Académique Documents
Professionnel Documents
Culture Documents
(Light) and U.S. Army Garrison Hawaii, tank gunnery standards and are the process of preparation of this EIS.
ATTN: APVG–GWV, Schofield inadequate to support training for This list includes local, state and
Barracks, Hawaii 96857–5013; regional conflicts in urban and Federal officials having jurisdictional
Telephone: (808) 656–2878, ext. 1062, restricted areas. The project would expertise or other interests in the
and Fax (808) 656–1039. include the installation of fiber optics, project; concerned citizens;
SUPPLEMENTARY INFORMATION: Public upgrading of existing roadways and conservation groups; and local news
scoping meetings and public meetings construction of utilities to the site. The media.
were held after distribution of the DEIS. proposed training complex would Comments concerning the scope of
All interested individuals, private ensure soldiers are combat ready. the EIS may also be emailed to Ms. Gail
organizations, and government agencies ADDRESSES: Please direct written Pollock at pollockl@ftknox-
were encouraged to provide input into comments concerning the scope of the emph3.army.mil.
the EIS review process. All comments Northern Training Complex to: Dated: May 15, 2000.
received were addressed and included Al Freeland, Chief, Environmental Raymond J. Fatz,
in the FEIS. Management Division, Directorate of Deputy Assistant Secretary of the Army,
Coordination was undertaken with Base Operations Support, U.S. Army (Environment, Safety and Occupational
adjoining land owners; the U.S. Armor Center, ATTN: ATZK–OSE, Health) OASA (I&E).
Environmental Protection Agency; other Building 1110, Room 216, Ironsides & [FR Doc. 00–12584 Filed 5–17–00; 8:45 am]
Federal agencies; State of Hawaii 6th Avenue, Fort Knox, KY 40121– BILLING CODE 3710–08–M
agencies such as the Departments of 5000;
Health, Land and Natural Resources, or
Transportation, Business and Economic Gail Pollock, Environmental Protection DEPARTMENT OF EDUCATION
Development, Offices of State Planning, Specialist, at the same address; by fax
and Environmental Quality Control; at (502) 624–3000. Notice of Proposed Information
City and County of Honolulu agencies FOR FURTHER INFORMATION CONTACT: Al Collection Requests
such as Board of Water Supply, Freeland at (502) 624–3629 or Gail
Departments of Public Works, Land Pollock at (502) 624–6684. AGENCY: Department of Education.
Utilization, and General Planning; and SUMMARY: The Leader, Information
SUPPLEMENTARY INFORMATION: The EIS
organizations such as the Mililani and Management Group, Office of the Chief
will consider reasonable alternatives
Wahiawa Neighborhood Boards. Information Officer, invites comments
including: (1) Construct the Northern
on the proposed information collection
Dated: May 15, 2000. Training Complex that includes the
requests as required by the Paperwork
Raymond J. Fatz, Wilcox Multi-Purpose Digital Training
Reduction Act of 1995.
Deputy Assistant Secretary of the Army, Range (Wilcox MPDTR) and the
Maneuver Areas, Drop Zones, and DATES: Interested persons are invited to
(Environment, Safety and Occupational
Health) OASA (I&E). Landing Zones in Training Areas 16, 17, submit comments on or before July 17,
[FR Doc. 00–12562 Filed 5–17–00; 8:45 am] and 18 (Training Area Complex) 2000.
BILLING CODE 3710–08–M (preferred alternative); (2) upgrade Yano SUPPLEMENTARY INFORMATION: Section
Multi-Purpose Tank Range to a Digital 3506 of the Paperwork Reduction Act of
Range and construct Maneuver Areas, 1995 (44 U.S.C. Chapter 35) requires
DEPARTMENT OF DEFENSE Drop Zones, and landing Zones in that the Office of Management and
Training Areas 16, 17, and 18; (3) Budget (OMB) provide interested
Department of the Army upgrade Cedar Creek Multi-Purpose Federal agencies and the public an early
Tank Range to a Digital Range and opportunity to comment on information
Notice of Intent To Prepare an collection requests. OMB may amend or
construct Maneuver Areas, Drop Zones,
Environmental Impact Statement (EIS) waive the requirement for public
and Landing Zones in Training Areas
for the Northern Training Complex consultation to the extent that public
16, 17, and 18; and (4) no action
With a Multi-Purpose Digital Training participation in the approval process
(continue operations with existing
Range and Expanded Maneuver Areas, would defeat the purpose of the
ranges and facilities). Other reasonable
Drop Zones, and Landing Zones at Fort information collection, violate State or
alternatives will also be considered.
Knox, KY Significant Issues: The primary issues Federal law, or substantially interfere
AGENCY: U.S. Army Armor Center and to be analyzed in this EIS include: Noise with any agency’s ability to perform its
Fort Knox, Department of the Army. (aircraft/range firing), impacts to statutory obligations. The Leader,
ACTION: Notice of intent. wetlands and riparian areas, removal of Information Management Group, Office
approximately 2,500 acres of forests, of the Chief Information Officer,
SUMMARY: Fort Knox proposes to soil erosion, water quality, endangered publishes that notice containing
construct and operate a multi-purpose species, cultural resources, and other proposed information collection
digital training range and a series of issues raised during public scoping. requests prior to submission of these
maneuver areas, drop zones and landing Scoping: The Army prepared Draft requests to OMB. Each proposed
zones. These facilities would provide a Environmental Assessments for the information collection, grouped by
multi-functional war-fighting capability Wilcox Multi-Purpose Digital Tank office, contains the following: (1) Type
to meet the Army’s training needs for Range and the Training Area 16, 17 and of review requested, e.g. new, revision,
soldiers in urban and restricted terrain 18 Maneuver/Drop Zones and Landing extension, existing or reinstatement; (2)
combat scenarios. These facilities would Zones. The Environmental Assessments title; (3) summary of the collection; (4)
upgrade existing substandard range resulted in a determination to prepare description of the need for, and
facilities and expand the installation’s an EIS to encompass all areas affected proposed use of, the information; (5)
training capacity to train Armor soldiers within the proposed Northern Training respondents and frequency of
in a realistic training environment for Complex. collection; and (6) reporting and/or
urban and restricted terrain combat. The A mailing list has been prepared for Recordkeeping burden. OMB invites
current facilities do not meet modern public scoping and review throughout public comment.
VerDate 11<MAY>2000 20:21 May 17, 2000 Jkt 190000 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\18MYN1.SGM pfrm01 PsN: 18MYN1
Federal Register / Vol. 65, No. 97 / Thursday, May 18, 2000 / Notices 31535
VerDate 11<MAY>2000 20:21 May 17, 2000 Jkt 190000 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\18MYN1.SGM pfrm01 PsN: 18MYN1