Académique Documents
Professionnel Documents
Culture Documents
Siemens AG 2011. All rights reserved. Siemens AG 2012. All rights reserved. Energy Sector / Services AL: N ECCN: N
High Efficient Peak Power on Demand Power-Gen Middle East 2012 Contents Need for power on demand Wet Compression description Performance benefits Experiences Conclusion
Siemens AG 2012. All rights reserved. AL: N ECCN: N
Jan Dirk Beiler Senior Performance Engineer Development Lead for Wet Compression on 50Hz Service Frames Modernization and Upgrade Engineering
Peter Trauner
Head of Marketing Performance Increase for Advanced 50Hz Frames
Page 2 January 2012
Modernizations and upgrades for existing plants Backup power needed High flexibility Power need for seasonal or daily peak time Wet Compression
Page 3
January 2012
AL: N ECCN: N
High Efficient Peak Power on Demand Power-Gen Middle East 2012 Contents Need for power on demand Wet Compression description Performance benefits Experiences Conclusion
Siemens AG 2012. All rights reserved. AL: N ECCN: N
Jan Dirk Beiler Senior Performance Engineer Development Lead for Wet Compression on 50Hz Service Frames Modernization and Upgrade Engineering
Peter Trauner
Head of Marketing Performance Increase for Advanced 50Hz Frames
Page 4 January 2012
Page 5
January 2012
AL: N ECCN: N
Page 6
January 2012
AL: N ECCN: N
High Efficient Peak Power on Demand Power-Gen Middle East 2012 Contents Need for power on demand Wet Compression description Performance benefits Experiences Conclusion
Siemens AG 2012. All rights reserved. AL: N ECCN: N
Jan Dirk Beiler Senior Performance Engineer Development Lead for Wet Compression on 50Hz Service Frames Modernization and Upgrade Engineering
Peter Trauner
Head of Marketing Performance Increase for Advanced 50Hz Frames
Page 7 January 2012
t af Sh
it lim
d he ac re
50% of design
mass flow
(start)
AL: N ECCN: N
Up to 10.2 kg/s
Wet Compression performance measured at first time application for SGT5-4000F @ 30C, 60% r.H.
Page 9
January 2012
AL: N ECCN: N
Page 10
January 2012
High Efficient Peak Power on Demand Power-Gen Middle East 2012 Contents Need for power on demand Wet Compression description Performance benefits Experiences Conclusion
Siemens AG 2012. All rights reserved. AL: N ECCN: N
Jan Dirk Beiler Senior Performance Engineer Development Lead for Wet Compression on 50Hz Service Frames Modernization and Upgrade Engineering
Peter Trauner
Head of Marketing Performance Increase for Advanced 50Hz Frames
Page 11 January 2012
5 x SGT5-2000E 3 x SGT5-4000F
2 x SGT5-4000F
Siemens AG 2012. All rights reserved.
6 x SGT5-4000F (planned)
Experiences
More than 35 x on following frame types: SGT6-2000E SGT6-3000E SGT6-5000F
Page 12 January 2012
4 x SGT5-4000F (Grid)
Advanced compressor coating to minimize corrosion Integrated safety functions to ensure operation within expectations
Page 13
January 2012
AL: N ECCN: N
Coating loss on the leading edge and on the pressure side, but coating stays intact in the areas where salt residuals are left on the blades and vanes Lasting corrosion protection The leading edge gets rougher (needle structure) but no significant shortening of the blade width by erosion Base blade material not weakened
Page 14 January 2012 Jan Beiler / Peter Trauner
High Efficient Peak Power on Demand Power-Gen Middle East 2012 Contents Need for power on demand Wet Compression description Performance benefits Experiences Conclusion
Siemens AG 2012. All rights reserved. AL: N ECCN: N
Jan Dirk Beiler Senior Performance Engineer Development Lead for Wet Compression on 50Hz Service Frames Modernization and Upgrade Engineering
Peter Trauner
Head of Marketing Performance Increase for Advanced 50Hz Frames
Page 15 January 2012
Customer needs in general Power Efficiency Reliability & availability Operational flexibility Reduction of maintenance costs Emission reduction
Page 16
January 2012
AL: N ECCN: N
Jan Dirk Beiler Senior Performance Engineer Development Lead for Wet Compression Modernization and Upgrade Engineering Peter Trauner Head of Marketing Performance Increase for Advanced 50Hz Frames
Siemens AG 2012. All rights reserved.
Page 17
January 2012
Siemens AG 2012. All rights reserved. Energy Sector / Services AL: N ECCN: N
Disclaimer
Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners.
Page 18
January 2012
AL: N ECCN: N
This document contains forward-looking statements and information that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as expects, anticipates, intends, plans, believes, seeks, estimates, will or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SECs website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated.