BRITISH SCHOOL MANILA

Fort Bonifacio Global City, Taguig City


CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

A.

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

BILL NO. 1 - PRELIMINARIES AND GENERAL CONDITIONS


1,029,461.52

90%

10%

100%

926,515.37

230,000.00

100%

0%

100%

230,000.00

161,587.92

100%

0%

100%

161,587.92

Advance Payment Bond

129,334.75

100%

0%

100%

129,334.75

Performance Bond

193,841.13

100%

0%

100%

193,841.13

70,203.91

100%

0%

100%

70,203.91

1,093,024.69

100%

0%

100%

1,093,024.69

74,980.00

90%

10%

100%

67,482.00

7,498.00

1.0

Permit/Fees/etc

2.0

Site Investigation

3.0

Bonds/Insurances
Surety Bond

Guarantee Bond
Insurance

102,946.15

4.0

Setting-out

5.0

Site Management Personnel

2,038,518.75

92%

8%

100%

1,875,437.25

163,081.50

6.0

Testing

402,500.00

92%

8%

100%

370,300.00

32,200.00

7.0

Security/Safety/Protection

715,875.00

92%

8%

100%

658,605.00

57,270.00

8.0

Offices, workshops, storage & toilets

409,687.50

100%

0%

100%

409,687.50

9.0

Lighting, power, water, telephone, fire protection, ventilation and

534,750.00

92%

8%

100%

491,970.00

42,780.00
60,320.00

air-conditioning
10.0

Temporary plant, equipment & scaffolding

754,000.00

92%

8%

100%

693,680.00

11.0

Temporary hoardings

612,375.00

100%

0%

100%

612,375.00

12.0

Disposal of rubbish

172,500.00
8,622,640.17

92%

8%

100%

158,700.00

13,800.00

94%

6%

100%

8,142,744.52

479,895.65

450,000.00

100%

0%

100%

450,000.00

450,000.00

100%

0%

100%

450,000.00

Total ( A )
B.

BILL NO. 2 - DESIGN FEE


Total ( B )

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

C.

BILL NO. 3 - LEVEL 1 - ASSEMBLY HALL FLOOR

I.

CIVIL / STRUCTURAL WORKS

I.A

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Site Works

1.0

Site clearing

2.0

Stake and lay-out

28,750.00

100%

0%

100%

28,750.00

131,928.00

100%

0%

100%

131,928.00

3.0

Structural excavation

27,370.00

100%

0%

100%

27,370.00

4.0

Bulk excavation

1,295,245.00

100%

0%

100%

1,295,245.00

5.0

Compacted backfilling and compaction

12,392.40

100%

0%

100%

12,392.40

6.0

Lean concrete, 1500 psi, 3" thick

150,788.00

100%

0%

100%

150,788.00

7.0

Soil treatment

350,621.78

100%

0%

100%

350,621.78

8.0

Hauling & disposal of excess soil

714,418.64

100%

0%

100%

714,418.64

I.B

Concrete Works

1.0

Column footings, 3000 psi, 28 days, G-1

299,210.45

100%

0%

100%

299,210.45

2.0

Columns, 3000 psi, 28 days, G-3/4

258,060.00

100%

0%

100%

258,060.00

3.0

Shear wall, 3000 psi, 28 days, G-3/4

1,173,818.80

100%

0%

100%

1,173,818.80

4.0

Stairs, 3000 psi, 28 days, G-3/4

69,524.40

100%

0%

100%

69,524.40

5.0

Slab on grade, 3000 psi, 28 days, G-1 with Fibrin 23

398,510.65

100%

0%

100%

398,510.65

I.C

Reinforced Steel Bars, Grade 40

1.0

Column footings

929,821.22

100%

0%

100%

929,821.22

2.0

Columns

940,235.42

100%

0%

100%

940,235.42

3.0

Shear wall

714,229.23

100%

0%

100%

714,229.23

4.0

Stairs

130,500.24

100%

0%

100%

130,500.24

5.0

Slab on grade

176,074.44

100%

0%

100%

176,074.44

I.D

Formworks

1.0

Column footings (to produce rough surface)

43,079.46

100%

0%

100%

43,079.46

2.0

Columns (to produce smooth surface)

143,330.25

100%

0%

100%

143,330.25

3.0

Shear wall (to produce smooth surface)

520,501.50

100%

0%

100%

520,501.50

4.0

Stairs (to produce smooth surface)

39,580.13

100%

0%

100%

39,580.13

5.0

Slab on grade

135,727.83

100%

0%

100%

135,727.83

6.0

Construction joint

401,769.75

100%

0%

100%

401,769.75

7.0

Slope protection

489,037.50

100%

0%

100%

489,037.50

9,574,525.09

100%

0%

100%

9,574,525.09

152,705.08

100%

0%

100%

152,705.08

Total ( I )
II.
II.A
1.0

CIVIL / ARCHITECTURAL WORKS


Floor Finishes
FF-1 Smooth, straight to finish concrete with brass nosing and
epoxy paint finish

2.0

FF-2 Smooth, straight to finish concrete with concrete sealer

12,580.43

0%

100%

100%

3.0

FF-3 Smooth, straight to finish concrete with epoxy paint

10,904.30

0%

100%

100%

10,904.30

4.0

FF-9 600 x 600mm Carpet Tiles, Axis by FB Carpet

460,379.50

0%

100%

100%

460,379.50

Concrete Topping

126,554.28

0%

100%

100%

126,554.28

607,210.63

20%

80%

100%

121,442.13

485,768.50

16,609.27

90%

10%

100%

14,948.34

1,660.93

378,157.26

80%

20%

100%

302,525.81

75,631.45

4,117.23

100%

0%

100%

4,117.23

207,339.62

100%

0%

100%

207,339.62

5.0
II.B

Wall Finishes

1.0

WF-1

Smooth, plain cement plaster, semi-gloss latex paint finish

2.0

WF-5

Smooth, plain cement plaster, unpainted

II.C
1.0

12,580.43

Ceiling Finishes
CF-1 Smooth-formed, smooth rubbed concrete finish with latex
paint finish

2.0
II.D
1.0
II.E

CF-7 Fair Faced (Off-form concrete) unpainted.


Masonry
CHB 150mm, 700 PSI
Metal Works

1.0

SS Railing, Floor mounted

165,600.00

100%

0%

100%

165,600.00

2.0

SS Railing, Wall mounted

165,600.00

100%

0%

100%

165,600.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

II.F

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Metal Doors (Hardware and paint finish is included)

1.0

900mm x 2100mmH

27,485.00

100%

0%

100%

27,485.00

2.0

3100mm x 2455mmH

148,695.00

100%

0%

100%

148,695.00

II.G

Vapor Barrier

1.0

Damproofing 6mils polyethelene sheet

39,719.68

100%

0%

100%

39,719.68

2.0

Bentonite strip water stop

221,321.81

100%

0%

100%

221,321.81

3.0

Integral waterproofing, 3cc

754,562.56

100%

0%

100%

754,562.56

II.H

Cistern Tank / Pump Room Finishes

1.0

Access Manhole, 800mm x 600mm

27,887.50

100%

0%

100%

27,887.50

2.0

Access manhole, 600mm x 600mm w/ grilles and padlock

25,012.50

100%

0%

100%

25,012.50

3.0

Ladder rung, 20mm dia. stainless steel

19,320.00

100%

0%

100%

19,320.00

4.0

Grating cover, 6.5m stainless steel

80,730.00

100%

0%

100%

80,730.00

5.0

Tank lining waterproofing

68,310.00

100%

0%

100%

68,310.00

6.0

Ceramic tile, 300mm x 300mm

68,701.00

100%

0%

100%

68,701.00

3,789,502.64

69%

31%

100%

2,616,023.26

22,254.80

0%

100%

100%

22,254.80

Total ( II )
III.
III.A
1.0

1,173,479.38

ELECTRICAL WORKS
Panelboards and Circuit breaker - Square D
Panel LPA NEMA 1 - Surface Mounted
Main CB:
40AT,100AF,3,3P,230V, 60Hz

III.B

Enclosed Circuit Breaker

1.0

40 AT,3P,230V 60 Hz,NEMA 1

4,784.00

0%

100%

100%

4,784.00

2.0

40 AT,3P,230V 60 Hz, NEMA 3R

4,784.00

0%

100%

100%

4,784.00

3.0

30 AT,2P,230V 60 Hz, NEMA 1

6,856.30

0%

100%

100%

6,856.30

86,415.60

0%

100%

100%

86,415.60

5,575.20

0%

100%

100%

5,575.20

25,679.50

0%

100%

100%

25,679.50

5,129.00

0%

100%

100%

5,129.00

III.C

Lighting Fixtures - Brilliant Lightings

1.0

2x26Watts CFL Pinlight

2.0

1x36W Flourescent Fixture, Batten Type

3.0

Wall Mounted Emergency Light, Battery Pack

4.0
III.D

Wall Mounted Exit Light


Wiring Devices - National

1.0

Single Pole Switch-1 Gang

1,186.80

0%

100%

100%

1,186.80

2.0

Two gang switch, 15A, 250V

357.65

0%

100%

100%

357.65

3.0

Three Way Switch(2 Gang)

474.95

0%

100%

100%

474.95

4.0

Duplex Recepatcle Outlet 15A,250V,G.T.

3,799.60

0%

100%

100%

3,799.60

III.E

Wires and Cable - Phelps Dodge

1.0

THHN Copper Wires, 600V

1.1

3.5 mm

69,262.20

40%

60%

100%

27,704.88

41,557.32

1.2

5.5 mm

15,088.00

30%

70%

100%

4,526.40

10,561.60

1.3

8.0 mm

1,831.95

0%

100%

100%

3,276.35

98%

2%

100%

III.F

Conduits and Fittings

1.0

Condulet LB, 90R

1.1
2.0

20mm

3,210.82

65.53
18.91

PVC PIPE SCHEDULE -40

2.1

32mm

945.30

98%

2%

100%

926.39

2.2

25mm

2,525.40

98%

2%

100%

2,474.89

2.3

20mm

51,441.80

0%

100%

100%

3.0

1,831.95

50.51
51,441.80

PVC pipe male adapter with locknut and bushing

3.1

32mm

251.85

98%

2%

100%

246.81

3.2

25mm

425.50

98%

2%

100%

416.99

8.51

3.3

20mm

3,073.95

98%

2%

100%

3,012.47

61.48

5,152.00

50%

50%

100%

2,576.00

2,576.00

1,196.00

50%

50%

100%

598.00

598.00

4.0
4.1
5.0
5.1

5.04

Flexible Mettalic Conduit


15mm
Flexible Straight Connector
15mm

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

III.G

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Outlet Boxes and Pull boxes - Fumaco

1.0

Utility Box with Cover

1,400.70

100%

0%

100%

1,400.70

2.0

Octagonal Box with Cover

9,660.00

100%

0%

100%

9,660.00

3.0

Square Box with Cover

621.00

100%

0%

100%

621.00

4.0

Pull Box 500mmx700mmx300mm NEMA-1

8,776.80

35%

65%

100%

3,071.88

5,704.92

Pull Box 400mmx400mmx400mmx200mm NEMA-1

2,222.95

35%

65%

100%

778.03

1,444.92
5,520.00

5.0
III.H

Clock System - Notifier

1.0

Wall Mounted Secondary Clock

2.0

Octagonal Box

3.0

PVC PIPE

3.1
4.0
4.1
5.0
5.1

20 mm PVC Pipe

5,520.00

0%

100%

100%

119.60

100%

0%

100%

119.60

7,036.85

98%

2%

100%

6,896.11

140.74

62.10

98%

2%

100%

60.86

1.24

4,588.50

50%

50%

100%

2,294.25

2,294.25

PVC Pipe adapter with locknut and bushing


20 mm PVC
Wires
1.25 mm TF Wire

III.I

Public address system - TOA

1.0

Ceiling Mounted Speaker

13,020.30

0%

100%

100%

13,020.30

2.0

Paging Amplifier

53,475.00

0%

100%

100%

53,475.00

3.0

Octagonal Box

1,196.00

100%

0%

100%

1,196.00

4.0

Pull Box

109.25

100%

0%

100%

109.25

5.0

PVC PIPE
12,132.50

98%

2%

100%

11,889.85

242.65

558.90

98%

2%

100%

547.72

11.18

5.1
6.0
6.1
7.0

20 mm PVC Pipe
PVC pipe adapter adapter with locknut and bushing
20 mm PVC
Conduits and Fittings

7.1

15 mm Flexible Metallic Conduit

579.60

50%

50%

100%

289.80

289.80

7.2

15 mm St. Connector

134.55

50%

50%

100%

67.28

67.28

6,686.10

60%

40%

100%

4,011.66

2,674.44

8.0
8.1
III.J
1.0

Wires
1.25 mm TF Wire
Fire Alarm System - Notifier
Equipment/Devices

1.1

Fire Alarm Manual station, Addressable Type

14,218.60

0%

100%

100%

14,218.60

1.2

Photo Electric Smoke Detector, Addressable Type

51,575.20

0%

100%

100%

51,575.20

1.3

Fire Alarm Horn With Strobe Light

9,857.80

0%

100%

100%

9,857.80

2.0

PVC Pipe

2.1

25mm

10,943.40

100%

0%

100%

10,943.40

2.2

32mm

7,247.30

60%

40%

100%

4,348.38

2,898.92

2.3

15 mm Flexible Metallic Conduit

515.20

60%

40%

100%

309.12

206.08

2.4

Flexible Straight Connector

119.60

50%

50%

100%

59.80

59.80

2.5

Octagonal Box with Cover

1,449.00

100%

0%

100%

1,449.00

2.6

Square Box

134.55

100%

0%

100%

134.55

3.0

PVC Adapter with Locknut and Bushing,

3.1

25mm

1,106.30

100%

0%

100%

1,106.30

3.2

32mm

335.80

40%

60%

100%

134.32

201.48

8,521.50

20%

80%

100%

1,704.30

6,817.20

7,015.00

100%

0%

100%

7,015.00

170.20

100%

0%

100%

170.20

0%

100%

100%

100%

0%

100%

200.10

0%

100%

100%

4.0
4.1
III.K
1.0
1.1
2.0
2.1

Wires
1.25 TF Wires
Telephone System
PVC PIPE
25mm PVC Pipe

PVC PIPE ADAPTER WITH LOCKNUT AND BUSHING


25mm PVC Pipe

3.0

Telephone Outlet

4.0

Utility Box

5.0

Cat 5e Cable

1,239.70
200.10
2,511.60

1,239.70
2,511.60

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

III.L

CCTV System

1.0

CCTV PIPE

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

1.1

25mm PVC Pipe

10,662.80

95%

5%

100%

10,129.66

533.14

1.2

20mm PVC Pipe

18,441.40

95%

5%

100%

17,519.33

922.07

2.0

PVC Pipe Adapter with locknut & bushing

2.1

20mm PVC Pipe

248.40

95%

5%

100%

235.98

12.42

2.2

25mm PVC Pipe

170.20

95%

5%

100%

161.69

8.51

3.0

Octagonal Box Box

241.50

100%

0%

100%

241.50

4.0

Flexible Metallic Conduit

128.80

0%

100%

100%

128.80

5.0

Flexible Straight Connector

59.80

0%

100%

100%

59.80

6.0

Pullbox 300x300x300

1,265.00

95%

5%

100%

1,201.75

63.25

7.0

Pullbox
10x10x6

5,313.00

95%

5%

100%

5,047.35

265.65

8.0

Condulet LB, 90R, 20mm

1,872.20

95%

5%

100%

1,778.59

93.61

9.0

Condulet LB, 90R, 25mm

1,173.00

95%

5%

100%

1,114.35

58.65

III.M

Miscellaneous and Consumables

1,725.00

95%

5%

100%

1,638.75

86.25

III.N

Hangers and Support

4,600.00

95%

5%

100%

4,370.00

230.00

III.O

Testing and Commissioning


Total ( III )

IV.
IV.A
1.0

2,300.00

0%

100%

100%

615,030.35

26%

74%

100%

159,721.07

455,309.28

2,300.00

288,650.00

50%

50%

100%

144,325.00

144,325.00

MECHANICAL AND PLUMBING WORKS


Drainage Ejection System
Sump pump, submersible, non-clog, Duplex, 100 gpm at 65 ft tdh
230 volts, 3, hz. Complete with duplex type controller, level
switches and all std accessories
(EIM Model SES-8585HSBH)

2.0

G.I. Pipe, sch 40 ; 100mm

27,255.00

40%

60%

100%

10,902.00

16,353.00

3.0

Bend ; 100mm

8,970.00

50%

50%

100%

4,485.00

4,485.00

4.0

Tee ; 100mm

5,290.00

40%

60%

100%

2,116.00

3,174.00

5.0

Flange
15,525.00

40%

60%

100%

6,210.00

9,315.00

2,472.50

40%

60%

100%

989.00

1,483.50

31,510.00

20%

80%

100%

6,302.00

25,208.00

5.1

100mm slip-on

5.2

100mm blind

6.0
6.1
7.0
7.1

Gate valve
100mm
Check Vlave
15,640.00

20%

80%

100%

3,128.00

12,512.00

8.0

Electrical field wiring

100mm

10,350.00

20%

80%

100%

2,070.00

8,280.00

9.0

Pipe Hangers Supprts and Consumables

12,075.00

20%

80%

100%

2,415.00

9,660.00

10.0

Pump Railing

9,775.00

20%

80%

100%

1,955.00

7,820.00

11.0

Leak Test

1,150.00

0%

100%

100%

913,100.00

50%

50%

100%

456,550.00

456,550.00

IV.B

Cold Water system

1.0

Equipment

1.1

1,150.00

Constant Pressure booster pump, end suction centrifugal type,


Duplex type with system capacity of 80 gpm at 95 ft TDH.230 Volts.
3, 60 hz,.complete with Control panel, level switches, bladder tank
and all standard accessories (Pacoflo 9000 CPS Model ES Series II)

IV.C
1.0

Piping Inside Pump Room


Stainless pipe, Schedule 40 T-304

1.1

75 mm

23,846.40

20%

80%

100%

4,769.28

19,077.12

1.2

50 mm

15,548.00

20%

80%

100%

3,109.60

12,438.40

2.0

Bend, S/S T-304

2.1

75 mm

2,898.00

20%

80%

100%

579.60

2,318.40

2.2

50 mm

5,106.00

20%

80%

100%

1,021.20

4,084.80

1,650.25

20%

80%

100%

330.05

1,320.20

3.0
3.1

Tee, S/S T-304


50 mm

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

4.0
4.1
5.0
5.1
6.0
6.1

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Union
50 mm

1,268.45

30%

70%

100%

380.54

887.92

9,487.50

30%

70%

100%

2,846.25

6,641.25

2,991.50

26,923.46

Gate Valve, NRS, 200 WOG, Screw Type "TOZEN"


50 mm
Float Valve
50 mm

29,914.95

10%

90%

100%

7.0

Vortex Plate

6,325.00

0%

100%

100%

IV.D

Distrbution Line
50,825.40

60%

40%

100%

30,495.24

20,330.16

581.90

60%

40%

100%

349.14

232.76

1.0
1.1
2.0
2.1
3.0

6,325.00

PPRC Pipe, PN 20 "Boreplus" by Unipipe


63 mm
PPRC Bend PN 20
63 mm
PPRC Tee, PN 20

3.1

63 x 63 mm

848.70

60%

40%

100%

509.22

339.48

3.2

50 x 50 mm

1,375.40

60%

40%

100%

825.24

550.16

3,654.70

60%

40%

100%

2,192.82

1,461.88

26,983.60

50%

50%

100%

13,491.80

13,491.80

22,137.50

20%

80%

100%

4,427.50

17,710.00

4.0
4.1
5.0
5.1
6.0
6.1
7.0
7.1
8.0
9.0
IV.E
1.0

PPRC Coupling / reducer


63 x 63 mm
Male adapter
63 mm
Gate Valve, NRS, 200 WOG, threaded "TOZEN"
50 mm
Pipe Clamps
1,144.25

40%

60%

100%

457.70

686.55

Teflon Tape, Pipe Hanger Support & Consumables and tools rental

63 mm

8,050.00

50%

50%

100%

4,025.00

4,025.00

Testing and Commissioning

1,437.50

0%

100%

100%

1,437.50

FCU Drain Pipe


PVC Pipe Series 1000 "Crown"

