Vous êtes sur la page 1sur 100

DEVELOPMENT CONSTRUCTIONS LTD.

ESTABLISHED IN 1972

House No. 11, Road No. -19/A, Sector 4, Uttara, Dhaka -1230, Bangladesh. G. P. O Box No.-609, Cable: DRILLCO, Dhaka. Telephone: +88-02-8957236, 8957243, Fax: +88-02-8957243. E-Mail: dcl@dcl-fcl.com Web Site: www.dcl-fcl.com

CONTENTS
Page No. 1. 2. 3. 4. 5. 6. 7. Introduction Scope of Services Some Photographs of completed Project Activities Our Key Personnel Curriculum Vitae List of Construction Equipment and Vehicles List of Equipment for Geotechnical Exploration and Testing Laboratory Our Current Projects List of Major Projects Completed List of Geotechnical Investigation and Engineering Services Rendered during 1972-2005. 1 2 3 4 13 14

18 27 28

8. 9. 10.

51

INTRODUCTION
Development Constructions Ltd., is a reputed name in the field of foundation and geotechnical engineering as well as construction. The organization came into being in 1972, soon after the emergence of Bangladesh as an independent and sovereign nation. During the initial period of its inception, the companys field of activities was mainly limited to geotechnical investigation and pile foundation. It made its mark in the relevant arena in a very short time and never looked back thereafter. With the passage of time, the company increased its activities progressively in terms of volume and discipline and rose to its present position as highly reputed multidiscipline engineering enterprise in the country. To cope with its ever-expanding activities, a subsidiary company, namely, Development Constructions Ltd., was set up subsequently. Development Constructions Ltd., with its team of highly trained, experienced and skilled professionals comprising engineers, geologists, hydrologists, supported by up-to-date equipment, stands out from the others in the respective field for its outstanding performance. During last 28 years it has accomplished innumerable challenging jobs which include Railway Bridges, Highway Bridges with Pre-stressed Concrete Girders, Jetties with large diameter piles and Prestressed Concrete Girders/RCC Girder and Deck Slab both for Ocean Going Vessels and in land River Ports, Dolphin Jetty for LPG Terminal, Multi-storey Factory Building with Pre-Cast RCC Drilled shaft foundation and pre-stressed concrete Flat Slab concept, Clinker SILO and Cement SILO with RCC and pre-stressed Concrete shell using slipform. Massive Overhead R.C.C Water Reservoirs, Large Diameter Water Mains, Water Treatment Plant, Pre-cast R.C.C Piles and Large Diameter Bored Castin-situ R.C.C Piles etc. Its achievements also include providing perfect foundations and geotechnical service to lots of bridges, industrial installations, deep tubewells, pump houses, regulators etc. In fact, creditable entries in the record of performance of the company are countless. The company has also made innovative contribution to the faculty of foundation engineering through continuous research and analysis. In this connection, the know-how of Compaction sand Pile Foundation in multistoried building construction and Confined Sand Column with Grouted Tips for Foundation in Soft Ground evolved by the company may, particularly, be referred to. The Managing Director of the company, on various occasions, presented a number of papers on the subject in different international forums where the same were highly appreciated as basic conceptual contribution to the faculty. The company is known for its pioneering role in introducing up-to date equipment and advanced know how in Bangladesh. It has introduced masonry well in building foundations in weak ground in Bangladesh. It has recently introduced Electronic Cone Penetration test for Soil using 40 Ton Hydraulic Thrust Machine, Computerized Pile Integrity Test and Dynamic Load Testing of pile in Bangladesh with the co-operation of Pile Dynamic Inc., USA. This has given a new dimension to geotechnical and foundation engineering in Bangladesh. Besides, the company is soon going to further strengthen its capability through introduction of know-how like Prestressed Concrete in Silo Construction and Pre-stressed Concrete in Railway Bridge Girders. All these, combined with dynamic and efficient management are bound to usher greater success to the company in the coming days.

SCOPE OF SERVICE
Collection, review and interpretation of geotechnical information at project feasibility, design and construction stages. Site investigation planning, implementation and supervision. Preparation of geotechnical reports including planing and structural submission. In-situ and laboratory testing which include determination of physio-mechanical properties of soil and rock, analysis of the parameters, evaluation of bearing capacity, settlement, swelling and collapsing characteristics of soil. Investigation and design of structures foundation. Detailed engineering geological and regional geological investigation for engineering purposes. Investigation for ground water, design and installations of deep tubewells. Construction of 400 mm to 2500 mm diameter cast in-situ, pre cast R.C.C. and Franki pile foundation. Construction of highway & railway bridges, regulators, pump houses, factories and multistoried buildings. Ground water table lowering, drainage, and water supply projects. Design and construction of cement silo with slip form and pre-stressed concrete shell wall. Design and construction of road and railway bridge with pre-stressed concrete girder. Design and construction of Multi-storey Commercial/Factory Buildings with pre-stressed concrete Flat Slab concept. Special repair work.

SOME PHOTOGRAPHS OF OUR PROJECT ACTIVITIES

FLYOVER AT KHILGAON RAIL & ROAD INTERSECTION IN DHAKA CITY

Project: Design Build Turnkey Project of 1.9km long Flyover at Khilgaon, Dhaka City.

Project Cost: Tk. 720 million (Est.) Project Cost: 627 million taka.

View of the Flyover from the Malibagh end.

The Loop: 465m long RCC box, 47m radius of curvature at an average elevation 14.5m above surface road Constructed over running railway track and surface roads allowing flow of normal traffic. Longest curved RCC box span constructed in Bangladesh Malibagh loop of the Flyover with passenger train passing underneath

Reinforced earth ramps: Reinforced earth ramps of 9.6m, 7.8m, and 7.4m height. Vertical segmental retaining wall. Ground improvement was performed along the ramp using deep soil densification in the soft soil below the ramp to control the settlement. Densification was done using vibro-compaction.

Ground improvement using vibro-compaction for reinforced earth ramp at Malibagh

Segmental retaining wall at Saidabad ramp

Main Bridge Elevated 804m long 4-lane carriageway

Main Bridge

Main Bridge

Construction of 450m long Arial Khan Bridge


The Mission took note of the contractors innovative, and more cost effective way of placing the 110-ton bridge girders in place using a 600-ton capacity barge mounted crane. The crane was designed, and manufactured in Bangladesh using local engineering capacity, and with input from the contractor [Development Constructions Ltd.]. As a result Bangladesh has now national capacity in form of a 600-ton capacity barge crane, this equipment was earlier only available regionally from Singapore. Source: Asian Development Bank (ADB)

Lifting of 45m long PSC Girders from floating barge

Erection of PSC Girders on bridge piers

Project: 450m long Pre-stressed Concrete Bridge over the River Arial Khan under SRNDP Contract 2 Main Contractor: Hanil Construction Co., Korea. Authorized Sub Contractor: Development Constructions Ltd.

Development Constructions Ltd.


House # 11, Road # 19/A, Sector 4, Uttara Model Town, Dhaka - 1230. Phone: 8957236, 8957243 Fax: +880-2-8957243 Email: dcl@dcl-fcl.com Website: http://www.dc-fcl.com

Lafarge Surma Cement Plant at Chattak, Sylet

Project: Constrictoion of pile and substructure for Surma Energy Power plant at Chattak, Sylet Work includes construction of cast-insitu pile of 32m length, The last 8 meters of the piles are embeded in a hard Shale layer. Project Cost: Tk. 67 million.

Construction of 36 MW Power Plant.

Construction of the cooling tower for the power plant

Construction of the cooling tower for the power plant

Project: Construction of pilling for the plant and Jetty for the Lafarge Surma Cement Plant at Chatak, Sylet.

Project Cost: Tk. 230 million

Construction of the Jetty

Construction of cast-in-situ piles with 1.4m diameter and 40m length for the jetty

Design and Construction of Floating Steel Bridge

Cement and Clinker Loading Jetty

Project: Construction of 1200mm diameter 38m long Bored Cast in-situ Pile from offshore by Rotary Drilling Method for 3rd Buriganga Bridge near Dhaka. Project Cost: Tk. 12.3 Million

Offshore Drilling

Project Name: Construction of Shore Piling for GrameenPhone Corporate Head Quarter at Baridhara, Dhaka by Rotary Drilling Method. Project Cost: Tk 28.1 Million

Piling Works

Project Name: Construction of 1000mm diameter 47m long bored piles by Reverse Circulation Drilling method for Meteorological Weather Station at Moulovibazar, Sylhet. Project Cost: Tk. 5 Million (w/o cost of material) Employer: FukudaMitshubishi JV, Japan Reverse Circulation Drilling

Reverse Circulation Drilling

Rocks Recovered during Reverse Circulation Drilling

Lowering of Rebar Cage

Dynamic Load Testing using Pile Driving Analyzer (PDA) by Pile Dynamics Inc, USA.

Free Fall Drop of 10Ton Ram.

Project: Construction of 2nd Unit for Seven Rings Cement Factory for Seven Circles (Bangladesh) Ltd, at Kaliganj, Gazipur. Project Cost: Tk. 14.3 Million

Main Factory Building

Ball Mill

Fly Ash Silo

Bin for Conveyance System

Construction of Tunnel for Conveyance System

Construction of Tunnel 9m below Existing Ground

Project: Construction of 312m long Prestressed Girder Bridge at Shekhpur, Madaripur over Arial Khan River.

Project Cost:Tk.70.5 Million

Construction of 38m long Pre-stressed Girder

Construction of 1200mm diameter 38m long bored piles using rotary drilling method

Project: Construction of 16 Storied Commercial Building with Two Basements at Kawran Bazar Dhaka

Estimated Cost: Tk. 19.2 Million (Excluding Cost of Material)

Construction of Shore Piling for the two basements.

Project: Construction of 8 Story Factory Building is Prestressed Flat Slab Concept for Medlar Fashion, Asulia, Dhaka Project Cost: 80 Million.

