35
Series1
ation Planned
Calibration Achieved
90 80 70 60 50 40 30 20 10 0 Jul-12 Aug-12 2 2 44 38
1stOct-15th Oct.
85 68 Analysis - Incoming Inspection (PVC + Copper+MB) Total No. of Times Received Materials. Analysis - Incoming Inspection (PVC + Copper+MB) Total Rejection Linear (Analysis - Incoming Inspection (PVC + Copper+MB) Total Rejection) 2 Aug-12 1 Sep-12 1 Oct-12
ppm
685
ppm
193.8
23 0 Jul-12
1015 Aug-12
556 Sep-12
0 Oct-12
180,000 160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 0 0 Jul-12 Aug-12 Sep-12 Oct-12 45 25 5 56,358 84,688 89,732 Total Prd In ''Mtr'' Total Rejection in Mtrs. 156201
ppm
10
ppm
23 Jul-12
1015 Aug-12
556 Sep-12
0 Oct-12
180,000 160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 0 0 Jul-12 Aug-12 Sep-12 Oct-12 45 25 5 56,358 84,688 89,732 Total Prd In ''Mtr'' Total Rejection in Mtrs. 156201
Month
Jul-12 Aug-12 Sep-12 Oct-12
No.of Breakdowns
0 0 2 0
Rectified
0 0 0 0
Un Rectified
0 0 1 0
No.Of Breakdown / Error Analysis - Test Equipments No.of Breakdowns No.Of Breakdown / Error Analysis - Test Equipments Rectified No.Of Breakdown / Error Analysis - Test Equipments Un Rectified
CCN-1
1.10.12
HI-COOL
CCN-2
16.10.12
E.K.ELECTRONICS
CCN-3
22.10.12
Ramson Engineering
1.00 SQMM BC X 1 CORE PVC INS. WIRE GREY -300 Mtrs. & 2.50 SQ MM BC X 1 CORE GREY 200 MTRS.
CCN-4
6.11.12
BSA
CCN-5
6.11.12
BSA
0.50 SQMM BC X 2 CORE (Inner Yellow, Brown) FLRY B SHIELDED CABLE Outer BLACK-500 Mtrs. 0.75 SQ MM BC X 1 CORE FLRY B WIRE WHITE COLOUR -1200 Mtrs. AT AMBERNATH PLANT
ISTER
CUSTOMER COMPLAINT ROOT CAUSE IMMEDIATE ACTION PLAN
NO PRINTING ON 4 N0s OF COILS & COILING NOT PROPER PRINTER NOT SET PROPERLY
0.189,0.188,0.190MM SIZE BC COPPER FOUND They required +_ 0.002 mm Tolerance only.
Visited at HI-COOL
REPLACEMENT GIVEN Without inspection of QC TO CUSTOMER By Mr. BLACK COPPER ISSUE IN Person materials were Rajendra on Dtd. BOTH SIZE OF WIRES. dispatched 22.10.2012
FRESH LOT PRODUCTION OUTER SHEATH THICKNESS TAKEN & SENT THE OUTER SHEATHING OPEN ISSUE NOT MAINTAINED PROPERLY. MATERIAL TO CUSTOMER.
Diameter Variation 1.90 MM TO NOT SETTING DIAMETER 2.30 MM PROPERLY ON EXTR. M/C
CA/PA
CLOSED/OPEN
1.10.12
OPEN
Before taking the production , first approval should be taken from QA & MD BEFORE TAKING BUNCHING PROCESS IT IS INSTRUCTED TO BUNCHING M/C OPERATOR , TO SELECT ONLY BRIGHT ANNEALED COPPER & ALSO BEFORE DESPATCH ALL MATERIALS SHOULD BE FINALLY CHECKED BY QC PERSON.
17.10.12
CLOSED
22.10.12
CLOSED
7.11.12
CLOSED
7.11.12
OPEN
DOC. ENCLOSED
May-12
May-12
Without Drain wire Tape Shielded 200Mtr Reliance0.5sqmmx 4Pair Manish-Taping m/c.
Emerson export 28core x 1.0sqmm 2nd lay stranding defect ( core damage) due to wrong selection of Die _ Jun-12 Yogesh reworked -100Mtr
On Reliance item FRLS not printed on cable as per customer requirement, QTY : 3000M-black -MulticoreJun-12 cable, 1.50sqmm x 3 core BC - Vinod -operator
Wrong production taken , 50/42swg ATC White Jun-12 5000Mtr instead of White/Red. Anna/Rajendra Bobst items- 22 AWG BC X 11core 1st lay wrong Jun-12 stranding -100mtr, Reworked - Kamlesh
Kamlesh
THYSEN 0.75sqmm x 3core Flat cable Wrong outer PVC sheathed instead of HOFR pvc sheathing pvc used.Jun-12 Ambernath Harness . Vinod.
10
11
Aug-12 Emerson H.W. 10.00 Sq mm ATC X 1 core FRLS . Red. Prakash Patil
12
Sept.2012
Quality Automation
13
Sept. 2012
14
Sept. 2012
15
Sept. 2012
16
Nov. 2012
KUSHAL UDYOG
Green colour cable sent to Store for Wrong colour Job sheet prepared as another customers future requirements per Customer P.O. mentioned short and New production taken as per description like GR instead of GREY customer colour requirement GR means GREY colour.
White colour is sent to store for other costomers future requirements and New production is taken as per the costomers requirement.
Even mentioned in job sheet for using HOFR PVC . By over looking mistake happened by Operator & No proper communication Sent to store for costomers between Production Head & future requirements. And Operator. Taken the new production
By over looking
Removed the Existing printing & reThis mistake was happened printing done as per BY OPERATOR costomer requirement
Instead of RED Colour , BLACK Colour production taken. Wrong job sheet preparation
Black colour sent to store for future requirements of customers And new production taken..
Removed the existing tape .And Re-taping properly. Also removing of outer sheathing
Rough surface & Bubbles on surface of wire Due to Improper setting of Extruder M/c Temp.
Removed the Outer sheathing of said cable & Set the proper Temp. of Extruder & Start the production.
NC closed: 27.5.2012
NC closed:Date: 04.06.12
Instructed to stranding m/c operator to carefully select the Die sizes before running the items. Instruction is given to operator regarding proper selection of printing matter as per the job sheet.
NC closed: Date : 30.6.2012 Instruction is given to operator regarding proper selection of printing matter as per the job sheet NC : Closed: Date : 14.06.2012
Before preparation of job sheets carefully study the p.o. and than prepare the job sheet.
Instructed the Operator to Carefully study the job sheet before run the Extr. M/c. Instructed to operator before running any item,proper care should be taking while selecting the printing matter. and than run the extruder m/c. Also check the printing matter in starting length.
Instructed to Production Head , before preparation of job sheets carefully study the P.O. And than prepare the job sheet. NC : Closed :Date:30.08.2012
NC: Closed :Date:18.09.2012 Instructed to taping m/c operator to follow the carefully time to time changes & instructions from production head
Instructed to taping m/c operator to follow the carefully time to time changes & instructions from production head NC: Closed :Date :18.09.2012
Instructed to taping m/c operator to follow the carefully time to time changes & instructions from production head NC: Closed :18.09.2012
Instruction given to operator to NC: Closed : Date : 22.09.2012 check the surface of wire during the Nylon coating time.