1.1

150 mm

29,031.75

95%

5%

100%

27,580.16

1,451.59

1.2

110mm

2,173.50

95%

5%

100%

2,064.83

108.68

1.3

63mm

1,600.80

95%

5%

100%

1,520.76

80.04

2.0

PVC Bend Series 1000

2.1

1/4 x 150mm

2,271.25

95%

5%

100%

2,157.69

113.56

2.2

1/4 x 110mm

246.10

95%

5%

100%

233.80

12.31

2.3

1/4 x 63mm

58.65

95%

5%

100%

55.72

2.93

2.4

1/8 x 150mm

818.80

95%

5%

100%

777.86

40.94

2.5

1/8 x 100mm

106.95

95%

5%

100%

101.60

5.35

2.6

1/8 x 63mm

108.10

95%

5%

100%

102.70

5.41

3.0

PVC Wye Series 1000

3.1

150 x 150 mm

3,689.20

95%

5%

100%

3,504.74

184.46

3.2

150 x 63 mm

809.60

95%

5%

100%

769.12

40.48

3.3

110 x 110mm

514.05

95%

5%

100%

488.35

25.70

3.4

110 x 63mm

303.60

95%

5%

100%

288.42

15.18

4.0

PVC Pipe, In-house blue

4.1

32 mm

356.50

95%

5%

100%

338.68

17.83

4.2

25 mm

1,913.60

95%

5%

100%

1,817.92

95.68

5.0

Coupling Reducer PVC

5.1

50 x 25 mm

188.60

95%

5%

100%

179.17

9.43

5.2

50 x 32 mm

49.45

95%

5%

100%

46.98

2.47

6.0

PVC Bend, In-house blue

6.1

32 mm

437.00

95%

5%

100%

415.15

21.85

6.2

25 mm

667.00

95%

5%

100%

633.65

33.35

7.0

Rubber Insulation, 12 mm thk

7.1

50 mm

5,640.75

40%

60%

100%

2,256.30

3,384.45

7.2

32 mm

1,759.50

40%

60%

100%

703.80

1,055.70

7.3

25 mm

8,280.00

40%

60%

100%

3,312.00

4,968.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

8.0
8.1
9.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Parking Drain
150 mm

4,255.00

30%

70%

100%

1,276.50

2,978.50

Floor cleanout

9.1

150 mm

4,567.80

30%

70%

100%

1,370.34

3,197.46

9.2

110mm

2,962.40

30%

70%

100%

888.72

2,073.68

9.3

50mm

886.65

30%

70%

100%

266.00

620.66

10.0

PVC Cement, Pipe Hangers Supprts and Consumables

3,267.15

95%

5%

100%

3,103.79

163.36

11.0

Gravity leak test

1,437.50

95%

5%

100%

1,365.63

71.88

64,965.80

100%

0%

100%

64,965.80

IV.F

Perforated Drain Pipe

1.0

PPVC Pipe Series 1000 "Crown" ; 150mm

2.0

PVC Bend Series 1000

2.1

1/4 x 150mm

507.15

100%

0%

100%

507.15

2.2

1/8 x 150mm

3,187.80

100%

0%

100%

3,187.80

2,067.70

100%

0%

100%

2,067.70

1,745.70

100%

0%

100%

1,745.70

41,975.00

100%

0%

100%

41,975.00

2,817.50

100%

0%

100%

2,817.50

12,765.00

100%

0%

100%

12,765.00

3.0
3.1

PVC Wye Series 1000


150 x 150 mm

4.0

PVC End Cap ; 150mm

5.0

Geotextile cloth/ filter cloth

6.0

Excavation / Backfill

7.0

Gravel Filter

IV.G

Cistern tank Drain and overflow

1.0

G.I. Schedule 40 ; 100mm

13,627.50

30%

70%

100%

4,088.25

2.0

G.I. Bend,, 100mm

8,970.00

30%

70%

100%

2,691.00

6,279.00

3.0

Gate Valve, 100mm

15,755.00

30%

70%

100%

4,726.50

11,028.50

3,450.00

30%

70%

100%

1,035.00

2,415.00

86,825.00

100%

0%

100%

86,825.00

110,630.00

100%

0%

100%

110,630.00

86,825.00

100%

0%

100%

86,825.00

96,428.65

100%

0%

100%

96,428.65

86,825.00

100%

0%

100%

86,825.00

105,398.65

100%

0%

100%

105,398.65

86,825.00

100%

0%

100%

86,825.00

96,428.65

100%

0%

100%

96,428.65

86,825.00

100%

0%

100%

86,825.00

84,468.65

100%

0%

100%

84,468.65

86,825.00

100%

0%

100%

86,825.00

72,507.50

100%

0%

100%

72,507.50

4.0
IV.H
1.0

Flanged, 100mm

9,539.25

Air Conditioning Ventilation System


FCU LN-1, 6Hp cap. Ceiling Suspended Type
Samsung brand, Model: NS60CCRFA,( Assembly Hall )

2.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

3.0

FCU LN-1, 6Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS60CCRFA,( Assembly Hall )

4.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

5.0

FCU LN-1, 6Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS60CCRFA,( Assembly Hall )

6.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

7.0

FCU LN-1, 6Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS60CCRFA,( Assembly Hall )

8.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

9.0

FCU LN-1, 6Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS60CCRFA,( Assembly Hall )

10.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

11.0

FCU LN-1, 6Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS60CCRFA,( Assembly Hall )

12.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

13.0

Description of Work

FCU LN-1, 6Hp cap. Ceiling Suspended Type

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

86,825.00

100%

0%

100%

86,825.00

64,285.00

100%

0%

100%

64,285.00

86,825.00

100%

0%

100%

86,825.00

53,820.00

100%

0%

100%

53,820.00

105,380.25

95%

5%

100%

100,111.24

5,269.01

105,380.25

95%

5%

100%

100,111.24

5,269.01

97,710.90

100%

0%

100%

97,710.90

Samsung brand, Model: NS60CCRFA,( Assembly Hall )


14.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

15.0

FCU LN-1, 6Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS60CCRFA,( Assembly Hall )

16.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

IV.I
1.0

Ventilating Fan
SF LN-1, Kruger Brand, model: CFT-FDA 315 C, centrifugal
In - line cabinet fan DIDW-FC, c/w Belt driven Motor,
7599 CMH, 1.5kw ( assembly RM ).

2.0

EF LN-1, Kruger Brand, model: CFT-FD 315 C, centrifugal


In - line cabinet fan DIDW-FC, c/w Belt driven Motor,
7599 CMH, 1.5kw ( assembly RM ).

IV.J

Ventilating Ductworks

1.0

Fresh airduct, G.I Sheet ; 1250 X 400

2.0

Exhaust Air Duct , G.I Sheet

2.1

1500 X 600

13,356.10

100%

0%

100%

13,356.10

2.2

1250 X 400

74,446.40

100%

0%

100%

74,446.40

2.3

450 X 200

4,757.55

100%

0%

100%

4,757.55

2.4

1200 x 600

10,264.90

100%

0%

100%

10,264.90

5,057.70

100%

0%

100%

5,057.70

3.0

Supply Air Grille ; 1200 x 400

4.0

Exhaust Air grille

4.1

1200 x 600

6,647.00

70%

30%

100%

4,652.90

4.2

400 x 400

1,700.85

70%

30%

100%

1,190.60

510.26

14,398.00

70%

30%

100%

10,078.60

4,319.40

5.0

Fire Damper ; 1250 x 400

6.0

Volume Damper

1,994.10

6.1

1250 x 400

6,647.00

50%

50%

100%

3,323.50

3,323.50

6.2

450 x 200

1,537.55

50%

50%

100%

768.78

768.78

7.0

Filter for Supply fan

7.1

24" X 24" X 1 " washable air filter

4,830.00

50%

50%

100%

2,415.00

2,415.00

7.2

Access Panel 300 x 300

6,900.00

50%

50%

100%

3,450.00

3,450.00

8.0

Vibration Isolator

8.1

AC Equipment

33,120.00

50%

50%

100%

16,560.00

16,560.00

8.2

EF Equipment

23,460.00

50%

50%

100%

11,730.00

11,730.00

17,868.70

90%

10%

100%

16,081.83

1,786.87

9.0

Metal hanger, bracket, bolt & nut, paint, screw, expansion bolt, full
threaded round bar, angle bar, sealant and other miscellaneous.

10.0

Electrical works for Ventilation


22,908.00

30%

70%

100%

6,872.40

16,035.60

11.0

Control panel for Exhaust Blower with magnetic starter

75,900.00

20%

80%

100%

15,180.00

60,720.00

12.0

Air conditioning disconnect switches

26,220.00

20%

80%

100%

5,244.00

20,976.00

13.0

Testing and commissioning

10,350.00

0%

100%

100%

29,095.00

30%

70%

100%

8,728.50

20,366.50

13,294.00

30%

70%

100%

3,988.20

9,305.80

Electrical wire, IMC pipe, connector & misc.

IV.K
1.0

10,350.00

Fire Protection
Fire Hose Cabinet Recessed type, 32" x 27" x 7", complete with
40mm x 30 meters long fire hose, double jacketed
40 mm brass angle valve, Giacomini Brand
40 mm Adjustable nozzle
Semi-automatic pin hose rack
10 lbs ABC type fire extinguisher ( Dry Chemical)

2.0

Fire hose valve, 65 mm, with cap and chain, Giacomini Brand

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

3.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

B.I. Pipe, sch. 40

3.1

100 mm

10,770.90

30%

70%

100%

3,231.27

7,539.63

3.2

40 mm

3,174.00

30%

70%

100%

952.20

2,221.80

4.0

Tee

4.1

100 x 65 mm

4,509.15

30%

70%

100%

1,352.75

3,156.41

4.2

100 x 40 mm

4,509.15

30%

70%

100%

1,352.75

3,156.41

5.0

Flange

5.1

100 mm slip-on

5.2

100 mm Blind

6.0

Hangers and supports

844.10

30%

70%

100%

253.23

590.87

1,951.55

30%

70%

100%

585.47

1,366.09

2,242.50

30%

70%

100%

672.75

1,569.75

Total ( IV )

3,922,880.00

72%

28%

100%

2,817,489.25

1,105,390.75

Total ( C )

17,901,938.08

85%

15%

100%

15,167,758.67

2,734,179.41

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

D.

BILL NO. 4 - LEVEL 0 - DANCE STUDIO / CHANGING ROOMS FLOOR

I.

CIVIL / STRUCTURAL WORKS

I.A
1.0
I.B

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Site Works
Soil treatment

30,810.23

100%

0%

100%

30,810.23

Concrete Works, 3000 psi, 28 days, G-3/4

1.0

Columns

105,197.40

100%

0%

100%

105,197.40

2.0

Shear wall

135,557.40

100%

0%

100%

135,557.40

3.0

Girders

256,542.00

100%

0%

100%

256,542.00

4.0

Beams

133,027.40

100%

0%

100%

133,027.40

5.0

Suspended slabs

267,572.80

100%

0%

100%

267,572.80

6.0

Stairs

24,895.20

100%

0%

100%

24,895.20

I.C

Reinforced Steel Bars, Grade 40

1.0

Columns

404,186.56

100%

0%

100%

404,186.56

2.0

Shear wall

462,863.17

100%

0%

100%

462,863.17

3.0

Girders

1,020,223.70

100%

0%

100%

1,020,223.70

4.0

Beams

235,622.15

100%

0%

100%

235,622.15

5.0

Suspended slabs

404,768.84

100%

0%

100%

404,768.84

6.0

Stairs

42,611.03

100%

0%

100%

42,611.03

I.D

Formworks

1.0

Columns (to produce rough surface)

80,708.44

100%

0%

100%

80,708.44

2.0

Shear wall (to produce smooth surface)

77,025.56

100%

0%

100%

77,025.56

3.0

Girders (to produce smooth surface)

79,781.25

100%

0%

100%

79,781.25

4.0

Beams (to produce smooth surface)

59,590.13

100%

0%

100%

59,590.13

5.0

Suspended slab (to produce smooth surface)

208,587.00

100%

0%

100%

208,587.00

6.0

Stairs (to produce smooth surface)

14,175.19

100%

0%

100%

14,175.19

4,043,745.42

100%

0%

100%

4,043,745.42

55,497.87

50%

50%

100%

27,748.94

27,748.94

36,368.75

50%

50%

100%

18,184.38

18,184.38

188,043.39

50%

50%

100%

94,021.69

94,021.69

125,660.04

100%

0%

100%

125,660.04

Total ( I )
II.
II.A
1.0

CIVIL / ARCHITECTURAL WORKS


Floor Finishes
FF-1

Smooth, straight to finish concrete with brass nosing and


epoxy paint finish

2.0

FF-2

Smooth, straight to finish concrete with concrete sealer

3.0

FF-5

300 x 300mm x 7.35mm thick vitrified ceramic tiles "Mariwasa"

4.0

FF-10 140mm x 2185mm x 32mm T&G Hardwood Flooring by

5.0
II.B

Concrete topping

OSM
-

Wall Finishes

1.0

WF-1
Smooth, plain cement plaster, semi-gloss latex paint finish

456,633.75

50%

50%

100%

228,316.88

228,316.88

2.0

WF-2
300mm x 300mm vitrified cerami tiles @1.80m height. Rest in

144,445.16

50%

50%

100%

72,222.58

72,222.58

323,328.47

50%

50%

100%

161,664.23

161,664.23

26,915.75

0%

100%

100%

17,249.31

100%

0%

100%

17,249.31

118,650.56

50%

50%

100%

59,325.28

59,325.28

209,166.60

50%

50%

100%

104,583.30

104,583.30

168,708.68

50%

50%

100%

84,354.34

84,354.34

210,997.58

100%

0%

100%

210,997.58

plain cement finish. Semi-gloss latex paint finish


3.0

WF-4
Semi-Gloss Acrylic solvent base paint finish on cementitious
coating, textured with 20mm thick groove lines

4.0
II.C
1.0

BF-1Solid KD 19mm x 100mm wwoden baseboard in stained finish

26,915.75

Ceiling Finishes
CF-1Smooth-formed, smooth rubbed concrete finish with latex

paint finish
2.0

CF-212.0mm thick sag-resistant gypsum board on metal framing in


flat latex paint finish

3.0

CF-313.0mm thick moisture resistant gypsum board on metal


framing in flat latex paint finish

4.0

CF-4600mm x 600mm x 15mm thick acoustical ceiling tile on oven


baked T-runner AMF acoustic board

II.D
1.0

Waterproofing
WP-3
Self-adhearing rubberized waterproofing membrane
( Bithuthene 3000/ Texself)

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

II.E

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Masonry

1.0

CHB 150mm, 700 PSI

II.F

544,101.64

100%

0%

100%

544,101.64

Metal Works

1.0

SS Railing, Floor mounted

29,900.00

50%

50%

100%

14,950.00

14,950.00

2.0

SS Railing, Wall mounted

29,900.00

50%

50%

100%

14,950.00

14,950.00

II.G

Miscellaneous

1.0

Toilet partition-Phenolic

563,500.00

0%

100%

100%

563,500.00

2.0

Urinal partition-Phenolic

20,125.00

0%

100%

100%

20,125.00

3.0

Countertop

90,562.50

0%

100%

100%

90,562.50

4.0

Toilet paper "Bonco" Model 3039-F25

6,900.00

0%

100%

100%

6,900.00

5.0

Soap holder "Spira" Model SNV1

11,385.00

0%

100%

100%

11,385.00

6.0

Soap dispenser "Spira" , Model TS125R

30,739.50

0%

100%

100%

30,739.50

7.0

Paper towel dispenser "Spira" Model YKT300MR

85,790.00

0%

100%

100%

85,790.00

8.0

Handryer "Phil std" Model 8005

48,645.00

0%

100%

100%

48,645.00

9.0

Mirror

47,696.25

0%

100%

100%

47,696.25

10.0

Benches

56,580.00

0%

100%

100%

56,580.00

11.0

Lockers

263,810.00

0%

100%

100%

263,810.00

II.H

Caulking and Sealant

1.0

Sealant

51,577.50

100%

0%

100%

51,577.50

2.0

Compressible material

2,783.00

100%

0%

100%

2,783.00

3.0

Backer Rod 12.5 mm dia

3,967.50

100%

0%

100%

3,967.50

114,425.00

90%

10%

100%

102,982.50

11,442.50

79,350.00

90%

10%

100%

71,415.00

7,935.00

II.I

Doors & Windows

1.0

Wood Doors and Hardwares (Varnish finish is included)

1.1
a.
2.0
2.1
3.0

Hollow Core
900mm x 2100mmH
Aluminum Glass Door, Powder Coated
1800mm x 2100mmH
Aluminum Awning Type Glass Windows

3.1

W1

2600mm x 600mmH

10,925.00

90%

10%

100%

9,832.50

1,092.50

3.1

W2

2300mm x 1200mmH

40,250.00

90%

10%

100%

36,225.00

4,025.00

3.2

W5

1400mm x 650mmH

23,000.00

90%

10%

100%

20,700.00

2,300.00

3.3

W8

2300mm x 650mmH

30,360.00

90%

10%

100%

27,324.00

3,036.00
4,887.50

4.0

Aluminum Fixed Type Glass Windows

4.1

W13 FFFFF 5200mm x 1900mmH

48,875.00

90%

10%

100%

43,987.50

4.2

W14 FFF

30,475.00

90%

10%

100%

27,427.50

3,047.50

4,347,288.81

50%

50%

100%

2,176,552.19

2,170,736.62

207,414.00

0%

100%

100%

207,414.00

84,117.90

0%

100%

100%

84,117.90

31,949.30

0%

100%

100%

31,949.30

22,254.80

0%

100%

100%

22,254.80

47,380.00

3386mm x 1900mmH
Total ( II )

III.
III.A
1.0

ELECTRICAL WORKS
Panelboards and Circuit breaker - Square D
MDP NEMA 1- Surface Mounted
Main CB: 1000 AT,1000AF,3,3P,230V, 60Hz

2.0

Panel PPA NEMA 1 - Surface Mounted


Main CB: 300 AT,400 AF, 3P,3, 60 hz, 240 Volts

3.0

Panel PPB NEMA 1 - Surface Mounted


Main CB: 60AT,100AF,3,3P,230V, 60Hz

4.0

Panel LPB NEMA 1 - Surface Mounted


Main CB: 40AT,100AF,3,3P,230V, 60Hz

III.B

Enclosed Circuit Breaker

1.0

60 AT,3P,230V 60 Hz, NEMA 3R

47,380.00

0%

100%

100%

2.0

40 AT,3P,230V 60 Hz, NEMA 3R

4,784.00

0%

100%

100%

4,784.00

3.0

30 AT,2P,230V 60 Hz, NEMA 1

20,568.90

0%

100%

100%

20,568.90

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

III.C

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Lighting Fixtures - Brilliant Lightings

1.0

2x26Watts CFL Pinlight

65,508.60

0%

100%

100%

65,508.60

2.0

1x18Watts,CFL Bulb E-27 Socket

21,403.80

0%

100%

100%

21,403.80

3.0

1x 36 W Flourescent Fixture, Louvre Type

11,580.50

0%

100%

100%

11,580.50

4.0

1x36W Flourescent Fixture, Batten Type

2,787.60

0%

100%

100%

2,787.60

5.0

Wall Mounted Emergency Light, Battery Pack

29,348.00

0%

100%

100%

29,348.00

6.0

Wall Sconce

6,559.60

0%

100%

100%

6,559.60

7.0

Wall Mounted Exit Light

7,693.50

0%

100%

100%

7,693.50

III.D

Wiring Devices - National

1.0

Single Pole Switch-1 Gang

1,780.20

0%

100%

100%

1,780.20

2.0

Two gang switch, 15A, 250V

715.30

0%

100%

100%

715.30

3.0

Three Way Switch(1 Gang)

710.70

0%

100%

100%

710.70

4.0

Three Way Switch(2 Gang)

4,274.55

0%

100%

100%

4,274.55

Duplex Recepatcle Outlet 15A,250V,G.T.

