Vous êtes sur la page 1sur 4

Rites - ENVIRONMENTAL ENGG./URBAN ENGG.

http://new.rites.com/printpage.php?page=page&id=30&name=ENVIRONMENTAL ENGG./URBAN ...

ENVIRONMENTAL ENGG./URBAN ENGG. Business Profile


RITES has a team of highly qualified and experienced environmental engineer, scientists and sociologists and facilities for taking up all types of developmental projects. RITES also has laboratory facilities for monitoring of air, water, soil and noise parameters.

Awards
INDO-GERMAN GREENTECH ENVIRONMENTAL EXCELLENCE AWARD: for excellent environmental management system from Greentech Foundation, Germany for the year 1999-2000 JAWAHARLAL NEHRU MEMORIAL NATIONAL GOLD AWARD 2001-02: for excellent environmental & ecological implementation from International Greenland Society, Hyderabad

Services
Water supply, sewerage and drainage network for the infrastructure projects Water supply intake structure and treatment plant designs Sewerage collection and treatment Industrial wastewater collection, treatment and disposal Environmental Impact assessment and preparation of management plans Environmental appraisal and Audit Ecological studies Air and noise pollution control Environmental policy formulation Training Socio-economic impact evaluation Solid waste management

Contact Information
Group General Manager(Environment) Tel :- +91-124-2571663 email Id :- kpal@rites.com

Important Projects
Ongoing 1. Environmental Impact Assessment and Environmental Management Plan for Integrated Checkpost at Indo Pakistan Border, Atari. 2. 3. 4. 5. 6. 7. 8.
Location : Amritsar, Punjab Client : Ministry of Home Affairs Initial Environmental Examination for High Speed Corridor from Ahmedabad to Mumbai. Location : Gujarat and MaharastraC Client : Railway Board, N Delhi Water Supply, Sewerage, Drainage and Sewage treatment Plant for Integrated Checkpost at Indo Pakistan Border, Atari. Location : Amritsar, Punjab Client : Ministry of Home Affairs Water Supply, Sewerage, Drainage and Sewage treatment Plant for Integrated Checkpost at Indo Nepal Border, Raxaul. Location : Raxaul, Bihar Client : Ministry of Home Affairs Environmental Impact Assessment Study for Elevated Suburban Rail corridor from Chruch gate to Virar in Mumbai. Location : Maharastra Client : Railway Board, New Delhi Consultancy Services for Techno-Economic Feasibility Study for Water Drawal Studies for Marakannam 4000 MW Super Thermal Power Plant. Location : Tamil Nadu Client : National Thermal Power Corporation limited EIA study for Extension of Runway and allied works at Agatti Airport Location : Lakshadeep Client : Airport Authority of India Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Mori Hanol Hydroelectric Project on river Tons in Uttarkashi. Location : Uttarakhand Client : Krishna Knitwear P Limited Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Chango Yagthang Hydroelectric Project (140MW) on river Spiti in Kinnaur. Location : Himachal Pradesh Client : Bhilwara Energy Limited Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Sumte Kothang Hydroelectric Project (130MW) on river Spiti in Kinnaur. Location : Himachal Pradesh Client : Bhilwara Energy Limited Environmental Impact Assessment Study for EIA Study for UBDCIII in Gurdaspur of Punjab Location : Himachal Pradesh Client : Bhilwara Energy Limited Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Mumbai Mono rail Location : Maharastra Environmental Impact Assessment, and Environmental Management Plan for MUTP-II Project Mumbai Location : Maharastra Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Trans Harbour Link project Mumbai.

9.

10.

11. 12. 13. 14.

1 of 4

31/01/2013 2:43 PM

Rites - ENVIRONMENTAL ENGG./URBAN ENGG.

http://new.rites.com/printpage.php?page=page&id=30&name=ENVIRONMENTAL ENGG./URBAN ...

