 0 L 7 1 7 2 7 3

P ha se L 1 Mo du le

P ha se L 1 Mo du le

P ha se L 2 Mo du le

P ha se L 3 Mo du le

P ha se L 2 Mo du le

P ha se L 3 Mo du le

P ha se L 1 Mo du le

P ha se L 2 Mo du le

2000/5

= 87B

= 87B

= 87B

= 87B

= 87B

= 87B

= 87B

= 87B

L3 N

L3 N

L3 N

Id >

Id >

Id >

Id >

Id >

Id >

Id >

Id >

Ref. BAY
S t ep -d own in jec t io n t ra ns f orm e r R Y B R Y B

Tested BAY

CTs Ratio, polarity, secondary leads phasing, grounding line side CT terminals checked by primary current injection. Primary current was low due to high impedance of loop injected. Injected current level meets requirements for a/m checks and verifications

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc11/24

Id >

= 87B

L2

2000/5

L2

2000/5

L2

P ha se L 3 Mo du le

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


BUS COUPLER

BB1 BB2
QB 2 QB1 Q B2 QB1 QB 2

QB1 QA1

F4
P2 P1 E s1 s2 L1 L2 L3 N CT Secondaries s2 s1 L1

Q0 P1 P2

QA1 P1 P2 E s2

QA1

L2

L3

s1 L1

L2

L3

REB 6 L1 RE 67 L2 REB 6 L 70 B 0 70 3

REB 6 L1 RE 67 L2 REB 6 L 70 B 0 70 3

REB 6 L1 RE 67 L2 REB 6 L 70 B 0 70 3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

F2
BUS COUPLER

BB1 BB2
Q B2 QB1 Q B2 QB1 QB 2

QB1 QA1

P2 P1 E s1 s2 L1 L2 L3 N CT Secondaries s2 s1 L1

QA1 P1 P2 E s2 L2 L3 N s1 L1 L2 L3 P1 P2

QA1

RE 67 L1 REB670 L REB 6 L3 B 0 2 70

B 0 2 70 RE 67 L1 REB670 L REB 6 L3

RE 67 L1 REB670 L REB 6 L3 B 0 2 70

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc12/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

F1
BUS COUPLER

BB1 BB2
QB 2 QB1 Q B2 QB1 QB 2

QB1 QA1

P2 P1 E s1 s2 L1 L2 L3 N CT Secondaries s2 s1 L1

QA1 P1 P2 E s2 L2 L3 N s1 L1 L2 P1 P2

QA1

L3

REB67 L REB 6 L2 REB67 L 0 1 70 0 3

REB67 L REB 6 L2 REB67 L 0 1 70 0 3

REB67 L REB 6 L2 REB67 L 0 1 70 0 3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

BUS COUPLER

BB1 BB2
Q B2 QB1 QB 2 QB1 Q B2

QB1 QA1

P2 P1 E s1 s2 L1 L2 L3 N CT Secondaries s2 s1 L1

QA1 P1 P2 E s2 L2 L3 N s1 L1 L2 L3 P1 P2

Q A1

F3
E

REB 6 L1 REB67 L REB 6 L3 70 0 2 70

REB 6 L1 REB67 L REB 6 L3 70 0 2 70

REB 6 L1 REB67 L REB 6 L3 70 0 2 70

P h a se L 1 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B

P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc13/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION

Site Test Record Sheet for Busbar Protection System SECONDARY CURRENT INJECTION WITH BUS COUPLER IN SERVICE.

Busbar Protection REB 670 Blocking of Bus Coupler Test Circuit: Bus coupler with two neighboring feeders Nominal C Breaker bck-up time: 150 m.sec Tolerance: Measured time Nominal time <30 m.sec.
Fault Location F3 External Phase R Y B R F1Section 'I' Y B R F2 Section 'B' Y B F4 Between the C.B. & C.T. in B.C. or C.B. Failure in B.C. R Y B 'I' 'II' 'II' 'I' 'I' "II" -Tripping of C.B.in B.C.& Section t T ( ms ) ---'I' & 'II' Fault is Ext. for Section Blocking of the Coupl. & Trip Sect. ---------'II' II' 'II' ----------

Observation of Testing engineer:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc14/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Client : KRG-MOE Substation :132/33/11 kV Contract: KRG-MOE/ED5-00/2008-Erbil/Dohuk S/S Stage 5 Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection System:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 1
Amp. Phase

REF. BAY

TESTED BAY I diff.

ZONE 1 I stab. I diff.


-

ZONE 2 I stab.
-

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No. L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In)


-

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
QB 2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2

QA1 E

QA1 E CT Secondaries

QA1 E

L3

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK: Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc15/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc16/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc17/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc18/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc19/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc20/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc21/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc22/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc23/24

Substation:

Contract: KRG-MOE

Stage 5

Busbar differential Protection System SECONDARY and PRIMARY CURRENT INJECTION


Substation :132/33/11 kV Switchgear : 132 kV

SITE COMMISSIONING TEST RECORD SHEET STABILITY/ SENSITIVITY TEST BY SECONDARY CURRENT INJECTION BB Protection system:
CURRENT INJECTED

Reference Bay:

Tested Bay:
CURRENTS READING (% In)

VIA BB 2
Amp. Phase

REF. BAY

TESTED BAY I diff.


-

ZONE 1 I stab.
-

ZONE 2 I diff. I stab.

CHK. ZONE I diff. I stab.

L1-N L2-N L3-N


L1 L1-L2 L2 L2 L2-L3 L3

Bay. No.
L1-N L2-N L3-N

SENSITIVITY CHECK: Pick-up Current Reading (% In) -

Zone 1&2 Setting: Check Zone Setting:

Id= K= Id= K=

xIn xIn

CB tataus at Ref. Bay: ON CB tataus at Tested Bay: ON CTs Ratio: CTs Grounded at: SIDE Testing arrangement for P-P BB Ptn. Sec. Injection

OPEN CT GUARD Setting: Testing arrangement for P-E BB Ptn. Sec. Injection
Ref. BAY Tested BAY

BB1 BB2
Q B2

Ref. BAY

Tested BAY

BB1 BB2
Q B2

QB1

QB 2

QB1

QB1

QB 2

QB1

QA1 E CT Secondaries L1 L2 L3 N L1 L2 L3

QA1 E

QA1 E CT Secondaries

QA1 E

L1

L2

L3

L1

L2

L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

REB670 L1 REB 670 L2 REB 670 L3

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

P h a se L 1 M o d u le Id> =87B P h a se L 2 M o d u le Id> =87B P h a se L 3 M o d u le Id> =87B

Stability checked and results OK: CB rip test and LED Indication check:

Sensitivity checked and results OK:

Other Tests & Checks:

ZOZIK Testing eng.

Witnessed by:

Witnessed by:

File Name:65. Low impedance Busbar Protection System.doc24/24