4,749.50

0%

100%

100%

4,749.50

5.0
III.E

Wires and Cable - Phelps Dodge

1.0

THHN Copper Wires, 600V

1.1

3.5 mm

79,759.40

40%

60%

100%

31,903.76

1.2

5.5 mm

1,196.00

30%

70%

100%

358.80

1.3

8.0 mm

13,502.15

0%

100%

100%

13,502.15

1.4

14.0 mm

84,966.60

0%

100%

100%

84,966.60

1.5

22.0 mm

1,679.00

0%

100%

100%

1,679.00

1.6

30.0 mm

8,533.00

0%

100%

100%

8,533.00

1.7

150.0 mm

33,292.50

0%

100%

100%

33,292.50

III.F
1.0

47,855.64
837.20

Conduits and Fittings


PVC PIPE SCHEDULE -40

1.1

75mm

2,259.75

30%

70%

100%

677.93

1,581.83

1.2

40mm

16,042.50

95%

5%

100%

15,240.38

802.13

1.3

32mm

2,205.70

95%

5%

100%

2,095.42

110.29

1.4

20mm

60,177.20

95%

5%

100%

57,168.34

3,008.86
1,259.02

2.0

PVC pipe male adapter with locknut and bushing

2.1

75mm

1,798.60

30%

70%

100%

539.58

2.2

40mm

1,840.00

95%

5%

100%

1,748.00

92.00

2.3

20mm

4,533.30

95%

5%

100%

4,306.64

226.67

3.0

PVC Elbow

3.1

75mm

592.25

0%

100%

100%

592.25

3.2

40mm

339.25

95%

5%

100%

322.29

16.96
139.15

4.0

PVC endbell

4.1

75mm

139.15

0%

100%

100%

4.2

40mm

124.20

95%

5%

100%

117.99

6.21

5.0

Condulet LB, 90R

5.1

40mm

4,370.00

95%

5%

100%

4,151.50

218.50

5.2

20mm

3,276.35

95%

5%

100%

3,112.53

163.82

7,084.00

30%

70%

100%

2,125.20

4,958.80

1,644.50

30%

70%

100%

493.35

1,151.15

6.0
6.1
7.0
7.1
III.G

Flexible Mettalic Conduit


15mm
Flexible Straight Connector
15mm
Outlet Boxes and Pull boxes - Fumaco

1.0

Utility Box with Cover

2.0

Octagonal Box with Cover

3.0
4.0
5.0
6.0

2,701.35

100%

0%

100%

2,701.35

13,161.75

100%

0%

100%

13,161.75

Square Box with Cover

1,242.00

100%

0%

100%

1,242.00

Pull Box 500mmx700mmx300mm NEMA-1

8,776.80

15%

85%

100%

1,316.52

7,460.28

4,445.90

15%

85%

100%

666.89

3,779.02

6,969.00

0%

100%

100%

6,969.00

Pull Box 400mmx400mmx400mmx200mm NEMA-1


300 x 300 x 250 mm wire gutter NEMA-1

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

III.H

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Clock System - Notifier

1.0

Wall Mounted Secondary Clock

0%

100%

100%

2.0

Octagonal Box

119.60

100%

0%

100%

119.60

3.0

PullBox 10"10"x6"

759.00

30%

70%

100%

227.70

531.30
218.39

4.0

5,520.00

PVC PIPE

4.1

20 mm PVC Pipe

4,367.70

95%

5%

100%

4,149.32

4.2

25 mm PVC Pipe

2,525.40

95%

5%

100%

2,399.13

4.3

32 mm PVC Pipe

34,030.80

0%

100%

100%

5.0

5,520.00

126.27
34,030.80

PVC Pipe adapter with locknut and bushing

5.1

20 mm PVC

62.10

95%

5%

100%

59.00

5.2

25 mm PVC

170.20

95%

5%

100%

161.69

5.3

32 mm PVC

167.90

0%

100%

100%

10,356.90

40%

60%

100%

8.51
167.90

6.0

Wires ; 1.25 mm TF Wire

III.I

Public address system - TOA

1.0

Ceiling Mounted Speaker

0%

100%

100%

2.0

Octagonal Box

956.80

100%

0%

100%

956.80

3.0

Pull Box

109.25

30%

70%

100%

32.78

76.48

4.0

PVC Pipe ; 20 mm PVC Pipe

6,066.25

95%

5%

100%

5,762.94

303.31

5.0

PVC pipe adapter adapter with locknut and bushing ; 20 mm PVC

496.80

95%

5%

100%

471.96

24.84

6.0

Conduits and Fittings


386.40

30%

70%

100%

115.92

270.48

89.70

30%

70%

100%

26.91

62.79

3,321.20

30%

70%

100%

996.36

2,324.84

6.1

15 mm Flexible Metallic Conduit

6.2

15 mm St. Connector

7.0

Wires ; 1.25 mm TF Wire

III.J

Fire Alarm System - Notifier

1.0

11,573.60

4,142.76

3.11

6,214.14
11,573.60

Equipment/Devices

1.1

Fire Alarm Control Panel, Addressable

153,387.00

0%

100%

100%

153,387.00

1.2

Fire Alarm Manual station, Addressable Type

21,327.90

0%

100%

100%

21,327.90

1.3

Photo Electric Smoke Detector, Addressable Type

25,787.60

0%

100%

100%

25,787.60

1.4

Fire Alarm Horn With Strobe Light

14,786.70

0%

100%

100%

14,786.70

1.5

Wall Mounted panic Button

3,277.50

0%

100%

100%

3,277.50

2.0

PVC Pipe

2.1

25mm

10,101.60

95%

5%

100%

9,596.52

505.08

2.2

32mm

11,973.80

15%

85%

100%

1,796.07

10,177.73

2.3

15 mm Flexible Metallic Conduit

579.60

0%

100%

100%

2.4

Flexible Straight Connector

134.55

0%

100%

100%

134.55

2.5

Octagonal Box with Cover

1,569.75

0%

100%

100%

1,569.75

3.0

579.60

PVC Adapter with Locknut and Bushing

3.1

25mm

1,106.30

95%

5%

100%

1,050.99

55.32

3.2

32mm

335.80

15%

85%

100%

50.37

285.43

9,941.75

30%

70%

100%

2,982.53

6,959.23

3,998.55

4.0
III.K
1.0

Wires ; 1.25 TF Wires


Telephone System
PVC PIPE

1.1

25mm PVC Pipe

4,209.00

95%

5%

100%

1.2

40 mm PVC Pipe

16,042.50

0%

100%

100%

2.0

210.45
16,042.50

PVC PIPE ADAPTER WITH LOCKNUT AND BUSHING

2.1

25mm PVC Pipe

170.20

95%

5%

100%

161.69

2.2

40 mm PVC Pipe

184.00

0%

100%

100%

184.00
1,239.70

3.0

Telephone Outlet

4.0

Utility Box

5.0

Cat 5e Cable

6.0
7.0

1,239.70

8.51

0%

100%

100%

100%

0%

100%

200.10

1,577.80

0%

100%

100%

1,577.80

Cat 5e , 25 Pairs

31,878.00

0%

100%

100%

31,878.00

IDF

11,845.00

0%

100%

100%

11,845.00

200.10

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

III.L

CCTV System

1.0

CCTV PIPE

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

1.1

25mm PVC Pipe

4,209.00

95%

5%

100%

3,998.55

210.45

1.2

20mm PVC Pipe

7,279.50

95%

5%

100%

6,915.53

363.98

2.0

PVC PIPE ADAPTER WITH LOCKNUT AND BUSHING

2.1

25mm PVC Pipe

170.20

95%

5%

100%

161.69

8.51

2.2

20mm PVC Pipe

248.40

95%

5%

100%

235.98

12.42

3.0

Square Box

241.50

100%

0%

100%

241.50

4.0

Flexible Metallic Conduit

128.80

0%

100%

100%

128.80

5.0

Flexible Straight Connector

59.80

0%

100%

100%

6.0

Pullbox 300x300x300

1,265.00

15%

85%

100%

189.75

1,075.25

7.0

Pullbox 10x10x6

1,518.00

15%

85%

100%

227.70

1,290.30

8.0

Condulet LB, 90R, 20mm

936.10

95%

5%

100%

889.30

46.81

9.0

Condulet LB, 90R, 25mm

586.50

95%

5%

100%

557.18

29.33

5%

100%

2,731.25

143.75

7,647.50

59.80

III.M

Miscellaneous and Consumables

2,875.00

95%

III.N

Hangers and Support

8,050.00

95%

5%

100%

III.O

Testing and Commissioning

3,450.00

0%

100%

100%

1,375,986.50

15%

85%

100%

63,077.50

0%

100%

100%

63,077.50

Total ( III )
IV.

206,705.77

402.50
3,450.00
1,169,280.73

MECHANICAL AND PLUMBING WORKS

IV.A

Plumbing Fixtures

1.0

Water closet, white flush Valve, floor mounted complete with seat
and cover, Flush Valve and all standard accessories
American Standard, New Linear

2.0

Flush Valve for water closet, American standard F511

48,472.50

0%

100%

100%

48,472.50

3.0

Lavatory, white, under the- counter, complete with p-trap,

42,766.20

0%

100%

100%

42,766.20

85,408.20

0%

100%

100%

85,408.20

38,595.15

0%

100%

100%

38,595.15

supply pipe and valve and all standard installation


accessories (AM STD Ovalyn)
4.0

In-wall shower head and valve (American Standard)


SAGA 1521.

5.0

Lavatory, faucet, single hole single lever control, American


Standard SAGA 1502

6.0

Urinal, wall mounted, w/ flush valve, American Std. Washbrook Jr.

26,820.30

0%

100%

100%

26,820.30

7.0

Urinal Flush Valve push button type, American Std. F501.

14,559.00

0%

100%

100%

14,559.00

IV.B

Sanitary Works

1.0

Sewer Pipe Line

1.1

PVC Pipe, Series 1000 "Crown"

a.

160 mm

17,646.75

30%

70%

100%

5,294.03

12,352.73

b.

110 mm

7,141.50

40%

60%

100%

2,856.60

4,284.90

c.

90 mm

6,003.00

40%

60%

100%

2,401.20

3,601.80

d.

63 mm

6,603.30

40%

60%

100%

2,641.32

3,961.98

1.2

Bend, PVC series 1000

a.

1/4 x 160mm

2,271.25

40%

60%

100%

908.50

1,362.75

b.

1/4 x 110mm

2,584.05

40%

60%

100%

1,033.62

1,550.43

c.

1/4 x 90mm

619.85

40%

60%

100%

247.94

371.91

d.

1/4 x 63mm

1,114.35

40%

60%

100%

445.74

668.61

e.

1/8 x 160mm

1,228.20

40%

60%

100%

491.28

736.92

f.

1/8 x 110mm

1,390.35

40%

60%

100%

556.14

834.21

g.

1/8 x 90mm

563.50

40%

60%

100%

225.40

338.10

h.

1/8 x 63mm

1,729.60

50%

50%

100%

864.80

864.80

1.3

Wye, PVC Series 1000

a.

160 x 160 mm

2,766.90

50%

50%

100%

1,383.45

1,383.45

b.

160 x 110 mm

6,808.00

50%

50%

100%

3,404.00

3,404.00

c.

160 x 90 mm

5,071.50

50%

50%

100%

2,535.75

2,535.75

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

d.

160 x 63 mm

809.60

30%

70%

100%

242.88

566.72

e.

110 x 110 mm

2,227.55

40%

60%

100%

891.02

1,336.53

f.

110 x 63 mm

2,776.10

40%

60%

100%

1,110.44

1,665.66

g.

90 x 63 mm

3,137.20

40%

60%

100%

1,254.88

1,882.32

h.

63 x 63 mm

154.10

40%

60%

100%

61.64

92.46

1.4

Tee Pvc Series 1000

a.

110 x 63 mm

1,094.80

40%

60%

100%

437.92

656.88

b.

63 x 63 mm

3,542.00

40%

60%

100%

1,416.80

2,125.20

2,870.40

30%

70%

100%

861.12

2,009.28

12,420.00

30%

70%

100%

3,726.00

8,694.00

1.5

P-Trap, PVC Series 1000

a.
1.6

50mm
Floor Drain " JAMAN" model JFD 102 by Eurobrass

a.
1.7

50mm
Floor Clean-out "JAMAN" model JCO 136 by Eurobrass

a.

150 mm

9,453.00

10%

90%

100%

945.30

8,507.70

b.

100 mm

8,307.60

10%

90%

100%

830.76

7,476.84

c.

75 mm

7,011.55

10%

90%

100%

701.16

6,310.40

d.

50 mm

765.90

10%

90%

100%

76.59

689.31

519.80

10%

90%

100%

51.98

467.82

57,500.00

30%

70%

100%

17,250.00

40,250.00

2,300.00

40%

60%

100%

920.00

1,380.00

1.8

Ceiling Cleanout ; 150 mm

1.9

Hanger and support

1.10
2.0

Gravity leak test


Vent Line

2.1

PVC Pipe Series 1000 "Crown"

a.

90mm

5,175.00

40%

60%

100%

2,070.00

3,105.00

b.

63mm

26,490.25

40%

60%

100%

10,596.10

15,894.15

2.2

PVC Bend Series 1000


a.

1/4 x 90mm

177.10

40%

60%

100%

70.84

106.26

b.

1/4 x 63mm

6,040.95

40%

60%

100%

2,416.38

3,624.57

1/8 x 63mm

54.05

40%

60%

100%

21.62

32.43

c.
2.3

PVC Tee Series 1000


a.

90 x 63mm

1,738.80

40%

60%

100%

695.52

1,043.28

b.

63 x 63mm

2,656.50

40%

60%

100%

1,062.60

1,593.90

2.4

PVC Coupling Reducer Series 1000


a.

2.5
2.6
IV.C
1.0

90 x 63mm

262.20

40%

60%

100%

104.88

157.32

17,590.40

40%

60%

100%

7,036.16

10,554.24

805.00

40%

60%

100%

322.00

483.00

677,706.50

0%

100%

100%

677,706.50

94,702.50

0%

100%

100%

94,702.50

23,747.50

10%

90%

100%

2,374.75

21,372.75

2,645.00

10%

90%

100%

264.50

2,380.50

20,182.50

10%

90%

100%

2,018.25

18,164.25

2,587.50

10%

90%

100%

258.75

2,328.75

49,450.00

10%

90%

100%

4,945.00

44,505.00

150mm

28,290.00

10%

90%

100%

2,829.00

25,461.00

Vortex Plate

19,550.00

10%

90%

100%

1,955.00

17,595.00

PVC Cement, Pipe Hangers Supprts and Consumables


Leak Test
Sewage Ejection System
Sewage pump, non-submersible, non-clog, Duplex, 150 gpm
at 50 ft tdh 230 volts, 3, hz. Complete with duplex type controller,
level switches and all std accessories
(FLYGT Model ENM-10)

2.0
2.1
3.0
3.1
4.0
4.1
5.0

G.I. Pipe, sch 40


150mm
Bend
150mm
Tee
150mm
Flange

5.1

150mm slip-on

5.2

150mm blind

6.0
6.1
7.0
7.1
8.0

Gate valve
150mm
Check Vlave

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

9.0

Pipe Hangers Supprts and Consumables

12,075.00

40%

60%

100%

4,830.00

7,245.00

10.0

Electrical field wiring

14,950.00

40%

60%

100%

5,980.00

8,970.00

11.0

Pump Railing

9,775.00

0%

100%

100%

12.0

Leak test

1,150.00

40%

60%

100%

460.00

IV.D
1.0

9,775.00
690.00

Distrbution Line
PPRC Pipe, PN 20 "Boreplus" by Unipipe

1.1

63 mm

19,278.60

50%

50%

100%

9,639.30

9,639.30

1.2

50 mm

35,636.20

50%

50%

100%

17,818.10

17,818.10

1.3

40 mm

10,754.80

50%

50%

100%

5,377.40

5,377.40

1.4

32mm

11,812.80

50%

50%

100%

5,906.40

5,906.40

1.5

25mm

4,968.00

50%

50%

100%

2,484.00

2,484.00

1.6

20mm

5,078.40

50%

50%

100%

2,539.20

2,539.20

2.0

PPRC Bend PN 20

2.1

63 mm

872.85

50%

50%

100%

436.43

436.43

2.2

50 mm

2,415.00

50%

50%

100%

1,207.50

1,207.50

2.3

40 mm

609.50

50%

50%

100%

304.75

304.75

2.4

32mm

1,442.10

50%

50%

100%

721.05

721.05

2.5

25mm

524.40

50%

50%

100%

262.20

262.20

2.6

20mm

1,242.00

50%

50%

100%

621.00

621.00

3.0

PPRC Tee, PN 20

3.1

63 x 63 mm

848.70

50%

50%

100%

424.35

424.35

3.2

50 x 50 mm

2,063.10

50%

50%

100%

1,031.55

1,031.55

3.3

50 x 32 mm

655.50

50%

50%

100%

327.75

327.75

3.4

50 x 25 mm

641.70

50%

50%

100%

320.85

320.85

3.5

40 x 40 mm

335.80

50%

50%

100%

167.90

167.90

3.6

40 x 32 mm

989.00

50%

50%

100%

494.50

494.50

3.7

40 x 25 mm

239.20

50%

50%

100%

119.60

119.60

3.8

40 x 20 mm

943.00

50%

50%

100%

471.50

471.50

3.9

32 x 20 mm

669.30

50%

50%

100%

334.65

334.65

3.10

25 x 20 mm

822.25

50%

50%

100%

411.13

411.13

3.11

20 x 20 mm

1,076.40

50%

50%

100%

538.20

538.20

3.12

20 mm x 1/2 Faucet Tee

4,916.25

20%

80%

100%

983.25

3,933.00

3.13

32 mm x 3/4 Faucet Tee

1,725.00

20%

80%

100%

345.00

1,380.00

3.14

32 mm x 1 Faucet Tee

4,807.00

20%

80%

100%

961.40

3,845.60

4.0

PPRC Coupling / reducer

4.1

63 x 63 mm

1,566.30

50%

50%

100%

783.15

783.15

4.2

63 x 50 mm

258.75

50%

50%

100%

129.38

129.38

4.3

63 x 40 mm

250.70

50%

50%

100%

125.35

125.35

4.4

63 x 32 mm

243.80

50%

50%

100%

121.90

121.90

4.5

63 x 25 mm

233.45

50%

50%

100%

116.73

116.73

4.6

63 x 20 mm

230.00

50%

50%

100%

115.00

115.00

4.7

50 x 50 mm

3,109.60

50%

50%

100%

1,554.80

1,554.80

4.8

50 x 40 mm

603.75

50%

50%

100%

301.88

301.88

4.9

50 x 20 mm

354.20

50%

50%

100%

177.10

177.10

4.10

40 x 40 mm

621.00

50%

50%

100%

310.50

310.50

4.11

40 x 32 mm

103.50

50%

50%

100%

51.75

51.75

4.12

40 x 25 mm

97.75

50%

50%

100%

48.88

48.88

4.13

32 x 32 mm

703.80

50%

50%

100%

351.90

351.90

4.14

32 x 25 mm

94.30

50%

50%

100%

47.15

47.15

4.15

25 x 25 mm

269.10

50%

50%

100%

134.55

134.55

25 x 20 mm

1,233.95

50%

50%

100%

616.98

616.98

4.16
5.0

PPRC End Cap PN 20

5.1

32mm

407.10

50%

50%

100%

203.55

203.55

5.2

25mm

1,267.30

50%

50%

100%

633.65

633.65

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

6.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Male adapter

6.1

63 mm

3,854.80

50%

50%

100%

1,927.40

1,927.40

6.2

50 mm

7,831.50

50%

50%

100%

3,915.75

3,915.75

6.3

40 mm

1,750.30

50%

50%

100%

875.15

875.15

6.4

32mm

5,814.40

50%

50%

100%

2,907.20

2,907.20

6.5

25mm

295.55

50%

50%

100%

147.78

147.78

6.6

20mm

1,504.20

50%

50%

100%

752.10

752.10

7.0

Gate Valve, NRS, 200 WOG, threaded "TOZEN"

7.1

50 mm

3,162.50

30%

70%

100%

948.75

2,213.75

7.2

40 mm

5,799.45

30%

70%

100%

1,739.84

4,059.62

7.3

32mm

1,403.00

30%

70%

100%

420.90

982.10

7.4

25mm

4,508.00

40%

60%

100%

1,803.20

2,704.80

7.5

20mm

2,190.75

40%

60%

100%

876.30

1,314.45

7.6

12mm

1,322.50

40%

60%

100%

529.00

793.50

8.0

Pipe Clamps

8.1

63 mm

4,805.85

60%

40%

100%

2,883.51

1,922.34

8.2

50 mm

8,004.00

60%

40%

100%

4,802.40

3,201.60

8.3

40 mm

3,601.80

60%

40%

100%

2,161.08

1,440.72

8.4

32mm

6,403.20

60%

40%

100%

3,841.92

2,561.28

8.5

25mm

4,402.20

60%

40%

100%

2,641.32

1,760.88

8.6

20mm

9,604.80

60%

40%

100%

5,762.88

3,841.92

48,300.00

60%

40%

100%

28,980.00

19,320.00

1,867.60

60%

40%

100%

1,120.56

747.04

400.20

80%

20%

100%

320.16

80.04

117.30

80%

20%

100%

93.84

23.46

9.0
10.0
IV.E
1.0
1.1
2.0
2.1
3.0

Teflon Tape, Pipe Hanger Support & Consumables and tools rental
Testing and Commissioning
FCU Drain Pipe
PVC Pipe Series 1000 "Crown"
63mm
PVC Bend Series 1000
1/8 x 63mm
PVC Pipe, In-house blue

3.1

32 mm

926.90

80%

20%

100%

741.52

185.38

3.2

25 mm

1,794.00

80%

20%

100%

1,435.20

358.80

4.0

PVC Bend, In-house blue

4.1

32 mm

524.40

80%

20%

100%

419.52

104.88

4.2

25 mm

400.20

80%

20%

100%

320.16

80.04
211.14

5.0

Rubber Insulation, 12 mm thk

5.1

32 mm

1,055.70

80%

20%

100%

844.56

5.2

25 mm

3,105.00

80%

20%

100%

2,484.00

621.00

6.0

PVC Cement, Pipe Hangers Supprts and Consumables

5,175.00

80%

20%

100%

4,140.00

1,035.00

7.0

Excavation / Backfill

5,635.00

80%

20%

100%

4,508.00

1,127.00

8.0

Gravity leak test

1,437.50

80%

20%

100%

1,150.00

287.50

65,090.00

100%

0%

100%

65,090.00

76,592.30

100%

0%

100%

76,592.30

65,090.00

100%

0%

100%

65,090.00

57,557.50

100%

0%

100%

57,557.50

65,090.00

100%

0%

100%

65,090.00

IV.F

Airconditioning and Ventilation System

1.0

FCU LO-1, 4Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS36CCRBA( Dance Studio )

2.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

3.0

FCU LO-1, 4Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS36CCRBA( Dance Studio )

4.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

5.0

FCU LO-1, 4Hp cap. Ceiling Suspended Type


Samsung brand, Model: NS36CCRBA( Dance Studio )

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

6.0

Description of Work

Copper pipes, acetylene, oxygen, nitrogen, freon R-22, Metal hanger,

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

20,182.50

100%

0%

100%

20,182.50

29,895.40

100%

0%

100%

29,895.40

74,002.50

100%

0%

100%

74,002.50

110,383.90

50%

50%

100%

55,191.95

55,191.95

110,383.90

50%

50%

100%

55,191.95

55,191.95

33,200.50

50%

50%

100%

16,600.25

16,600.25

33,200.50

50%

50%

100%

16,600.25

16,600.25

33,200.50

50%

50%

100%

16,600.25

16,600.25

33,200.50

50%

50%

100%

16,600.25

16,600.25

bracket, paint, polyethylene tape electrical wire, angle bar, sealant &
other misc.
7.0

FCU LO-2, 1.5Hp cap. Wall mounted Type


Samsung brand, Model: AS-12UAN ( Lobby )

8.0

Copper pipes, acetylene, oxygen, nitrogen, freon R22, Metal hanger,


bracket, paint, polyethylene tape electrical wire, angle bar, sealant &
other misc.

