PROGRAM OF INSTRUCTION Page No: 1 COURSE: 720-51K10 COURSE TITLE: PLUMBER PHASE: VER:

Proponent School:

U.S. Army Maneuver Support Center, Directorate of Training Development, Warrior Department. ATTEN: ATZT-DT-WR-E Fort Leonard Wood, Missouri 65473-6650 5 weeks/1 days 3 weeks/1 days 107.3 136.7 Hours Hours

Peacetime Course Length: Mobilization Course Length: IDT Course Length: ADT Course Length: Approval Date: Approval Authority:

Commandant U.S. Army Maneuver Support Center, Directorate of Training Development, Warrior Department. ATTEN: ATZT-DT-WR-E Fort Leonard Wood, Missouri 65473-6650 Supersedes 51K10 AC POI dated 1 April 1992 and RC 051-51K10-001 dated January 1991.

Supersession Info:

06/01/00 51K1POI

TABLE OF CONTENTS Page No: 2 COURSE: 720-51K10 COURSE TITLE: PLUMBER Sections Preface Page (AC) Preface Page (RC) Course Summary Training Modules Module A: Common Engineer Training (CET) Module B: Course Introduction Module C: Plumbing Tools and Materials Module D: Waste Systems Module E: Water Supply Systems Module F: Plumbing Systems Maintenance Test Module Administrative Module Task Summary Ammunition Summary Equipment Summary Training Support Equipment Summary Facilities Summary Training Aid, Device, Simulation and Simulator Summary 12 13 18 22 25 33 37 54 56 58 60 80 81 83 PHASE: VER:

Page # 3 6 9

PREFACE PAGE (AC) Page No: 3 COURSE: 720-51K10 COURSE TITLE: PLUMBER PHASE: VER:

Resident Training Location (SC): Distance Learning Location: Job # & Title: Supported Individual Training Plan (ITP): Purpose:

U.S. Army Engineer School; Fort Leonard Wood, MO 51K10, Plumber Individual Training Plan for MOS 51K, Plumber, dated 10 April 1992 The resident MOS 51K10 Plumber Course provides skill level 1 soldiers with the skills and knowledge required to perform installation, troubleshooting, repair, and maintenance of plumbing systems and components, and assist in combat engineering missions. The student receives Common Engineer and MOS-specific training: 39.7 hours of Common Engineer Training (CET) consisting of basic demolitions and basic mobility, countermobility, and survivability training. 10.0 hours of MOS 51K Course Introduction which introduces the facility, course procedures, and criteria for successful course completion; course safety; environmental stewardship; and basic mathematics. 194.3 hours of MOS specific training in identifying plumbing materials, maintaining plumbing tools, preparing a plumbing materials takeoff list, installing a cast iron sewer line, installing a waste system, installing a water system, installing a lavatory, installing a water closet with tank, installing urinals, installing an exposed pipe shower system, installing a drinking fountain, winterizing a water supply system, maintaining internal water distribution systems, clearing water system stoppages, and preventing backflows.

Scope:

Prerequisites: Security Clearance: Special Information:

Resident course students must meet current requirements listed in AR 611-21 and AR 600-9. None CET is developed by DOTD-TD-12, U.S. Army Engineer School and is published as a separate standalone POI.

PREFACE PAGE (AC) Page No: 4 COURSE: 720-51K10 COURSE TITLE: PLUMBER Data: Course Length: Developed Course ICH: TMA Validated ICH: Approved ICH: Class Sizes: Maximum: Optimum: Minimum: Academic Hours: Course Unique: Shared: Total: 244.0 0.0 244.0 244.0 0.0 244.0 15 12 6 15 12 6 169.78 169.78 Peacetime 5 weeks/1 days Mobilization 3 weeks/1 days PHASE: VER:

10/15/98 51K1POI

PREFACE PAGE (AC) Page No: 5 COURSE: 720-51K10 COURSE TITLE: PLUMBER PHASE: VER:

Course Type Code: ITRO Code: Contract Code: Training Start Date: TD Proponent: Design and Development: Instructor Provided Support: Army Course Proponent: Training Evaluation Proponent: Remarks:

06 C N

U.S. Army Engineer School - Fort Leonard Wood, MO U.S. Army Engineer School - Fort Leonard Wood, MO U.S. Army Engineer School - Fort Leonard Wood, MO U.S. Army Engineer School - Fort Leonard Wood, MO 1. For peacetime, all modules are conducted using a 36-hour academic week. 2. For mobilization, all modules are conducted using a 56-hour academic week.

