GREEN-HOUSE SAHARA TECHNICAL DATA SHEET

The Green-House Sahara has an area of 43,57 M2 and offers: Dining room, Kitchen / WC (7,20 m x 2,40 m) = 17,28 m2 Bedroom 1 - Main (7,20 m x 2,40 m) = 17,28 m2 Hall (2,4 m x 2,4 m) = 5,76 m2 Access and circulations = 3,25m2 Total Internal Area = 43,57 m2

FLOOR PLANS - GREEN-HOUSE SAHARA

GREEN-HOUSE SYSTEM Copyright @ 2010 US Library of Congress Authors Bill of Rights To promote the progress of science and useful arts, by securing for limited times to authors and inventors the exclusive right to their respective writings and discoveries (U.S. Constitution, Article I, Section 8)

TECHNICAL INFORMATION Area Number of modules Green-House Technology Total modules weight - Green-House Technology Live load resistance on roof Seismic (Earthquake) resistance : 43,57 m2 : 62 Green-House Modules : 1767.68 Kg approx. : 200 Kg per m2 : High (Sa=1.125g)

ENVIRONMENTAL INFORMATION A high rate of stabilization and protection against the harmful meteorological effects of climate change, solar storms, and UV radiation. - Sound insulation level - Energy savings (cooling) in summer - Energy savings (heating) in winter - Extraction of toxic elements from the surrounding air - R factor of resistance to heat transfer : 63 Approx. decibels. : 80 100%. : 30% approx. : 90 kg per hectare per year. : 6 approx.

ECONOMIC AND COMMERCIAL INFORMATION Total cost of modules -Green-House technology : $ 43957.517 Pesos Col.- (USD 25.831)

Cost per square meter (M2) of Green-House technology : $ 1008.894/M2 Pesos Col.- (USD 593/M2)

GREEN-HOUSE SYSTEM Copyright @ 2010 US Library of Congress Authors Bill of Rights To promote the progress of science and useful arts, by securing for limited times to authors and inventors the exclusive right to their respective writings and discoveries (U.S. Constitution, Article I, Section 8)

GREEN HOUSE TECHNOLOGY - MODULES COST-SAHARA


REF E3 E3C T TA TB TC TP TE P VA VB
EXTENSION MODULE 3 FOR 2.40 MTS WIDE SPACES (7.87 FEET)

QUANTITY 14 2 EXTENSION MODULE 3 WITH CONNECTION 14 TERMINAL MODULE 4 TERMINAL MODULE WITH 1/2 WINDOW TYPE A 2 TERMINAL MODULE WITH WINDOW TYPE B 2 TERMINAL MODULE WITH CONNECTION 2 TERMINAL MODULE WITH 1/2 ACCESS DOOR 12 TERMINAL CORNER 2 1/2 ACCESS DOOR 4 1/2 WINDOW TYPE A 4 1/2 WINDOW TYPE B TOTAL 62 AREA

DESCRIPTION

UNIT COST USD 642 USD 603 USD 527 USD 376 USD 460 USD 495 USD 271 USD 52 USD 514 USD 458 USD 204

TOTAL COST USD 8.992 USD 1.206 USD 7.378 USD 1.504 USD 920 USD 991 USD 543 USD 619 USD 1.027 USD 1.833 USD 818 USD 25.831

M2 SqFt

43,57 468,9835769
$ $ 593 55

COST PER M2 COST PER SqFt

IMPORTANT Woodwork (doors and windows) are not included. These are ex-works (EXW) prices of the modules of the Green-House technology in our factory in Cali-Colombia (excluding transport).

GREEN-HOUSE SYSTEM Copyright @ 2010 US Library of Congress Authors Bill of Rights To promote the progress of science and useful arts, by securing for limited times to authors and inventors the exclusive right to their respective writings and discoveries (U.S. Constitution, Article I, Section 8)

APPROXIMATE SHIPPING COST TO DIFFERENT REGIONS OF THE WORLD REGION USD USA USD 5.490 CANADA USD 6.100 SOUTH AMERICA (WEST) USD 2.527 SOUTH AMERICA (EAST) USD 4.183 CENTRAL AMERICA USD 4.052 EUROPE AND MEDITERRANEAN AREA USD 5.795 AFRICA AND MIDDLE EAST USD 6.536 AUSTRALIA USD 6.971

Manufacturing time Payment

: 30 days approx. : 60% advance 40% against shipping documents

ADDITIONAL WORK:
EASY AND FAST Green-House modules can be easily assembled at the construction site without complex machinery by two or three people without major expertise. The modules are lightweight and easy to unload and move by 2 people. NO COMPLICATIONS The additional work required is: 1. Footings and slab with electrical and water pipes and drains installed. 2. Earthworks and vegetation. 3. Interior finishing (flooring, partitions, cabinet work, doors and windows, bathroom and kitchen fixtures and casework). LOW COST The cost of these additional items should be a small percentage of the finished cost of the house. These expenses will vary with the country or region where you live, the availability of local materials, and subcontracting costs in your area for the jobs that you cannot do yourself. Some of these items, such as replanting, earth berms, and other site work can be reduced to almost zero in the case of self-construction, depending on the physical conditions of the land on which you are to build.

GREEN-HOUSE SYSTEM Copyright @ 2010 US Library of Congress Authors Bill of Rights To promote the progress of science and useful arts, by securing for limited times to authors and inventors the exclusive right to their respective writings and discoveries (U.S. Constitution, Article I, Section 8)

EASY BUILDING All of the additional work required to complete your Green-House can be accomplished (or subcontracted) by a do-it-yourselfer with some experience in simple construction; or if you prefer, our local Sales Representative will provide the help you need, from a consultancy to the delivery of turnkey project. EASY TO UNDERSTAND ColFibrex will provide a Technical Manual, which serves as a complete guide for selfconstruction, and explains all the details necessary to build with our technology as well as an overview of the additional work required.

GREEN-HOUSE SYSTEM Copyright @ 2010 US Library of Congress Authors Bill of Rights To promote the progress of science and useful arts, by securing for limited times to authors and inventors the exclusive right to their respective writings and discoveries (U.S. Constitution, Article I, Section 8)