BusinessPerformanceAspectsinRefining Refining Case RefiningCase ProductionAccountingandDataReconciliation (PADR)Requirements (PADR) Requirements PowerfulDataReconciliationConcepts Customer Benefits Using Sigmafine CustomerBenefitsUsingSigmafine YieldAccountingManagementPresentedby OMVPetrom OMV Petrom Conclusion
GlobalRefiningSummit Rotterdam,May18,2011 VisiantPimsoftInc.2011 Allrightsreserved.
BusinessPerformanceAspectsinRefining
Operational
o o o
Yield,Recovery,QualityTargets , y, Q y g ProductionRates ProcessConstraints(e.g.,environmental,physicallimitations) BestOperationalParameters(e.g.,LPs) ComparisonofPlannedvs.Actual MaterialLoss CostAllocation Cost Allocation InventoryPositions Taxes(e.g.,domesticvs.foreign)
GlobalRefiningSummit Rotterdam,May18,2011 3 VisiantPimsoftInc.2011 Allrightsreserved.
Planning
o o
Financials
o o o o
MarketDrivers
Environmental(GHG) Financial (Sarbanes Oxley Act) Financial(SarbanesOxleyAct) YieldAccountingStandards
o
GlobalRefiningSummit Rotterdam,May18,2011
VisiantPimsoftInc.2011 Allrightsreserved.
RefiningCase
SourceofInformation
o o o o
ProcessHistorian Process Historian OilMovementSystem(OMS) VesselPositioningSystem(VPS) Vessel Positioning System (VPS) LIMS VCFaccordingtoAPI2004 OwnershipTracking ForeignandDomesticTracking MassBalance
GlobalRefiningSummit Rotterdam,May18,2011 5 VisiantPimsoftInc.2011 Allrightsreserved.
BusinessRules
o o o o
RefiningCase
Integration
o o
Reporting
o o o
GlobalRefiningSummit Rotterdam,May18,2011
VisiantPimsoftInc.2011 Allrightsreserved.
SolutionMap
DataFlowforRefiningCase
Historian Sigmafine OMS
Aggregation/ Integration
Excel Reports
Rules
SQL Access
Report Logic
Webbased Reports
GlobalRefiningSummit Rotterdam,May18,2011
VisiantPimsoftInc.2011 Allrightsreserved.
ProductionAccountingSolutionIntegration
TheBridgeBetweenBusinessandProcessData The Bridge Between Business and Process Data
Process Data
Lab Data
Movements Records
Planning Data
Scheduling Information
VisiantPimsoftInc.2011 Allrightsreserved.
SolvabilityandRedundancy
R NR
S NR
R
Themoreredundancy The more redundancy thebetter.Thisway, morevaluesmaybe crosscheckedto increaseaccuracy. increase accuracy
S S NR
GlobalRefiningSummit Rotterdam,May18,2011 9
R
VisiantPimsoftInc.2011 Allrightsreserved.
SolvabilityandRedundancy
R R
S NR
R
*Byaddingameter totheflow,theflow becomesredundant. Asaresult,other meteredflowsalso becomeredundant.
*R
S S
R
GlobalRefiningSummit Rotterdam,May18,2011 10
R
VisiantPimsoftInc.2011 Allrightsreserved.
FindingtheBestFitforYourModelandData Finding the Best Fit for Your Model and Data
54.2
Reconciliation
98.4 98 4
98.4 98 4
44.2
GlobalRefiningSummit Rotterdam,May18,2011
11
VisiantPimsoftInc.2011 Allrightsreserved.
OptimalUtilizationofExistingMeters
Redundant Network
Accurate Meter
GlobalRefiningSummit Rotterdam,May18,2011
12
VisiantPimsoftInc.2011 Allrightsreserved.
ErrorDetection
GlobalRefiningSummit Rotterdam,May18,2011
13
VisiantPimsoftInc.2011 Allrightsreserved.