IV.G

Ventilating Fan

1.0

SF LO-1, Kruger Brand, model: CFT-BDB 355 C, centrifugal In - line


cabinet fan DIDW-FC, c/w Belt driven Motor, 5653 CMH, 1.1kw
( Dance Studio ).

2.0

EF LO-1, Kruger Brand, model: CFT-BDB 355 C, centrifugal In - line


cabinet fan DIDW-FC, c/w Belt driven Motor, 5653 CMH, 1.1kw
( Dance Studio ).

3.0

TEF LO-1, Kruger brand, Model: TSK II 315 L, Centrifugal, In-line Duct
Fan, c/w Direct Driven Motor, 986 CMH, 0.352 kw, ( Male 2 ).

4.0

TEF LO-2, Kruger brand, Model: TSK II 315 L, Centrifugal, In-line Duct
Fan, c/w Direct Driven Motor, 1462 CMH, 0.352 kw, ( Male 1 ).

5.0

TEF LO-3, Kruger brand, Model: TSK II 315 L, Centrifugal, In-line Duct
Fan, c/w Direct Driven Motor, 1173 CMH, 0.352 kw, ( Female 1 ).

6.0

TEF LO-4, Kruger brand, Model: TSK II 315 L, Centrifugal, In-line Duct
Fan, c/w Direct Driven Motor, 1490 CMH, 0.352 kw, ( Female 2 ).

IV.H
1.0

Ventilating Ductworks
Fresh airduct, G.I Sheet

1.1

1200 X 300

8,553.70

100%

0%

100%

8,553.70

1.2

900 X 300

30,801.60

100%

0%

100%

30,801.60

2.0

Toilet exhaust duct, G.I Sheet

2.1

500 x 200

63,186.75

100%

0%

100%

63,186.75

2.2

400 x 400

5,854.65

100%

0%

100%

5,854.65

2.3

400 x 200

13,175.55

100%

0%

100%

13,175.55

2.4

350 x 200

6,710.25

100%

0%

100%

6,710.25

3.0

Exhaust Air Duct , G.I Sheet

3.1

1250 X 400

18,611.60

100%

0%

100%

18,611.60

3.2

1200 X 300

17,107.40

100%

0%

100%

17,107.40

3.3

1000 X 400

7,985.60

100%

0%

100%

7,985.60

3.4

900 X 300

13,689.60

100%

0%

100%

13,689.60

3.5

450 X 200

6,343.40

100%

0%

100%

6,343.40

4,261.90

100%

0%

100%

4,261.90

4.0

Kitchen supply air duct, G. I Sheet

5.0

Supply air grilles

5.1
6.0

1000 X 400
Exhaust air grilles

6.1

1000 x 400

4,365.40

100%

0%

100%

4,365.40

6.2

400 X 400

3,401.70

100%

0%

100%

3,401.70

6.3

300 X 300

2,166.60

100%

0%

100%

2,166.60

7.0

Exhaust air louver with insect screen

7.1

1200 X 300

7,730.30

100%

0%

100%

7,730.30

7.2

1000 X 300

3,269.45

100%

0%

100%

3,269.45

8.0

Volume Damper

8.1

900 X 300

7,709.60

100%

0%

100%

7,709.60

8.2

500 X 200

3,339.60

100%

0%

100%

3,339.60

8.3

400 X 200

1,405.30

100%

0%

100%

1,405.30

8.4

350 X 200

1,273.05

100%

0%

100%

1,273.05

1,736.50

100%

0%

100%

1,736.50

9.0
9.1

Fire Damper
450 x 200

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

10.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Filter for Supply fan

10.1

24" X 24" X 1 " washable air filter

4,830.00

0%

0%

100%

10.2

Access Panel 300 x 300

2,300.00

0%

0%

100%

11.0

Vibration Isolator

11.1

AC Equipment

12,420.00

0%

0%

100%

11.2

EF Equipment

15,640.00

0%

0%

100%

26,409.75

0%

0%

100%

12.0

Metal hanger, bracket, bolt & nut, paint, screw, expansion bolt, full
threaded round bar, angle bar, sealant and other miscellaneous.

13.0

Electrical works for Ventilation


Electrical wire, IMC pipe, connector & misc.

14.0

Control panel for Exhaust Blower with magnetic starter

15.0

Air conditioning disconnect switches

16.0

Testing and commissioning

IV.I
1.0

28,750.00

0%

0%

100%

151,800.00

0%

0%

100%

13,110.00

0%

0%

100%

9,890.00

0%

0%

100%

58,190.00

30%

0%

100%

17,457.00

13,294.00

30%

0%

100%

3,988.20

Fire Protection
Fire Hose Cabinet Recessed type, 32" x 27" x 7", complete with
40mm x 30 meters long fire hose, double jacketed
40 mm brass angle valve, Giacomini Brand
40 mm Adjustable nozzle
Semi-automatic pin hose rack
10 lbs ABC type fire extinguisher ( Dry Chemical)

2.0

Fire hose valve, 65 mm, with cap and chain, Giacomini Brand

3.0

B.I. Pipe, sch. 40

3.1

100 mm

20,003.10

50%

0%

100%

10,001.55

3.2

40 mm

12,696.00

50%

0%

100%

6,348.00

3,919.20

50%

0%

100%

1,959.60

809.60

50%

0%

100%

404.80

4.0

Bend,

4.1

100 mm

4.2

40 mm

5.0

Tee

5.1

100 x 100mm

4,509.15

50%

0%

100%

2,254.58

5.2

100 x 65 mm

4,509.15

50%

0%

100%

2,254.58

5.3

100 x 40 mm

4,509.15

50%

0%

100%

2,254.58

5.4

40 x 40 mm

277.15

50%

0%

100%

138.58

6.0

Flange

6.1

100 mm slip-on

4,220.50

50%

0%

100%

2,110.25

6.2

100 mm Blind

1,951.55

50%

0%

100%

975.78

7.0

Isolation Valve ; 40 mm

3,047.50

50%

0%

100%

1,523.75

8.0

Hangers and supports

2,242.50

50%

0%

100%

1,121.25

Total ( IV )

3,229,022.90

36%

64%

100%

1,167,703.79

1,714,783.29

Total ( D )

12,996,043.63

58%

42%

100%

7,594,707.18

5,054,800.63

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

E.

BILL NO. 5 LEVEL 1 - REFECTORY / KITCHEN / TOILETS FLOOR

I.

CIVIL / STRUCTURAL WORKS

I.A

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Concrete Works, 3000 psi, 28 days, G-3/4

1.0

Columns

99,226.60

100%

0%

100%

99,226.60

2.0

Girders

95,229.20

100%

0%

100%

95,229.20

3.0

Beams

138,087.40

100%

0%

100%

138,087.40

4.0

Suspended Slabs

208,927.40

100%

0%

100%

208,927.40

5.0

Stairs

27,627.60

100%

0%

100%

27,627.60

I.B

Reinforced Steel Bars, Grade 40

1.0

Columns

380,968.02

100%

0%

100%

380,968.02

2.0

Girders

205,594.35

100%

0%

100%

205,594.35

3.0

Beams

345,110.32

100%

0%

100%

345,110.32

4.0

Suspended Slabs

359,315.71

100%

0%

100%

359,315.71

5.0

Stairs

47,345.13

100%

0%

100%

47,345.13

I.C

Formworks

1.0

Columns (to produce smooth surface)

76,094.06

100%

0%

100%

76,094.06

2.0

Girders (to produce smooth surface)

52,181.25

100%

0%

100%

52,181.25

3.0

Beams (to produce smooth surface)

85,892.06

100%

0%

100%

85,892.06

4.0

Suspended slab (to produce smooth surface)

178,054.50

100%

0%

100%

178,054.50

5.0

Stairs (to produce smooth surface)

15,749.25

100%

0%

100%

15,749.25

2,315,402.85

100%

0%

100%

2,315,402.85

77,272.45

80%

20%

100%

61,817.96

15,454.49

Total ( I )
II.
II.A
1.0

CIVIL / ARCHITECTURAL WORKS


Floor Finishes
FF-1Smooth, straight to finish concrete with brass nosing and
epoxy paint finish

2.0

FF-7600 x 600mm x 10.35mm thick homogeneous tiles (Non-Skid)

480,536.01

80%

20%

100%

384,428.81

96,107.20

3.0

Concrete topping

103,433.76

80%

20%

100%

82,747.01

20,686.75

II.B

Wall Finishes

1.0

WF-1

Smooth, plain cement plaster, semi-gloss latex paint finish

401,011.96

80%

20%

100%

320,809.57

80,202.39

2.0

WF-2

300mm x 300mm vitrified cerami tiles @1.80m height.

125,871.55

80%

20%

100%

100,697.24

25,174.31

Rest in plain cement finish. Semi-gloss latex paint finish


3.0

WF-3

Plain cement plaster, final finish by Kitchen Consultant

4.0

WF-4

Semi-Gloss Acrylic solvent base paint finish on

5.0

BF-1

30,561.58

80%

20%

100%

24,449.27

6,112.32

433,231.81

80%

20%

100%

346,585.45

86,646.36

16,031.00

0%

100%

100%

131,403.60

30%

70%

100%

39,421.08

91,982.52

21,734.31

50%

50%

100%

10,867.16

10,867.16

208,656.00

50%

50%

100%

104,328.00

104,328.00

104,976.60

50%

50%

100%

52,488.30

52,488.30

232,929.65

50%

50%

100%

116,464.82

116,464.82

14,222.97

50%

50%

100%

7,111.49

7,111.49

134,359.01

100%

0%

100%

134,359.01

561,420.43

100%

0%

100%

561,420.43

cementitious coating, textured with 20mm thick groove lines


Solid KD 19mm x 100mm wwoden baseboard in

16,031.00

stained finish
6.0
II.C
1.0

Concrete ledges, semi gloss acrylic


Ceiling Finishes
CF-1 Smooth-formed, smooth rubbed concrete finish with latex
paint finish

2.0

CF-2 12.0mm thick sag-resistant gypsum board on metal framing


in flat latex paint finish

3.0

CF-3 13.0mm thick moisture resistant gypsum board on metal


framing in flat latex paint finish

4.0

CF-4 600mm x 600mm x 15mm thick acoustical ceiling tile on oven


baked T-runner AMF acoustic board

5.0

CF-5 Smooth-formed, smooth rubbed concrete finish , ready to


received finish by Kitchen Consultant

II.D
1.0

Waterproofing
WP-3
Self-adhearing rubberized waterproofing membrane
( Bithuthene 3000/ Texself)

II.E
1.0

Masonry
CHB 150mm, 700 PSI

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

II.F

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Metal Works

1.0

SS Railing, Floor mounted

82,800.00

50%

50%

100%

41,400.00

2.0

SS Railing, Wall mounted

82,800.00

50%

50%

100%

41,400.00

41,400.00

3.0

SS Balcony railing

315,100.00

50%

50%

100%

157,550.00

157,550.00

II.G

41,400.00

Miscellaneous

1.0

Toilet partition-Phenolic

221,375.00

0%

100%

100%

2.0

Urinal partition-Phenolic

32,200.00

0%

100%

100%

32,200.00

3.0

Countertop

119,025.00

0%

100%

100%

119,025.00

4.0

Toilet paper "Bonco" Model 3039-F25

7,590.00

0%

100%

100%

7,590.00

5.0

Soap dispenser "Spira" , Model TS125R

40,986.00

0%

100%

100%

40,986.00

6.0

Handryer "Phil std" Model 8005

72,967.50

0%

100%

100%

72,967.50

7.0

Mirror

62,686.50

0%

100%

100%

62,686.50

II.H

221,375.00

Caulking and Sealant

1.0

Sealant

69,517.50

100%

0%

100%

69,517.50

2.0

Compressible material

5,573.37

100%

0%

100%

5,573.37

3.0

Backer rod 12.5 mm dia

5,347.50

100%

0%

100%

5,347.50

II.I

Others

1.0

Chipping of wall and floor tiles at Level 1 toilets

116,910.15

100%

0%

100%

116,910.15

2.0

Demolition of existing ceiling at Level 1 toilets

15,000.60

100%

0%

100%

15,000.60

3.0

Demolition of roof

23,000.00

100%

0%

100%

23,000.00

137,310.00

50%

50%

100%

68,655.00

68,655.00

24,840.00

50%

50%

100%

12,420.00

12,420.00

39,675.00

50%

50%

100%

19,837.50

19,837.50

II.J

Doors & Windows

1.0

Wood Doors and Hardwares (Varnish finish is included)

1.1

Hollow Core

a.

900mm x 2100mmH

1.2

Hollow Core (Fire Rated)

a.
2.0
2.1
3.0

1000mm x 2100mmH
Aluminum Glass Door, Powder Coated
1800mm x 2100mmH
Aluminum Awning Type Glass Windows

3.1

W1

2600mm x 600mmH

32,775.00

50%

50%

100%

16,387.50

16,387.50

3.2

W2

2300mm x 1200mmH

40,250.00

50%

50%

100%

20,125.00

20,125.00

3.3

W6

1200mm x 650mmH

28,980.00

50%

50%

100%

14,490.00

14,490.00

3.4

W8

2300mm x 650mmH

20,240.00

50%

50%

100%

10,120.00

10,120.00

3.5

W10 3400mm x 650mmH

28,750.00

50%

50%

100%

14,375.00

14,375.00

4.0

Aluminum Fixed Type Glass Windows

4.1

W11 FFSSFF 6600mm x 1550mmH

56,925.00

50%

50%

100%

28,462.50

28,462.50

4.2

W12 FFFF 4500mm x 2000mmH

43,125.00

50%

50%

100%

21,562.50

21,562.50

4.3

W15 FF 2300mm x 2000mmH

23,575.00

50%

50%

100%

11,787.50

11,787.50
27,485.00

II.K

Metal Doors (Hardware nad paint finish is included)

1.0

900mm x 2100mmH

54,970.00

50%

50%

100%

27,485.00

2.0

3100mm x 2455mmH

74,347.50

50%

50%

100%

37,173.75

37,173.75

4,956,294.31

63%

37%

100%

3,126,575.95

1,829,718.36

387,527.00

0%

100%

100%

387,527.00

58,648.85

0%

100%

100%

58,648.85

22,254.80

0%

100%

100%

22,254.80

Total ( II )
III.
III.A
1.0
III.B
1.0

ELECTRICAL WORKS
Transformer
300 KVA,480V/230V,3,60 HZ- Dry Type Transformer -Delta Star
Panelboards and Circuit breaker - Square D
Panel PPC - Surface Mounted
Main CB: 150 AT,150AF,3,3P,230V, 60Hz

2.0

Panel LPC NEMA 1 - Surface Mounted


Main CB: 40AT,100AF,3,3P,230V, 60Hz

III.C

Enclosed Circuit Breaker

1.0

30 AT,3P,230V 60 Hz, NEMA 3R

19,136.00

0%

100%

100%

19,136.00

2.0

20 AT,2P,230V 60 Hz, NEMA 3R

12,592.50

0%

100%

100%

12,592.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

3.0

20 AT,2P,230V 60 Hz,NEMA 1

3,428.15

0%

100%

100%

4.0

100 AT, 3P,230V, 60 HZ

8,234.00

0%

100%

100%

3,428.15
8,234.00

5.0

600 AT, 3P,480V, 60 HZ NEMA 1

42,185.45

0%

100%

100%

42,185.45

6.0

1000A, 3P, 230V, 60 Hz, NEMA 1

112,037.60

0%

100%

100%

112,037.60

III.D

Lighting Fixtures - Brilliant Lightings


127,098.00

0%

100%

100%

127,098.00

42,366.00

0%

100%

100%

42,366.00

5,575.20

0%

100%

100%

5,575.20

1.0

2x 36W, Flourescent Fixture, Pendant Type

2.0

2x 36 W Flourescent Fixture, Louvre Type

3.0

1x36W Flourescent Fixture, Batten Type

4.0

Wall Mounted Emergency Light, Battery Pack

22,011.00

0%

100%

100%

22,011.00

5.0

Wall Sconce

13,119.20

0%

100%

100%

13,119.20

6.0

Wall Mounted Exit Light

2,564.50

0%

100%

100%

2,564.50

7.0

Pole Mounted Lamp-3"x5"x20ftc/w luminaire die-cast aluminum

97,980.00

0%

100%

100%

97,980.00

housing and 70 HPS bulb ballast Ignitor and Capacitor


III.E

Wiring Devices - National

1.0

Single Pole Switch-1 Gang

5,043.90

0%

100%

100%

5,043.90

2.0

Three Way Switch( 3 Gang)

1,186.80

0%

100%

100%

1,186.80

3.0

Duplex Recepatcle Outlet 15A,250V,G.T.

