Vous êtes sur la page 1sur 1

20616 Federal Register / Vol. 63, No.

80 / Monday, April 27, 1998 / Notices

DEPARTMENT OF EDUCATION that the purpose of the proposed fuel or appeal the Commission’s final order
gas line is to provide processed fuel gas to a Federal court.
National Assessment Governing from the mainline transmission system The Commission will consider all
Board; Meeting to the Sturgis Compressor Station. CIG comments and concerns equally,
AGENCY: National Assessment further states that providing processed whether filed by the Commenters or
Governing Board; Education. gas to the Sturgis Compressor will those requesting intervenor status.
improve operating efficiency, reliability, Take further notice that, pursuant to
ACTION: Amendment to notice.
and decrease in maintenance the authority contained in and subject to
SUMMARY: Notice is hereby given of an requirements. the jurisdiction conferred upon the
amendment to the notice of the National Any person desiring to participate in Federal Energy Regulatory Commission
Assessment Governing Board meeting the hearing process or to make any by Sections 7 and 15 of the Natural Gas
scheduled for May 7–9, 1998, at the protest with reference to said Act and the Commission’s Rules of
Crystal Gateway Marriott Hotel, 1700 application should on or before May 12, Practice and Procedure, a hearing will
Jefferson Davis Highway, Arlington, 1998, file with the Federal Regulatory be held without further notice before the
Virginia, as published in the Federal Commission, 888 First Street, NE., Commission or its designee on this
Register on March 20, 1998, Vol. 63, No. Washington, DC 20426, a motion to application if no motion to intervene is
78, page 19477. The following changes intervene or a protest in accordance filed within the time required herein, if
have been made in the session schedule with the requirements of the the Commission on its own review of
for Friday, May 8. The time for the Commission’s Rules of Practice and the matter finds that a grant of the
closed meeting of the Subject Area Procedure Gas Act (18 CFR 157.10). All certificate is required by the public
Committee #1 has been extended until protests filed with the Commission will convenience and necessity. If a motion
11:30 a.m. Also, an agenda item was be considered by it in determining the for leave to intervene is timely filed, or
added to the afternoon session of the appropriate action to be taken but will if the Commission on its own motion
full Board meeting. Between 3:15–4:00 not serve to make the protestants parties believes that a formal hearing is
p.m. the Board will hear comments from to the proceeding. The Commission’s required, further notice of such hearing
the test development subcontractors for rules require that protesters provide will be duly given.
the Voluntary National Tests. The copies of their protests to the party or Under the procedure herein provided
Friday, May 8 session of the Governing person to whom the protests are for, unless otherwise advised, it will be
Board meeting will conclude at 4:30 directed. Any person wishing to become unnecessary for CIG to appear or be
a party to a proceeding are directed. represented at the hearing.
p.m.
Any person wishing to become a party
Dated: April 22, 1998. Linwood A. Watson, Jr.,
to a proceeding or to participate as a
Roy Truby, Acting Secretary.
party in any hearing therein must file a
Executive Director, National Assessment motion to intervene in accordance with [FR Doc. 98–11048 Filed 4–24–98; 8:45 am]
Governing Board. the Commission’s Rules. BILLING CODE 6717–01–M
[FR Doc. 98–11076 Filed 4–24–98; 8:45 am] A person obtaining intervenor status
BILLING CODE 4000–01–M will be placed on the service list
maintained by the Secretary of the DEPARTMENT OF ENERGY
Commission and will receive copies of
all documents issued by the Federal Energy Regulatory
DEPARTMENT OF ENERGY Commission
Commission, filed by the applicant or
Federal Energy Regulatory by all other intervenors. An intervenor
Commission can file for rehearing of any Commission [Docket No. RP98–17–002]
order and can petition for court review
[Docket No. CP98–348–000] Dauphin Island Gathering Partners;
of any such order. However, an
Notice of Tariff Filing
Colorado Interstate Gas Company; intervenor must serve copies of
Notice of Application comments or any other filing it makes April 21, 1998.
with the Commission to every other Take notice that on April 15, 1998,
April 21, 1998. intervenor in the proceeding, as well as Dauphin Island Gathering Partners
Take notice that on April 13, 1998, filing and original and 14 copies with (DIGP) tendered for filing as part of its
Colorado Interstate Gas Company (CIG) the Commission. FERC Gas Tariff, Original Volume No. 1,
P.O. Box 1087, Colorado Springs, A person does not have to intervene, the following tariff sheets to be effective
Colorado 80944, filed in Docket No. however, in order to have comments April 16, 1998:
CP98–348–000 an application, pursuant considered. A person, instead, may
to Section 7(c) of the Natural Gas Act, submit two copies of such comments to Second Revised Sheet No. 9
First Revised Sheet No. 9A
for a certificate of public convenience the Secretary of the Commission.
and necessity authorizing the Commenters will be placed on the DIGP states that the purpose of this
construction and operation of pipeline Commission environmental mailing list, filing is to report the name and rate of
facilities, all as more fully set forth in will receive copies of environmental each person that will begin receiving
the application which is on file with the documents, and will be able to service at negotiated rates on April 16,
Commission and open to public participate in meetings associated with 1998, when DIGP will commence
inspection. the Commission’s environmental review service.
CIG seeks to construct and operate process. Commenters will not be Any person desiring to protest this
approximately 6 miles of 3.5-inch required to serve copies of filed filing should file a protest with the
diameter fuel gas line from the Cimarron documents on all other parties. Federal Energy Regulatory Commission,
Meter Station on CIG’s Fourway-Kit However, Commenters will not receive 888 First Street, N.E., Washington, D.C.
Carson mainline to CIG’s Sturgis copies of all documents filed by other 20426, in accordance with Section
Compressor Station, all located in parties or issued by the Commission and 385.211 of the Commission’s Rules and
Cimarron County, Oklahoma. CIG states will not have the right to seek rehearing Regulations. All such protests must be

Vous aimerez peut-être aussi