PREFACE PAGE (RC) Page No: 6 COURSE: 720 51K10 COURSE TITLE: PLUMBER PHASE: VER:

Resident Training Location (SC): Distance Learning Location: Job # & Title: Supported Individual Training Plan (ITP): Purpose:

U.S. Army Engineer School; Fort Leonard Wood, MO 51K10, Plumber Individual Training Plan for MOS 51K, Plumber, dated 10 April 1992 The TASS MOS 51K10 Plumber Course provides skill level 1 soldiers with the skills and knowledge required to perform installation, troubleshooting, repair, and maintenance of plumbing component systems, and assist in combat engineering missions The student receives Common Engineer and MOS-specific training: 39.7 hours of Common Engineer Training (CET) consisting of basic demolitions and basic mobility, countermobility, and survivability training. 10.0 hours of MOS 51K Course Introduction which introduces the facility, course procedures, and criteria for successful course completion; course safety; environmental stewardship; and basic mathematics. 194.3 hours of MOS specific training in identifying plumbing materials, maintaining plumbing tools, preparing a plumbing materials takeoff list, installing a cast iron sewer line, installing a waste system, installing a water system, installing a lavatory, installing a water closet with tank, installing urinals, installing an exposed pipe shower system, installing a drinking fountain, winterizing a water supply system, maintaining internal water distribution systems, clearing water system stoppages, and preventing backflows.

Scope:

Prerequisites: Security Clearance: Special Information:

Reclassification course students must meet requirements listed in AR 611-21 and AR 600-9. None CET is developed by DOTD-TD-12, U.S. Army Engineer School and is published as a separate standalone POI.

10/15/98 51K1POI

PREFACE PAGE (RC) Page No: 7 COURSE: 720 51K10 COURSE TITLE: PLUMBER Data: Course Length: Developed Course ICH: TMA Validated ICH: Approved ICH: Class Sizes: Maximum: Optimum: Minimum: Academic Hours: Course Unique: Shared: Total: 107.3 0.0 107.3 136.7 0.0 136.7 16 12 6 16 12 6 169.78 169.78 IDT 107.3 N/A ADT 136.7 N/A PHASE: VER:

10/15/98 51K1POI

PREFACE PAGE (RC) Page No: 8 COURSE: 720-51K10 COURSE TITLE: PLUMBER PHASE: VER:

Course Type Code: ITRO Code: Contract Code: Training Start Date: TD Proponent: Design and Development: Instructor Provided Support: Army Course Proponent: Training Evaluation Proponent: Remarks:

06 C N

U.S. Army Engineer School - Fort Leonard Wood, MO RC TASS Battalions U.S. Army Engineer School - Fort Leonard Wood, MO U.S. Army Engineer School - Fort Leonard Wood, MO

TRAINING MODULE(S) Page No: 9 COURSE: 720-51K10 COURSE TITLE: PLUMBER Academic Time: Module A: Module B: Module C: Module D: Module E: Module F: Common Engineer Training Course Introduction Plumbing Tools and Materials Waste Systems Water Supply Systems Plumbing Systems Maintenance COURSE TOTAL: Administrative Time: Admin. Module: Administration Peacetime 39.7 10.0 26.5 61.3 76.0 30.5 244.0 Mobilization 39.7 10.0 26.5 61.3 76.0 30.5 244.0 IDT 39.7 10.0 26.5 10.3 16.5 1.3 107.3 ADT 0.0 0.0 0.0 51.0 59.5 26.2 136.7 DL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

28.0

18.0

0.0

0.0

0.0

Academic Hours By Security Classification: Unclassified: 244.0 244.0 107.3 136.7 0.0

Remarks: Administrative time, with the exception of physical training, is calculated into the course length. Time projected for administrative functions must be estimated by each respective TASS battalion contingent upon projected student input.

