Vous êtes sur la page 1sur 30

2013

TURNKEY & ENGINEERING SYSTEMS CL EN MAIN & INGNIEIRE DES SYSTMES

LABEAU TUNISIE

INT RODUTION
SEA WATER DESALINATION STATION
Main Activities We are leader in Water & Seawater treatment Systems and Plants sector since more than 20 years. We are active in design as engineering company of Desalination systems and stations with capacity until 30000m3/day and we are active as design and manufacturing with a wide range of small-medium size products. Engineering company Over 20 years of experience and our devotion to quality permitted us to become specialists in water treatment and particularly in sea water desalination. As engineering company we are able to design turn-key desalination stations until 30000 m3/day and more to organize the production by our specialized supervision, to organize and supervison commissioning and plant running.

ORGANIZATION
Nothing is left to chance, every steps, every actions are organized according our engineering programs. 1. Analysis of site To realize your desalination station, we will provide first to examine the site of installation. Geological analysis of that area are very important to develop the best project and offer the best solution. These type of information should be analyzed in different time of the year, due the matter that working contidions can be different season by season. 2. Design and drawing Full and detailed drawing will be realized by our staff, about: - civil works required - parts and components realization - equipment installation Based on our 3D drawing your staff will be able to realize the civil works required for the correct installation of the components and equipments of station. At same time, will be realized also the drawings about the parts of the plants to manufacture, like the structures for the vessel or bases for pumps, etc. 3. Civil works and realization procedures We will provide to supply the exact procedures for the the civil works and the realization of the parts required for the installation of the plant. These procedures together with the 3D drawings will permit to your staff to realize the work required. 4. Supervision All the procedures required for the realization of the station, like the civil works and the realization of the parts, will be supervised by our technical staff, to be sure that time and way in the realization are respected. 5. Order list together with the procedures you will get also the list of the orders of materials to purchase to suppliers. This procedure permits you to purchase the materials directly to the most important brand suppliers and get maximum discount (OEM discount). This allows to halve the costs of realization

QUALITY

all our plants are designed and manufactured according highest level of quality and the official standard international rules.

WHAT WE DO

We design your desalination station for you! Based on our experience we offer our service to design and organize the installation of a new desalination station. Moreover one of the most important matter is that cost to realize your station will be halved by the direct purchasing of material to the most important and qualified suppliers at discounted price. We have the possibility to access to special discount thanks to our position of engineering consultant company, that first select the products and the suppliers and then decide which between them are correct to use in our projects. Our main objective is: to offer to our customers a service. Your requirements are analysed in every details by an highly specialized engineers staff. Our solutions are discussed with your technicians in order to offer you the best decisions for your needs.

6. Installation As for the realization, also for the installation, will be supplied the procedures to follow for the correct ending of the works. All the procedures of installation, performed by your staff will be supervised by our engineers, so to guarantee the correct realization and the respect of time. 7. Commissioning and running The final trial and commissioning will be performed by our engineers at presence of your technical staff. Full details on the user and technical assistant procedures will be given to your user engineers, so to guarantee the correct use of the station and the correct maintenance of it. We offer also the possibility to supervise the running of the plants according specific agreement, so to guarantee perfect performance of the station and the working people. Advantages using Labeau T.enginnering co. Choosing our solution, you choose our experience. We have realized several stations in this way, offering great opportunity to our customer and start business cooperation for the present and the future.

Our solution is: - We put you in the condition to realize by yourself your desalination station - to pay half price respect to common market price. - to start a cooperation with us to realize in your area in the future also other stations bigger than present.

We offer Italian engineering: our experience based on 20 years of working and desing in water treatment, by italian specialized engineers. Best material: only best and high qaulity materials and components are used in our projects. We have contact every day with the most important manuacturers and suppliers of plants components, this permit us to selct the best one and choise the correct solution for your area and your needs. Economic: Best material but at OEM price. Only by us and choosing our solution you can get halfed prices respect the common price list. Long duration: We work for duration. high quality of components is the first guarantee for long years duration. Together with our maintenance planning you are in the position to have a long life station. CHOOSE LABEAU T.ENGINEERING CO. fOR DESALINATION.