Construction of 20ft Cantilever Slab at 70ft elevation

Project: 800Ton Maintained Load Test for Construction of Bridge at Kanaighat. Project Cost: Tk. 1.2Million

Maintained Load Test Project: Drilling and Installation of 5 Nos. 450mmx200mm, 200m Deep Gravel Packed Deep Tube Well for Universal Jeans in Chittagong EPZ, Chittagong Project Cost: 2.5 Million (Excluding Materials)

Drilling of 200m Deep Well

KEY TECHNICAL PERSONNEL

Managing Director

Director Mechanical

MD. NURUL AMIN B.Sc. Engineer. (Civil) FIE (B), M SEAGS, Member ASCE, USA. Member, Deep Foundation Institute Cliffs U.S.A. ASAADUZZAMAN A.B.M. B.Sc. Engineer. (Mech) SABINA SHAHNAZ (REMY AMIN) M.Sc. Engineer (Civil). USA. SONIA SHAHNAJ (SONY AMIN) M.Sc. Engineer (Civil). USA. CHAITANNA KUMAR MANDAL B.Sc. Engineer. (Civil), FIE(B) NURUL AMIN TALUKDAR

38 Years.

47 Years.

Director

10 Years.

Director

10 Years.

Director (Planning&Cost) Director (Field Operation) Director Technical

16 Years.

30 Years.

MEHEDY AMIN M. Sc. Engineer (Civil) Magna cum Laude with Distinction The Ohio State University, U.S.A. Awards: O.S.U Graduate Fellowship, C.N. Brown Scholarship, Karl. V. Taylor Memorial Scholarship, O.S.U College of Engineering Research Award

2 Years.

Director Operations

SAADY AMIN 2 Years. M. Sc. Engineer (Civil) Magna cum Laude with Distinction The Ohio State University, U.S.A. Awards: O.S.U College of Engineering Research Award, O.S.U Civil Engineering Alumni Scholarship Member: ACI, USA M. K. CHATTERJEE M.Sc. Engineer. (Civil) Member: Indian Road Congress, Member: Various IRC Codes/ Bridge Standard Committees. 42 Years.

Senior Advisor

Senior Advisor

ABDUR RAHMAN KHAN B.Sc. Engineer. (Civil) FIE (B), Member ASCE, USA. Member, American Concrete Institute A.K.M. AKHTARUZZAMAN M.Sc. Engineer. (Civil) LAILA NOOR B.Sc. Engineer (Civil) MOHAMMAD MOSLEM UDDIN B.Sc. Engineer (Civil), MIE(B) SHEIKH SAIFUL ISLAM B.Sc. Engineer (Civil)

39 Years.

Senior Advisor

20 Years.

Design Engineer

9 Years.

Design Engineer

7 Years.

Design Engineer

6 Years.

Project Engineer

A.R. FARUOQUE M.Sc. Engineer. (Civil) MEL. MOSCOW, USSR MD. TAYABUR RAHMAN B.Sc. Engineer. (Civil)

19 Years.

Project Engineer

9 Years.

Project Engineer

MD. EBADUR RAHMAN CHOWDHURY B.Sc. Engineer. (Civil)

6 Years.

MANAGEMENT STAFF (OFFICE)


Designation Senior Accountant Senior Accountant Account Account Assistant Accountant Assistant Account Auto CAD Engineer Name Md. Shamsuzzaman Prodip Kumar Das Md. Ashaduzzaman Md. Shahabuddin Md. Harun-Or-Rashid Md. Rashedule Bari Shamima Afroz Dip-in-Architecture Senior Drafts man System Analyst Computer Operator Real State Officer Purchase officer Reception-Cum-P.A. Reception-Cum-P.A. Commercial Assistant Office Peon Md. Siddiqur Rahman Mr. Mazharul Haque (B.Sc.) Md. Enayet Hossain (M.Sc.) Md. Mamun Hyder (B.A.) Md. Shahjahan (B.A) Anamika Shah-Alam Talukder Md. Nurul Islam Khan Eakub Ali Talukder

WORK MANAGEMENT AND SUPERVISORY STAFF


Manager Construction Project Manager Project Engineer Project Engineer Project Engineer Project Engineer Construction Engineer Construction Engineer N. A TALUKDER A.R.FARUOQUE
M.Sc. Engg. (Civil) MEL. MOSCOW, USSR

27 Years. 19 Years

MD. EBADUR RAHMAN CHOWDHURY 8 Years


B.Sc. Engg. (Civil)

MD. JAKIR HOSSAIN SRAKER


B.Sc. Engg. (Civil)

4 Years 2 Years 2 Years

AHMED SHAFI
B.Sc. Engg. (Civil)

MOSHAROF HOSSAIN
B.Sc. Engg. (Civil)

MD. GIAS UDDIN (Dip.in Civil Engg) MAJIBUR RAHMAN (Dip.in. Civil Engg.) ABDUL WADUD (Dip.in. Civil Engg.) MAZAMMEL HAQUE (Dip.in. Civil Engg.) MD. ABDUL JALIL (Dip.in Civil Engg) MD. MAMUNUR RASHID (Dip.in. Civil Engg.) MD. AMINUL ISLAM (Dip.in. Civil Engg.) MD. MOSTAFIZUR RAHMAN (Dip.in. Civil Engg.) MD. NAZMUL AHSAN BHUYAN (Dip.in. Civil Engg.) MD. SHAMSUR RAHMAN(JEWEL) (Dip.in. Civil Engg.)

18 Years. 15 Years.

Construction Engineer

14 Years.

Construction Engineer

23 Years.

Construction Engineer

10 Years.

Construction Engineer

5 Years.

Construction Engineer

5 Years.

Construction Engineer

8 Years.

Construction Engineer

3 Years.

Construction Engineer

5 Years.

Asstt. Engineer

MD. IBRAHIM KAZI (Dip.in. Civil Engg.) MD. SHAJAHAN (Dip.in. Civil Engg.) MD. R.A. KAMAL MD. AMANULLAH MD. MESBAHUDDIN MD. ELIAS MOLLAH MD. ABDUL BATEN AKHAND MD. A. BARI KHAN

6Years

Asstt. Engineer

4Years

Inspector of Works Inspector of Works Inspector of Works Inspector of Works Inspector of Works Inspector of Works

18 Years 10 Years 14 Years 12 Years 10 Years 12 Years.

QUANTITY SURVEY AND QUALITY ASSURANCE STAFF


Name SALINA AKTER JAHAN B.Sc. Engg. (Civil) Md. Aminul Haque Chowdhury Dip-in-Civil Engg. Designation Quantity Surveyor Experience 3 Years

Asstt. Engineer

6 Years.

KEY FIELD STAFF


Designation Drilling Foreman Piling Foreman Piling Foreman Driller Driller Driller Driller Driller Driller Driller (Soil) Driller (Rotary) Driller (Rotary) Driller (Rotary) Asstt. Driller Asstt. Driller Asstt. Driller Asstt. Driller Asstt. Driller Asstt. Driller Asstt. Driller Name Md. Amirul Huq Md. Abul Hashem Md. Shahjahan Md. Nurul Islam Shahjahan Md. Sobhan Miah Shabuj Miah Badal Chow Faizuddin Md. Anusur Rahman Md. Saidur Rahman Rafique (i) Md. Humayun Mir Md. Nurul Islam (ii) Md. Nur Mohammad Md. Khirmohon Md. Kafiluddin Md. Milon Md. Ashadul Md. Habibur Rahman ( Hoby)

Mechanic Mechanic Mechanic Mechanic Helper Mechanic Slip Form Welder Welder Welder Welder Welder Welder Welder Welder Welder Welder Electrician

Md. Eshak Mr. Ajoy Sarker Md. Sanowar Md. Shamim Md. A. Motin Talukder Md. S. Islam (Uzzal) Md. Rafique (ii) Md. Bachu Miah Md. Achimuddin Mr. Rashmohon Md. Osmani (i) Md. Abul Basher Md. Ibrahim (2) Md. Osman(3) Md. Jahangir Md. Mokleur Rahman

KEY HEAVY EQUIPMENT OPERATORS


Designation Hydriq Minor Operator Hydriq Minor Operator Hydriq Operator Hydriq Minor Driver Crane Operator (70T) Crane Operator (40T) Crane Operator (25T) Crane Driver (70T) Crane Driver (25T) Crane Truck Driver Low Bed Trailler Driver Low Bed Trailler Helper Batching Plant Technician Batching Plant Operator Pay Loader Driver Drum Truck Driver Ramico Driver Ramico Driver Name Md. Abul Hossain Md. Aminul Islam Md. A Majid Md. Muslem Md. Karim Md. Jashim Md. Dulal Md. Anisul Haque Md. Shamsul Haque Sree Nikhil Acharjee Md. Kizir Ahmed Md. Saidul ( Liton) Md. Nazrul Md. Abdul Baset Md. Shahbuddin Md. Gulzer Md. Farook (i) Md. Afsar Uddin

WORKSHOP STAFF
Designation Asstt. Engineer Workshop and Store Sr. Store In-Charge Store Asstt. Store Asstt. Senior Foreman Master Mechanic Senior Mechanic Mechanic Mechanic Mechanic Electrician Welder Welder Welder Welder Welder Welder Welder Lathe Man Lathe Man Lathe Man Lathe Helper Name MD. SHAFIQUE AHMED (Dip. in Civil Engg.) Beni Madhab Sharkar Mr. Dipangkar Das Mr. Narayan Mr. Kanchab Miah Md. Ibrahim Md. Nur Mohammed Md. Kabir Hossain Abu Sufian Md. Fazlul Haque Md. Mynuddin ( Liton) Md. Nurul Islam ( Nuru) Md. Alamgir Md. Farid Md. Hafizur Md. Fardous Md. Minto (1) Md. Minto (2) Md. Faroque (2) Md. Laikat Ali Md. Ansur Ali Md. Masum

CURRICULUM VITAE OF MD. NURUL AMIN MANAGING DIRECTOR


QUALIFICATION : B. Sc. Engg. (Civil), Bangladesh University of Engineering and Technology, Dhaka, 1964, Post Graduate studies (Soil Mech. & Foundation Engineering). Dynamic Testing of Pile (non-destructive test) for integrity and ultimate load carrying capacity, conducted by pile Dynamics Inc., Ohio, U.S.A., 1989.

ADVANCE TRAINING :

MEMBERSHIP : i) ii) iii) iv)

Fellow, Institution of Engineers, Bangladesh. Member, Deep Foundation Institute, Cliffs, U.S.A. Member, South East Asian Geotechnical Society. Member, International Society for Soil Mechanics and Foundation Engineering. v) Member, American Society of Civil Engineers. vi) Vice President, Bangladesh Society for Geotechnical Engineering. vii) Resource person (Foundation Engineering) Institution of Engineers Bangladesh. viii) Member of the Organizing Committee for the Fifth International Conference on the Application of Stress Wave Theory to Piles held in Orlando, Florida, USA in 1996. ix) Convener Editorial Sub-Committee Structural Design (Foundation) Bangladesh National Building Code. x) Specialist Resource person (Foundation Engineering) BPWD, RHD.

