Network Swap, Rollout, Expansions, Managed Services, Customer Support. NEC, ZTE, ALCATEL, NOKIA, SIEMENS, HUAWEI. DESIGNATION:
RAN Engineer (TL)
COMPANY NAME:
ZTE Pakistan (Pvt) Ltd
TP VEGA PROJECT: Swap of BTS and MW Transmission. Supervision and Handling of sub-cons for BTS/MW Swap Activities. Implementation of New IP based BTS (ZTE SDR) & MW (NEC iPasso). Implementation of VLAN IP based Transmission system. Implementation of visibility of NEs on NMS Server. Connectivity of iPasso 1000/400/200 to ZTE PTN node. Implementation of iPasso (MW) E2E Connectivity. Implementation of new 3G Supporting ZTE SDR BTS. Commissioning of SDR BTS in different configurations using LMT. Swap of SDR BTS/NEC iPasso with different scenarios (Hard Swap, Cold Swap). Implementation of New ZTE OD/ID W301, T601 Power System. Responsible for all Pre-swap activities (Installation of RRU, Fiber, Jumper, Labeling). Responsible for all pre-swap external alarm verification from NOC. Responsible for Swap activity in outage window. Responsible for Support for Call Testing after Swap activities. Responsible for PAT with Quality Assurance.
DURATION:
Nov-11 to Sep-12
DESIGNATION:
Sr. Engineer (TL)
PROJECT:
O&M -Mobilink
COMPANY NAME:
Mobiserve Pakistan (Pvt) Ltd
Responsible for O&M of Telecom System & Power System on Mobilink Project, o Managing PM, CM, BSS, MW & ENV Activities in C-III for more than 700 Sites. o Responsible for daily BSS & Connectivity Activities to reduce TT Count. o Escalation of root causes to reduce the TT count and for better performance of Network. o Preparation of QOS Reports on daily bases. Supervision & Analyzing performance to BSS Team on daily bases. o Performing PM Audits and preparing the PM Audit Reports. Addressing daily Environmental CM Issues (Genset, AC, BSS and MW). o Preparing the daily outage Analysis Reports. o Coordination with field teams for technical support for better performance of Network. o Evaluation the performance of field engineers and encouraging the field teams. Maintaining the daily Hardware consumption record.
o o o o
DURATION:
Daily analysis for consumption of resources for cost saving. Guiding the field teams to reduce the consecutive visits for efficient utilization of resources. Special supervisions for NE, HUB and BSC sites. Responsible for power issues for all kinds.
DESIGNATION:
BSS/Transmission Team Lead
PROJECT:
Telenor PK
COMPANY NAME:
IKAN ENGINEERING SERVICES
Jun-08 to Nov-11
o o o o
o o o o o o o o o o o o o
Responsible for MW Loss surveys for NEC PHD links for Telenor roll out sites. Responsible for MW TXN links up gradations for Capacity increase. Responsible for the Achievements of Annual Targets, Quality Assurance. Responsible for all TI Activates in the Region, including Implementation, Commissioning, Alarm patching, Sweep Test, Troubleshooting to Partial Acceptance and Final Acceptance of a site. Responsible to carry out all the TI the Rollout activates in the region to meet monthly targets. Responsible to maintain the Quality of TI installation as described by the client (Telenor). Responsible for assigning the daily task to TI team. Responsible for making FAB forms for more than 200 sites.
Nokia Flexi Packet Networks & Flexi Hub MW Network Implementation & Troubleshooting. Nokia Flexi Hub configuration with Nokia Flexi Packet Hub. Commissioning & Configuration of Nokia Flexi Packet HW 1200 & 2200. Configuring the Flexi Packet 1200 & 2200 for 2G (E1) and 3G (Eth) interfaces. Configuring the MW Chain site without Flexi Packet First Mile. Performance and Monitoring of Flexi Packet Networks. Nokia Flexi Hopper 4/8/16xE1 IDU, ODU (1+0) configuration and commissioning. Nokia Flexi Hopper 4/8/16xE1 IDU, ODU (1+0) configuration and commissioning. Nokia Flexi Hopper FIU19E 16xE1 IDU, (1+1) ODU configuration and commissioning. Nokia E1/T1 Cross Connection configuration b/w different MW Links. Nokia Flexi Hopper FIU19E to RRI E1 Cross connection creation. Nokia BSC3i ET to PDH Cross Connection Creation & Hard Patching with HiT. Nokia Flexi Hopper FIU 19 connectivity with Huawei OSN-7500.
o o o o o o
Implementation of RTN620 with Microwave 1+1 Space Diversity (SD) protection Implementation of RTN620 with Cross-connect and clock unit (PXC) active/standby protection Configuring the HUAWEI IDU 610 16xE1 (1+0) Microwave Transmission Network. Configuring the HUAWEI IDU 620 16xE1 (1+1) Microwave Transmission Network. DCN Connectivity of HUAWEI RTN 600/620 IDUs. WM Transmission Nodes. E1 Line Cross Connection of HUAWEI RTN 610/620 MW Transmission Network.
with
NEC
Pasolink
NEO
(MW
NEC: installation & Commissioning NEC PDH (5/10/16/20/32/40/48/2x40/2x48E1, 1/2E3). NEC: installation & Commissioning NEC SDH (STM-1, 2xSTM-1). NEC: Up gradation of Capacity of NEC 5E1 to 16E1 or 5E1 to 32E1 or 40E1 to 48E1 16E1 to 32E1 or 16E1 to 48E1 (interface card swap) 16E1 to STM-1 (interface card swap). NEC: SW Modulation Selection QPSK to 128 QAM. NEC: installation & Commissioning of X. Polarized XPIC STM Links. NEC: Implementation of VLAN & Gigabit Ethernet over STM Links. NEC: Implementation of NEC Hybrid & Adaptive modulation for SDH Link. DESIGNATION: BSS & TXN ENGINEER PROJECT: COMPANY NAME: MYSON
DURATION:
Nokia/Siemens
o
o o o o o o o o o o o
EDUCATION DURATION: 20022006 DEGREE BS (Elect Engr) UNIVERSITY University of Lahore GRADE A-
HSSC SSC
BISE-Faisalabad BISE-Faisalabad
A+ A+