DESIGN & ENGINEERING


Local Company Geneal Contractor Labeau T.Engineering co. partnership

Tender or Order Design & Drawings

civil works Design & Drawings

civil works realization

civil works Supervision

Equipments & components ORDERS LIST

ORDER TO SUPPLIERS

Construction PROCEDURES

CONSTRUCTION PARTS & STRUCTURES

Construction Design & Drawings

Construction Supervision

RUNNING & CONDUCTION

RUNNING SUPERVISION

COMMISSIONING PROCEDURES

Installation Supervision

Installation Design & Drawings

INSTALLATION PARTS & STRUCTURES

INSTALLATION PROCEDURES

DESIGN & ENGINEERING


1 ANALYSIS OF INSTALLATION AREA

Full an detailed analysis of area of installation The area of installation of the new desalination station, is very important and particular attention and analysis have to be performed. Geological and sea water analysis made in different time of the year and seasons are the basic job to develop to prepare the correct bases for the best project. Below its indicated the way of a pipeline to link the area site with the wells area.

DESIGN & ENGINEERING


2 3D DRAWING OF SITE

3D drawing of the site area with the buildings and the facility required for the correct working of the station. Also the architecture used for the project will be studied according the context of the country of installation, the buildings present in the area or close to it. A full station includes: main building with the desalination devices, office building with facility for the workmen as showers, sleeping rooms, but also meeting room to meet visitors and technical buildings for electricity device, water pools for different services.

DESIGN & ENGINEERING


3 2D DRAWING OF SITE

3D drawing of the site area with the buildings and the facility required for the correct working of the station. Also the architecture used for the project will be studied according the context of the country of installation, the buildings present in the area or close to it. A full station includes: main building with the desalination devices, office building with facility for the workmen as showers, sleeping rooms, but also meeting room to meet visitors and technical buildings for electricity device, water pools for different services.

ITALIAN ENGINEERING
Multimedia Filters Qty 6x100% : 360 m3/h.Capacity Material: GRP

Raw water Pool 1050m3

P1.5 P1.4 P1.3 P1.2


Intake Wells Pump Qty 4+1 3 Capacity: 100 m /h.each Head: 80m.

PO-1

OPERATIONAL PROJECT LABEAU TUNISIE sarl 7033 - 51 Cite Marine, Ghar El Mehl - Tunisie
www.labeau.110mb.com / labeau@gmx.fr
Design

CLEAN DRAIN

CLEAN DRAIN

CLEAN DRAIN

CLEAN DRAIN

CLEAN DRAIN

CLEAN DRAIN

Multimedia Feed Pump Qty 2+1 3 Capacity: 170 m /h./each Head: 30m.

P1.1

P2.1

28

CLEAN DRAIN CLEAN DRAIN CLEAN DRAIN CLEAN DRAIN CLEAN DRAIN CLEAN DRAIN

P2.2

FEED PUMPS

Object

P2.3
Hypochlorite Sodium Dosing Pump Qty 1+1 Capacity max 10lit/hr Head: 100m

Hypochlorite Sodium tank Qty 1x100% Material HDPE Capacity: 1000lt FeCl3 Ferric Chloride Dosing Pump Qty 1+1 Capacity max 10lit/hr Head: 100m
DILUTION LINE

FeCl3 Ferric Chloride Qty 1x100% Material HDPE Capacity: 1000lt


DILUTION LINE

LSA

LSA

Feed Pumps Qty 2+1 Capacity: 170 m3/h./each Head: 30m.