NONPROFESSIONAL MEMBERSHIP : i) ii) Member, Rotary Club of Dhaka North West, Paul Harris Fellow. Life Member, Gulshan Central Mosque and Islamic Research Society, Dhaka.

PUBLICATIONS /:1. Foundations for Tall Buildings in and around Dhaka City. Presented in the Annual Convention of Institute of Engineers, Dhaka, Bangladesh . 2. Compaction Sand Pile in non-cohesive loose ground. A case study presented in Annual Convention of institute of engineers, Dhaka, Bangladesh. 3. Foundation in Swelling Clay in Bangladesh A case study. Presented in Annual Convention of Institute of Engineers, Bangladesh. 4. Geotechnical Behaviour of Soils from Coastal Region of Bangladesh Presented in the Ninth South East Asian Geo-technical Conference, Bangkok, Thailand /1987.

5. Pre-Loading of soft fine grained soil materials using Inflatable Tubes and vacuum. Presented in International Symposium on Shallow Sea and Low Land, Saga Japan / 1988. 6. Some Experiences on Integrity Test of Pile in Bangladesh by Nondestructive low strain test method. Presented in the 2nd Asian Pile Driving Analyzer Users Conference, Hongkong, 1990. 7. Some Experiences on Bored Cast in-Situ Reinforced Concrete Piles in Bangladesh A Case Study presented in U.S. FHWA International Conference on Design & Construction of Deep Foundations, December 1994 in Orlando, Florida, USA. 8. Integrity testing of foundation Piles in Bangladesh-Case Study Presented in Fifth International Conference on the Application of Stress-Wave Theory to piles. Sept 1996 in Orlando, Florida, USA. 9. Bored Cast in-Situ R.C.C. piles, Model Procedure and specifications Presented in Annual Conference of the Institute of Engineers Bangladesh 1995. 10. Performance of Bored Cast in-Situ R.C.C Piles in Bangladesh Presented in the Forth International Conference on Case Histories of Geotechnical Engineering, St. Louis Missouri, USA on March 8-15, 1998. INNOVATIONS / : a) Compaction Sand Pile for structure foundation in non-cohesive loose ground. b) Confined Sand Column with grouted tips as structure foundation in soft ground. C) Introduced small diameter Masonry Well as Building Foundations in Bangladesh. d) Innovated and developed design & construction methodology for for Pre-cast Hollow R.C.C. Drilled shaft with in-situ concrete pedestal. EXPERIENCES / : 1964-68 : Project Engineer, Swiss Boring Overseas Corpn. (Switzerland), Dhaka. 1. Developed and executed driven cast in-situ enlarged base pile Foundation work : a. National Assembly Building, 184 Ft high R.C.C structure at Shere e- Bangla Nagar, Dhaka. (2500 numbers of 40t to 60 T capacity piles). b. MNAS Hostel, Sharwardhy Hospital, Shere e-Bangla Nagar, Dhaka. (1800 numbers of 40 T to 60 T capacity piles). C. 80 MW Siddhirgonj Power Station (800 numbers of 60 T capacity rake piles).

1968-70 1.

2.

1970-71

1.

1971-72

ESSO Jetty at Godnail, Narayangonj, Dhaka. IWTA-Jetty at Dhaka / Narayangonj, Ground Water lowering work for Pumping house and water intake structures for 120 MW Ashugonj Power Station . : Deign Engineer, Swiss Boring Overseas Crop. (Zurich, Switzerland) Dhaka. Designed foundation of the following project : a. Dhaka International Airport, Terminal Building. b. 13-storied Science Faculty Building for Dhaka University. c. 14-storied LACO Building at Motijheel, Dhaka. d. 11 storied C.G.O Building at Chittagong and Khulna. Designed or ground water lowering for following projects) a. Chittagong Dry-Dock. b. Shantahar Food silo. c. Karachi Dry-Dock., Pakistan. : Design Engineer, Soil Tech International Ltd. Dhaka. Designed foundation for the following Projects :a. Child Welfare Center, Dhaka. b. Dhaka Water Works intake structure. c. 10-storied Telephone House, Mogbazar, Dhaka. : Administrator, Soil Tech International Ltd. Dhaka. Appointed by the Government of the Peoples Republic of Bangladesh to run the affairs of the company. : Executive Director, DRILLCO LTD.

e. f.

1972-73

1.

1973-till date

1.

Designed foundations for the following project :a. 18-Storied P.M.G. Building Khulna. b. 400 ft high Radio Mast at Kalurghat, Chittagong. : Managing Director Foundations Consultants Ltd and Development Constructions Ltd. Construction of the following projects : a. Two numbers R.C.C bridge (Span-16.5 m) on cast in- Situ R.C.C. rake pile diameter 500 mm and length 8m on Dhaka Chittagong Highway. b. 2.25 lac gallon capacity R.C.C overhedad water Tank at Mymensingh on 46 m long bored cast -n situ R.C.C. pile foundation. c. Railway (Span 200 ft.) Bridge No. 207, Feni-Laksham Section, founded on 42 diameter drilled caissons (bored cast-in-situ piles), length75-0 and masonry piers/abutment .

2.

Railway Bridge No. 119, Sreepur Kawraid, section (Span160 ft.) founded on 42 diam drilled caissons (bored Cast-in-Situ R.C.C. Piles), Length 70-0 drilled caissons (bored cast-in-situ R.C.C piles). e. Railway Bridge over Turag River (Span 300 ft.) at Tongi, Dhaka founded on 42 diam. 75-0 drilled caissons (bored cast in-situ R.C.C. Piles). f. Railway Bridge No. 20 (Span 70ft.) Geo-tech. investigation Design and Construction) on 500 mm diam. Bored cast in-situ rake pile and 42 diam. drilled caissons (bored vertical pile foundation). g. Railway Bridge No. 2A, Shambhugonj, Mymensingh. (Span 130 ft.) (Geo-tech. Investigation Design & Construction). Founded on 42 diam. 65-0 long drilled caissons (bored cast insitu R.C.C.piles) h. Railway Bridge No. 8 A (Geo-tech. Investigation & Design).(Span 160-0) i. 5 M.G.D. Iron removal plant for Chittagong WASA. j. 22.5 Km, 600 mm to 200 mm dia water pipe line (Ductile Iron Pipe) for Chittagong, WASA. Construction of R.C.C. Cast-in-Situ, Pre-cast R.C.C. and Sand piles foundation of following projects: a. b. Godown, Factory and Administration Building of National Cotton Mills, Chittagong (500 Piles). National Library Building at Agargaon, Dhaka. (Investigation, design, construction of 800 Nos. Piles capacity 60 Ton each). 132 KV Anchor, River Crossing Towers on Karnafully & Halda River, Chittagong (Span 1000 m each). Bangladesh Agriculture Research Institution at Chittagong. 132 KV Greater Dhaka Power Distribution Towers from Postogola to Siddhirgonj. Chemical Water Treatment Plant of 110 MW Goalpara Power Station, Khulna. 2 Nos. Permeable Steel Pile Spares for Protection of Hatiya Town from Erosion. 500 Beded Hospital at Chittagong Cantonment Housing Complex, CUFL, CHITTAGONG. (1600 Nos. 14X14 and 16X16 Pre-cast R.C.C Pile). 130 Nos 132 KV Power Distribution Towers (Barisal-Bherapara) along 207 Km cross-country route. Design & Construction of 69.4m and 58 m Span Road Bridge with pre-stressed concrete girder bored Cast-in-Situ piles in KustiaMagura and Faridpur Daulatdia Road under RIP. Design & Construction of 65.23 m long Road Bridge with prestressed concrete girder on Ichamati River in Pabna by pass.

d.

d. e. f. g. h. i. j. k. L.

M.

3.

Major Geotechnical Investigation works executed are:a. b. c. d. e. f. g. h. 20 Nos. Cyclone shelters at Dublar Char. Bagerhat. Land Reclamation Project at Ashugonj for BOGMC. Navigation Channel Dredging Project at Mongla Port. Bagerhat. 200 Nos. Cyclone Shelters in Greater Barisal and Patuakhali (IDA financed) in Coastal region of Bangladesh. 200 Nos. food grain storage in Greater Dinajpur, Rangpur, Bogra, Rajshahi, Districts. (IDA financed). Numbers of Hospital Centres, Natural Health Centres at different places in Bangladesh (IDA financed). Explosive Cargo Jetty and Multi-storied Transit Sheds at CPA Project area at Chittagong. 132 KV Power Transmission Towers for PDB 300 Numbers for Greater Dhaka Power Distribution 200 Numbers for Khulna- Bagerhat Mongla 94 Numbers for Bagerhat Perozpur 47 Numbers for Modanhat Dohozari 8 Numbers for Mahamudabad Ashugonj. Meghna Dhonagoda irrigation Project. Karnafully Irrigation project along Halda River. 5 Nos light tower installation at Hiron Point at Sundarban Area for Mongla Port Authority. 900 m long Buriganga Bride, Dhaka. 300 m long Sitalaykhya Bridge, Dhaka. 700 m long Bramaputra Bridge, Mymensingh. 700 m long Mohanada Bridge, Rajshahi. 1200 m long Mohananda Bridge, Rajshahi. Span proposed PAKSEY Road Bride on the River Padma. Meghna Bridge at Bhairab Bazar.

i. j. k. l. m. n. o. p. q. r.