MeterPerformance
ErrorIdentification Error Identification
Pure Gas E 1750 1600 1400 1200 1000 800 600 400 200 0 02-Sep-01 00:00:00 SLO East 250 C0F1230.AD 1649.4 C0F1230.SF Not Reconciled B2F1003.AD 400.5 400 5 B2F1003.SF Not Reconciled B2F2003.AD 402.47 B2F2003.SF Not Reconciled F0F1013B.AD 19.939 F0F1013B.SF Not Reconciled Pure Gas W 1750 1600 1400 1200 1000 800 600 400 200 0 11-Nov-01 00:00:00 C0F1109M.AD 89.787 ton/h C0F1109M.SF Not Reconciled ton/h C0F1116M.AD 76.712 ton/h C0F1116M.SF Not Reconciled ton/h C9F1004.AD 181.66 m3/h 3/h C9F1004.SF Not Reconciled m3/h SLO West 250 20F0101.AD 1571.4 20F0101.SF Not Reconciled 12F1003.AD 422.08 422 08 12F1003.SF Not Reconciled 12F2003.AD 428.68 12F2003.SF Not Reconciled F0F1013A.AD 0. F0F1013A.SF Not Reconciled
Bias
Drift
30.59 Day(s) 11-Dec-01 14:02:56 20F1109.AD 99.745 m3n/h 20F1109.SF Not Reconciled m3/h 20F1116.AD 89.789 m3/h 20F1116.SF Not Reconciled m3/h 29F1004.AD 192.7 m3/h 3/h 29F1004.SF Not Reconciled m3/h
100.59 Day(s)
11-Dec-01 14:02:54
200
200
150
150
100
100
50
50
0 02-Sep-01 00:00:00
100.59 Day(s)
Meter Error
11-Dec-01 14:03:04
0 02-Sep-01 00:00:00
100.59 Day(s)
11-Dec-01 14:03:05
GlobalRefiningSummit Rotterdam,May18,2011
14
VisiantPimsoftInc.2011 Allrightsreserved.
OptimumMaintenanceofRefineryMeters
TakingActiontoImproveMeterPerformance Taking Action to Improve Meter Performance
GlobalRefiningSummit Rotterdam,May18,2011
15
VisiantPimsoftInc.2011 Allrightsreserved.
ImprovingtheOverallPicture
HigherConfidenceinRefineryData Higher Confidence in Refinery Data
30% 25% 20% 15% 10% 5% 0%
GlobalRefiningSummit Rotterdam,May18,2011
16
VisiantPimsoftInc.2011 Allrightsreserved.
OilLossMonitoring
BeforeandAfterSigmafine Before and After Sigmafine
Error Elimination Meter Improvements
Better Decisions
GlobalRefiningSummit Rotterdam,May18,2011
17
VisiantPimsoftInc.2011 Allrightsreserved.
OilLossMonitoring
BeforeandAfterSigmafine Before and After Sigmafine
Loss Accountability Loss Accountability 5 4 3 2 1 0 -1 -2 -3 Sigmafine available
(%)
ja n04 m ar -0 4 m ai -0 4 ju l-0 4 se p04 no v04 ja n05 m ar -0 5 m ai -0 5 ju l-0 5 se p05 no v05 ja n06 m ar -0 6 m ai -0 6 ju l-0 6 se p06 no v06 ja n07 m ar -0 7 m ai -0 7
GlobalRefiningSummit Rotterdam,May18,2011
18
VisiantPimsoftInc.2011 Allrightsreserved.
OilLossMonitoring
BeforeandAfterSigmafine Before and After Sigmafine
Feb/01 - Jan/02 (Loss % Cumulative = 1.09%)
10.0% 8.0% 6.0% 4.0% 2.0% 2 0% 0.0% -2.0% -4.0% -6.0% Loss % 3 Month Rolling Loss % Cumulative
Benchmark
SF Losses
1.08 1.20 1.00 0.80 0.60 0.40 0.20 0.00 Jun/02 Jul/02 Aug/02 Sep/02 Oct/02 Nov/02 %
0.53
SF monthly
SF cumulative
GlobalRefiningSummit Rotterdam,May18,2011
19
VisiantPimsoftInc.2011 Allrightsreserved.
CustodyTransferErrorDetection
20
VisiantPimsoftInc.2011 Allrightsreserved.
AccountingFuelConsumption
5,000 4,500 4,000 3,500 3,000 , 2,500 2,000 1,500 1,000 500 14Oct 15Oct 16Oct 17Oct 18Oct 19Oct 20Oct 21Oct 22Oct 23Oct
Legacy System
24Oct 25Oct 26Oct 27Oct 28Oct 10Oct 11Oct 29Oct 1Oct 2Oct 3Oct 4Oct 5Oct 6Oct 7Oct 8Oct 9Oct 12Oct 13Oct
21
VisiantPimsoftInc.2011 Allrightsreserved.
MonitoringRefineryPerformance
ValidationofKPIs Validation of KPIs
Current/Shift/Running Plan Reconciled vs. Theoretical Yields Running Plan KPIs
22
VisiantPimsoftInc.2011 Allrightsreserved.
PerformanceMonitoring
ValidatingYieldData Validating Yield Data
Reconciled Yields
Theoretical Yields
23
VisiantPimsoftInc.2011 Allrightsreserved.
IncreasingYieldProfitability
PerformanceManagementImprovement Performance Management Improvement
Exampleofdieselyieldimprovements
o
Analyzinghomogeneousdatarelatedto sweet crudes: Analyzing homogeneous data related to sweetcrudes: 2003actualaveragedieselyield 37,4% 2004actualaveragedieselyield 39,6% Averageactualdieselyieldincreasedduebothtoinvestmentson ld l ld dd b h plantsandtoperformancemanagement. Historicalanalysisondieselyieldshowedthattheaverageincrease duetoperformancemanagementamountwasabout0.8%inthe d f b h period20032004. ThisledtoaprofitincreaseestimatedinUS$1 millionperyear.