LAYOUT SWRO Plant RoMP3000 Prod. 2500m3/20h


Review

Backwashing water Pool

Filtered water Pool

PO-3
P4.2
600m
3

PO-2

P3.1 P3.2

DO-1.1

DO-1.2

Sodium Hypochlorite 1000lt

DO-1.3

DO-1.4

FeCl3 Ferric Chloride 1000lt

DRAIN

DRAIN

P3.3 P4.1
300m
OVER FULL
3

OVER FULL

P5.1
Reverse Osmosis Membranes Qty 24x6 Capacity: 62,50 m3/h.
EC

Final Clarification Clarification Project define First release DESCRIPTION


35 37

15.10.11 10.10.11 10.10.11 DATA

P5.2
36

DILUTION LINE

Sodium Hydroxide tank Qty 1x100% Material HDPE Capacity: 1000lt

Cleaning/Flushing tank Qty 1+1x100% Capacity: 5000 + 10000 lt. Material: HDPE
32

32

14

13

R.O. UNIT STAGE 1

12

33

Sodium Meta Bisulphite tank Qty 1x100% Material HDPE Capacity: 500lit

36

34

Antiscalant tank Qty 1x100% Material HDPE Capacity: 500lit

Soda tank Qty 1x100% Material HDPE Capacity: 1000lit


LSA

PROGETTO INFORMATIONS
Scale
Soda NaOH Dosing Pump Qty 1x100% Capacity 1,47lit/hr

LSA

DILUTION LINE
LSA

LSA

CARTRIDGE FILTER

FL3-1/3

17

Sodium Meta Bisulphite Dosing Pump Qty 1x100% Capacity 0,8lit/hr

LSA

Antiscalant Dosing Pump Qty 1x100% Capacity 0,14lit/hr

(Size A0 - H. cm.420) Project by Data Nome file

1:50

MDP

Oct. 2011

Brine water Pool

This drawing is property of Labeau Tunisie sarl - Tunisia, any reproduction and/or distribution without Labeau Tunisie approval is unlawful.

CP 1.1

CP 1.2

16

PO-5

14

13

12

600m3

Sodium Hydroxide 1000lt

DOF 1.1

DOF1.2

CLEANING TANK MGBN01 BB001 5000lit

31

High pressure pump with energy recovery Qty 1x100% Capacity: 180 m3/h. Head: 620m.
11 9
RH

Cartridge Filters Qty 1x100% Capacity: 180 m3/h. Material: GRP

FL1

SODIUM BISULPHITE DOSING TANK


500lit

DOB 1.1

DOB 1.2

ANTISCALANT DOSING TANK 500lit

DOB 1.3

DOB1.4

ACID DOSING TANK 500lit

DOB 1.5

DOB 1.6

RO.MP3000.04 P+I.cdr
Tavola N

CLEANING PUMP

17

TN-110-1975.12371
Customer:

DRAIN DRAIN

Cleaning/Flushing pump Qty 1x100% Capacity: 90 m3/h. Head: 40m.

HP1
Energy recovery Qty 1x100%
DRAIN

DRAIN

DRAIN

DRAIN

14

13

12

37

Hypochlorite Sodium tank Qty 1x100% Material HDPE Capacity: 1000lt

CLEAN DRAIN

Permeate Water 62,5 m3/h.


PH

LSA

25

Hypochlorite Sodium Dosing Pump Qty 1+1 Capacity max 2,37lit/hr


Sodium Hypochlorite 1000lt

LEGENDA
GLOBE VALVE N.O. butterfly valve check valve gate valve pneumatic butterfly valve normaly close penumatic butterfly valve normaly open penumatic control butterfly valve ball valve safety valve pump dosing pump

DOE 1.1

DOE 1.2
14 13

Reverse Osmosis Membranes Qty 21x6 Capacity: 62,50 m3/h.


37

R.O. UNIT STAGE 1

Product water Pool

PO-4

12

33

Sodium Meta Bisulphite tank Qty 1x100% Material HDPE Capacity: 500lit
DILUTION LINE

36

34

DRAIN

Antiscalant tank Qty 1x100% Material HDPE Capacity: 500lit

Soda tank Qty 1x100% Material HDPE Capacity: 1000lit


LSA

LSA
17

LSA

1500m3

Service Water 50 m3/h.

