Vous êtes sur la page 1sur 2

Payment receipt Account number Circle Customer Name Transaction Date Amount Paid Transaction Reference number Transaction

status Transaction status Desc 935467478 WBC Kunjal Kumar .Singh 05-Oct-2012 10:23:52 PM INR 730.00 MHCC2823625047 Success CAPTURED Tata Docomo CDMA/ Walky/ Photon Number 9230638986

JIT vs MRP JIT and MRP are completely unlike, but are complementary concepts used in material planning and control. MRP stands for Manufacturing Resource Planning, while JIT is Just in Time. MRP is a resource and planning tool that is forward-thinking, and time-phased. The philosophy of JIT, on the other hand, is based on the riddance of waste. One important feature of JIT is known as kanbas, which is a method of performance based on restoring used material that has no forward visibility. While operating a manufacturing business, it is possible to operate only with MRP, but the case isnt the same with JIT, because it does allow for forward planning, which is a vital planning requirement when running a manufacturing operation. There is a need to ensure that materials which cannot be replaced by kanbas, can be availed when needed. This makes MRP a tool that gives more control, while JIT increases the value of your processes. There is a mistaken analysis of referring to JIT as a pull system, and to MRP as a push system. This analysis can be greatly misleading. MRP is a system which focuses on satisfying the requirements of the projected usage in a determined time frame. JIT is very much focused on the current, real usage, where parts of the production system are connected with the use of Kanbans, while the system runs. It is this kind of linkage that is the main distinguishing feature between JIT and MRP. The JIT system is dynamically linked, whereas MRP is not. This means that JIT is most applicable when lead times are short, whereas MRP is suited for longer lead times. To add to that, for computerized operations, you are better off implementing MRP, than JIT. Generally, in MRP, there are two basic information types that are required: Structural and tactical. Structural information includes the information about the components used by the company, and the relationship between the different items. Things such as the lead time and batch size rule are included in structural information. The essential point about this information, is that it does infrequently vary. Tactical information includes such things as the current state of the operation, for instance, pending sales orders, master production schedules, inventory levels, and purchase orders. Obviously, the fundamental point about this information, is that it frequently varies.

Summary: JIT is Just in Time, while MRP refers to Manufacturing Resource Planning. MRP is a resource planning system that focuses on the future, and is time phased, while JIT does not provide for forward-thinking. The JIT system is a dynamically linked system, that is better applied for short lead times, while MRP is not linked, and is better suited for long lead times. Whereas the JIT system enhances the value of processes, MRP will give you more control

Read more: Difference Between JIT and MRP | Difference Between | JIT vs MRP http://www.differencebetween.net/business/difference-between-jit-andmrp/#ixzz259GrHS7B

Meshing has become one of the main bottlenecks in integrating geometric design and engineering analysis activities. We propose a meshfree approach for modelling and analysis based on RFM (the R-function method) that has the potential to achieve unprecedented levels of ease and automation

Vous aimerez peut-être aussi