3,324.65

0%

100%

100%

3,324.65

III.F

Wires and Cable - Phelps Dodge

1.0

THHN Copper Wires, 600V

1.1

3.5 mm

60,246.20

50%

50%

100%

30,123.10

1.2

14.0 mm

16,215.00

50%

50%

100%

8,107.50

1.3

38.0 mm

129,347.40

0%

100%

100%

129,347.40

1.4

50.0 mm

36,225.00

0%

100%

100%

36,225.00

1.5

60.0 mm

17,186.75

0%

100%

100%

17,186.75

1.6

200.0 mm

1,957,760.00

0%

100%

100%

1,957,760.00

3,276.35

95%

5%

100%

3,112.53

163.82

III.G

Conduits and Fittings

1.0

Condulet LB, 90R

1.1
2.0

20mm

30,123.10
8,107.50

PVC PIPE SCHEDULE -40

2.1

110mm

190,966.70

95%

5%

100%

181,418.37

9,548.34

2.2

63mm

4,330.90

95%

5%

100%

4,114.36

216.55

2.3

25mm

2,244.80

95%

5%

100%

2,132.56

112.24

2.4

20mm

43,677.00

95%

5%

100%

41,493.15

2,183.85

3.0

PVC pipe male adapter with locknut and bushing

3.1

110mm

3,049.80

95%

5%

100%

2,897.31

152.49

3.2

63mm

676.20

95%

5%

100%

642.39

33.81

3.3

40mm

368.00

95%

5%

100%

349.60

18.40

3.4

32mm

671.60

95%

5%

100%

638.02

33.58

3.5

25mm

425.50

95%

5%

100%

404.23

21.28

3.6

20mm

3,570.75

95%

5%

100%

3,392.21

178.54

14,996.00

95%

5%

100%

14,246.20

749.80

165.60

95%

5%

100%

157.32

8.28

4.0

PVC Elbow

4.1

110mm

4.2

63mm

5.0

PVC endbell

5.1

110mm

902.75

95%

5%

100%

857.61

45.14

5.2

63mm

69.00

95%

5%

100%

65.55

3.45

3,864.00

95%

5%

100%

3,670.80

193.20

897.00

95%

5%

100%

852.15

44.85

6.0
6.1
7.0
7.1
III.H

Flexible Mettalic Conduit


15mm
Flexible Straight Connector
15mm
Outlet Boxes and Pull boxes - Fumaco

1.0

Utility Box with Cover

2,601.30

95%

5%

100%

2,471.24

130.07

2.0

Octagonal Box with Cover

9,539.25

95%

5%

100%

9,062.29

476.96

3.0

Square Box with Cover

1,242.00

95%

5%

100%

1,179.90

62.10

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

4.0

Pull Box 500mmx700mmx300mm NEMA-1

8,776.80

0%

100%

100%

8,776.80

5.0

Pull Box 400mmx400mmx400mmx200mm NEMA-1

4,445.90

0%

100%

100%

4,445.90

5,520.00

0%

100%

100%

5,520.00

119.60

80%

20%

100%

95.68

23.92

4,853.00

80%

20%

100%

3,882.40

970.60

62.10

80%

20%

100%

49.68

12.42

1,966.50

60%

40%

100%

1,179.90

786.60

III.I

Clock System - Notifier

1.0

Wall Mounted Secondary Clock

2.0

Octagonal Box

3.0

PVC PIPE

3.1
4.0
4.1
5.0
5.1

20 mm PVC Pipe
PVC Pipe adapter with locknut and bushing
20 mm PVC
Wires
1.25 mm TF Wire

III.J

Public address system - TOA

1.0

Ceiling Mounted Speaker

11,573.60

0%

100%

100%

11,573.60

2.0

Wall Mounted Horn Speaker

4,982.95

0%

100%

100%

4,982.95

3.0

Octagonal Box

1,076.40

60%

40%

100%

645.84

430.56

4.0

Pull Box

109.25

10%

90%

100%

10.93

98.33

5.0

PVC PIPE
6,066.25

80%

20%

100%

4,853.00

1,213.25

558.90

20%

80%

100%

111.78

447.12
579.60

5.1
6.0
6.1
7.0

20 mm PVC Pipe
PVC pipe adapter adapter with locknut and bushing
20 mm PVC
Conduits and Fittings

7.1

15 mm Flexible Metallic Conduit

579.60

0%

100%

100%

7.2

15 mm St. Connector

134.55

0%

100%

100%

3,408.60

40%

60%

100%

8.0

Wires ; 1.25 mm TF Wire

III.K

Fire Alarm System - Notifier

1.0

1,363.44

134.55
2,045.16

Equipment/Devices

1.1

Heat Detector Comb. Of Rate of Rise

4,986.40

0%

100%

100%

4,986.40

1.2

Fire Alarm Manual station, Addressable Type

14,218.60

0%

100%

100%

14,218.60

1.3

Photo Electric Smoke Detector, Addressable Type

38,681.40

0%

100%

100%

38,681.40

1.4

Fire Alarm Horn With Strobe Light

9,857.80

0%

100%

100%

9,857.80

1.5

Wall Mounted panic Button

9,832.50

0%

100%

100%

9,832.50

2.0

PVC Pipe

2.1

25mm

6,173.20

40%

60%

100%

2,469.28

2.2

32mm

7,247.30

40%

60%

100%

2,898.92

4,348.38

2.3

40mm

43,849.50

30%

70%

100%

13,154.85

30,694.65

2.4

15 mm Flexible Metallic Conduit

450.80

0%

100%

100%

2.5

Flexible Straight Connector

104.65

0%

100%

100%

2.6

Octagonal Box with Cover

1,690.50

15%

85%

100%

253.58

2.7

Square Box

2.8

Pull Box 200X200X150

3.0

134.55

15%

85%

100%

20.18

1,840.00

0%

100%

100%

3,703.92

450.80
104.65
1,436.93
114.37
1,840.00

PVC Adapter with Locknut and Bushing

3.1

25mm

2,127.50

60%

40%

100%

1,276.50

851.00

3.2

30mm

335.80

30%

70%

100%

100.74

235.06

3.3

40mm

184.00

30%

70%

100%

55.20

128.80

22,287.00

40%

60%

100%

8,914.80

13,372.20

10,101.60

40%

60%

100%

4,040.64

6,060.96

255.30

40%

60%

100%

102.12

1,859.55

0%

100%

100%

4.0
III.L

Wires ; 1.25 mm TF Wire


Telephone System

1.0

PVC Pipe ; 25mm PVC Pipe

2.0

PVC Pipe Adapter with Locknut & Bushing ; 25mm PVC Pipe

3.0

Telephone Outlet

4.0

Utility Box

5.0

Cat 5e Cable

III.M

CCTV System

1.0

CCTV PIPE

300.15

40%

60%

100%

120.06

3,606.40

0%

100%

100%

153.18
1,859.55
180.09
3,606.40

1.1

25mm PVC Pipe

11,785.20

40%

60%

100%

4,714.08

7,071.12

1.2

20mm PVC Pipe

20,382.60

40%

60%

100%

8,153.04

12,229.56

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

2.0

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

PVC PIPE ADAPTER WITH LOCKNUT AND BUSHING

2.1

20mm PVC Pipe

340.40

40%

60%

100%

136.16

2.2

25mm PVC Pipe

124.20

40%

60%

100%

49.68

204.24
74.52

3.0

Square Box

241.50

15%

85%

100%

36.23

205.28

4.0

Flexible Metallic Conduit

128.80

15%

85%

100%

19.32

109.48

5.0

Flexible Straight Connector

59.80

15%

85%

100%

8.97

6.0

Pullbox 300x300x300

1,265.00

0%

100%

100%

7.0

Pullbox 10x10x6

5,313.00

0%

100%

8.0

Condulet LB, 90R, 20mm

2,808.30

15%

85%

9.0

Condulet LB, 90R, 25mm

1,759.50

15%

5,175.00
22,951.70

III.N

Miscellaneous and Consumables

III.O

Hangers and Support

III.P

Testing and Commissioning


Total ( III )

IV.

50.83

1,265.00

100%

5,313.00

100%

421.25

2,387.06

85%

100%

263.93

1,495.58

40%

60%

100%

2,070.00

3,105.00

40%

60%

100%

9,180.68

13,771.02

6,900.00

0%

100%

100%

3,804,421.95

10%

90%

100%

69,385.25

0%

100%

100%

69,385.25

382,041.21

6,900.00
3,422,380.74

MECHANICAL AND PLUMBING WORKS

IV.A

Plumbing Fixtures

1.0

Water closet, white flush Valve, floor mounted complete with seat
and cover, Flush Valve and all standard accessories
American Standard, New Linear

2.0

Flush Valve for water closet, American standard F511

53,319.75

0%

100%

100%

53,319.75

3.0

Lavatory, white, under the- counter, complete with p-trap,

57,021.60

0%

100%

100%

57,021.60

51,460.20

0%

100%

100%

51,460.20

supply pipe and valve and all standard installation


accessories (AM STD Ovalyn)
4.0

Lavatory, faucet, single hole single lever control, American


Standard SAGA 1502

5.0

Urinal, wall mounted, with flush valve, American Std. washbrook Jr.

35,760.40

0%

100%

100%

35,760.40

6.0

Urinal Flush Valve push button type, American Std. F501.

19,412.00

0%

100%

100%

19,412.00

7.0

Stainless steel sink single bowl, 2-drain board with faucet

19,061.25

0%

100%

100%

19,061.25

IV.B

Sanitary Works

1.0

Sewer Pipe Line

1.1

PVC Pipe, Series 1000 "Crown"

a.

160 mm

14,800.50

45%

55%

100%

6,660.23

8,140.28

b.

110 mm

15,835.50

45%

55%

100%

7,125.98

8,709.53

c.

63 mm

8,004.00

45%

55%

100%

3,601.80

4,402.20

1.2

Bend, PVC series 1000

a.

1/4 x 160mm

1,362.75

60%

40%

100%

817.65

545.10

b.

1/4 x 110mm

1,353.55

60%

40%

100%

812.13

541.42

c.

1/4 x 63mm

1,642.20

60%

40%

100%

985.32

656.88

d.

1/8 x 160mm

818.80

60%

40%

100%

491.28

327.52

e.

1/8 x 110mm

1,497.30

60%

40%

100%

898.38

598.92

f.

1/8 x 63mm

756.70

60%

40%

100%

454.02

302.68

1.3

Wye, PVC Series 1000

a.

160 x 160 mm

2,766.90

60%

40%

100%

1,660.14

1,106.76

b.

160 x 110 mm

3,404.00

60%

40%

100%

2,042.40

1,361.60

c.

160 x 63 mm

6,476.80

60%

40%

100%

3,886.08

2,590.72

d.

110 x 110 mm

2,227.55

60%

40%

100%

1,336.53

891.02

e.

110 x 63 mm

4,572.40

60%

40%

100%

2,743.44

1,828.96

231.15

60%

40%

100%

138.69

92.46

f.
1.4

63 x 63 mm
Tee Pvc Series 1000

a.

110 x 63 mm

1,094.80

60%

40%

100%

656.88

437.92

b.

63 x 63 mm

2,898.00

60%

40%

100%

1,738.80

1,159.20

3,229.20

60%

40%

100%

1,937.52

1,291.68

1.5
a.

P-Trap, PVC Series 1000


50mm

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

1.6
a.
1.7
a.
1.8

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Floor Drain " JAMAN" model JFD 102 by Eurobrass


50mm

13,972.50

20%

80%

100%

2,794.50

11,178.00

1,384.60

20%

80%

100%

276.92

1,107.68

Floor Clean-out "JAMAN" model JCO 136 by Eurobrass


100 mm
Ceiling Cleanout

a.

150 mm

519.80

20%

80%

100%

103.96

415.84

b.

100 mm

748.65

20%

80%

100%

149.73

598.92

c.

50 mm

54.05

20%

80%

100%

10.81

43.24

2,110.25

20%

80%

100%

422.05

1,688.20

1.9
a.
1.10
a.

Ground Clean-out
150 mm
Grease Trap
12,605.15

20%

80%

100%

2,521.03

10,084.12

1.11

PVC Cement, Pipe Hangers Supprts and Consumables

61,989.60

20%

80%

100%

12,397.92

49,591.68

1.12

Excavation / Backfill

10,062.50

20%

80%

100%

2,012.50

8,050.00

1.13

Gravity leak test

2,300.00

20%

80%

100%

460.00

1,840.00

2.0

10.0 GPM

Vent Line

2.1

PVC Pipe Series 1000 "Crown"

a.

90mm

2,898.00

60%

40%

100%

1,738.80

1,159.20

b.

63mm

14,955.75

60%

40%

100%

8,973.45

5,982.30

2.2

PVC Bend Series 1000

a.

1/4 x 90mm

88.55

60%

40%

100%

53.13

35.42

b.

1/4 x 63mm

4,692.00

60%

40%

100%

2,815.20

1,876.80
153.18

2.3

PVC Tee Series 1000

a.

90 x 90mm

382.95

60%

40%

100%

229.77

b.

90 x 63mm

869.40

60%

40%

100%

521.64

347.76

c.

63 x 63mm

2,898.00

60%

40%

100%

1,738.80

1,159.20

2.4
a.
2.5
2.6
IV.C
1.0

PVC Coupling Reducer Series 1000


90 x 63mm
PVC Cement, Pipe Hangers Supprts and Consumables
Leak Test

393.30

60%

40%

100%

235.98

157.32

17,825.00

60%

40%

100%

10,695.00

7,130.00

805.00

20%

80%

100%

161.00

644.00

Distrbution Line
PPRC Pipe, PN 20 "Boreplus" by Unipipe

1.1

50 mm

21,031.20

20%

80%

100%

4,206.24

16,824.96

1.2

40 mm

1,536.40

20%

80%

100%

307.28

1,229.12

1.3

32mm

9,844.00

20%

80%

100%

1,968.80

7,875.20

1.4

25mm

4,140.00

35%

65%

100%

1,449.00

2,691.00

1.5

20mm

4,655.20

35%

65%

100%

1,629.32

3,025.88

2.0

PPRC Bend PN 20

2.1

50 mm

1,207.50

20%

80%

100%

241.50

966.00

2.2

32mm

1,048.80

20%

80%

100%

209.76

839.04

2.3

25mm

131.10

35%

65%

100%

45.89

85.22

2.4

20mm

1,311.00

35%

65%

100%

458.85

852.15

3.0

PPRC Tee, PN 20

3.1

50 x 50 mm

1,031.55

20%

80%

100%

206.31

825.24

3.2

50 x 40 mm

740.60

20%

80%

100%

148.12

592.48

3.3

50 x 32 mm

327.75

20%

80%

100%

65.55

262.20

3.4

50 x 20 mm

632.50

20%

80%

100%

126.50

506.00

3.4

40 x 32 mm

741.75

20%

80%

100%

148.35

593.40

3.5

40 x 25 mm

6,697.60

20%

80%

100%

1,339.52

5,358.08

3.6

32 x 32 mm

190.90

20%

80%

100%

38.18

152.72

3.7

32 x 20 mm

223.10

20%

80%

100%

44.62

178.48

3.8

25 x 25 mm

56.35

35%

65%

100%

19.72

36.63

3.8

25 x 20 mm

442.75

35%

65%

100%

154.96

287.79

3.9

20 mm x 1/2 Faucet Tee

6,468.75

35%

65%

100%

2,264.06

4,204.69

3.10

32 mm x 3/4 Faucet Tee

2,300.00

20%

80%

100%

460.00

1,840.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

3.11
4.0

Description of Work

32 mm x 1 Faucet Tee

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

5,287.70

20%

80%

100%

1,057.54

4,230.16

PPRC Coupling / reducer

4.1

50 x 50 mm

2,915.25

20%

80%

100%

583.05

2,332.20

4.2

50 x 32 mm

233.45

20%

80%

100%

46.69

186.76

4.3

40 x 40 mm

207.00

20%

80%

100%

41.40

165.60

4.4

40 x 25 mm

97.75

20%

80%

100%

19.55

78.20

4.5

32 x 32 mm

586.50

20%

80%

100%

117.30

469.20

4.6

25 x 25 mm

358.80

35%

65%

100%

125.58

233.22

4.7

25 x 20 mm

85.10

35%

65%

100%

29.79

55.32

5.0

PPRC End Cap PN 20

5.1

32mm

1,967.65

20%

80%

100%

393.53

1,574.12

5.2

25mm

1,092.50

35%

65%

100%

382.38

710.13

6.0

Male adapter

6.1

50 mm

7,831.50

20%

80%

100%

1,566.30

6,265.20

6.2

40 mm

1,750.30

20%

80%

100%

350.06

1,400.24

6.3

32mm

4,360.80

20%

80%

100%

872.16

3,488.64

6.4

25mm

591.10

35%

65%

100%

206.89

384.22

6.5

20mm

2,507.00

35%

65%

100%

877.45

1,629.55

7.0

Gate Valve, NRS, 200 WOG, threaded "TOZEN"

7.1

50 mm

6,325.00

20%

80%

100%

1,265.00

5,060.00

7.2

40 mm

5,799.45

20%

80%

100%

1,159.89

4,639.56

7.3

32mm

1,403.00

20%

80%

100%

280.60

1,122.40

7.4

25mm

3,381.00

20%

80%

100%

676.20

2,704.80

7.5

20mm

730.25

20%

80%

100%

146.05

584.20

7.6

12mm

3,306.25

20%

80%

100%

661.25

2,645.00

8.0

Pipe Clamps

8.1

63 mm

9,611.70

20%

80%

100%

1,922.34

7,689.36

8.2

50 mm

800.40

20%

80%

100%

160.08

640.32

8.3

40 mm

800.40

20%

80%

100%

160.08

640.32

8.4

32mm

5,202.60

20%

80%

100%

1,040.52

4,162.08

8.5

25mm

3,201.60

35%

65%

100%

1,120.56

2,081.04

8.6

20mm

6,403.20

35%

65%

100%

2,241.12

4,162.08

1,207.50

20%

80%

100%

241.50

966.00

48,300.00

35%

65%

100%

16,905.00

31,395.00

1,868.75

35%

65%

100%

654.06

1,214.69

9.0

Excavation / Backfill

10.0

Teflon Tape, Pipe Hanger Support & Consumables and tools rental

11.0
IV.D
1.0
1.1

Testing and Commissioning


Connection to existing water line
Water meter

43,125.00

0%

100%

100%

43,125.00

2.0

Work to Existing

8,625.00

0%

100%

100%

8,625.00

3.0

Excavation / Backfill

1,207.50

0%

100%

100%

1,207.50

4.0

Check Valve 50

3,565.00

0%

100%

100%

3,565.00

5.0

Strainer 50

8,395.00

0%

100%

100%

8,395.00

6.0

Water meter box

5,750.00

0%

100%

100%

5,750.00

IV.E
1.0

50 mm

Drainage
PVC Pipe Series 1000 , "Crown"

1.1

250 mm

11,435.60

20%

80%

100%

2,287.12

9,148.48

1.2

210mm

25,978.50

20%

80%

100%

5,195.70

20,782.80

1.3

110mm

27,634.50

20%

80%

100%

5,526.90

22,107.60

1.4

90mm

33,948.00

20%

80%

100%

6,789.60

27,158.40

1,107.45

20%

80%

100%

221.49

885.96

531.30

20%

80%

100%

106.26

425.04

80%

100%

357.19

1,428.76

2.0

PVC Bend Series 1000

2.1

1/4 x 110mm

2.2

1/4 x 90mm

2.3

1/8 x 250mm

1,785.95

20%

2.4

1/8 x 210mm

1,665.20

20%

80%

100%

333.04

1,332.16

2.5

1/8 x 100mm

2,032.05

20%

80%

100%

406.41

1,625.64

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

2.6
3.0

Description of Work

1/8 x 90mm

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

885.50

20%

80%

100%

Accomplishment To Date (Php)


Previous

177.10

This Period

708.40

PVC Wye Series 1000

3.1

250 x 210 mmn

3,941.05

20%

80%

100%

788.21

3,152.84

3.2

210 x 110 mm

18,000.95

20%

80%

100%

3,600.19

14,400.76

3.3

110 x 110mm

3.4

110 x 90mm

3.5
4.0

90 x 90mm

514.05

20%

80%

100%

102.81

411.24

2,691.00

20%

80%

100%

538.20

2,152.80

125.35

20%

80%

100%

25.07

100.28

PVC Ceiling cleanout

4.1

110 mm

641.70

20%

80%

100%

128.34

513.36

4.2

90 mm

80.50

20%

80%

100%

16.10

64.40

4.3

63 mm

54.05

20%

80%

100%

10.81

43.24

427.80

20%

80%

100%

85.56

342.24

5.0
5.1
6.0

Ground Clean-out PVC


100 mm
Coupling Reducer PVC

6.1

210 x 110 mm

578.45

20%

80%

100%

115.69

462.76

6.2

250 x 110 mm

3,662.75

20%

80%

100%

732.55

2,930.20

7.0
7.1

Deck Drain
18,188.40

20%

80%

100%

3,637.68

14,550.72

8.0

PVC Cement, Pipe Hangers Supprts and Consumables

50,896.70

20%

80%

100%

10,179.34

40,717.36

9.0

Excavation / Backfill

15,295.00

20%

80%

100%

3,059.00

12,236.00

10.0

Gravity leak test

2,875.00

20%

80%

100%

575.00

2,300.00

IV.F
1.0

75 mmn

FCU Drain Pipe


PVC Pipe Series 1000 "Crown"

1.1

90mm

6,210.00

20%

80%

100%

1,242.00

4,968.00

1.2

63mm

2,501.25

20%

80%

100%

500.25

2,001.00
93.84

2.0

PVC Bend Series 1000

2.1

1/4 x 63mm

117.30

20%

80%

100%

23.46

2.2

1/8 x 90mm

80.50

20%

80%

100%

16.10

64.40

2.3

1/8 x 63mm

270.25

20%

80%

100%

54.05

216.20

308.20

20%

80%

100%

61.64

246.56

54.05

20%

80%

100%

10.81

43.24

54.05

20%

80%

100%

10.81

43.24

3.0
3.1
4.0
4.1
5.0
5.1
6.0

PVC Wye Series 1000


63 x 63 mm
PVC Ceiling cleanout
63 mm
Ground Clean-out PVC
63 mm
PVC Pipe, In-house blue