TRAINING MODULE(S) Page No: 10 COURSE: 720-51K10 COURSE TITLE: PLUMBER PHASE: VER:

Techniques for Delivering Instruction: Training Module: Title: Purpose: A (CET)

TATS CET Module To provide 51K soldiers with skill level 1 training in the knowledge and skills required to perform common engineer tasks to include basic demolitions, mobility, and survivability. *****ACADEMIC HOURS***** Mobilization IDT Hours Hours 39.7 39.7 39.7 39.7

Peacetime Hours 39.7 Total Hours: 39.7

ADT Hours 0.0 0.0

REFER TO SKILL LEVEL 1 CET POI.

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 11 COURSE: 720-51K10 COURSE TITLE: PLUMBER Techniques for Delivering Instruction: Training Module: Title: Purpose: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 1:12 1:12 6.0 3.0 1.0 10.0 CO PE2 TE2 00.0 00.0 00.0 00.0 B Course Introduction To provide 51K soldiers with an overview of the course, course safety, environmental stewardship, and skill level 1 training in basic mathematics. PHASE: VER:

Peacetime Hours MI 6.0 3.0 1.0 Total Hours: 10.0 CO PE2 TE2

Mobilization Hours MI 6.0 3.0 1.0 10.0 CO PE2 TE2

Instructor/ Student Ratio 1:12 1:12 1:12

DL Hours MI 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 12 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-B01 PHASE: VER:

Security Classification: Unclassified Title: Scope: Introduction to Course The purpose of this introduction is to provide the students with an overview of the training they will receive during the 51K10 Plumber course. Students will also be briefed on training policies, facilities, academic and administrative procedures, course objectives, and training methods.

Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 1.0 1.0 CO 00.0 00.0

Peacetime Hours MI 1.0 Total Hours: 1.0 CO

Mobilization Hours MI 1.0 1.0 CO

Instructor/ Student Ratio 1:12

DL Hours MI 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 13 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-B02 PHASE: VER:

Security Classification: Unclassified Title: Scope: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 1.0 1.0 CO 00.0 00.0 Introduction to Safety The student will be provided with information on general construction safety requirements for installation and testing of plumbing systems. Emphasis will be on the use of tools, materials, personal clothing, and equipment.

Peacetime Hours MI 1.0 Total Hours: 1.0 CO

Mobilization Hours MI 1.0 1.0 CO

Instructor/ Student Ratio 1:12

DL Hours MI 00.0 00.0

TRAINING MODULE(S) Page No: 14 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-B03 PHASE: VER:

Security Classification: Unclassified Title: Scope: Introduction to Environmental Stewardship The purpose of this instruction is to provide you with a basic understanding of federal, state, local host nation laws, and Army regulations regarding the environment and environmental issues. You will also learn the proper procedures for handling/disposal of POL products, soiled rags, cleanup operations, how to avoid unnecessary equipment usage and damage to surrounding areas. You will also learn how to restore surrounding areas as close as possible to the original ecological condition.

Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 1.0 1.0 CO 00.0 00.0

Peacetime Hours MI 1.0 Total Hours: 1.0 CO

Mobilization Hours MI 1.0 1.0 CO

Instructor/ Student Ratio 1:12

DL Hours MI 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 15 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-B04 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 1:12 1:12 3.0 3.0 1.0 7.0 CO PE2 TE2 00.0 00.0 00.0 00.0 Perform basic mathematical calculations. In a classroom, given mathematical problems, a calculator, a ruler, a scaled drawing, paper and a pencil Perform calculations for addition, subtraction, multiplication, and division of whole numbers, fractions, and decimals; and convert measurements from scaled drawings. Basic Mathematics