24
VisiantPimsoftInc.2011 Allrightsreserved.
LowYieldDetectionAfterCatalystImprovement
UnmaskingHiddenProblems Unmasking Hidden Problems
105
*Data reconciliation group identified LCO flow meter fault *During this p g period it was believed that LCO yield had increased.
100
95
Flow meters maintenance required by reconciliation group Unit shut down Different catalyst loaded
90
85
**LCO flow meter repaired Actual **Actual LCO yield equal to the value previously to the catalyst change
**Lower light HC and more decanted Lower oil produced = Less profits
17-02-2005 09-03-2005 29-03-2005 18-04-2005 08-05-2005 28-05-2005 17-06-2005 07-07-2005 27-07-2005
80
28-01-2005
Date
Global Refining Summit Rotterdam, May 18, 2011 25 VisiantPimsoftInc.2011 Allrightsreserved.
LowYieldDetectionAfterCatalystImprovement
UnmaskingHiddenProblems Unmasking Hidden Problems
*Data reconciliation group identified LCO flow meter fault *During this period it was believed that During LCO yield had increased.
100
95
Flow meters maintenance required by reconciliation group Unit shut down Different catalyst loaded
90
85
80
2 8 -0 1 -2 0 0 5 1 7 -0 2 -2 0 0 5 0 9 -0 3 -2 0 0 5 2 9 -0 3 -2 0 0 5 1 8 -0 4 -2 0 0 5 0 8 -0 5 -2 0 0 5
**LCO flow meter repaired **Actual LCO yield equal to the value previously to the catalyst change **Lower light HC and more decanted oil produced = Less profits
2 8 -0 5 -2 0 0 5 1 7 -0 6 -2 0 0 5 0 7 -0 7 -2 0 0 5 2 7 -0 7 -2 0 0 5
D a te
26
VisiantPimsoftInc.2011 Allrightsreserved.
ReconciliationCoupledwithOptimization
ValidatingBlendingOptimization Validating Blending Optimization
62,77 US$/m3
63,84 US$/m3
1,00 US$/m3
difference
x 15 000 m3 15.000 15.000,00 US$/batch x 40 batches/month 600.000,00 US$/month x 12 month/year 7.200.000,00 US$/year
27
VisiantPimsoftInc.2011 Allrightsreserved.
DetectingOperationalErrors
FindingUndetectedProblems Finding Undetected Problems
Data reconciliation group detected rubber solvent entrainment from solvent unit to gasoline unit.
Date Date
Global Refining Summit Rotterdam, May 18, 2011
28 VisiantPimsoftInc.2011 Allrightsreserved.
DetectingOperationalErrors
FindingUndetectedProblems Finding Undetected Problems
Potential profit depends on the difference between rubber solvent and gasoline prices
Date Date
Global Refining Summit Rotterdam, May 18, 2011
29 VisiantPimsoftInc.2011 Allrightsreserved.
DetectingOperationalErrors
FindingUndetectedProblems Finding Undetected Problems
Total solvent entrainment: 14 % of feed Total annual losses: US$ 0.7 million
Date Date
Global Refining Summit Rotterdam, May 18, 2011
30 VisiantPimsoftInc.2011 Allrightsreserved.
LossofCapacityVersusNominalCapacity
BiasDetectionofaMeter Bias Detection of a Meter
01-09-07
15-09-07
29-09-07
13-10-07
27-10-07
10-11-07
24-11-07
08-12-07
22-12-07
05-01-08
19-01-08
02-02-08
16-02-08
01-03-08
15-03-08
29-03-08
12-04-08
26-04-08
10-05-08
24-05-08
07-06-08
21-06-08
05-07-08
19-07-08
02-08-08
16-08-08
30-08-08
13-09-08
31
VisiantPimsoftInc.2011 Allrightsreserved.
27-09-08
CustomerPresentation
YieldAccountingManagement by byMihaelaCristinaPopescu ae a s a opescu OMVPETROM
32
VisiantPimsoftInc.2011 Allrightsreserved.
Conclusions
Sigmafinebased solutions Sigmafine basedsolutions deliversignificantbenefitsto refiningcustomersworldwide. Solutionshavetobeadaptive, keepingthecustomer requirementsinmind. requirements in mind Sigmafinetechnologiesare designedtosatisfycurrentand designed to satisfy current and futurebusinessrequirements.
21% 28%
33
VisiantPimsoftInc.2011 Allrightsreserved.
34
VisiantPimsoftInc.2011 Allrightsreserved.