LIST OF CONSTRUCTION EQUIPMENT, VEHICLES AND FACILITIES OWNED BY DEVELOPMENT CONSTRUCTIONS LTD.
SI. Name of plant, Machinery of equipment No. Country of Manufacture Year of Manufacture 1982 1987 Capacity Present condition Number Present Location (Running or out of order) 1 Company Central Running Depot, Tongi 1 Company Central Running Depot, Tongi Type

1 "P & H" KOBELCO 670-S Crawler Crane Japan 2 NCK 605 Crawler Crane 12.5 Tons single England line pull, equipped with long and wide u/c 36 pads, 60 ft boom hook block, Dorman engine, part air controls 3 "P & H" KOBELCO 35Ton Crawler Crane Japan 4 HITACHI 25Ton Crawler Crane 5 25 Ton Capacity (10 Wheeler) Heavy Crane Model : Allen Oxford 6 5 Ton Capacity (6 Wheeler) Heavy Crane Model : 1976 7 ICE 416 Hydraulic Vibro Hammer with Single with Single clamps, Double Clamps, Cummins Engine, 500 KV Hydraulic Power Pack complete with hoses. 8 CMV TRM 35/21, 21 Tons-meter torque piling Rig equipped with GM 4/71 engine and ZF transmission, 5 X 12 m Kelly bar max. drilling depth 85 m, and dia 2.5 m. 9 Hydreq Minor Rotary Direct/Reverse Circulation Rig Precast and Cast-in-Situ Piling Equipment 10 Koken Heavy Duty Rotary Drilling Rig for Construction of Cast in Situ R.C.C Piles (Vertical and Rake piles). 11 Hydraulic Operated Turntable Reverse Circulation Rotary Drilling Rig Japan England Japan USA

70 Metric Ton 38 Metric Ton

Crane

1988 1985 1988 1995 1988

35 Metric Ton 25 Metric Ton 25 Metric Ton 5 Metric Ton 10.5 Tons

1 1 1

Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi

Running Running Running Running Running

England

1987

Torque 21 Tonsmeter. drilling depth 85 m, and dia 2.5 m. 1200 mm dia and 40 m long Bored pile 1200 mm dia and 40 m long Bored pile 2500 mm dia and 100m long Bored pile. 10.5 Ton-Meter 10.5 Ton-Meter 7 Ton Power Winch & 38m Leader to Drive 31 m long Pre-cast / Steel Tube Piles in Single Length up to 1:5 Rake

Company Central Depot, Tongi

Running

England

1985

Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi

Running

Japan

1990

Running

Major Component: Norway, England 12 Diesel Hammer K35 complete with tripping Japan device 13 Diesel Hammer IDH35 complete with Japan tripping device 14 Pile Frame (Own Design and Fabrication)

2006

Running

1992 1992

3 1 3

Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi

Running Running Running

15 Piling Rig (Percussion Type) for construction of cast in-situ R.C.C. Piles

1988

Diameter 450 mm to 1200 mm & Length up to 50m SP Type, Head 28 m, 30,000 L/hr 2 cu.ft/sec

10

Company Central Depot, Tongi

Running

16 Heavy Duty Mud Pump

India

1988

12

Company Central Depot, Tongi Company Central Depot, Tongi

Running

17 Centrifugal Pump

China

1989

12

Running

LIST OF CONSTRUCTION EQUIPMENT, VEHICLES AND FACILITIES OWNED BY DEVELOPMENT CONSTRUCTIONS LTD.
SI. Name of plant, Machinery of equipment No. Country of Manufacture Year of Manufacture Capacity Present condition Number Present Location (Running or out of order) 2 Company Central Running Depot, Tongi 1 Company Central Running Depot, Tongi 1 Company Central Depot, Tongi Running Type

18 Hydraulic jack and kentledge for pile load test 19 Computerized Pile Integrity Tester by Low USA Strain Dynamic Response method Origin : Pile Dynamic Inc. USA 20 Pile Driving Analyzer inclusive of USA CAPWAP SoftwareIt measures, calculates and checks i) Hammer performance (energy transfer) ii) Pile Integrity or damage (extent and location of damage) iii) Driving stress (compressive and tension) iv) Bearing capacity (at time of testing)

Up to 1500 Ton 2002

Equipment Pile TestingCrane

2003

21 Caterpillar CAT121 Excavator 22 Kobelco PC 200 Excavator 23 TCM Front End Shovel Loader Model: 75111 24 Hino Dumper Truck Model: EK100 25 Grabs (clam-shell buckets), Winch & Hoist 26 Earth Compactor 27 Earth Compactor 28 Shallow Tube Well with Electrically Operated Pump 29 Vacuum Pump for ground water table lowering 30 Pre-stressing Jack MG1000, S-8 Pre-stressing Equipment 31 Pre-Stressing Jack Monowire 32 P-6 Prestressing Pump 33 Grout Pump 34 Agitator 35 SR 200 Sheathing Machine, Drossbach type

USA Japan Japan Japan

1996 1990

0.5m3 0.75m3

Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi

Running

1 1996 2000 10 Tons 0.5 m3 10 Tons 1 Ton 2 5 6 4 15

Running Running Running Running Running Running Running Running Running Running Running Running Running

Earthwork Equipment

Japan India

1985 2004

England, Japan 1985-88 India India India India India India 1998 1998 1998 1998 1998 1988 Suitable for manufacturing of sheathing of 100 mm I.D 100 Ton 20 Ton

6 4 6 4 1 1 1

LIST OF CONSTRUCTION EQUIPMENT, VEHICLES AND FACILITIES OWNED BY DEVELOPMENT CONSTRUCTIONS LTD.
SI. Name of plant, Machinery of equipment No. 36 Steel Shutter, Props, 1 Beams, Adjustable Jacks etc 37 Shutter for Pre-stressed Concrete Girders Country of Manufacture Year of Manufacture Capacity Present condition Number Present Location (Running or out of order) 1 set Company Central Running Depot, Tongi 3,200 Company Central Running sq. Depot, Tongi meter 4 Company Central Running Depot, Tongi 7 10 Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Running Running Type

10,000 sq. meter

Slip Form and Jump Form Shuttering Crane

38 Lifting, Shifting Jacks and arrangements for Pre-stressed Concrete Girders 39 Welding Machine 40 Diesel Generating Set Bangladesh China, UK 1988 1988 10kW 20KW,50 KW,75KW150KW

41 Diesel Engines 42 Hoist with Winch 43 Slip Form Comprising i) 3 Ton capacity continuous lifting Hydraulic jack. 40 Sets. ii) 3 Ton capacity cap jaw 40 Sets. iii) Jack Rod. 40 Sets. iv) Jack holder. 40 Sets. v) Hose pipe. 40 Sets. vi) Jack Holder. 40 Sets. vii) Power pack 40 Sets. viii) Oil seal 40 Sets. ix) Jack Rod stand 40 Sets. x) Wailers, Yoke etc 40 Sets. xi) 300 Ton capacity Hydraulic power pack 1 Sets. 44 Nissan Concrete Transit Mixer Truck 45 Concrete Transit Mixer Truck TATA LPK 1313/49 46 Concrete Mixing Plant 47 Concrete Pump 48 Concrete Drum Mixtures 49 Stone crusher machine 50 Petrol and Electric Vibrators (Concrete) 51 Load Frame for Concrete Cylinder / Cube Compressive strength test model 405

England, Japan, China Bangladesh

1989 1995 60m

20 3 1 set

Running Running Running

Concrete Mixing, Transport, and Pouring

India Japan Denmark China England

1996 1996 1996 2000 1989

6 m3 6 m3 15 m3/Hr 65m3/Hr 7.5cft to 10.5 cft 2000 cu.ft/day

3 3 1 1 17 3 15 2

China, India Norway, India

1988

40 mm, 70 mm dia Nozzle 8000 PSI

Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi

Running Running Running Running Running Running Running Running

LIST OF CONSTRUCTION EQUIPMENT, VEHICLES AND FACILITIES OWNED BY DEVELOPMENT CONSTRUCTIONS LTD.
SI. No. 52 53 Off-Shore and On-Shore Transportation Crane Present condition Country of Year of Name of plant, Machinery of equipment Capacity Number Present Location (Running Manufacture Manufacture or out of order) Nissan Diesel Prime mover (10 wheels) Japan 1995 1 Company Central Running Model: W-CW620GNT. Depot, Tongi Low Bed Trailer (16 wheels) Japan 1994 65 M.Ton capacity 1 Company Central Running 30' x 10'-6" Depot, Tongi Singapore Japan India Japan Korea Korea Japan Japan Japan Japan Japan Japan 2005 1985 2006 1985 1992 1990 1992 700 HP 600 Ton capacity 130 ft x 46 ft 200 Ton capacity 95 ft x 30 ft 40' x 10'-6" Truck-7 Ton Crane-3 Ton 1 1 1 1 1 1 3 1 5 1 1 1 Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Pagla, Narayanganj Pagla, Narayanganj Pagla, Narayanganj Company Central Depot, Tongi Head office Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Company Central Depot, Tongi Running Running Running Type

54 High Bed Trailer (8 Wheels) 55 Hino Truck with Cargo Crane 56 Tractor with Trailer 57 Tug Boat 58 Flat Barge with Pile Rig Installed 59 Flat Barge with Pile Rig Installed 60 Toyota Pickup truck 61 Sports Utility Vehicles 62 Cars 63 Sokkia Set2010 Total Station & PFAl with original accessories 64 Sokkia KPS11PT Single Pole Prism Complete Set 65 Sokkia B21-Automatic Level with PFA1 Original with tripod and standard accessories 66 Theodolite and Leveling Instrument 67 Engineering Workshop at Shilmon, Tongi Industrial Area, Dhaka for repair and maintenance of equipments, equipped with Lathe Machine, Drill Machine, Welding Machine and Bending Machine to manufacture steel pipes from 400 mm to 3000 mm diameter using plate up to 12mm thickness etc.