Location : Maharastra

15. Assessment of Plastic Waste and its management at Airport and Railway stations in Delhi. 16. 17.
Location : Delhi Client : Central Pollution Control Board Environmental Impact Assessment, for proposed underground LPG Cavern Storage Facilities at HPCL, Manglore. Location : Karnataka Client : Hindusthan Petroleum Corporation Limited Comprehensive Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Arakot-Tiuni (72 MW ) Hydroelectric Project on River Pabar in District Uttarkashi, Location : Uttarakhand Client : Irrigation Department Environmental Impact Assessment Study for Noida - Greater Noida LRT Location : Uttar Pradesh Client : Delhi Metro Rail Corporation Limited Comprehensive Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Tiuni-Plasu (66 MW ) Hydroelectric Project on River Tons in District Dehradun, Uttranchal. Location : Uttarakhand Client : Irrigation Department Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Bowala-Nandpryag (300 MW ) Hydroelectric Project on River Alaknanda in District Chamoli, Uttranchal. Location : Uttarakhand Client : Irrigation Department Environmental Impact Assessment and preparation of Environmental Management Plan for 7 Tunnels in Shimla and other parts of the state for HPRIDC Ltd, Shimla (World Bank Funded) Location : Himachal Pradesh Client : Himachal Pradesh State Road and other Infrastructure Development Corporation Limited Comprehensive Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Mapang Sirkari Hydro Electric Power Project (370 MW) at Mapang in Pithoragarh district Location : Uttarakhand Client : GVK Power Limited

18. 19.

20.

21.

22.

Completed 1. Environmental Impact Assessment for Rupaligad (240 MW) and Purnagiri (1000 MW) hydropower projects, D/s of Pancheshwar Multipurpose
Project in Champawat District. (2009) Location : Uttarakhand Client : Central Water Commission Rapid Socio-Economic Survey/Studies and Ecological as well as Environmental Impact Assessment Studies of proposed Parwati Kalisindh Chambal Link project. (2009) Location : Madhya Pradesh & Rajasthan Client : National Water Development Agency Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Hanol Tiuni Hydroelectric Project on river Tons in Dehradun and Uttarkashi districts of Uttarakhand (2008) Location : Uttarakhand Client : Sunflag Power Limited Environmental/Social Impact Assessment for extension from Howrah to Howrah Maidan of East West Metro Rail Corridor (2008) Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Aurangabad airport. (2008) Location : Maharastra Client : Airport Authority of India Comprehensive Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Tidong Hydro Electric Project (2x50MW) at Kinnaur, Himachal Pradesh. (2007) Location : Himachal Pradesh Client : Nuzuveedu Seeds Limited Environmental Impact Assessment, and preparation of Environmental Management Plan for Karaikkudi Ramanathapuram (NH-210) in Tamilnadu (2007) Location : Tamil Nadu Client : National Highway Authority of India Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Chitrakoot Airport. (2007) Location : Uttar Pradesh Client : Airport Authority of India Environmental Impact Assessment For Proposed Extension of Howrah to Howrah Maiden of East-West Corridor of Kolkata Metro Rail Project (2007) Location : West Bengal Client : Transport Department, Calcutta Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Moradabad Airport (2007) Location : Uttar Pradesh Client : Airport Authority of India Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Azamgarh Airport (2007) Location : Uttar Pradesh Client : Airport Authority of India Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Chitrakoot Airport (2007) Location : Uttar Pradesh Client : Airport Authority of India Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for New Delhi Airport Metro Express line. (2006) Location : Delhi Client : Delhi Metro Rail Corporation Limited Environmental Impact Assessment and preparation of Environmental Management Plan for Kundali Manesar Palwal Expressway (2006) Location : Haryana Client : Haryana State Industrial Development Corporation Limited Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Ahmedabad airport. (2006) Location : Gujarat

2.

3.

4. 5.

6.

7.

8. 9.

10. 11. 12. 13.

14. 15.

2 of 4

31/01/2013 2:43 PM

Rites - ENVIRONMENTAL ENGG./URBAN ENGG.

http://new.rites.com/printpage.php?page=page&id=30&name=ENVIRONMENTAL ENGG./URBAN ...

Client : Airport Authority of India

16. Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Chandigarh Mono rail
project. (2006)