16

INTERMEDIE PERMEATE TANK 5000lit


PH

14

13

12

High pressure pump with energy recovery Qty 1x100% Capacity: 180 m3/h. Head: 620m.
11

Cartridge Filters Qty 1x100% Capacity: 180 m3/h. Material: GRP

Sodium Meta Bisulphite Dosing Pump Qty 1x100% Capacity 0,8lit/hr

LSA

Antiscalant Dosing Pump Qty 1x100% Capacity 0,14lit/hr

Soda NaOH Dosing Pump Qty 1x100% Capacity 1,47lit/hr

HP2
9
RH

FL2

SODIUM BISULPHITE DOSING TANK


500lit

DOC 1.1

DOC 1.2

ANTISCALANT DOSING TANK 500lit

DOC 1.3

DOC1.4

ACID DOSING TANK 500lit

DOC 1.5

DOC 1.6

17

P7.1

DRAIN

DRAIN

DRAIN

DRAIN

Permeate Water 3 125 m /h.


DRAIN

(ABBREVATIONS)

CO2
P6.2 P6.1
Permeate Water 62,5 m3/h.
25

14

13

12

Energy recovery Qty 1x100%

LSA PI M PH EC

level switch alarm pressure indicator motor PH Analayser

CLEAN DRAIN

Electro conductivity analyser

Product water Pool

PO-4

RH

RH controller

1500m3

Motor

(KIND OF DRIVING )

pneumatic / diaphragm pneumatic/Analog Control pneumatic

10

ITALIAN ENGINEERING

OPERATIONAL PROJECT
11

LABEAU TUNISIE sarl 7033 - 51 Cite Marine, Ghar El Mehl - Tunisie


7 6 5
www.labeau.110mb.com / labeau@gmx.fr
Design Object

(1)
HP01 P2.1

10
P6.1 P6.2

LAYOUT SWRO Plant RoMP3000 Prod. 2500m3/20h


Review

P2.2

P2.3

P3.1

P3.2

P3.3

Final Clarification Clarification Project define First release DESCRIPTION

15.10.11 10.10.11 10.10.11 DATA

(9)
HP01 P4.1

PROGETTO INFORMATIONS
Scale

This drawing is property of Labeau Tunisie sarl - Tunisia, any reproduction and/or distribution without Labeau Tunisie approval is unlawful.

5
P4.2

(2)

(Size A0 - H. cm.420) Project by Data Nome file

1:50

MDP

Oct. 2011

RO.MP3000.04 top.cdr
Tavola N

TN-110-1975.12371B
Customer:

ISO Integrated System Organization

(3)

LEGENDA
1 Raw water pool 2 Filtered water pool 3 Backwashing water pool 4 Reject water pool 5 Multimedia filters 6 Cartridge filters 7 RO Train 1 8 RO Train 2 9 C.I.P. 10 Lime Stone Filtration 11 Carbon dioxide Injection P2.1-P2.3 Intake pumps P3.1-P3.3 Feed pumps P4.1-P4.2 Brackish pumps P5.1-P5.2 Reject pumps P6.1-P6.2 Permeate tanks

P5.1

P5.2

(4)

STOP

STOP

11

DESIGN & ENGINEERING


4 P&ID DRAWING OF THE PLANT

P&Id drawing permits to offer the complete layout of the working procedure of the station. On the left a sample of the hydraulic layout of ta 3000m3/day station. Different solutions are possible according the philosophy in the design of the desalination station. Every section is clearly identified and readable and offer immediately vision about the working.

12

5CONSTRUCTION OF PREASSEBLED PLANT

Some parts and components according the size and capacity of the station can be prepared in our factory Below is visible the preparation of 3x1500m3/day sea water desalination station that then will be composed on the site. in this case pre-treatment station composed by sand filters is placed outside the contyainers.