Running Running Running Running Running Running Running

Survery Equipment

2001 2001 2001

Japan

1980-88

10 1 Set

Running Running

Workshop

LIST OF EQUIPMENT FOR GEOTECHNICAL EXPLORATION AND TESTING EQUIPMENTS


A. FIELD EQUIPMENTS : SI. No. Name of plant, Machinery of equipment KOKEN Heavy Duty Drilling Machine RK-2: 1 RK-2, 540 1985 Country of Manufacture / Model Year of Manufacture Capacity High pressureup to 70 Kg/Square-cm (Capable of drilling and rock coring by diamond bit upto 450 m depth) with 10T Static Cone Penetration Test attachment. Capable of drilling and rock coring. with diamond bit upto 1000 ft.) with packer Tests Assembly etc. Apparatus with DATA -ACQUISITION SYSTEM Software, a Pentium (H) Processor, 32 MB 6 GB hard disk and Hydraulic Thrust Machine of 30Ton capacity. It measures, calculates and checks: i) Cone resistance ii) Local Sleeve friction iii) Inclination iv) Pore Pressure v) Conductivity vi) Acidity (pH) vii) Penetration Depth viii) Temperature ix) Permittivity x) Penetration speed xi) Redox xii) Time xiii) Fuel Fluorescence response 4 5 6 7 8 9 10 11 12 13 Soil Boring & Testing Rig complete. Piston Pump Vane Shear Set Plate Bearing & Evaluation of Sub-grade Reaction. Mud Pump. Water Pump (Centrifugal). 3 Ton Pickup for Transportation. Four Wheel Drive Jeep. Tools for Running the Drilling Rigs Well equipped workshop for repair and maintenance of equipment. Local Local India Local Italy Italy Japan Substantial Quantity. 1 1980-89 12 Sets. 2 Nos. 1 Nos. 6 Nos. 7 Nos. 7. Nos. 3 Nos. 2 Nos. Cental Strore Cental Strore Cental Strore Cental Strore Cental Strore Cental Strore Cental Strore Cental Strore Cental Strore Cental Strore Running Running Running Running Running Running Running Running Running Running Quantity Present Location Present condition

3 Sets.

Cental Strore

Running

Drilling Rig Tone Model THS-C Japan made with mud pump etc. complete

THS-IC

1979

1 Set.

Cental Strore

Running

Electronic Cone Penetration Test (ECPT)

GME-500 (IP65) 1 Unit Made in The Netherlands.

2001

Cental Strore

Running

SI. No. B: 1 2 3 4 5

Name of plant, Machinery of equipment LABORATORY EQUIPMENTS Unconfined Compression for rocks and soils Atterberg Limits Natural Moisture Content for rocks and soils. Specific Gravity for rocks and soils. Grainsize Analysis (both sieve and hydrometer).

Country of Manufacture / Model

Year of Manufacture

Capacity

Quantity

Present Location

Present condition Running Running Running Running Running Running Running Running

3 1 2 1 6 2

Geotech Lab Geotech Lab Geotech Lab Geotech Lab Geotech Lab Geotech Lab Geotech Lab Geotech Lab

6 Unit Weight (Dry & Wet) for rocks and soils 7 Consolidation 8 Direct Shear Tri-axial Model EL25-284/01 with accessories Viz. Digital readout unit for un-drained tri-axial tests, submersible load transducer, Pressure Transducer 9 module and XY/I recorder complete, Suitable for point load testing of rocks. 10 11 12 13 14 15 Permeability Compaction C.B.R. Tests Drying Ovens Field Density of Back fill. Petrography, Visual and Microscopic equipment

Geotech Lab

Running

2 4 1 2 1

Geotech Lab Geotech Lab Geotech Lab Geotech Lab Geotech Lab Geotech Lab

Running Running Running Running Running Running

SI. No.

Name of plant, Machinery of equipment

Country of Manufacture / Model

Year of Manufacture

Capacity

Quantity

Present Location

Present condition Running Running

C. COMPUTER EACILITIES : 1 Pentium-4, Computers. 2 3 Pentium-3 Laptop Computers One Unit HP DesignJet 800 (Size 42") Product type - Plotter, Product Family - HP DesignJet, Product Name - 800 Print, Quality Ultimate line and photo quality Resolution - 2400 x 1200 dpi, Speed - Line drawings in fast mode 60 seconds (D-size bond paper) Image in fast mode 3 minutes 54 second (D-size), Memory - 96MB RAM and 6 GB Hard Disk. Minimum 160MB RAMP and 6GB Hard Disk.

14 3

H/O H/O

H/O

Running

4 One Number EPSON LQ 300 Printer. Three Numbers HP Laser Jet 6P, 1100 HP Laser Jet 5 and 1200 HP Laser Jet. 6 One BJC-2100SP CANON Bubble Jet Printer. 7 One HP ColorPro Graphics Plotter. 8 Computers Operated by AutoCAD 2004 ADAPT-PT Software for analysis and design of pre9 stressed (post tensioned) flat slab & 10 pre-stressed beams/girders. ADAPT-FELT Software for analysis of loss in pre11 stressed (post tensioned) member STAAD Pro 2001 Software for Analysis (2D/3D) and 12 design of Structures.

1 1 1 1 14 1

H/O H/O H/O H/O H/O H/O H/O

Running Running Running Running Running Running Running Running Running

1 1

H/O H/O

SI. No.

Name of plant, Machinery of equipment NISA/CIVIL

Country of Manufacture / Model

Year of Manufacture

Capacity NISA/CIVIL Software for analysis and design of prestressed as well as RCC Structures. Offering CAD based solution encountered in the Analysis, Design of reinforced concrete, steel and pre-stressed structures. The output will be both in design document format and drawings will be in AutoCAD format. Following are the Salient features related to moving loads as applied to bridges and fly-overs available in i) Vehicle Configuration and Vehicle Group. ii) Path Specification. iii) Wheel Load Direction and distribution. iv) Automatic Generation of Loads due to Vehicle Movement on Railway and Highway Bridges. v) Pre-stressed Loads. vi) Static Analysis. vii) Wheel Load Direction and distribution. viii) Graphic Display of the above features. ix) Transient Dynamic Analysis under Moving Loads. x) Comprehensive Vehicle Database.

Quantity

Present Location

Present condition

13

H/O

Running

CURRENT PROJECTS
1. Employer Principal Contractor Project : : : ROADS AND HIGHWAYS DEPARTMENT. DEVELOPMENT CONSTRUCTIONS LTD. Construction of 161.64m long Pre-stressed Concrete Girder Bridge at Sheikpur at 18th Km of PancharShibchar-Madaripur Road, under Madaripur Road Division. Tk. 6,70,24,040.00 ROADS AND HIGHWAYS DEPARTMENT. DEVELOPMENT CONSTRUCTIONS LTD. Construction of 155.43m long ( 4X 38.21m) Prestressed Concrete. Girder Bridge over Old Brahmaputra River at 17th K.M. of EkdoriaAgarpur Regional Highway under Narshingdi Road Division. Tk. 6,72,91,403.20 LARSEN & TOUBRO LIMITED (INDIA). Development Constructions Ltd. Pilling work for plat area and construction pilling and superstructure for jetty at Chatak for Lafarge Surma Cement plant. 23,45,39,071.00

Contract value 2. Employer Principal Contractor Project

: : : :

Contract value 3. Employer Principal Contractor Project

: : : :

Contract value

4.

Employer Principal Contractor Project

: : :

MEDLAR FASHIONS LTD. Development Constructions Ltd. Construction of 8-Storied factory and office building at Ashulia, Savar. 84 million taka.

Contract value

CURRENT PROJECTS
1. Employer Principal Contractor Project : : : ROADS AND HIGHWAYS DEPARTMENT. DEVELOPMENT CONSTRUCTIONS LTD. Construction of 161.64m long Pre-stressed Concrete Girder Bridge at Sheikpur at 18th Km of PancharShibchar-Madaripur Road, under Madaripur Road Division. Tk. 6,70,24,040.00 ROADS AND HIGHWAYS DEPARTMENT. DEVELOPMENT CONSTRUCTIONS LTD. Construction of 155.43m long ( 4X 38.21m) Prestressed Concrete. Girder Bridge over Old Brahmaputra River at 17th K.M. of EkdoriaAgarpur Regional Highway under Narshingdi Road Division. Tk. 6,72,91,403.20 LARSEN & TOUBRO LIMITED (INDIA). Development Constructions Ltd. Pilling work for plat area and construction pilling and superstructure for jetty at Chatak for Lafarge Surma Cement plant. 23,45,39,071.00

Contract value 2. Employer Principal Contractor Project

: : : :

Contract value 3. Employer Principal Contractor Project

: : : :

Contract value

4.

Employer Principal Contractor Project

: : :

MEDLAR FASHIONS LTD. Development Constructions Ltd. Construction of 8-Storied factory and office building at Ashulia, Savar. 84 million taka.

Contract value

LIST OF MAJOR PROJECTS COMPLETED


A. A1. FLYOVER: Employer Principal Contractor Project : : : : LOCAL GOVERNMENT ENGINEERING DEPARTMENT. Development Constructions Ltd. Design Build Contract of Flyover at Khilgaon Rail & Road Intersection, Length 1880m with 4 lane carriage way, in Dhaka City. Tk. 627.00 Million 23/06/2001 to 31/12/2004.

Contract value Contract period

: :

B. B1.

HIGHWAY BRIDGE: Employer Principal Contractor Project : : : ROADS AND HIGHWAYS DEPARTMENT. HANIL CONSTRUCTION CO LTD. Construction of 450m long pre-stressed concrete girder bridge (10 span of 45m) on 1m diameter, 57m long bored cast-in-situ R.C.C piles over River Arial khan at SRNDP, Contract No.-2, Mawa (Char Janajat) - Bhanga including manufacture and driving of 47 m long 12 mm thick permanent steel casing. 27,49,42,486.00 Tk. (Including cost of materials) January 2001 to January 2005.

Contract value Contract period

: :

B2.

Employer Principal Contractor Project

: : :

ROAD AND HIGHWAYS DEPARTMENT TOWER ENTERPRISE LTD. Construction of 303.25 m long Pre-Stressed concrete girder Bridge at Mollahat over Modhumoti River on Bhanga-Bhatiapara Gopalgonj-Mollahat Fakirhat-Tower NoaparaKhulna Road , Under Gopalgonj Road Division, Roads & Highways Department works comprising (1) (2) 1000 mm dia 34 m long, 44 Nos. Bored Cast in Situ R.C.C pile. 1200 mm dia 48m long, 72 Nos. Bored Cast in-Situ R.C.C pile, off shore at 16 m water 43.32 m long 2.286 m. height 35 Nos. PreStressed Post Tensioning Girder.

(3) Contract Value Contract Period Completion Date B3. Employer : : : :

2,20,00,000/- (Excluding cost of materials) (30% completed) 21-11-98 to 20/06/2000 15.06.2000 CHINA HARBOUR ENGINEERING CONSTRUCTION CO. DEVELOPMENT CONSTRUCTIONS LTD. Constructions of Contract No. 3, Atrail & Ayermari Bridge at Nalkha-Hatikamrul Bonpara New Road Project RRMP-III, Natore. Tk. 117,833,486/15/03/99 to 31/03/2000. 30.03.2000. ROAD AND HIGHWAYS DEPARTMENT . DEVELOPMENT CONSTRUCTIONS LTD. Construction of 92.96 m long Pre-Stressed concrete girder Bridge on River Ghagor at 20 the K.M. of Gopalgonj Kotalipara-Paisarhat Road, Gopalgonj. Tk 2,76,24,165/5514-07-97 to 28-02-99. 20-02-99.