Peacetime Hours MI 3.0 3.0 1.0 Total Hours: 7.0 CO PE2 TE2

Mobilization Hours MI 3.0 3.0 1.0 7.0 CO PE2 TE2

Instructor/ Student Ratio 1:12 1:12 1:12

DL Hours MI 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 16 COURSE: 720-51K10 COURSE TITLE: PLUMBER Techniques for Delivering Instruction: Training Module: Title: Purpose: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:12 1:6 1:12 10.0 2.0 2.0 7.5 1.0 4.0 26.5 CO DM PE1 PE2 TE1 TE2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CO DM PE1 PE2 TE1 TE2 C Plumbing Tools and Materials To provide 51K soldiers with the knowledge and skills required to identify plumbing materials, prepare a plumbing materials takeoff list, and maintain plumbing tools. PHASE: VER:

Peacetime Hours MI 10.0 2.0 2.0 7.5 1.0 4.0 Total Hours: 26.5 CO DM PE1 PE2 TE1 TE2

Mobilization Hours MI 10.0 2.0 2.0 7.5 1.0 4.0 26.5 CO DM PE1 PE2 TE1 TE2

Instructor/ Student Ratio 1:12 2:12 1:6 1:12 1:6 1:12

DL Hours MI 00.0 00.0 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 17 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-C01 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Identify plumbing materials. In a classroom, given FM 5-420; cast iron, plastic, and galvanized pipe with fittings; copper tubing with compression rings and couplings; plumbing fixtures; waste system components; water supply system components; valves; fixture control devices; faucets; and winterizing materials Identify plumbing materials and their uses, and identify fixture and system components in accordance with FM 5-420. Identify Plumbing Materials

Standards: Remarks:

Peacetime 2.5 1.0 1.0 4.5

Mobilization MI Student MI Ratio 2.5 1.0 1.0 4.5 1:12 1:12 1:12

*****ACADEMIC HOURS***** IDT ADT MI Student MI Ratio 2.5 1.0 1.0 0.0 0.0 0.0 0.0 1:12 1:12 1:12

DL MI

TRAINING MODULE(S) Page No: 18 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-C02 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: Maintain plumbing tools. At a training site, given TM 9-243, SC 5180-90-N13, SC 5180-90-N42, a general and supplementary pipefitters tool kit, an electric grinder, metal files, sandpaper, emery cloth, linseed oil, rags, goggles, gloves, hearing protection, paper, and a pencil Clean, adjust, sharpen, lubricate, and identify the use of plumbing tools in accordance with TM 9-243, SC 5180-90-N13, and SC 5180-90-N42. Maintain Plumbing Tools

Peacetime Hours MI 3.0 1.0 2.0 1.0 1.0 Total Hours: 8.0 CO DM PE1 TE1 TE2

Mobilization Hours MI 3.0 1.0 2.0 1.0 1.0 8.0 CO DM PE1 TE1 TE2

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 1:12 3.0 1.0 2.0 1.0 1.0 8.0 CO DM PE1 TE1 TE2 0.0 0.0 0.0 0.0 0.0 0.0 CO DM PE1 TE1 TE2

Instructor/ Student Ratio 1:12 2:12 1:6 1:6 1:12

DL Hours MI 00.0 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 19 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-C03 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:12 1:12 4.5 1.0 6.5 2.0 14.0 CO DM PE2 TE2 00.0 00.0 00.0 00.0 00.0 Prepare a plumbing materials takeoff list. In a classroom or at a training site, given FM 5-420, TM 5-302 (Extract), TM 5-704, a ruler, paper, and a pencil Identify lines, symbols, title block information, general notes and specifications, and prepare a plumbing materials takeoff list including all fittings and fixture components in accordance with construction prints and drawings, FM 5-420, and TM 5-704. Prepare a Plumbing Materials Takeoff List