13

DESIGN & ENGINEERING


6 CIVIL WORKS

Hereby some example of the progression and developng of the civil works on site. As usual its very important the correct realization of the civil works on the site. The perfect realization of this job permits of offer the correct correspondence with the pre-pared components and parts. Its very important that direction of the civil works will be organized and manage together with one of our director. We prefer organize the civl works procedure according our European style, so to offer guarantee in the correct realization and also respect of the expected time

14

7 - INSTALLATION OF APPARATUS

Below examples on the installation of the apparatuses, components and prepared parts on the site of installation. The civil works direction, has to be conduct to organize a perfect planning in the realization of the job, in the manage of the workmen, step by step according the needs of the contractor and the delivery time of the materials.

15

DESIGN & ENGINEERING

EGYPT - Private Company Model RoMP PLUS 20000 Water Sea Water Production 4x5000 m3/day (Total 20000m3/day) Note Design on turn-key basis realized on request of an Egyptian private company

16

17

DESIGN & ENGINEERING

EGYPT - Private Company Model RoMP PLUS 2500 Water Sea Water Production 2x1250 m3/day (Total 20000m3/day) Note Design on turn-key basis realized on request of an Egyptian private company for Egyptian Army.

18

19

DESIGN & ENGINEERING

YEMEN - Private Company Model RoMPROS3050 Water Sea Water Production 4x500+3x350 m3/day (Total 2500m3/day) Note Design on turn-key basis realized on request of an Yemen company for a sugar factory.

20

21

SWRO PLANTS

IRAN - Municipal Company Model RoMP PLUS Water Sea Water Production 3x1500 m3/day (Total 4500 m3/day) Quantity: 1 pcs Note Special plant installed inside container

22

23

SWRO PLANTS

24

EQYPT- Municipal Company Model RoMP 3000 I Water Sea Water Production 3000 m3/day (Total 3000 m3/day) Quantity: 1 pcs Note Special plant installed inside a closed shed - photo about RO section

25

SWRO PLANTS

26

EQYPT- Municipal Company Model RoMP 1500 I Water Sea Water Production 1500 m3/day (Total 1500 m3/day) Quantity: 1 pcs Note Special plant installed inside a closed shed - photo about RO section

27

BWRO PLANTS

SOUTH AFRICA - Dealer Company Model Sand Filtration Water Brackish Water Production 200 m3/h. (4800 m3/day) Quantity: 1 pcs Note Special Sand filtration as pretreatment for local industry.

ITALY and other country - Washing Car industry Model Duplex Softener Water Tap/Brackish Water Production 20/30 m3/h. Quantity: more than 30pcs installed Note Duplex softener as pretreatment for washing car industry.

28

MAIN LABEAU REFERENCE

IRLAND Dublin - Pharmaceutical Company Model SOFT-AD50DX Water Tap Water Production 50 m3/h. (1200m3/day) Quantity: 1 pcs Note Special duplex Softener to produce water for pharmaceutical purpose

29

Labeau Corporation brings more than 20 years experience to designing and building advanced water purification systems. Labeau Tunisie is distributed to the global market exclusively through industrial water treatment companies worldwide. Our industry-leading manufacturing capability enables us to guarantee immediate shipment anywhere in the world for standard Labeau products, backed by a level of technical, service and parts support that is unparalleled in the water industry. Labeau is the result of the substantial investment that each year we have made in R&D. We work with development partners worldwide for the continual advancement of industrial water treatment technology.

Labeau Corporation worldwide

Activity of Labeau T.Engineering co.


We project, manufacture and delivery water purification systems for our customers. Our projects are MADE BY ITALIAN ENGINEERING - based on more than 20 years of experience High quality is guarantee by the long experience and by the exclusive use of high quality components and parts made in EU, USA or JAPAN. None economical material is used in none part of the plants. Also best quality of stainless steel (S.S. Duplex in the material that is contact with sea water) and best brands present in the market. Every components and parts is certified by the manufucturer and specific documents can be available. Each installation problem is discussed and resolved by our technical office within 24h. Every situation is monitored and reported so to propose to our customers updating or modification.

Water Treatment Systems Production


www.labeau-tn.com - info@labeau-tn.com
Tunisie - Tel.+216 27045506

30

LABEAU08010312 01/10 Printed in tunisie

LABEAU T.Engineering co.

Vous aimerez peut-être aussi