Principal Contractor Project

: :

Contract Value Contract Period Completion Date B4. Employer Principal Contractor Project

: : : : : :

Contract value Contract period Completion Date

: : :

B5.

Employer Principal Contractor Project :

: : :

ROADS & HIGHWAYS DEPARTMENTS. SUNGJEE CONSTRUCTION CO. LTD. Construction of 188 Nos. 600 mm & 750 dia, Bored Cast-in-Situ pile for Str. No 68,69,70 & 72 at Jamuna Bridge Project, Contract No-3 Tk. 60,00,000/00 (Excluding cost of materials) 20/02/99 to 20/06/99 20.06.99 ROADS & HIGHWAYS DEPARTMENT. IRCON INTERNATIONAL Construction of 40 m long Kansat Canal Bridge at Ch. 21+735 Sonamasjid- Shibganj-Nawabganj Road (RRMP-II /WA) Tk 3,250,370.00 05/12/97 to 05/06/98 ROADS AND HIGHWAYS DEPARTMENT. ANSAL PUBALI JOINT VENTURE. Construction of 65.67 m long Road Bridge super Structure with Pre-stressed concrete girders, R.C.C deck-slab, R.C.C. cross-beam, railing, approach slab, guide wall, piers and abutment, Roads & Highway Department. Tk.12,045,648Dec. 93 to Dec. 1994. ROADS AND HIGHWAYS DEPARTMENT. CHINA NATIONAL COMPLETE PLANT EXPORT CORPORATION.IN DAWLATDIAFARIDPUR-JHENAIDAH-KUSTIA ROAD. Construction of 69.4 m Long Bridge with pre-stressed concrete girders on 1.2 m diam 36m long bored Cast-in-Situ pile foundation in RIP, Contract-11, Jhenaidah (Structure No.46). Roads and Highways Department. Tk. 21,620,003/00

Contract value Contract period Completion Date B6. Employer Principal Contractor Project

: : : : : :

Contract value Contract period B7. Employer Principal Contractor Project

: : : : :

Owner Contract value Contract period B8. Employer Principal Contractor

: : : : :

Project

Owner Value of Completed work.

: :

Contract Period Date of completion B9. Employer Principal Contractor

: : : :

April 1992 to 15th Sept, 1994. 28.08.1994. ROADS AND HIGHWAYS DEPARTMENT. CHINA NATIONAL COMPLETE PLANT EXPORT CORPORATION. IN DAWLATDIAFARIDPUR-JHENAIDAH-KUSTIA ROAD. Construction of 58 m Long Bridge with pre-stressed concrete girders on 500 mm diam 22 m long bored Cast-in-Situ pile foundation in RIP, Contract-9, Faridpur (Structure No.20). Roads and Highways Department. Tk. 18,281,832/00 April 1992 to 15th June 1994. 28.08.1994. ROADS AND HIGHWAYS DEPARTMENT. ACF- SWEEHONG JOINT VENTURE. Construction of Bored Cast in-Situ R.C.C. Piles (Rake & Vertical) Road Bridge under RIP, Contract -4 (Dohazari-Lohagara Section). Bored Cast in-Situ R.C.C. piles, R.C.C. Abutment, piers, girders, deck slab, railing. Tk. 25 million. October 1993 to- June 1993. ROADS AND HIGHWAYS DEPARTMENT. CHINA NATIONAL COMPLETE PLANT EXPORT CORPORATION. IN DAWLATDIAFARIDPUR-JHENAIDAH-KUSTIA ROAD. Construction of 58 m Long Bridge with pre-stressed concrete girders on 500 mm diam 22 m long bored Cast-in-Situ pile foundation in RIP, Contract-9, Faridpur (Structure No.16). Roads and Highways Department. Tk. 15,858,432/00 April 1992 to 15th June 1993. 15.06.1993.

Project

Owner Value of Completed work. Contract Period Date of completion B10. Employer Principal Contractor Project

: : : : : : :

Type of Foundation Contract value Year of completion B11. Employer Principal Contractor

: : : : :

Project

Owner Value of Completed work. Contract Period Date of completion

: : : :

B12.

Employer Principal Contractor Project Type of Foundation Contract value Year of completion Execution period

: : : : : : : : : :

DIRECTORATE OF RELIEF AND REHABILITATION. DHAKA, BANGLADESH. DEVELOPMENT CONSTRUCTIONS LTD. Construction of 280-0 Long Bridge over the River Mathabanga on Chudanga- Alamdanga Road. Bored Cast in-Situ R.C.C. piles, R.C.C. Abutment, piers, girders, deck slab, railing. Tk. 7.142 million. January 92 to July 1993. September 1990 to March 1992. ROADS & HIGHWAY DIRECTORATE. RDC-TPL, SINGAPORE. 5 Nos. Bridge sub-structure on ShambugonjHaluaghat Highway under FRIP, 9 ADB financed. Span 20 m to 77 m. Pre-stressed concrete girders R.C.C. Slab, Pre-Cast and cast-in-situ R.C.C piles. Tk. 46.09 million. 1992 September 1990 to March 1992. ROADS & HIGHWAY DIRECTORATE. INDIAN RAILWAY CONSTRUCTIONS LTD. 16.5 m long bridge at 4.15 and 9.15 Km DhakaChittagong Highway (Dawoud Kandi-Comilla Section). 500 mm diameter 18 m long bored cast in-situ R.C.C. (Rake) piles R.C.C girders, deck slab. crush barrier, railings, Tk. 16.5 million. (ADB Financed). May, 1991. December, 1989 to May 1990.

B13.

Employer Principal Contractor Project

Type of Foundation

Contract value Year of completion Execution period B14. Employer Principal Contractor Project

: : : : : :

Type of Foundation

Contract value Year of completion Execution period

: : :

C. RAILWAY BRIDGE: C1. Employer Principal Contractor Project : : : BANGLADESH RAILWAY. SAMWHAN TSO-JOINT VENTURE. Construction of 30m long (without splice) Pre-cast RCC Driven Piles for 33 Nos. of Bridge in Division- 1 & V on Bangabandhu Bridge Railway Link Project. Contract 1 at Tangail Tk. 52,385,060.00 (Excluding cost of materials) 16/12/97 to 26/06/2000 20.06.2000 JAMUNA MULTIPURPOSE BRIDGE PROJECT AUTHORITY. SAMWHAN CORPORATION, KOREA. Construction of Bridges & Culverts on JMB Approach Road, Contract 3 & Contract 4, comprising. Construction of 12 Nos. Double Cell Box Culverts of 5m x 5.9 m x 2. 7 Nos. Single Cell Box culverts, 5m x 5.9m. 12 Nos. Slab Bridges, Span 31 m founded on 4mx4mx28.4m Pre-cast R.C.C single length driven pile. 9 Nos. Slab Bridges, Span 66m founded on.4mx4 x 28.4m Pre-cast R.C.C. single length driven pile. Tk.57 million (Excluding cost of cement, aggregates & Re-bar, Batch Plant, Transit mixers). January 95 June, 1997. BANGLADESH RAILWAY (WEST) Rebuilding of Railway Bridge No.20A at Shambhuganj, Mymensingh. 106 cm diameter cast in-situ R.C.C piles and 50.8 cm diameter cast in-situ R.C.C piles in wingwalls Tk. 9.65 million. March, 1990. March 1989 to March 1990

Contract Value Contract Period Completion Date C2. Employer Principal Contractor Project

: : : : : :

a) b) c)

d)

Contract value Contract period C3. Employer Project Type of Foundation

: : : : :

Contract value Year of completion Execution period

: : :

C4.

Employer Principal Contractor Project Type of Foundation Contract value Contract Period Year of completion

: : : : : : :

BANGLADESH RAILWAY DAEWOO CORPORATION. Railway Workshop at Parbatipur. 450 mm diameter 18-24 m long bored cast in-situ R.C.C piles (925 numbers) Tk. 23.2 million. Sept 1989 to March 1990 February, 1990. (All piles were tested for integrity by pile integrity tester) BANGLADESH RAILWAY (West) Rebuilding of Railway Bridge No.20, in Ishurdi-Sirajganj Section. 42 dia Cast in-situ R.C.C Piles & 24 diam. Rake Piles. Tk. 9.50 million. 1989 March 1989 to October 1989 BANGLADESH RAILWAY Rebuilding of Bridge No. 42 (Turag DN) in between DACT. TGI Station. 42 dia 70 0 long Cast in-situ R.C.C Piles Construction of 2 piers & 1 Abutment with wing walls. Tk. 9.75 million. 1989 January 1989 to May 1989.

C5.

Employer Project

: :

Type of Foundation

Contract value Year of completion Execution period C6. Employer Project

: : : : :

Type of Foundation

Contract value Year of completion Execution period

: : :

C7.

Employer Project

: :

BANGLADESH RAILWAY Rebuilding of Bridge No. 119 in between Shat Khamair & Kawraid Stations. 36 dia 70 0 long Cast in- situ R.C.C Piles. Tk. 3.6 million. 1987 January 1986 to September 1987.

Type of Foundation Contract value Year of completion Execution period

: : : :

C8.

Employer Project Type of Foundation

: : :

BANGLADESH RAILWAY (EAST) Bridge No. 207 on Feni Laksham Section. 42 diam 75 ft. long 70 Nos. Cast in-situ R.C.C. Piles. Tk. 10.4 million. 1979 October 1978 to January 1979.

Contract value Year of completion Execution period

: : :

D. D1.

SILO: Employer : CHITTAGONG CEMENT CLINKER GRINDING CO. LTD. DEVELOPMENT CONSTRUCTIONS LTD. Construction of one 25,000 ton capacity 30m diam 38.5 m high Clinker Silo of pre-stressed concrete construction using SLIP FORM at Chittagong. Tk. 62.8 Million. 15/02/2001 to 15/02/2002

Principal Contractor Project

: :

Contract value Contract period

: :

D2.