6.1

32 mm

499.10

20%

80%

100%

99.82

399.28

6.2

25 mm

1,495.00

20%

80%

100%

299.00

1,196.00

57.50

20%

80%

100%

11.50

46.00

94.30

20%

80%

100%

18.86

75.44

7.0
7.2
8.0
8.1
9.0

PVC Tee, In-house blue


32 x 25 mm
Coupling Reducer PVC
50 x 25 mm
PVC Bend, In-house blue

9.1

32 mm

349.60

20%

80%

100%

69.92

279.68

9.2

25 mm

233.45

20%

80%

100%

46.69

186.76

10.0

Rubber Insulation, 12 mm thk

10.1

50 mm

7,521.00

20%

80%

100%

1,504.20

6,016.80

10.2

32 mm

2,463.30

20%

80%

100%

492.66

1,970.64

10.3

25 mm

5,951.25

20%

80%

100%

1,190.25

4,761.00

12.0

PVC Cement, Pipe Hangers Supprts and Consumables

4,600.00

20%

80%

100%

920.00

3,680.00

13.0

Excavation / Backfill

5,796.00

20%

80%

100%

1,159.20

4,636.80

14.0

Gravity leak test

1,437.50

20%

80%

100%

287.50

1,150.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

IV.G
1.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Air Conditioning Ventilation System


FCU L1-2, 5.0Hp cap. Ceiling cassette Type

101,315.00

90%

10%

100%

91,183.50

10,131.50

52,325.00

90%

10%

100%

47,092.50

5,232.50

101,315.00

90%

10%

100%

91,183.50

10,131.50

84,467.50

90%

10%

100%

76,020.75

8,446.75

81,650.00

90%

10%

100%

73,485.00

8,165.00

90,447.50

90%

10%

100%

81,402.75

9,044.75

81,650.00

90%

10%

100%

73,485.00

8,165.00

107,640.00

90%

10%

100%

96,876.00

10,764.00

81,650.00

90%

10%

100%

73,485.00

8,165.00

49,335.00

90%

10%

100%

44,401.50

4,933.50

81,650.00

90%

10%

100%

73,485.00

8,165.00

82,225.00

90%

10%

100%

74,002.50

8,222.50

23,786.60

50%

50%

100%

11,893.30

11,893.30

68,020.20

50%

50%

100%

34,010.10

34,010.10

84,004.05

50%

50%

100%

42,002.03

42,002.03

84,004.05

50%

50%

100%

42,002.03

42,002.03

19,576.45

50%

50%

100%

9,788.23

9,788.23

100,570.95

50%

50%

100%

50,285.48

50,285.48

97,399.25

50%

50%

100%

48,699.63

48,699.63

Samsung brand, Model: CC48FTVA ( Kitchen )


2.0

Copper pipes, acetylene, oxygen, nitrogen, freon R22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

3.0

FCU L1-2, 5.0Hp cap. Ceiling cassette Type


Samsung brand, Model: CC48FTVA ( Kitchen )

4.0

Copper pipes, acetylene, oxygen, nitrogen, freon R22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

5.0

FCU L1-1, 5.0Hp cap. Ceiling suspended Type


Samsung brand, Model: NS48CCRFA ( Reflectory )

6.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

7.0

FCU L1-1, 5.0Hp cap. Ceiling suspended Type


Samsung brand, Model: NS48CCRFA ( Reflectory )

8.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

9.0

FCU L1-1, 5.0Hp cap. Ceiling suspended Type


Samsung brand, Model: NS48CCRFA ( Reflectory )

10.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

11.0

FCU L1-1, 5.0Hp cap. Ceiling suspended Type


Samsung brand, Model: NS48CCRFA ( Reflectory )

12.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

IV.H

Ventilating Fan

1.0

TEF LI-1, Kruger brand, Model: KCE 300 M, Ceiling cassette fan
c/w Direct Driven Motor, 366 CMH, 0.032 kw,
( Male adult & Female Adult ).

2.0

TEF LI-2, Kruger brand, Model: KCE 600 M, Ceiling cassette fan
c/w Direct Driven Motor, 459 CMH, 0.085 kw,
( Primary/senior, Male & Female ).

3.0

SF LI-1, Kruger Brand, model: CFT-FDA 200 C, centrifugal


In - line cabinet fan DIDW-FC, c/w Belt driven Motor,
2423 CMH, 0.75kw ( Reflectory ).

4.0

EF LI-1, Kruger Brand, model: CFT-FDA 200 C, centrifugal


In - line cabinet fan DIDW-FC, c/w Belt driven Motor,
2423 CMH, 0.75kw ( Reflectory ).

5.0

EF LI-2, Kruger Brand, model: APK 315 4P-1, Propeller


Wall mounted fan, c/w driven Motor, 795 CFM, 0.12 kw,
( Transformer Romm ).

6.0

KSF LI-1, Kruger Brand, model: CFT-FDA 315 C, centrifugal


In - line cabinet fan DIDW-FC, c/w Belt driven Motor,
4580 CMH, 0.75kw ( Kitchen ).

7.0

KEF LI-1, Kruger Brand, model: CFT-BDB 315 C, centrifugal


In - line cabinet fan DIDW-FC, c/w Belt driven Motor,
4580 CMH, 0.75kw ( Kitchen ).

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

IV.I
1.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Ventilating Ductworks
Fresh airduct, G.I Sheet

1.1

1200 X 300

12,830.55

50%

50%

100%

6,415.28

6,415.28

1.2

600 X 300

4,393.00

50%

50%

100%

2,196.50

2,196.50

1.3

300 X 200

2,297.70

50%

50%

100%

1,148.85

1,148.85

77,653.75

50%

50%

100%

38,826.88

38,826.88

2.0
2.1
3.0

Toilet exhaust airduct, G.I Sheet


150 dia.
Exhaust Air Duct , G.I Sheet

3.1

1200 X 300

12,830.55

50%

50%

100%

6,415.28

6,415.28

3.2

600 X 300

6,586.05

50%

50%

100%

3,293.03

3,293.03

46,098.90

50%

50%

100%

23,049.45

23,049.45

2,076.90

50%

50%

100%

1,038.45

1,038.45

1,877.95

50%

50%

100%

938.98

938.98

4.0
4.1
5.0
5.4
6.0
6.1
7.0

Kitchen supply air duct, G. I Sheet


750 X 300
Supply air grilles
600 X 300
Exhaust air grilles
600 X 300
Exhaust air louver with insect screen

7.1

1200 X 550

13,691.90

50%

50%

100%

6,845.95

6,845.95

7.2

1200 X 300

7,730.30

50%

50%

100%

3,865.15

3,865.15

13,800.00

50%

50%

100%

6,900.00

6,900.00

9,660.00

50%

50%

100%

4,830.00

4,830.00

8.0
8.1
10.0
10.1
11.0

Exhaust wall cap s/s type 304 with insect screen


150 dia.
Filter for Supply fan
24" X 24" X 1 " washable air filter
Vibration Isolator

11.1

AC Equipment

24,840.00

50%

50%

100%

12,420.00

12,420.00

11.2

EF Equipment

23,460.00

50%

50%

100%

11,730.00

11,730.00

Metal hanger, bracket, bolt & nut, paint, screw, expansion bolt, full

34,488.50

50%

50%

100%

17,244.25

17,244.25

12.0

threaded round bar, angle bar, sealant and other miscellaneous.


13.0

Electrical works for Ventilation


Electrical wire, IMC pipe, connector & misc.

28,934.00

0%

100%

100%

28,934.00

101,200.00

0%

100%

100%

101,200.00

Air conditioning disconnect switches

19,665.00

0%

100%

100%

19,665.00

Testing and commissioning

14,260.00

0%

100%

100%

14,260.00

29,095.00

20%

80%

100%

5,819.00

23,276.00

13,294.00

20%

80%

100%

2,658.80

10,635.20

4,945.00

0%

100%

100%

14.0

Control panel for Exhaust Blower with magnetic starter

15.0
16.0
IV.J
1.0

Fire Protection
Fire Hose Cabinet Recessed type, 32" x 27" x 7", complete with
40mm x 30 meters long fire hose, double jacketed
40 mm brass angle valve, Giacomini Brand
40 mm Adjustable nozzle
Semi-automatic pin hose rack
10 lbs ABC type fire extinguisher ( Dry Chemical)

2.0

Fire hose valve, 65 mm, with cap and chain, Giacomini Brand

3.0

Portable Fire Extinguisher ; FE-1, 10 LBS ABC Type

4.0

B.I. Pipe, sch. 40

4,945.00

4.1

100 mm

7,693.50

40%

60%

100%

3,077.40

4,616.10

4.2

40 mm

7,935.00

40%

60%

100%

3,174.00

4,761.00

607.20

40%

60%

100%

242.88

364.32
2,705.49

5.0

Bend, 40 mm

6.0

Tee

6.1

100 x 65 mm

4,509.15

40%

60%

100%

1,803.66

6.2

100 x 40 mm

4,509.15

40%

60%

100%

1,803.66

2,705.49

22,287.00

40%

60%

100%

8,914.80

13,372.20
1,345.50

7.0

Isolation Valve ; 100 mm

8.0

Hangers and supports

2,242.50

40%

60%

100%

897.00

9.0

Work to existing

8,050.00

40%

60%

100%

3,220.00

4,830.00

Total ( IV )

3,095,231.90

49%

51%

100%

1,503,702.97

1,591,528.93

Total ( E )

14,171,351.01

52%

48%

100%

7,327,722.98

6,843,628.02

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

F.

BILL NO. 6 - LEVEL 2 - COMMON ROOM / OFFICES FLOOR

I.

CIVIL / STRUCTURAL WORKS

I.A

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Concrete Works, 3000 psi, 28 days, G-3/4

1.0

Columns

96,393.00

100%

0%

100%

96,393.00

2.0

Girders

66,488.40

100%

0%

100%

66,488.40

3.0

Beams

142,540.20

100%

0%

100%

142,540.20

4.0

Roof beams

139,909.00

100%

0%

100%

139,909.00

5.0

Suspended slabs

178,415.60

100%

0%

100%

178,415.60

I.B

Reinforced Steel Bars, Grade 40

1.0

Columns

370,082.86

100%

0%

100%

370,082.86

2.0

Girders

140,353.72

100%

0%

100%

140,353.72

3.0

Beams

362,744.70

100%

0%

100%

362,744.70

4.0

Roof beams

327,754.51

100%

0%

100%

327,754.51

5.0

Suspended slabs

352,763.48

100%

0%

100%

352,763.48

I.C

Formworks

1.0

Columns (to produce smooth surface)

73,916.25

100%

0%

100%

73,916.25

2.0

Girders (to produce smooth surface)

44,850.00

100%

0%

100%

44,850.00

3.0

Beams (to produce smooth surface)

71,967.00

100%

0%

100%

71,967.00

4.0

Roof beams (to produce smooth surface)

83,778.94

100%

0%

100%

83,778.94

5.0

Suspended slab (to produce smooth surface)

137,482.50

100%

0%

100%

137,482.50

1,207,482.28

50%

50%

100%

603,741.14

603,741.14

3,796,922.44

84%

16%

100%

3,193,181.30

603,741.14

I.D
1.0

Metal Works
Roof framing complete with steel trusses, rafters, purlins, cross
bracing, sag rods and other accessories
Total ( I )

II.
II.A

CIVIL / ARCHITECTURAL WORKS


Floor Finishes

1.0

FF-2Smooth, straight to finish concrete with concrete sealer

23,807.30

20%

80%

100%

4,761.46

19,045.84

2.0

FF-6300 x 300mm x3.0mm thick vinyl tiles, Apo, 3mm thick

189,937.39

20%

80%

100%

37,987.48

151,949.91

3.0

FF-7600 x 600mm x 10.35mm thick homogeneous tiles (Non-Skid)

4.0

Concrete topping

II.B

16,592.32

20%

80%

100%

3,318.46

13,273.85

109,704.48

20%

80%

100%

21,940.90

87,763.58

Wall Finishes

1.0

WF-1
Smooth, plain cement plaster, semi-gloss latex paint finish

611,219.66

20%

80%

100%

122,243.93

488,975.73

2.0

WF-4
Semi-Gloss acrylic solvent base paint finish on cementitious

647,275.12

20%

80%

100%

129,455.02

517,820.10

coating, textured with 20mm thk. Groove Lines


3.0

BF-3Reslient baseboard

61,271.43

20%

80%

100%

12,254.29

49,017.14

4.0

Concrete ledges, Semi gloss acrylic

68,754.13

20%

80%

100%

13,750.83

55,003.30

442,492.40

20%

80%

100%

88,498.48

353,993.92

12,001.58

20%

80%

100%

2,400.32

9,601.27

643,930.54

20%

80%

100%

128,786.11

515,144.43

II.C
1.0

Ceiling Finishes
CF-2

12.0mm thick sag-resistant gypsum board on metal framing

in flat latex paint finish


II.D
1.0

Waterproofing
WP-3

Self-adhearing rubberized waterproofing membrane

( Bithuthene 3000/ Texself)


II.E
1.0
II.F

Masonry
CHB 150mm, 700 PSI
Metal Works

1.0

SS Railing, Floor mounted

55,200.00

20%

80%

100%

11,040.00

44,160.00

2.0

SS Balcony railing

85,698.00

20%

80%

100%

17,139.60

68,558.40

II.G

Miscellaneous

1.0

Countertop

77,625.00

0%

100%

100%

77,625.00

2.0

Overhead cabinet

93,150.00

0%

100%

100%

93,150.00

3.0

Under cabinet

98,325.00

0%

100%

100%

98,325.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

II.H

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Roofing

1.0

Pre-painted seam roofing with complete accessories,"Colorlumb"

2.0

Gutters

3.0

End flashing

4.0

Flashing

5.0

Eaves, Ficem 5mm thick board on metal furring

6.0

Insulation, extruded polysterene roofmate 50mm thick

II.I

1,756,661.23

30%

70%

100%

526,998.37

1,229,662.86

682,007.50

30%

70%

100%

204,602.25

477,405.25

1,057,862.00

30%

70%

100%

317,358.60

740,503.40

Caulking and Sealant

1.0

Sealant

63,310.26

60%

40%

100%

37,986.16

25,324.10

2.0

Compressible material

5,336.00

60%

40%

100%

3,201.60

2,134.40

3.0

Backer rod 12.5 mm dia

4,870.02

60%

40%

100%

2,922.01

1,948.01

137,310.00

20%

80%

100%

27,462.00

109,848.00

158,700.00

20%

80%

100%

31,740.00

126,960.00

II.J

Doors & Windows

1.0

Wood Doors and Hardwares (Varnish finish is included)

1.1
a.
2.0
2.1
3.0

Hollow Core
900mm x 2100mmH
Aluminum Glass Door, Powder Coated
1800mm x 2100mmH
Aluminum Awning Type Glass Windows

3.1

W2

2300mm x 1200mmH

201,250.00

20%

80%

100%

40,250.00

161,000.00

3.2

W3

3200mm x 1200mmH

135,125.00

20%

80%

100%

27,025.00

108,100.00

3.3

W5

1400mm x 650mmH

11,500.00

20%

80%

100%

2,300.00

9,200.00

3.4

W7

6700mm x 1200mmH

56,350.00

20%

80%

100%

11,270.00

45,080.00

3.5

W9

3400mm x 650mmH

14,375.00

20%

80%

100%

2,875.00

11,500.00

3.6

W10 3400mm x 650mmH

28,750.00

20%

80%

100%

5,750.00

23,000.00

24.3%

75.7%

100.0%

1,835,317.85

5,715,073.49

22,254.80

0%

100%

100%

22,254.80

63,320.15

0%

100%

100%

63,320.15

Total ( II )
III.
III.A
1.0

7,550,391.35

ELECTRICAL WORKS
Panelboards and Circuit breaker - Square D
Panel LPD NEMA 1 - Surface Mounted
Main CB: 40AT,100AF,3,3P,230V, 60Hz

2.0

Panel PPD NEMA 1 - Surface Mounted


Main CB: 150AT,150AF,3,3P,230V, 60Hz

III.B

Enclosed Circuit Breaker

1.0

50 AT,3P,230V 60 Hz, NEMA 3R

59,225.00

0%

100%

100%

59,225.00

2.0

40 AT,2P,230V 60 Hz, NEMA 3R

14,352.00

0%

100%

100%

14,352.00

3.0

40 AT,3P,230V 60 Hz, NEMA 3R

4,784.00

0%

100%

100%

4,784.00

4.0

30 AT,3P,230V 60 Hz, NEMA 3R

19,136.00

0%

100%

100%

19,136.00

5.0

20 AT,2P,230V 60 Hz, NEMA 3R

6.0

20 AT,2P,230V 60 Hz,NEMA 1

III.C

4,197.50

0%

100%

100%

4,197.50

10,284.45

0%

100%

100%

10,284.45

Lighting Fixtures - Brilliant Lightings

1.0

1x 36 W Flourescent Fixture, Louvre Type

6,948.30

0%

100%

100%

6,948.30

2.0

2x 36 W Flourescent Fixture, Louvre Type

158,872.50

0%

100%

100%

158,872.50

3.0

1x36W Flourescent Fixture, Batten Type

5,575.20

0%

100%

100%

5,575.20

4.0

Wall Mounted Emergency Light, Battery Pack

22,011.00

0%

100%

100%

22,011.00

Wall Mounted Exit Light

10,258.00

0%

100%

100%

10,258.00

5.0
III.D

Wiring Devices - National

1.0

Single Pole Switch-1 Gang

1,780.20

0%

100%

100%

1,780.20

2.0

Two gang switch, 15A, 250V

1,072.95

0%

100%

100%

1,072.95

3.0

Three Way Switch( 3 Gang)

593.40

0%

100%

100%

593.40

4.0

Duplex Recepatcle Outlet 15A,250V,G.T.

15,198.40

0%

100%

100%

15,198.40

III.E

Wires and Cable - Phelps Dodge

1.0

THHN Copper Wires, 600V

1.1

3.5 mm

65,398.20

0%

100%

100%

65,398.20

1.2

5.5 mm

74,106.00

0%

100%

100%

74,106.00

1.3

8.0 mm

33,653.60

0%

100%

100%

33,653.60

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

III.F
1.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Conduits and Fittings