Peacetime Hours MI 4.5 1.0 6.5 2.0 Total Hours: 14.0 CO DM PE2 TE2

Mobilization Hours MI 4.5 1.0 6.5 2.0 14.0 CO DM PE2 TE2

Instructor/ Student Ratio 1:12 2:12 1:12 1:12

DL Hours MI 00.0 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 20 COURSE: 720-51K10 COURSE TITLE: PLUMBER Techniques for Delivering Instruction: Training Module: Title: Purpose: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:12 1:6 1:12 8.3 0.0 0.0 0.0 0.0 2.0 10.3 CO 00.0 8.0 23.0 2.0 18.0 00.0 51.0 DM PE1 PE2 TE1 TE2 D Waste Systems To provide 51K soldiers with the knowledge and skills required to install a cast iron sewer line and install a waste system. PHASE: VER:

Peacetime Hours MI 8.3 8.0 23.0 2.0 18.0 2.0 Total Hours: 61.3 CO DM PE1 PE2 TE1 TE2

Mobilization Hours MI 8.3 8.0 23.0 2.0 18.0 2.0 61.3 CO DM PE1 PE2 TE1 TE2

Instructor/ Student Ratio 1:12 2:12 1:6 1:12 1:6 1:12

DL Hours MI 00.0 00.0 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 21 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-D01 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a cast iron sewer line. At a training site, given FM 5-420, a general pipefitters tool kit, a carpenters tool kit, construction prints and drawings, a preinstalled main sewer line, an existing building, a shovel, a pick mattock with handle, a sledgehammer, 2 x 4 and 1 x 4 lumber, a mortarboard, a brick trowel, portland cement, sand, a sewer thimble, cast iron pipe, a hub and spigot, a cold chisel, oakum, lead wool or shredded lead, a packing and caulking iron, stainless steel clamps, neoprene sleeves, nails, rags, goggles, and gloves Install a cast iron sewer line with no leaks in accordance with FM 5-420 and to within + 1/8 of construction prints and drawings. Install a Cast Iron Sewer Line

Standards: Remarks:

Peacetime Hours MI 3.0 3.5 12.0 10.0 Total Hours: 28.5 CO DM PE1 TE1

Mobilization Hours MI 3.0 3.5 12.0 10.0 28.5 CO DM PE1 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 3.0 0.0 0.0 0.0 3.0 CO 00.0 3.5 12.0 10.0 25.5 DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 22 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-D02 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a waste system. At a training site, given FM 5-420, a general pipefitters tool kit, polyvinyl chloride (PVC) pipe, fittings, reducers, a level, a hammer, nails, screws, pipe hangers, ABS solvent and glue, emery cloth, gate valves, caps and plugs for waste system, source of air pressure, an air pressure gauge, a test plug, a calculator, goggles, gloves, paper, and a pencil Install waste system with no leaks and test a waste system in accordance with FM 5-420 and to within + 1/8 of construction prints and drawings. Install a Waste System

Standards: Remarks:

Peacetime Hours MI 5.3 4.5 11.0 2.0 8.0 2.0 Total Hours: 32.8 CO DM PE1 PE2 TE1 TE2

Mobilization Hours MI 5.3 4.5 11.0 2.0 8.0 2.0 32.8 CO DM PE1 PE2 TE1 TE2

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:12 1:6 1:12 2.0 7.3 TE2 5.3 CO 00.0 4.5 11.0 2.0 8.0 00.0 25.5 DM PE1 PE2 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:12 1:6 1:12

DL Hours MI 00.0 00.0 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 23 COURSE: 720-51K10 COURSE TITLE: PLUMBER Techniques for Delivering Instruction: Training Module: Title: Purpose: Remarks: *****ACADEMIC HOURS***** IDT ADT MI Student MI Ratio 0.0 10.5 27.0 1.5 20.5 0.0 59.5 1:12 2:12 1:6 1:12 1:6 1:12 E Water Supply Systems To provide 51K soldiers with the knowledge and skills required to install a water system, a lavatory, a water closet with tank, urinals, an exposed pipe shower system, a drinking fountain, and to winterize a water supply system. PHASE: VER:

Peacetime 15.5 10.5 27.0 1.5 20.5 1.0 76.0

Mobilization MI StudentMI Ratio 15.5 10.5 27.0 1.5 20.5 1.0 76.0 1:12 2:12 1:6 1:12 1:6 1:12