Employer Principal Contractor Project

: : :

ASHUGONJ CEMENT INDUSTRIES LTD. DEVELOPMENT CONSTRUCTIONS LTD. Construction of Cement Mill Building, Packing Building, Cement Silo, Clinker Silo, Gypsum Storage, Jetty and Conveyor for Ashugonj Cement Industries Ltd. at Mongla Port Area, Mongla, Bagerhat. Tk. 11,27,73,356.00 20/05/2000 to 20/07/2002 CHITTAGONG CEMENT CLINKER GRINDING CO. LTD. DEVELOPMENT CONSTRUCTIONS LTD. Construction of Gas Power Plant at Chittagong Cement Clinker Grinding Plant Project. Tk. 3.00 Million. 15/04/2002 to 15/06/2002

Contract Value Contract Period D3. Employer Principal Contractor Project Contract value Contract period

: : : : : : :

D4.

Employer Principal Contractor Project

: : :

SHAH CEMENT INDUSTRIES LTD. DEVELOPMENT CONSTRUCTIONS LTD. 3 Nos. Clinker Silos, capacity 25,000T/SILO, diameter 25m, height 57m using SLIPFORM for Shah Cement Industries Ltd., at Muktarpur, Munshigonj. January 2002 to August 2002. SHAH CEMENT INDUSTRIES LTD., DEVELOPMENT CONSTRUCTIONS LTD. Construction of 3 Nos Cement Silo wall & roof including Civil work using slip form for Shah Cement Industries Ltd., at Muktarpur, Munshigonj. July 2001 to November 2001.

Contract Period D5. Employer Principal Contractor Project

: : : :

Contract Period

D6.

Employer Principal Contractor Project

: : :

SCANCEM CEMENT INDUSTRIES LTD. DEVELOPMENT CONSTRUCTIONS LTD. a) Construction of One No. 40,000 Ton capacity Clinker Silo. b) Construction of Two Nos. 5,000 Ton Capacity Cement Silo. c) Construction of One Nos. 1,200 Ton Capacity Barge Berthing Jetty at Dhaka Grinding Plant Project, Tatki, Rupgonj, Narayangonj. Tk.152.132 million 15/11/99 to 30.11.2000 30.11.2000. CHITTAGONG CEMENT CLINKER GRINDING CO. LTD. DEVELOPMENT CONSTRUCTIONS LTD. Construction of Cement Packing Building for Factory Unit II of CCCGCL at Chittagong. TK 26,000,00/00. 04/04/98 to 19/10/98. 15/10/98

Contract value Contract period Completion Period D7. Employer Principal Contractor Project Contract value Contract period Completion Date

: : : : : : : : :

E. E1.

PILING WORKS: Employer Principal Contractor Project: : : WARTSILLA BANGLADESH LIMITED. DEVELOPMENT CONSTRUCTIONS LTD. Construction 244 piles of 600mm diameter and 32 m length, and civil installation work for site preparation, site works, substructure, and sewage for Surma Energy Ltd. Chatak : : 6,63,00,000.00 April 2004 to December 2004.

Contract value Contract Period

E2.

Employer Principal Contractor

: : :

UNIVERSITY OF SCIENCE & TECHNOLOGY CHITTAGONG. DEVELOPMENT CONSTRUCTIONS LTD. Execution of Piling work for construction of 500Bed Bangabandhu Memorial Hospital at Foy's Lake at Chittagong. Tk. 2,39,78,747.00 July 2001 to January 2002. HANIL CONSTRUCTION CO., LTD. DEVELOPMENT CONSTRUCTIONS LTD Constructions of Bored Cast-in-Situ R.C.C. piles for Saidabad Water Treatment Plant Project, Contract 4B, Saidabad. Tk. 51,698,190/(Excluding cost of materials). 24/04/99 to 24/04/2000. 20.04.2000. BROWN & ROOTS BANGLADESH LTD. Driving of Tubler Pile at Sangu Onshore Terminal at Chittagong. CIVIC ENGINEERING CO. Tk 30,00,000/- (Excluding cost of steel tube pile) aggregates & Re-bar, Batch Plant, Transit mixers). 17/08/97 to 15/11/97 BANGLADESH POWER DEVELOPMENT BOARD. River Crossing Tower Foundation of 132 KV Power Transmission Line at Labukhali, Barishal Patuakhali. 30" dia ( 750mm) 29m long Cast-in-Situ R.C.C. Piles. THE ENGINEERS & ENGINEERS. Tk.10 million May July 1995.

Project

Contract Value Contract Period E3. Employer Principal Contractor Project

: : : : :

Contract Value

Contract Period Completion Date E4. Employer


[

: : : : : : : : :

Project Principal Contractor Contract value Contract period E5. Employer Project

Type of Foundation Principal Contractor Contract value Contract period

: : : :

E6.

Employer Project Type of Foundation

: : :

DEPARTMENT OF PUBLIC HEALTH ENGINEERING BANGLADESH. Two numbers 2,20,000 gal. over head water reservoirs. (Two number ) at Mymensingh. 600 mm diameter 45 m long bored cast in-situ R.C.C. poles 13.6 m diam 10.7m high R.C.C. reservoirs or 9m diam, 29.54 m high R.C.C. shaft. Tk. 21.8 million. (ADB Financed). April, 1990. Sept, 1988-April 1991. POWER DEVELOPMENT BOARD . TOYOMENKA KAISHA LTD. JAPAN. Kaptai-Bara Aulia 132KV Trans. tower(86Towers). 16 dia (400 m) dia. 15 m long cast-in-situ R.C.C Piles. Tk. 15.50 million September 1985 to June 30, 1986.

Contract value Year of completion Execution period E7. Employer Principal Contractor Project Type of Foundation Contract value Year of completion Execution period E8. Employer Project

: : : : : : : : : : : :

CHITTAGONG UREA FERTILIZER LTD. Manufacturing & Driving of Pre-cast R.C.C. Piles at Housing complex at CUFL, Rangadia, Chittagong. 1600 Piles. Tk. 30.2 million 1986 August 1985 to February 1986. M/S. BHUIYAN & SONS 22 dia 60-0 long Cast in- situ R.C.C. piles. for 16-storied Commercial Bldg. at Plot No.28, Dilkusha C/A., Dhaka. Tk. 1.9 million 1985 July to September 1985 (2 months.)

Type of Foundation Contract value Year of completion E9. Execution period Employer Project :

: : : : : :

Contract value Year of completion Execution period

: : :

E10.

Employer Project

: :

POWER DEVELOPMENT BOARD. Proposed River Crossing Towers at Atri Baki River at Khulna. 16 dia 60-0 long Cast in- situ R.C.C. piles. Tk. 6.0 million 1985 April 1985 to July 1985.
BANGLADESH POWER DEVELOPMENT BOARD

Type of Foundation Contract value Year of completion Execution period E11. Employer Principal Contractor Project

: : : : : : :

SHOVAN BROTHERS, DHAKA Construction of Foundation of River Crossing Towers on the River Meghna and Gumati at Daudkandi. 16 dia 50 ft. long Cast in- situ R.C.C. piles. Tk. 3.0 million 1983-84 September 1983. to April 1984. POWER DEVELOPMENT BOARD ALSTHOM ATLANTIQUE, FRANCH/UNION MERCANILE AGENCIES BANGLADESH. 25 MW Barisal Gas Turbine Power Station Project. Pile Foundation & other Civil works. Tk. 10.0 million 1983-84 July 1983 to January 1984 BANGLADESH POWER DEVELOPMENT BOARD. TOYOMENKA KAISHA LTD., Japan. Bheramara-Faridpur-Madaripur-Barisal 132 KV Trans. Line/Towers (115Towers) 18 dia 50-0 long Cast in- situ R.C.C. piles. 51,211 rft. Tk. 15.40 million 1983-84 March 1983 to May 1984.

Type of Foundation Contract value Year of completion Execution period E12. Employer Principal Contractor Project Type of Foundation Contract value Year of completion E13. Execution period Employer Principal Contractor Project Type of Foundation Contract value Year of completion Execution period

: : : : : : : : : : : : : : : : : :

E14.

Employer Project

: :

POWER DEVELOPMENT/ AFCL. River Crossing Towers at Lata River and at Muladi, Barisal. 16 dia 40-0 long Cast in- situ R.C.C. piles. Tk. 10.0 million 1984 June 1984 to November 1984. CHITTAGONG WATER SUPPLY & SEWERAGE AUTHORITY. Extension of Kalurghat Iron Removal Plant C-14. Rapid Gravity Filler with Simultaneous air and water scour. Bored cast in-situ R.C.C. piles. Tk. 62,00,00- US $ 2,62,000 November 1983. to January 1984.

Type of Foundation Contract value Year of completion Execution period E15. Employer

: : : : :

Project

Type of Foundation Contract value Execution period

: : :

E16.

Employer Principal Contractor

: :

DEPARTMENT OF PUBLIC HEALTH ENGINEERING

ALSTHOM ATLANTIQUE, FRANCH/UNION MERCANILE AGENCIES BANGLADESH. Eusufzai Brothers. at Dhaka Overhead Water Tank at Chapai Nowabgonj, Rajshahi 12x12x45-0 Pre-Cast R.C.C. Piles. Tk. 2.5 million 1983-84 November 1983. to January 1984.

Project

Type of Foundation Contract value Year of completion Execution period

: : : :

E17.

Employer Project Type of Foundation Contract value Year of completion Execution period Employer Principal Contractor Project Type of Foundation Contract value Year of completion Execution period

: : : : : : : : : : : : : : : :

LALBAGH SHAHI MOSQUE COMMITTEE, DHAKA. Minar of Lalbagh Shahi Mosque, Dhaka. 16 dia 50 ft. long Cast in- situ R.C.C. piles. Tk. 6.5 million 1983 October 1982. ROYAL NAPAL EMBASSY. NIRMAN INTERNATIONAL LTD., DHAKA. Napal Embassy Project Complex at Baridhara Gulshan, Dhaka. 14x14x55 ft.12x12x45 ft. Pre-cast R.C.C. Piles Tk. 6.5 million 1983 March 1983 to May 1983. BANGLADESH T & T BOARD, DHAKA 20-Storied Admn. Building at 36/1, Mymensingh Road, Dhaka. 20 dia 6000 rft. 16 dia 3000 rft. Cast-in situ R.C.C Piles. Tk. 3.0 million 1982 March 1980 May 1982. UTTARA MOTORS LTD., Chittagong. Multi-storied Commercial Bldg. at Agrabad. C.A., Chittagong. 16 dia 53 ft. long Cast-in-situ R.C.C. piles 4320rft. Tk. 1.5 million 1982 August 1982 to September 1982.