PVC Pipe Schedule - 40

1.1

32mm

46,949.90

80%

20%

100%

37,559.92

9,389.98

1.2

20mm

48,530.00

80%

20%

100%

38,824.00

9,706.00

1.3

25mm

24,131.60

80%

20%

100%

19,305.28

4,826.32

2.0

Condulet LB, 90R

2.1

25mm

2,340.25

80%

20%

100%

1,872.20

468.05

2.2

32mm

5,278.50

80%

20%

100%

4,222.80

1,055.70

3.0

PVC Elbow

3.1

32mm

143.75

80%

20%

100%

115.00

28.75

3.2

25mm

346.15

80%

20%

100%

276.92

69.23

4.0

PVC pipe male adapter with locknut and bushing

4.1

32mm

335.80

80%

20%

100%

268.64

67.16

4.2

25mm

851.00

80%

20%

100%

680.80

170.20

20mm

4,253.85

80%

20%

100%

3,403.08

850.77

4,186.00

80%

20%

100%

3,348.80

837.20

971.75

80%

20%

100%

777.40

194.35

4.3
5.0

Flexible Mettalic Conduit ; 15mm

6.0

Flexible Straight Connector ; 15mm

III.G

Outlet Boxes and Pull boxes - Fumaco

1.0

Utility Box with Cover

6,203.10

80%

20%

100%

4,962.48

1,240.62

2.0

Octagonal Box with Cover

7,848.75

80%

20%

100%

6,279.00

1,569.75

3.0

Square Box with Cover

1,242.00

80%

20%

100%

993.60

248.40

4.0

Pull Box 500mmx700mmx300mm NEMA-1

8,776.80

80%

20%

100%

7,021.44

1,755.36

Pull Box 400mmx400mmx400mmx200mm NEMA-1

4,445.90

80%

20%

100%

3,556.72

889.18

5,520.00

0%

100%

100%

119.60

0%

100%

100%

119.60

1,941.20

0%

100%

100%

1,941.20

5.0
III.H

Clock System - Notifier

1.0

Wall Mounted Secondary Clock

2.0

Octagonal Box

3.0

PVC Pipe ; 20 mm PVC Pipe

4.0

PVC Pipe adapter with locknut and bushing ; 20 mm PVC

5.0

Wires ; 1.25 mm TF Wire

III.I

Public address system - TOA

1.0
2.0
3.0

Octagonal Box

4.0

Pull Box

5.0

PVC PIPE

5,520.00

62.10

0%

100%

100%

62.10

1,092.50

0%

100%

100%

1,092.50

Ceiling Mounted Speaker

13,020.30

0%

100%

100%

13,020.30

Paging Amplifier

53,475.00

0%

100%

100%

53,475.00

1,196.00

0%

100%

100%

1,196.00

109.25

0%

100%

100%

109.25
7,279.50

5.1

20 mm PVC Pipe

7,279.50

0%

100%

100%

5.2

25 mm PVC Pipe

3,647.80

0%

100%

100%

3,647.80

5.3

32 mm PVC Pipe

33,715.70

0%

100%

100%

33,715.70

6.0

PVC pipe adapter adapter with locknut and bushing

6.1

20 mm PVC

310.50

0%

100%

100%

310.50

6.2

25 mm PVC

170.20

0%

100%

100%

170.20

6.3

32 mm PVC

167.90

0%

100%

100%

167.90
579.60

7.0

Conduits and Fittings

7.1

15 mm Flexible Metallic Conduit

579.60

0%

100%

100%

7.2

15 mm St. Connector

134.55

0%

100%

100%

134.55

11,711.60

0%

100%

100%

11,711.60

8.0

Wires ; 1.25 mm TF Wire

III.J

Fire Alarm System - Notifier

1.0

Equipment/Devices

1.3

Fire Alarm Manual station, Addressable Type

14,218.60

0%

100%

100%

14,218.60

1.4

Photo Electric Smoke Detector, Addressable Type

70,915.90

0%

100%

100%

70,915.90

1.5

Fire Alarm Horn With Strobe Light

9,857.80

0%

100%

100%

9,857.80

1.6

Wall Mounted panic Button

3,277.50

0%

100%

100%

3,277.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

2.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

PVC Pipe

2.1

25mm

9,821.00

80%

20%

100%

7,856.80

1,964.20

2.2

32mm

11,343.60

80%

20%

100%

9,074.88

2,268.72

2.4

15 mm Flexible Metallic Conduit

708.40

0%

100%

100%

708.40

2.5

Flexible Straight Connector

164.45

0%

100%

100%

164.45

2.6

Octagonal Box with Cover

1,811.25

80%

20%

100%

2.7

Square Box

269.10

0%

100%

100%

269.10

2.8

Pull Box 200X200X150

920.00

0%

100%

100%

920.00
1,276.50

3.0

1,449.00

362.25

PVC Adapter with Locknut and Bushing

3.1

25mm

1,276.50

0%

100%

100%

3.2

32mm

335.80

0%

100%

100%

335.80

9,504.75

0%

100%

100%

9,504.75

29,463.00

0%

100%

100%

29,463.00

595.70

0%

100%

100%

595.70

4,338.95

0%

100%

100%

4,338.95

4.0

Wires ; 1.25 mm TF Wire

III.K

Telephone System

1.0

PVC Pipe ; 25mm PVC Pipe

2.0

PVC Pipe Adapter with locknut and bushing ; 25mm PVC Pipe

3.0

Telephone Outlet

4.0

Utility Box

5.0

Cat 5e Cable

III.L

700.35

0%

100%

100%

700.35

10,336.20

0%

100%

100%

10,336.20

CCTV System

1.0

CCTV Pipe

1.1

25mm PVC Pipe

26,657.00

0%

100%

100%

26,657.00

1.2

20mm PVC Pipe

46,103.50

0%

100%

100%

46,103.50

2.0

PVC Pipe Adapter with Locknut & Bushing

2.1

20mm PVC Pipe

680.80

0%

100%

100%

680.80

2.2

25mm PVC Pipe

248.40

0%

100%

100%

248.40

3.0

Square Box

483.00

0%

100%

100%

483.00

4.0

Flexible Metallic Conduit

257.60

0%

100%

100%

257.60

5.0

Flexible Straight Connector

119.60

0%

100%

100%

119.60

6.0

Pullbox 300x300x300

1,265.00

0%

100%

100%

1,265.00

7.0

Pullbox 10x10x6

7,590.00

0%

100%

100%

7,590.00

8.0

Condulet LB, 90R, 20mm

3,744.40

0%

100%

100%

3,744.40

9.0

Condulet LB, 90R, 25mm

3,519.00

0%

100%

100%

3,519.00

III.M

Miscellaneous and Consumables

2,875.00

0%

100%

100%

2,875.00

III.N

Hangers and Support

8,050.00

0%

100%

100%

8,050.00

III.O

Testing and Commissioning

3,450.00

0%

100%

100%

1,179,012.20

13%

87%

100%

21,758.00

0%

100%

100%

21,758.00

3,415.50

0%

100%

100%

3,415.50

300.15

0%

100%

100%

300.15

Total ( III )
IV.

151,848.76

3,450.00
1,027,163.44

MECHANICAL AND PLUMBING WORKS

IV.A
1.0

Plumbing Fixtures
Stainless steel sink, 2-bowl, 1-drainboard with faucet

IV.B
1.0

Sanitary Works
Sewer Pipe Line

1.1

PVC Pipe, Series 1000 "Crown"

a.

110 mm

b.

63 mm

1.2

Bend, PVC series 1000

a.

1/4 x 110mm

123.05

0%

100%

100%

123.05

b.

1/8 x 110mm

427.80

0%

100%

100%

427.80

1.3

Wye, PVC Series 1000

a.

110 x 110 mm

171.35

0%

100%

100%

171.35

b.

110 x 63 mm

326.60

0%

100%

100%

326.60

119.60

0%

100%

100%

119.60

517.50

0%

100%

100%

517.50

1.4
a.
1.5
a.

P-Trap, PVC Series 1000


50mm
Floor Drain " JAMAN" model JFD 102 by Eurobrass
50mm

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

1.6
a.
1.7
2.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Grease Trap
15.0 GPM
PVC Cement, Pipe Hangers Supprts and Consumables

16,016.05

0%

100%

100%

16,016.05

17,250.00

0%

100%

100%

17,250.00

Vent Line

2.1

PVC Pipe Series 1000 "Crown"

a.

90mm

3,312.00

0%

100%

100%

3,312.00

b.

63mm

977.50

0%

100%

100%

977.50
531.30

2.2

PVC Bend Series 1000

a.

1/4 x 90mm

531.30

0%

100%

100%

b.

1/4 x 63mm

175.95

0%

100%

100%

175.95

9,631.25

0%

100%

100%

9,631.25

690.00

0%

100%

100%

690.00

2.3
2.4
IV.C
1.0

PVC Cement, Pipe Hangers Supprts and Consumables


Leak Test
Distrbution Line
PPRC Pipe, PN 20 "Boreplus" by Unipipe

1.1

25mm

3,312.00

0%

100%

100%

3,312.00

1.2

20mm

2,327.60

0%

100%

100%

2,327.60

2.0

PPRC Bend PN 20

2.1

25mm

174.80

0%

100%

100%

174.80

2.2

20mm

448.50

0%

100%

100%

448.50

3.0

PPRC Tee, PN 20

3.1

25 x 20 mm

3.2

20 mm x 1/2 Faucet Tee

63.25

0%

100%

100%

63.25

776.25

0%

100%

100%

776.25

4.0

Excavation / Backfill

1,207.50

0%

100%

100%

1,207.50

5.0

Teflon Tape, Pipe Hanger Support & Consumables and tools rental

4,600.00

0%

100%

100%

4,600.00

6.0

Testing and Commissioning

575.00

0%

100%

100%

575.00

IV.D
1.0

Drainage
PVC Pipe Series 1000

1.1

110mm

6,210.00

0%

100%

100%

6,210.00

1.2

90mm

19,665.00

0%

100%

100%

19,665.00

63mm

1,400.70

0%

100%

100%

1,400.70
3,719.10

1.3
2.0

PVC Bend Series 1000

2.1

1/4 x 90mm

3,719.10

0%

100%

100%

2.2

1/4 x 63mm

293.25

0%

100%

100%

293.25

2.3

1/8 x 90mm

3,944.50

0%

100%

100%

3,944.50

1/8 x 63mm

432.40

0%

100%

100%

432.40

2.4
3.0

PVC Wye Series 1000

3.1

110 x 110mm

3.2

110 x 90mm

3.3

110 x 63mm

3.4

90 x 90mm

3.5

90 x 63mm

3.6

63 x 63 mm

4.0
4.1
5.0
5.1
6.0
6.1
7.0
8.0
IV.E

171.35

0%

100%

100%

171.35

1,449.00

0%

100%

100%

1,449.00

455.40

0%

100%

100%

455.40

4,011.20

0%

100%

100%

4,011.20

285.20

0%

100%

100%

285.20

77.05

0%

100%

100%

77.05

2,093.00

0%

100%

100%

2,093.00

24,150.00

0%

100%

100%

24,150.00

PVC Ceiling cleanout


90 mm
Roof Drain
90mm
Ledge Drain
50mm
PVC Cement, Pipe Hangers Supprts and Consumables
Gravity leak test

9,094.20

0%

100%

100%

9,094.20

48,875.00

0%

100%

100%

48,875.00

2,875.00

0%

100%

100%

2,875.00

FCU Drain Pipe

1.0

PVC Pipe Series 1000 "Crown" ; 63mm

1,800.90

0%

100%

100%

1,800.90

2.0

PVC Bend Series 1000 ; 1/4 x 63mm

117.30

0%

100%

100%

117.30

3.0

PVC Wye Series 1000 ; 63 mm

308.20

0%

100%

100%

308.20

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

4.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

PVC Pipe, In-house blue

4.1

32 mm

1,140.80

0%

100%

100%

1,140.80

4.2

25 mm

2,870.40

0%

100%

100%

2,870.40

5.0

PVC Tee, In-house blue

5.1

32 x 25 mm

115.00

0%

100%

100%

115.00

5.2

25 x 25 mm

55.20

0%

100%

100%

55.20

6.0

Coupling Reducer PVC

6.1

50 x 25 mm

47.15

0%

100%

100%

47.15

6.2

32 x 25 mm

186.30

0%

100%

100%

186.30

50 x 32 mm

98.90

0%

100%

100%

98.90

6.3
7.0

PVC Bend, In-house blue

7.1

32 mm

480.70

0%

100%

100%

480.70

7.2

25 mm

767.05

0%

100%

100%

767.05
4,888.65

8.0

Rubber Insulation, 12 mm thk

8.1

50 mm

4,888.65

0%

100%

100%

8.2

32 mm

9,149.40

0%

100%

100%

9,149.40

8.3

25 mm

17,077.50

0%

100%

100%

17,077.50

9.0

PVC Cement, Pipe Hangers Supprts and Consumables

4,600.00

0%

100%

100%

4,600.00

10.0

Gravity leak test

1,437.50

0%

100%

100%

1,437.50

81,650.00

50%

50%

100%

40,825.00

40,825.00

25,415.00

50%

50%

100%

12,707.50

12,707.50

81,650.00

50%

50%

100%

40,825.00

40,825.00

46,345.00

50%

50%

100%

23,172.50

23,172.50

81,650.00

50%

50%

100%

40,825.00

40,825.00

57,557.50

50%

50%

100%

28,778.75

28,778.75

81,650.00

50%

50%

100%

40,825.00

40,825.00

76,245.00

50%

50%

100%

38,122.50

38,122.50

65,090.00

50%

50%

100%

32,545.00

32,545.00

94,394.30

50%

50%

100%

47,197.15

47,197.15

26,997.40

50%

50%

100%

13,498.70

13,498.70

37,375.00

50%

50%

100%

18,687.50

18,687.50

IV.F
1.0

Air Conditioning Ventilation System


FCU L2-1, 5.0Hp cap. Ceiling suspended Type
Samsung brand, Model: NS48CCRFA
( Pantry, I.B. Common Room )

2.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.
FCU L2-1, 5.0Hp capacity, ceiling suspended type

3.0

FCU L2-1, 5.0Hp cap. Ceiling suspended Type


Samsung brand, Model: NS48CCRFA
( Pantry, I.B. Common Room )

4.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

5.0

FCU L2-1, 5.0Hp cap. Ceiling suspended Type


Samsung brand, Model: NS48CCRFA, ( Pantry, I.B. Common RM. )

6.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

7.0

FCU L2-1, 5.0Hp cap. Ceiling suspended Type


Samsung brand, Model: NS48CCRFA, ( Pantry, I.B. Common RM. )

8.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

9.0

FCU L2-2, 3.0Hp cap. Ceiling suspended Type


Samsung brand, Model: NS36CCRBA ( Computer room )

10.0

Copper pipes, acetylene, oxygen, nitrogen, freon R-22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

11.0

FCU L2-3, 1.0Hp cap. Wall mounted Type


Samsung brand, Model: AS-09RAN ( Offices )

12.0

Copper pipes, acetylene, oxygen, nitrogen, freon R22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

13.0

Description of Work

FCU L2-3, 1.0Hp cap. Wall mounted Type

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

26,997.40

50%

50%

100%

13,498.70

13,498.70

37,375.00

50%

50%

100%

18,687.50

18,687.50

26,997.40

50%

50%

100%

13,498.70

13,498.70

38,122.50

50%

50%

100%

19,061.25

19,061.25

38,175.40

50%

50%

100%

19,087.70

19,087.70

38,122.50

50%

50%

100%

19,061.25

19,061.25

86,450.10

50%

50%

100%

43,225.05

43,225.05

172,900.20

50%

50%

100%

86,450.10

86,450.10

84,159.30

50%

50%

100%

42,079.65

42,079.65

Samsung brand, Model: AS-09RAN ( Offices )


14.0

Copper pipes, acetylene, oxygen, nitrogen, freon R22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

15.0

FCU L2-3, 1.0Hp cap. Wall mounted Type


Samsung brand, Model: AS-09RAN ( Offices )

16.0

Copper pipes, acetylene, oxygen, nitrogen, freon R22,


Metal hanger, bracket, paint, polyethylene tape
electrical wire, angle bar, sealant & other misc.

17.0

FCU L2-4, 2.0Hp cap. Wall mounted Type


Samsung brand, Model: AS-09RAN ( Offices )

18.0

Copper pipes, acetylene, oxygen, nitrogen, freon R22, Metal


hanger, bracket, paint, polyethylene tape electrical wire, angle bar,
sealant & other misc.

IV.G
1.0

Ventilating Fan
SF L2-1, Kruger Brand, model: CFT-FDA 225 C, centrifugal
In - line cabinet fan DIDW-FC, c/w Belt driven Motor,
2924 CMH, 0.75kw ( I.B. Common Room ).

2.0

EF L2-1, Kruger Brand, model: CFT-FDA 225 C, centrifugal


In - line cabinet fan DIDW-FC, c/w Belt driven Motor,
2924 CMH, 0.75kw ( I.B. Common Room ).

3.0

EF LN-2, Kruger Brand, model: CFT-FDA 200 C, centrifugal In - line


cabinet fan DIDW-FC, c/w Belt driven Motor, 1360 CMH, 0.75kw (
Pump Room ).

IV.H
1.0

Ventilating Ductworks
Fresh airduct, G.I Sheet

1.1

1200 X 300

12,830.55

50%

50%

100%

6,415.28

6,415.28

1.2

800 X 300

6,274.40

50%

50%

100%

3,137.20

3,137.20

1.3

600 X 300

6,589.50

50%

50%

100%

3,294.75

3,294.75
4,276.85

2.0

Exhaust Air Duct , G.I Sheet

2.1

1200 X 300

8,553.70

50%

50%

100%

4,276.85

2.2

800 X 300

6,212.30

50%

50%

100%

3,106.15

113,687.85

0%

100%

100%

113,687.85

3.0

Kitchen exhaust airduct, B.I Sheet ; 450 X 300

4.0

KED, Rockwool Insulation, 2" thick, ( 100 kg/m3 )

3,106.15

24,063.75

0%

100%

100%

24,063.75

4.1

Duct tape

6,325.00

0%

100%

100%

6,325.00

4.2

Duct clip

2,875.00

0%

100%

100%

2,875.00

4.3

Cladding

58,822.50

0%

100%

100%

58,822.50

5.0

Supply air grilles 800 X 300

2,672.60

0%

100%

100%

2,672.60

6.0

Exhaust air grilles 800 X 300

2,408.10

0%

100%

100%

2,408.10

7.0

Exhaust air louver with insect screen ; 1200 X 300

7,730.30

0%

100%

100%

7,730.30

8.0

Filter for Supply fan ; 24" X 24" X 1 " washable air filter

4,830.00

20%

80%

100%

966.00

3,864.00

9.0

Vibration Isolator

9.1

AC Equipment

20,700.00

20%

80%

100%

4,140.00

16,560.00

9.2

EF Equipment

31,280.00

30%

70%

100%

9,384.00

21,896.00

17,983.70

30%

70%

100%

5,395.11

12,588.59

10.0

Metal hanger, bracket, bolt & nut, paint, screw, expansion bolt, full
threaded round bar, angle bar, sealant and other miscellaneous.

11.0

Electrical works for Ventilation

22,908.00

0%

100%

100%

22,908.00

12.0

Control panel for Exhaust Blower with magnetic starter

75,900.00

0%

100%

100%

75,900.00

13.0

Air conditioning disconnect switches

29,497.50

0%

100%

100%

29,497.50

14.0

Testing and commissioning

11,500.00

0%

100%

100%

11,500.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

IV.I
1.0

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

Fire Protection
Fire Hose Cabinet Recessed type, 32" x 27" x 7", complete with

29,095.00

0%

100%

100%

29,095.00

13,294.00

0%

100%

100%

13,294.00

40mm x 30 meters long fire hose, double jacketed


40 mm brass angle valve, Giacomini Brand
40 mm Adjustable nozzle
Semi-automatic pin hose rack
10 lbs ABC type fire extinguisher ( Dry Chemical)
2.0

Fire hose valve, 65 mm, with cap and chain, Giacomini Brand

3.0

Portable Fire Extinguisher

3.1

FE-1, 10 LBS ABC Type

9,890.00

0%

100%

100%

9,890.00

3.2

FE-2, 15.5 Lbs Halotron

35,661.50

0%

100%

100%

35,661.50

4.0

B.I. Pipe, sch. 40

4.1

100 mm

7,693.50

0%

100%

100%

7,693.50

4.2

40 mm

2,380.50

0%

100%

100%

2,380.50

607.20

0%

100%

100%

607.20

5.0

Bend, 40 mm

6.0

Tee

6.1

100 x 65 mm

4,509.15

0%

100%

100%

4,509.15

6.2

100 x 40 mm

4,509.15

0%

100%

100%

4,509.15

844.10

0%

100%

100%

844.10

1,951.55

0%

100%

100%

1,951.55

7.0

Flange

7.1

100 mm slip-on

7.2

100 mm Blind

8.0

Hangers and supports

2,242.50

0%

100%

100%

Total ( IV )

2,155,212.70

32%

68%

100%

692,774.84

1,462,437.87

2,242.50

Total ( F )

14,681,538.69

40%

60%

100%

5,873,122.75

8,808,415.94

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

G.

BILL NO. 7 - EXTERNAL WORKS

I.

CIVIL / STRUCTURAL WORKS

I.A
1.0

Contract Amount
in Php

Description of Work

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

External Works
Bleachers

1.1

Structural Excavation

1.2

Damproofing 6mils polyethelene sheet

42,310.80

100%

0%

100%

42,310.80

1.3

Soil Treatment

18,157.35

1.4

Water Proofing

Included under Civil / Architectural Works

100%

0%

100%

18,157.35

1.5

Ready Mix Concrete @ 3000 psi, 28 days

1.6

Formworks

331,683.00

30%

70%

100%

99,504.90

232,178.10

138,659.81

30%

70%

100%

41,597.94

1.7

Reinforced Steel Bars, Grade 40

97,061.87

97,453.36

30%

70%

100%

29,236.01

1.8

Roof framing complete with steel trusses, rafters, purlins

215,050.00

0%

100%

100%

215,050.00

230,000.00

0%

100%

100%

230,000.00

Included under Civil / Architectural Works

68,217.35

cross bracing, sagrods and other accessories


2.0
2.1
3.0

Landscaping
Restoration of affected Landscape / Lawn
External Staircases

3.1

Ready Mix Concrete @ 3000 psi, 28 days

62,895.80

30%

70%

100%

18,868.74

44,027.06

3.2

Formworks

41,757.94

30%

70%

100%

12,527.38

29,230.56

3.3

Reinforced Steel Bars, Grade 40

125,392.67

30%

70%

100%

37,617.80

87,774.87

41,699.00

100%

0%

100%

41,699.00

I.B

Sewage Holding Tank

1.0

Excavation

2.0

Damproofing 6mils polyethelene sheet

3.0

Soil Treatment

16,339.20

100%

0%

100%

16,339.20

4.0

Ready Mix Concrete

128,524.00

100%

0%

100%

128,524.00

5.0

Formworks and Scaffoldings

101,749.13

100%

0%

100%

101,749.13

6.0

Reinforced Steel Bars, Grade 40

21,238.82

100%

0%

100%

21,238.82

7.0

Manhole Cover, 1200mm x 600mm w/ grilles and padlock

27,600.00

10%

90%

100%

2,760.00

24,840.00

8.0

Service Manhole,600mm x 600mm w/ cat ladder rung

50,025.00

10%

90%

100%

5,002.50

45,022.50

9.0

Ladder rung, 20mm dia. Stainless steel

14,490.00

100%

0%

100%

14,490.00

10.0

Tank Lining Water Proofing

I.C

Refurbishment of Gate/Fence

I.D

Equipment - Crane

1,705,025.87

37%

63%

100%

631,623.57

Included under Civil / Architectural Works

II.