DL MI

TRAINING MODULE(S) Page No: 24 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E01 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a water supply system. At a training site, given FM 5-420, construction prints and drawings, an electric water heater with manufacturers instructions, a general and supplementary pipefitters tool kit, galvanized pipe and fittings, copper tubing with compression rings and couplings, gate valves, a level, nails, screws, pipe hangers, joint compound, a wire brush, cutting oil, emery cloth, muriatic acid, soldering flux, solder, a propane torch, goggles, and gloves Install a water supply system and an electric water heater in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Install a Water Supply System

Standards: Remarks:

Peacetime Hours MI 9.0 3.5 10.0 1.5 10.0 1.0 Total Hours: 35.0 CO DM PE1 PE2 TE1 TE2

Mobilization Hours MI 9.0 3.5 10.0 1.5 10.0 1.0 35.0 CO DM PE1 PE2 TE1 TE2

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:12 1:6 1:12 9.0 9.0 CO 0.0 3.5 10.0 1.5 10.0 1.0 26.0 DM PE1 PE2 TE1 TE2

Instructor/ Student Ratio 1:12 2:12 1:6 1:12 1:6 1:12

DL Hours MI 00.0 00.0 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 25 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E02 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a lavatory. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, a carpenters tool kit, a wall hung type lavatory with manufacturers instructions, installed water supply lines with gate valves and drain, a P-trap, faucets, copper tubing with compression rings and couplings, a pop-up plug, 2 x 6 lumber, nails, screws, and hanger brackets Install a wall hung type lavatory with no leaks in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Install a Lavatory

Standards: Remarks:

Peacetime Hours MI 1.5 2.0 4.0 1.5 Total Hours: 9.0 CO DM PE1 TE1

Mobilization Hours MI 1.5 2.0 4.0 1.5 9.0 CO DM PE1 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 1.5 2.0 4.0 1.5 9.0 CO DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 26 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E03 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a water closet with tank. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, a carpenters tool kit, a water closet, a water closet tank with components (wall hung or bowl mounted) with manufacturers instructions, a pre-installed polyvinyl chloride (PVC) waste drain, ABS solvent and cement, a pre-installed water supply line, gate valves, a floor flange with bolts, wax or rubber gaskets, copper tubing with compression rings and couplings, goggles, and gloves (For a wall hung water closet tank include: 2 x 6 lumber, nails, screws, and a closet elbow.) Install a water closet with tank (wall or bowl mounted) with no leaks in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Install a Water Closet with Tank

Standards: Remarks:

Peacetime Hours MI 1.0 1.0 3.0 2.0 Total Hours: 7.0 CO DM PE1 TE1

Mobilization Hours MI 1.0 1.0 3.0 2.0 7.0 CO DM PE1 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 1.0 00.0 00.0 00.0 1.0 CO 0.0 1.0 3.0 2.0 6.0 DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 27 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E04 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a wall hung urinal. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, a carpenters tool kit, a spud wrench, a carpenters level, a pre-installed water supply line with gate valve, a pre-installed roughed-in waste drain system, a wall hung type urinal with manufacturers instructions, urinal drain outlet hardware, a P-trap (if required), hanger brackets, a flushometer, joint compound, copper tubing with compression rings and couplings, a gate valve, 2 x 6 lumber, nails, and screws Install a wall hung urinal with no leaks in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Install Urinals

Standards: Remarks:

Peacetime Hours MI 1.0 1.0 3.0 2.0 Total Hours: 7.0 CO DM PE1 TE1

Mobilization Hours MI 1.0 1.0 3.0 2.0 7.0 CO DM PE1 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 1.0 00.0 00.0 00.0 1.0 CO 0.0 1.0 3.0 2.0 6.0 DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 28 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E05 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 1.0 00.0 00.0 00.0 1.0 CO 0.0 1.0 3.0 2.0 6.0 DM PE1 TE1 Install an exposed pipe shower system. At a training site, given FM 5-420, a general pipefitters tool kit, construction prints and drawings, a shower fixture, mixing or gate valves, a pre-installed water supply line, a pre-installed waste drain, galvanized pipe with fittings, pipe hangers, and screws Install an exposed pipe shower system with no leaks in accordance with FM 5-420 and to within + 1/8 of construction prints and drawings. Install an Exposed Pipe Shower System

