Vous êtes sur la page 1sur 1

TERM0xx

SYSTEMSENGINEERINGDEPARTMENT

SE307EngineeringEconomicAnalysis
Instructor:

AtiqWaliullahSiddiqui
Office:

Bldg22422(Phone(office):1619.Email:atique@kfupm.edu.sa)
OfficeHours:

Objective:Todevelopstudents'awarenessoftheconceptsusingcashflowapproach,timevalueofmoney,
product/projectcostingandrateofreturn.Tointroducestudentstotheprocessofintegratingengineering
proposalswitheconomicanalysisinordertoselectamongseveralviablealternativeprojects;andtounderstandand
appreciatethemodelsandmeasuresusedindecisionmakingintheareaofengineeringeconomics.

CourseOutcomes:Thiscashfloworientedcourseconcernstheprinciplesinvolvedinanalyzingeconomic
investmentalternatives.Studentscompletingthiscoursewillbeableto:
1. Evaluatetheeconomicfeasibilityofinvestmentsrelatedtoengineeringprojects.
2. Assesstheimpactofdepreciation,taxationandothereconomicfactorsonprojects'feasibility.
3. Conductsensitivityanalysisonkeycompoundingparameters.
4. Developpoliciesforassetsreplacement.
5. Assessalternativefinancingmodes.
6. Makefinanciallyprudentdecisionsineverydaylife(car/homeloansorinvestments).

CourseTextbook:Park,ChanS.,FundamentalsofEngineeringEconomics,1stEd.,PrenticeHall(2004).
Otherappropriatebookstobeusedasreferences:
OtherReadings:a.Park,ChanS.,ContemporaryEngineeringEconomics3rdEd.,PrenticeHall(2002).(**CEE)

Attendance:Universityregulationswillbeverystronglyenforced.

Homework:Latehomeworkwillnotbeacceptedunderanycircumstances.

GradingPolicy:

Attendance

5%
Homeworks

5%
Quiz(es)

5%
GroupProject(peerreviewed)

10%
MajorExams(I&II)

25%Each
FinalExam(checkreg.website)
25%
Thedistributionmaybereviewedifnecessary

Weeklybreakdownofcoursetopics
Topics
#ofweeks
i.
Engineeringeconomicdecisions
0.5ch.1
ii.
Costsconceptsandbehaviors
2.0ch.3(**CEE)
iii.
CashFlowsandTimeValueofmoneymanagement
1.5ch.2&3
iv.
PresentandFutureworthandannualequivalentworthanalysis
2.0ch.5&6
v.
BondProblems
1.5ch.6.4(**CEE)
vi.
RateofreturnanalysisandPaybackPeriod
2.0ch.7
vii.
Comparisonofalternatives&replacementdecisions
2.0ch.9&11
viii.
Depreciation
1ch.8
ix.
Corporateincometax
0.5ch.8
x.
Inflationanditsimpactonprojectcashflows
0.5ch.4
xi.
Economicanalysisinthepublicsector(BenefitCostAnalysis)
1ch.12
xii.
Projectbreakevenandsensitivityanalysis
0.5ch.10
Computerusage:Therewillbeanumberofhomeworkandcasestudiesthatwillbesolvedthroughcomputer
softwareandExcelspreadsheet.

CAVEAT:Thesyllabusissubjectedtochange.Soifthereisachangemakesuretoupdateyoursyllabuspromptly.

Vous aimerez peut-être aussi