Included under Civil / Architectural Works


Included under Preliminaries
Included under Preliminaries
Total ( I )

II.A

1,073,402.30

ARCHITECTURAL WORKS
External Works

1.0

Damproofing 6mils polyethelene sheet

2.0

Water Proofing

II.B

Sewage Holding Tank

1.0

Damproofing 6mils polyethelene sheet

2.0

Tank Lining Water Proofing

6,789.60

0%

100%

100%

6,789.60

74,351.18

0%

100%

100%

74,351.18

1,914.75

100%

0%

100%

117,645.00

0%

100%

100%

1,914.75

Total ( II )

200,700.53

1%

99%

100%

1,914.75

198,785.78

Total ( G )

1,905,726.40

33%

67%

100%

633,538.32

1,272,188.08

117,645.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Item
No.

Description of Work

Contract Amount
in Php

Accomplishment to date
Previous This Period To Date

Accomplishment To Date (Php)


Previous

This Period

SUMMARY
A.

Bill No.1 - Preliminaries and General Conditions

B.

Bill No.2 - Design Fee

8,622,640.17

94%

6%

100%

8,142,744.52

450,000.00

100%

0%

100%

450,000.00

C.

Bill No.3 - Level -1

17,901,938.08

85%

15%

100%

15,167,758.67

2,734,179.41

D.

Bill No.4 - Level 0

12,996,043.63

58%

42%

100%

7,594,707.18

5,054,800.63

E.

Bill No.5 - Level 1

14,171,351.01

52%

48%

100%

7,327,722.98

6,843,628.02

F.

Bill No.6 - Level 2

14,681,538.69

40%

60%

100%

5,873,122.75

8,808,415.94

G.

Bill No.7 - External Works

1,905,726.40

33%

67%

100%

633,538.32

1,272,188.08

70,729,237.97

64%

36%

100%

45,189,594.42

25,193,107.74

Total Main Contract

TOTAL AMOUNT BILLABLE TO DATE


LESS :
RECOUPMENT OF DOWNPAYMENT
RETENTION
PREVIOUSLY CERTIFIED
BILL NO. 01
BILL NO. 02
BILL NO. 03
BILL NO. 04
BILL NO. 05
BILL NO. 06
BILL NO. 07
NET AMOUNT BILLABLE TO DATE

14,145,847.59

479,895.65
-

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

1,029,461.52
230,000.00
161,587.92
129,334.75
193,841.13
70,203.91
1,093,024.69
74,980.00
2,038,518.75
402,500.00
715,875.00
409,687.50
534,750.00
754,000.00
612,375.00
172,500.00
8,622,640.17
450,000.00
450,000.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

28,750.00
131,928.00
27,370.00
1,295,245.00
12,392.40
150,788.00
350,621.78
714,418.64
299,210.45
258,060.00
1,173,818.80
69,524.40
398,510.65
929,821.22
940,235.42
714,229.23
130,500.24
176,074.44
43,079.46
143,330.25
520,501.50
39,580.13
135,727.83
401,769.75
489,037.50
9,574,525.09

152,705.08
12,580.43
10,904.30
460,379.50
126,554.28
607,210.63
16,609.27
378,157.26
4,117.23
207,339.62
165,600.00
165,600.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

27,485.00
148,695.00
39,719.68
221,321.81
754,562.56
27,887.50
25,012.50
19,320.00
80,730.00
68,310.00
68,701.00
3,789,502.64

22,254.80

4,784.00
4,784.00
6,856.30
86,415.60
5,575.20
25,679.50
5,129.00
1,186.80
357.65
474.95
3,799.60

69,262.20
15,088.00
1,831.95

3,276.35
945.30
2,525.40
51,441.80
251.85
425.50
3,073.95
5,152.00
1,196.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

1,400.70
9,660.00
621.00
8,776.80
2,222.95
5,520.00
119.60
7,036.85
62.10
4,588.50
13,020.30
53,475.00
1,196.00
109.25
12,132.50
558.90
579.60
134.55
6,686.10

14,218.60
51,575.20
9,857.80
10,943.40
7,247.30
515.20
119.60
1,449.00
134.55
1,106.30
335.80
8,521.50

7,015.00
170.20
1,239.70
200.10
2,511.60

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

10,662.80
18,441.40
248.40
170.20
241.50
128.80
59.80
1,265.00
5,313.00
1,872.20
1,173.00
1,725.00
4,600.00
2,300.00
615,030.35

288,650.00
27,255.00
8,970.00
5,290.00
15,525.00
2,472.50
31,510.00
15,640.00
10,350.00
12,075.00
9,775.00
1,150.00

913,100.00

23,846.40
15,548.00
2,898.00
5,106.00
1,650.25

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

1,268.45
9,487.50
29,914.95
6,325.00

50,825.40
581.90
848.70
1,375.40
3,654.70
26,983.60
22,137.50
1,144.25
8,050.00
1,437.50

29,031.75
2,173.50
1,600.80
2,271.25
246.10
58.65
818.80
106.95
108.10
3,689.20
809.60
514.05
303.60
356.50
1,913.60
188.60
49.45
437.00
667.00
5,640.75
1,759.50
8,280.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

4,255.00
4,567.80
2,962.40
886.65
3,267.15
1,437.50
64,965.80
507.15
3,187.80
2,067.70
1,745.70
41,975.00
2,817.50
12,765.00
13,627.50
8,970.00
15,755.00
3,450.00
86,825.00
110,630.00

86,825.00
96,428.65

86,825.00
105,398.65

86,825.00
96,428.65

86,825.00
84,468.65

86,825.00
72,507.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

86,825.00
64,285.00

86,825.00
53,820.00

105,380.25

105,380.25

97,710.90
13,356.10
74,446.40
4,757.55
10,264.90
5,057.70
6,647.00
1,700.85
14,398.00
6,647.00
1,537.55
4,830.00
6,900.00
33,120.00
23,460.00
17,868.70

22,908.00
75,900.00
26,220.00
10,350.00
29,095.00

13,294.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

10,770.90
3,174.00
4,509.15
4,509.15
844.10
1,951.55
2,242.50
3,922,880.00
17,901,938.08

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

30,810.23
105,197.40
135,557.40
256,542.00
133,027.40
267,572.80
24,895.20
404,186.56
462,863.17
1,020,223.70
235,622.15
404,768.84
42,611.03
80,708.44
77,025.56
79,781.25
59,590.13
208,587.00
14,175.19
4,043,745.42

55,497.87
36,368.75
188,043.39
125,660.04
456,633.75
144,445.16
323,328.47
26,915.75
17,249.31
118,650.56
209,166.60
168,708.68

210,997.58

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

544,101.64
29,900.00
29,900.00
563,500.00
20,125.00
90,562.50
6,900.00
11,385.00
30,739.50
85,790.00
48,645.00
47,696.25
56,580.00
263,810.00
51,577.50
2,783.00
3,967.50

114,425.00
79,350.00
10,925.00
40,250.00
23,000.00
30,360.00
48,875.00
30,475.00
4,347,288.81

207,414.00
84,117.90
31,949.30
22,254.80

47,380.00
4,784.00
20,568.90

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

65,508.60
21,403.80
11,580.50
2,787.60
29,348.00
6,559.60
7,693.50
1,780.20
715.30
710.70
4,274.55
4,749.50

79,759.40
1,196.00
13,502.15
84,966.60
1,679.00
8,533.00
33,292.50

2,259.75
16,042.50
2,205.70
60,177.20
1,798.60
1,840.00
4,533.30
592.25
339.25
139.15
124.20
4,370.00
3,276.35
7,084.00
1,644.50
2,701.35
13,161.75
1,242.00
8,776.80
4,445.90
6,969.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

5,520.00
119.60
759.00
4,367.70
2,525.40
34,030.80
62.10
170.20
167.90
10,356.90
11,573.60
956.80
109.25
6,066.25
496.80
386.40
89.70
3,321.20

153,387.00
21,327.90
25,787.60
14,786.70
3,277.50
10,101.60
11,973.80
579.60
134.55
1,569.75
1,106.30
335.80
9,941.75

4,209.00
16,042.50
170.20
184.00
1,239.70
200.10
1,577.80
31,878.00
11,845.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

4,209.00
7,279.50
170.20
248.40
241.50
128.80
59.80
1,265.00
1,518.00
936.10
586.50
2,875.00
8,050.00
3,450.00
1,375,986.50

63,077.50

48,472.50
42,766.20

85,408.20
38,595.15
26,820.30
14,559.00

17,646.75
7,141.50
6,003.00
6,603.30
2,271.25
2,584.05
619.85
1,114.35
1,228.20
1,390.35
563.50
1,729.60
2,766.90
6,808.00
5,071.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

809.60
2,227.55
2,776.10
3,137.20
154.10
1,094.80
3,542.00
2,870.40
12,420.00
9,453.00
8,307.60
7,011.55
765.90
519.80
57,500.00
2,300.00

5,175.00
26,490.25
177.10
6,040.95
54.05
1,738.80
2,656.50
262.20
17,590.40
805.00

677,706.50

94,702.50
23,747.50
2,645.00
20,182.50
2,587.50
49,450.00
28,290.00
19,550.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

12,075.00
14,950.00
9,775.00
1,150.00

19,278.60
35,636.20
10,754.80
11,812.80
4,968.00
5,078.40
872.85
2,415.00
609.50
1,442.10
524.40
1,242.00
848.70
2,063.10
655.50
641.70
335.80
989.00
239.20
943.00
669.30
822.25
1,076.40
4,916.25
1,725.00
4,807.00
1,566.30
258.75
250.70
243.80
233.45
230.00
3,109.60
603.75
354.20
621.00
103.50
97.75
703.80
94.30
269.10
1,233.95
407.10
1,267.30

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

3,854.80
7,831.50
1,750.30
5,814.40
295.55
1,504.20
3,162.50
5,799.45
1,403.00
4,508.00
2,190.75
1,322.50
4,805.85
8,004.00
3,601.80
6,403.20
4,402.20
9,604.80
48,300.00
1,867.60

400.20
117.30
926.90
1,794.00
524.40
400.20
1,055.70
3,105.00
5,175.00
5,635.00
1,437.50
65,090.00
76,592.30

65,090.00
57,557.50

65,090.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

20,182.50

29,895.40
74,002.50

110,383.90

110,383.90

33,200.50
33,200.50
33,200.50
33,200.50

8,553.70
30,801.60
63,186.75
5,854.65
13,175.55
6,710.25
18,611.60
17,107.40
7,985.60
13,689.60
6,343.40

4,261.90
4,365.40
3,401.70
2,166.60
7,730.30
3,269.45
7,709.60
3,339.60
1,405.30
1,273.05
1,736.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

4,830.00
2,300.00
12,420.00
15,640.00
26,409.75

28,750.00
151,800.00
13,110.00
9,890.00
58,190.00

13,294.00
20,003.10
12,696.00
3,919.20
809.60
4,509.15
4,509.15
4,509.15
277.15
4,220.50
1,951.55
3,047.50
2,242.50
3,229,022.90
12,996,043.63

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

99,226.60
95,229.20
138,087.40
208,927.40
27,627.60
380,968.02
205,594.35
345,110.32
359,315.71
47,345.13
76,094.06
52,181.25
85,892.06
178,054.50
15,749.25
2,315,402.85

77,272.45
480,536.01
103,433.76
401,011.96
125,871.55
30,561.58
433,231.81
16,031.00
131,403.60
21,734.31
208,656.00
104,976.60
232,929.65
14,222.97

134,359.01

561,420.43

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

82,800.00
82,800.00
315,100.00
221,375.00
32,200.00
119,025.00
7,590.00
40,986.00
72,967.50
62,686.50
69,517.50
5,573.37
5,347.50
116,910.15
15,000.60
23,000.00

137,310.00
24,840.00
39,675.00
32,775.00
40,250.00
28,980.00
20,240.00
28,750.00
56,925.00
43,125.00
23,575.00
54,970.00
74,347.50
4,956,294.31

387,527.00
58,648.85
22,254.80

19,136.00
12,592.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

3,428.15
8,234.00
42,185.45
112,037.60
127,098.00
42,366.00
5,575.20
22,011.00
13,119.20
2,564.50
97,980.00

5,043.90
1,186.80
3,324.65

60,246.20
16,215.00
129,347.40
36,225.00
17,186.75
1,957,760.00

3,276.35
190,966.70
4,330.90
2,244.80
43,677.00
3,049.80
676.20
368.00
671.60
425.50
3,570.75
14,996.00
165.60
902.75
69.00
3,864.00
897.00
2,601.30
9,539.25
1,242.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

8,776.80
4,445.90
5,520.00
119.60
4,853.00
62.10
1,966.50
11,573.60
4,982.95
1,076.40
109.25
6,066.25
558.90
579.60
134.55
3,408.60

4,986.40
14,218.60
38,681.40
9,857.80
9,832.50
6,173.20
7,247.30
43,849.50
450.80
104.65
1,690.50
134.55
1,840.00
2,127.50
335.80
184.00
22,287.00
10,101.60
255.30
1,859.55
300.15
3,606.40

11,785.20
20,382.60

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

340.40
124.20
241.50
128.80
59.80
1,265.00
5,313.00
2,808.30
1,759.50
5,175.00
22,951.70
6,900.00
3,804,421.95

69,385.25

53,319.75
57,021.60

51,460.20
35,760.40
19,412.00
19,061.25

14,800.50
15,835.50
8,004.00
1,362.75
1,353.55
1,642.20
818.80
1,497.30
756.70
2,766.90
3,404.00
6,476.80
2,227.55
4,572.40
231.15
1,094.80
2,898.00
3,229.20

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

13,972.50
1,384.60
519.80
748.65
54.05
2,110.25
12,605.15
61,989.60
10,062.50
2,300.00

2,898.00
14,955.75
88.55
4,692.00
382.95
869.40
2,898.00
393.30
17,825.00
805.00

21,031.20
1,536.40
9,844.00
4,140.00
4,655.20
1,207.50
1,048.80
131.10
1,311.00
1,031.55
740.60
327.75
632.50
741.75
6,697.60
190.90
223.10
56.35
442.75
6,468.75
2,300.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

5,287.70
2,915.25
233.45
207.00
97.75
586.50
358.80
85.10
1,967.65
1,092.50
7,831.50
1,750.30
4,360.80
591.10
2,507.00
6,325.00
5,799.45
1,403.00
3,381.00
730.25
3,306.25
9,611.70
800.40
800.40
5,202.60
3,201.60
6,403.20
1,207.50
48,300.00
1,868.75

43,125.00
8,625.00
1,207.50
3,565.00
8,395.00
5,750.00

11,435.60
25,978.50
27,634.50
33,948.00
1,107.45
531.30
1,785.95
1,665.20
2,032.05

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

885.50
3,941.05
18,000.95
514.05
2,691.00
125.35
641.70
80.50
54.05
427.80
578.45
3,662.75
18,188.40
50,896.70
15,295.00
2,875.00

6,210.00
2,501.25
117.30
80.50
270.25
308.20
54.05
54.05
499.10
1,495.00
57.50
94.30
349.60
233.45
7,521.00
2,463.30
5,951.25
4,600.00
5,796.00
1,437.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

101,315.00
52,325.00

101,315.00
84,467.50

81,650.00
90,447.50

81,650.00
107,640.00

81,650.00
49,335.00

81,650.00
82,225.00

23,786.60

68,020.20

84,004.05

84,004.05

19,576.45

100,570.95

97,399.25

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

12,830.55
4,393.00
2,297.70
77,653.75
12,830.55
6,586.05
46,098.90
2,076.90
1,877.95
13,691.90
7,730.30
13,800.00
9,660.00
24,840.00
23,460.00
34,488.50

28,934.00
101,200.00
19,665.00
14,260.00
29,095.00

13,294.00
4,945.00
7,693.50
7,935.00
607.20
4,509.15
4,509.15
22,287.00
2,242.50
8,050.00
3,095,231.90
14,171,351.01

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

96,393.00
66,488.40
142,540.20
139,909.00
178,415.60
370,082.86
140,353.72
362,744.70
327,754.51
352,763.48
73,916.25
44,850.00
71,967.00
83,778.94
137,482.50
1,207,482.28
3,796,922.44

23,807.30
189,937.39
16,592.32
109,704.48
611,219.66
647,275.12
61,271.43
68,754.13
442,492.40

12,001.58

643,930.54
55,200.00
85,698.00
77,625.00
93,150.00
98,325.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

1,756,661.23

682,007.50
1,057,862.00
63,310.26
5,336.00
4,870.02

137,310.00
158,700.00
201,250.00
135,125.00
11,500.00
56,350.00
14,375.00
28,750.00
7,550,391.35

22,254.80
63,320.15

59,225.00
14,352.00
4,784.00
19,136.00
4,197.50
10,284.45
6,948.30
158,872.50
5,575.20
22,011.00
10,258.00
1,780.20
1,072.95
593.40
15,198.40

65,398.20
74,106.00
33,653.60

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

46,949.90
48,530.00
24,131.60
2,340.25
5,278.50
143.75
346.15
335.80
851.00
4,253.85
4,186.00
971.75
6,203.10
7,848.75
1,242.00
8,776.80
4,445.90
5,520.00
119.60
1,941.20
62.10
1,092.50
13,020.30
53,475.00
1,196.00
109.25
7,279.50
3,647.80
33,715.70
310.50
170.20
167.90
579.60
134.55
11,711.60

14,218.60
70,915.90
9,857.80
3,277.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

9,821.00
11,343.60
708.40
164.45
1,811.25
269.10
920.00
1,276.50
335.80
9,504.75
29,463.00
595.70
4,338.95
700.35
10,336.20

26,657.00
46,103.50
680.80
248.40
483.00
257.60
119.60
1,265.00
7,590.00
3,744.40
3,519.00
2,875.00
8,050.00
3,450.00
1,179,012.20

21,758.00

3,415.50
300.15
123.05
427.80
171.35
326.60
119.60
517.50

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

16,016.05
17,250.00

3,312.00
977.50
531.30
175.95
9,631.25
690.00

3,312.00
2,327.60
174.80
448.50
63.25
776.25
1,207.50
4,600.00
575.00

6,210.00
19,665.00
1,400.70
3,719.10
293.25
3,944.50
432.40
171.35
1,449.00
455.40
4,011.20
285.20
77.05
2,093.00
24,150.00
9,094.20
48,875.00
2,875.00
1,800.90
117.30
308.20

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

1,140.80
2,870.40
115.00
55.20
47.15
186.30
98.90
480.70
767.05
4,888.65
9,149.40
17,077.50
4,600.00
1,437.50
81,650.00

25,415.00

81,650.00

46,345.00

81,650.00
57,557.50

81,650.00
76,245.00

65,090.00
94,394.30

26,997.40
37,375.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

26,997.40
37,375.00

26,997.40
38,122.50

38,175.40
38,122.50

86,450.10

172,900.20

84,159.30

12,830.55
6,274.40
6,589.50
8,553.70
6,212.30
113,687.85
24,063.75
6,325.00
2,875.00
58,822.50
2,672.60
2,408.10
7,730.30
4,830.00
20,700.00
31,280.00
17,983.70
22,908.00
75,900.00
29,497.50
11,500.00

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

29,095.00

13,294.00
9,890.00
35,661.50
7,693.50
2,380.50
607.20
4,509.15
4,509.15
844.10
1,951.55
2,242.50
2,155,212.70
14,681,538.69

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

42,310.80
18,157.35
331,683.00
138,659.81
97,453.36
215,050.00

230,000.00
62,895.80
41,757.94
125,392.67
41,699.00
16,339.20
128,524.00
101,749.13
21,238.82
27,600.00
50,025.00
14,490.00

1,705,025.87

6,789.60
74,351.18
1,914.75
117,645.00
200,700.53
1,905,726.40

BRITISH SCHOOL MANILA


Fort Bonifacio Global City, Taguig City
CONSTRUCTION OF CLUSTER F - PROGRESS BILLING NO. 07

Accomplishment To Date (Php)


To Date

8,622,640.17
450,000.00
17,901,938.08
12,996,043.63
14,171,351.01
14,681,538.69
1,905,726.40
70,729,237.97

70,729,237.97
(14,145,847.59)
(7,072,923.80)
(1,146,082.59)
(3,213,333.28)
(2,221,157.36)
(3,190,950.23)
(5,440,520.90)
(16,419,693.01)
(10,183,920.89)
7,694,808.33