17. Environmental Impact Assessment for Pala Maneri HEP (480 MW) hydropower project at on River Bhagirathi in Uttarkashi District of
Uttarakhand. (2005) Location : Uttarakhand Client : Uttaranchal Jal Vidyut Nigam Limited Environmental Impact Assessment for Bhilangana III HEP (24 MW) hydropower project at on River Bhilangana in Tehri District of Uttarakhand. (2004) Location : Uttarakhand Client : Uttaranchal Jal Vidyut Nigam Limited Initial Environmental Examination, Initial Social Assessment and Resettlement action Plan for Electrification of Nandalur Guntakal railway section. (2004) Location : Andhra Pradesh Client : Railway Board Environmental Examination(EE), Social Analysis(SA), and Resettlement Action Plan(RAP) for Daitari(Tomka)-Keonjhar new Railway line in Orissa for Railway Board (ADB funded) (2002) . Location : Orissa Client : Railway Board Rapid Environmental Impact Assessment and preparation of Environmental Management Plan for IT Park, Phase II, Shastri Park (2005) Location : New Delhi Client : Delhi Metro Rail Corporation Limited Consultancy Services for Updating of Goborane Sewage Treatment Plant for Department of Sanitation and Waste Management Republic of Botswana (2005). Location : Botswana Client : Department of Sanitation and Waste Management Republic of Botswana Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Ahemdabad Metro (2004-2005) Location : Gujarat Client : Airport Authority of India Environmental Impact Assessment (EIA) and Environmental Management Plan for Construction of clean Cargo Berth at Paradip Port in Paradip. (2004). Location : Orissa Client : Paradip Port Trust Initial Environmental Examination, Initial Social Assessment and Resettlement Action Plan for Munghyr Bridge at River Ganga in Bihar for Railway Board (2004) (World Bank funded). Location : Bihar Client : Railway Board Municipal Solid Waste Management for Patiala city for Patiala Municipal Corporation. (2003) Location : Punjab Client : Municipal Corporation of Pariala Initial Environmental Examination, Initial Social Assessment and Resettlement action Plan for Haridaspur-Paradeep New Railway line in Orissa (2003) (World Bank funded). Location : Orissa Client : Railway Board Initial Environmental Examination, Initial Social Assessment and Resettlement action Plan for Raichur-Guntakal Doubling of Railway line. (2003) (World Bank funded). Location : Andhra Pradesh/Karnataka Client : Railway Board Initial Environmental Examination, Initial Social Assessment and Resettlement action Plan for Hospet-Guntakal Doubling of Railway line (2003) (World Bank funded). Location : Andhra Pradesh/Karnataka Client : Railway Board Initial Environmental Examination, Initial Social Assessment and Resettlement action Plan for Panvel-JNPT Doubling of Railway line.(2003) (World Bank funded). Location : Maharastra Client : Railway Board Environmental Impact Assessment, Social Assessment Study and preparation of Environmental Management Plan for Agatti Airport in Union Territory of Lakshadeep (2003). Location : Lakshadeep Client : Airport Authority of India Water Supply, Drainage and Firefighting services for Pritampura Hospital in Delhi (2003) Location : Delhi Client : Public Works Department EIA studies for blasting of hill quarries at Bihora in the border districts of Golaghat and Karbi Anglong in the state of Assam(2002) Location : Assam Client : North East Frontier Railway EIA for Rohtang Tunnel and the road connecting Darcha to Leh (320 Kms.) for Border Roads Organisation. (2002) Location : Jammu and Kashmir Client : Border Road Organisation Water Supply, Drainage and Firefighting Services for Narela Hospital in Delhi (2002) Location : Delhi Client : Public Works Department Cost and Revenue Study for Rural and Urban Water Supply Schemes in Kerala for Kerala Water Authority. (2002) Location : Keralai Client : Kerala Water Authority Environmental Examination(EE), Social Analysis(SA), and Resettlement Action Plan(RAP) for Daitari(Tomka)-Keonjhar new Railway line in Orissa for Railway Board (ADB funded) (2002) Location : Orissa Client : Railway Board Environmental Examination(EE), Social Analysis(SA), and Resettlement Action Plan(RAP) for Talcher-Cuttack-Paradeep bridge on river Mahanadi in Orissa for Railway Board (ADB funded) (2002). Location : Orissa

18.

19.

20.

21. 22.

23.

24.

25.

26. 27.

28.

29.

30.

31.

32. 33. 34. 35. 36. 37.

38.

3 of 4

31/01/2013 2:43 PM

Rites - ENVIRONMENTAL ENGG./URBAN ENGG.

http://new.rites.com/printpage.php?page=page&id=30&name=ENVIRONMENTAL ENGG./URBAN ...

Client : Railway Board

39. Environmental Examination(EE), Social Analysis(SA), and Resettlement Action Plan(RAP) for Gooty-Pullampet doubling Railway line in Andhra
Pradesh for Railway Board (ADB funded) (2002). Location : Andhra Pradesh Client : Railway Board 40. EIA study for Cannaught Place Dwarka corridor of Mass Rapid Transport System for Delhi (2001) (JBIC Funded) Location : New Delhi Client : Delhi Metro Rail

4 of 4

31/01/2013 2:43 PM

Vous aimerez peut-être aussi