E18.

E19.

Employer Project Type of Foundation

Contract value Year of completion Execution period E20. Employer Project Type of Foundation Contract value Year of completion Execution period

: : : : : : : : :

E21.

Employer Project Type of Foundation Contract value Year of completion Execution period

: : : : : : : : : : : : : : : : : : : : :

BANGLADESH POWER DEVELOPMENT BOARD Anchor & River Crossing Towers of 132 KV Tr. line on Karnafully & Halda Rover. 16 dia 40/45 long 200 Nos. Cast in-Situ R.C.C Piles. Tk. 5.0 million 1981. March 1980 to May 1981.
BANGLADESH POWER DEVELOPMENT BOARD

E22.

Employer Project Type of Foundation Contract value Year of completion Execution period

132 KV Tr. Tower of GDPD between Posthogola & Siddhirgonj. Pre-Cast R.C.C. Pile 12x12, 40 ft. long Tk. 3.5 million 1981 April 1981 to May 1981.
BANGLADESH PUBLIC WORKS DEPARTMENT.

E23.

Employer Project Type of Foundation Contract value Year of completion Execution period

National Library at S.B. Nagar, Dhaka. 16/18 dia 45/55 long 400 Nos. Cast in-Situ R.C.C Piles. Tk. 6.0 million 1980-81 August 1980 to March 1981.
BANGLADESH PUBLIC WORKS DEPARTMENT.

E24.

Employer Project Type of Foundation

TIVT for Women at Eskaton Garden, Dhaka. 18 dia 53 ft. long 266 Nos.Cast-in-Situ R.C.C. Piles (1st Phase) 105 Nos. (2nd phase). Tk. 2.7 million 1980-81 December 1980 to April 1981.

Contract value Year of completion Execution period

: : :

E25.

Employer Project

: :

BANGLADESH PUBLIC WORKS DEPARTMENT.

Chemical Water Treatment Plant 110 MW Power Station, Khulna. 20 dia 70 ft. long 197 Nos. Cast-in-Situ R.C.C Piles. Tk. 4.3 million 1981 May 1981 to September 1981. BANGLADESH AGRICULTURE RESEARCH INSTITUTE Academic, Admn. and Residential Building at BARI, Hathazari, Chittagong. 16 dia 40 ft. long 1100 Compaction sand pile. Tk. 1.4 million 1980. February 1980 to July 1980.
BANGLADESH PUBLIC WORKS DEPARTMENT

Type of Foundation Contract value Year of completion E26. Execution period Employer Project Type of Foundation Contract value Year of completion Execution period E27. Employer Project Type of Foundation Contract value Year of completion Execution period E28. Employer Project Type of Foundation Contract value Year of completion Execution period

: : : : : : : : : : : : : : : : : : : : : :

FWVTS, Boyra, Khulna. 8 dia 25 ft. long 2000 Nos. compaction sand pile. Tk. 1.4 million 1979 March 1979 to June 1979. MILITARY ENGINEERING SERVICES, BANGLADESH ARMY. 100 Beded Hospital Building (Nursing Unit) Chittagong Cantt. 8 dia 35 ft. long compaction sand pile. Tk. 1.4 million 1978 September 1978 to December 1978.

F. F1.

JETTY: Employer Principal Contractor Project : : : : ELPIJI MALAYSIA BANGLADESH LIMITED. DEVELOPMENT CONSTRUCTIONS LTD. Civil construction works of LPG Depot Facilities, Reclamation & Embankment Profession work & Jetty for ELPIJI-Malaysia- Bangladesh at Mongla Port. Mongla, Bagerhat. Tk. 7,91,82,000/00 02/01/99 to 30/03/2001 20/03/2001 PUBLIC WORKS DEPARTMENT. (FOREIGN OWNED COMPANY IN BANGLADESH) DEVELOPMENT CONSTRUCTIONS LTD. Re- pair and Reconstruction of Cyclone Damaged Jetty at Marine Academy, Juldia and extension Jetty at Patenga, Chittagong. Tk.20 million August 1995,-December 1996. MONGLA PORT AUTHORITY Construction of Vessel Birth Jetty. M/S. Metropolitan Engineers. Tk.10 million January, 1995 to May, 1995. SENA KALYAN SHANGSTHA. M/S. EASTERN ENGINEERS (CTG.)LTD. Construction of 600 mm dia/50 m Long Bored Castin-Situ R.C.C. Piles vertical & Rake for Jetty of Mongla Cement Factory. Tk. 12 million. July 1993 to February1994.

Contract value Contract period Completion Date F2. Employer

: : : :

Principal Contractor Project

: :

Contract value Contract period F3. Employer Project Principal Contractor Contract value Contract period F4. Employer Principal Contractor Project

: : : : : : : : : :

Contract value Contract period

: :

G. G1.

INDUSTRY: Employer Principal Contractor Project :

: : :

SINHA YARN DYEING & FABRICS LTD. DEVELOPMENT CONSTRUCTIONS LTD Design Build Contract of 10 Storied Factory Building with pre-stressed concrete flat slab for M/S. Sinha Yarn Dyeing & Fabrics Ltd. at Kanchpur, Narayangonj. Tk.11,48,82,469.00 10/01/2001 to 21.09.2002 HYUNDAI ENGINEERIN & CONSTRUCTION CO. LTD. DEVELOPMENT CONSTRUCTIONS LTD. Construction of Hyundai Cement 3rd Cement expansion project at Meghna Ghat Narayangonj, Bangladesh. Tk.3,38,39,517.00 04/11/2000 to 10.01.2001 07/01/2001. S.K.S. GARMEMTS. DEVELOPMENT CONSTRUCTIONS LTD Constructions of 5 Storey Factory Building with Bored pile and pre-stressed concrete FLAT SLAB (7omx30m) for SKS Garments at Hemayetpur, Savar. Tk. 11,04,00,000/00 30/10/97 to 30/04/99 15.04.99. BOMBAY SWEETS & CO.LTD. DEVELOPMENT CONSTRUCTIONS LTD. Construction of Tricepack Main Factory Building for Bombay Sweets & Co. Ltd., at Kanchpur. Narayanganj. Tk. 25,243,980/00

Contract value Contract period G2. Employer

: : :

Principal Contractor Project

: :

Contract value Contract period Completion Date G3. Employer Principal Contractor Project

: : : : : :

Contract Value Contract Period Completion Date G4. Employer Principal Contractor Project

: : : : : :

Contract value

G5.

Employer Principal Contractor Project

: : :

R.M. COLD ROLLED STEEL MILLS LTD. DEVELOPMENT CONSTRUCTIONS LTD. Design, Fabrication and installation of HOLLOW SHAFT FOUNDATION (materials supplied free of cost by employer)at Kumira,Chittagong.(Innovated Foundation system by us). Tk 6,450,000.00 (Excluding cost of materials0 17/12/97 to 15/7/98 MARK GROUP OF INDUSTRIES & COMPANIES. DEVELOPMENT CONSTRUCTIONS LTD. Construction of 20 duan, 55-0 long Bored Cast in Situ R.C.C. Piles for Proposed Multi-Story Factory Complex at Plot No. 54,55,56, DEPZ, Savar. Tk.15 million April 1997, to August 1997.
HYUNDAI CEMENT (BD) CO. LTD. (100% FOREIGN OWNED COMPANY IN BANGLADESH)

Contract value Contract period G6. Employer

: : :

Principal Contractor Project

: :

Contract value Contract period G7. Employer Principal Contractor Project

: : : : :

DEVELOPMENT CONSTRUCTIONS LTD. Construction of Cement Factory at Meghna Ghat Narayangonj, Bangladesh. Work consists of Piling work of Jetty, Building Foundation & Roads Boundary Walls, Water Tank & Water Basin, Clinker & Gypsum Silo, Cement Silo, Cement Mill Building (Steel Structures), Packing House Building (Steel Structures), and Jetty. Tk.200 million February,-December 1995. BANGLADESH CHEMICAL INDUSTRIES CORPORATION. HCG. HOLLAND. 12000 Phosphoric Acid Tank at TSP Complex, Chittagong.

Contract value Contract period G8. Employer Principal Contractor Project

: : : : :

Type of Foundation Contract value Year of completion Execution period G9. Employer

: : : : :

500 mm diam. 17 m long Cast in- situ R.C.C piles. Tk. 3.6 million 1986 July to September, 1986. BANGLADESH TEXTILE MILLS CORPORATION, DHAKA. National Cotton Mills Ltd. Fauzderhat, Chittagong, 14/15 dia 40 ft. long 320 Nos. Cast in-situ R.C.C Piles Tk. 3.0 million. 1978. December 1977 to March 1978.

Project Type of Foundation Contract value Year of completion Execution period

: : : : :

H.

WATER SUPPLY:

H1.

Employer

CHITTAGONG WATER SUPPLY SEWERAGE AUTHORITY. Construction of Trunk Pipe Line Mohara-BattaliHill-WASA Patenga under Second Chittagong Water Supply Project-IDA Credit No. 1001 BD. 600 m to 1200 mm Ductile Iron Pipes and fittings; Installation, testing and commissioning Depth range 8 0 to 20-0, 25.5 Km inclusive 16 dia steel Pile in 25 ft water on Bangshai Khal, Kalurghat, Chittagong for pipe bridge. Tk. 44.246 million, US $. 15 million. 1987 May 1984 to September 1987.

Project

Type of Foundation

Contract value Year of completion Execution period

: : :

I.

OTHERS:

1.

Employer Project Contract value Year of completion Execution period

: : : : : : : : : :

MES (NAVY) 4-storied E Type Quarter at Chittagong. Tk. 4.0 million 1984 January1984 to May 1984. MES (Navy) 4-storied E Type Quarter at Chittagong. Tk. 4.0 million 1984. February 1984 to June 1984.

2.

Employer Project Contract value Year of completion Execution period

3.

Employer Project

: :

MR. K. RAHMAN KHULNA. 7-storied Bldg.with Basement Floor Provision for underground Reservoir & Car Park at KDA C.A.Khulna. Tk. 20.0 million 1981-82 June 1981 to August 1982.

Contract value Year of completion Execution period

: : :

4.

Employer Project

: :

MES (Navy) Construction of Parade Ground Complex at CDB, Patenga, Chittagong. Tk. 10.5 million

Contract value Year of completion Execution period

: : :

March to December 1987.

Vous aimerez peut-être aussi