Peacetime Hours MI 1.0 1.0 3.0 2.0 Total Hours: 7.0 CO DM PE1 TE1

Mobilization Hours MI 1.0 1.0 3.0 2.0 7.0 CO DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 29 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E06 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a drinking fountain. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, a carpenters tool kit, a wall hung water fountain with manufacturers instructions, a pre-installed water supply line with gate valve, a pre-installed waste drain, a P-trap, copper tubing with compression rings and couplings, 2 x 6 lumber, nails, and screws Install a drinking fountain with no leaks in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Install a Drinking Fountain

Standards: Remarks:

Peacetime Hours MI 0.5 1.0 2.0 1.5 Total Hours: 5.0 CO DM PE1 TE1

Mobilization Hours MI 0.5 1.0 2.0 1.5 5.0 CO DM PE1 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 .5 00.0 00.0 00.0 .5 CO 0.0 1.0 2.0 1.5 4.5 DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 30 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E07 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 1.5 00.0 00.0 00.0 1.5 CO 0.0 1.0 2.0 1.5 4.5 DM PE1 TE1 Winterize a water supply system. At a training site, given FM 5-420, a general pipefitters tool kit, an installed water supply system, wool-felt pipe covering, flexrubber and sponge-felt paper insulation, a utility knife, and duct tape Winterize a water supply system, covering all exposed pipe and valves, in accordance with FM 5-420. Winterize a Water Supply System

Peacetime Hours MI 1.5 1.0 2.0 1.5 Total Hours: 6.0 CO DM PE1 TE1

Mobilization Hours MI 1.5 1.0 2.0 1.5 6.0 CO DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 31 COURSE: 720-51K10 COURSE TITLE: PLUMBER Techniques for Delivering Instruction: Training Module: Title: Purpose: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 1.3 00.0 00.0 00.0 1.3 CO 3.0 5.2 12.0 9.0 29.2 CO DM PE1 TE1 F Plumbing Systems Maintenance To provide 51K soldiers with the knowledge and skills required to maintain an internal water distribution system, clear water system stoppages and prevent backflows. PHASE: VER:

Peacetime Hours MI 4.3 5.2 12.0 9.0 Total Hours: 30.5 CO DM PE1 TE1

Mobilization Hours MI 4.3 5.2 12.0 9.0 30.5 CO DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 32 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-F01 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 1.3 00.0 00.0 00.0 1.3 CO 0.0 2.2 8.5 6.0 16.7 DM PE1 TE1 Maintain an internal water distribution system. At a training site, given FM 5-420, a pipefitters tool kit, malfunctioning gate and globe valves, flushometers, faucets, and water closet; replacement valves, flushometers, faucet and water closet components, a P-Trap, joint compound and rags Troubleshoot; repair; or replace valves, fixture control devices, faucets, and water closet components in accordance with FM 5-420. Maintain an Internal Water Distribution System

Peacetime Hours MI 1.3 2.2 8.5 6.0 Total Hours: 18.0 CO DM PE1 TE1

Mobilization Hours MI 1.3 2.2 8.5 6.0 18.0 CO DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TRAINING MODULE(S) Page No: 33 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-F02 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 00.0 00.0 00.0 00.0 00.0 2.0 1.5 1.5 1.5 6.5 CO DM PE1 TE1 Clear waste system stoppages. At a training site, given FM 5-420, a general pipefitters tool kit, a pre-installed waste system with fixtures and stoppages, a plain or cone plunger, a 1/4 to 1/2 drain snake, a 3/4 heavy duty drain snake, a closet auger, a bucket, drainage chemicals, and rags Clear waste system stoppages in accordance with FM 5-420. Clear Water System Stoppages

Peacetime Hours MI 2.0 1.5 1.5 1.5 Total Hours: 6.5 CO DM PE1 TE1

Mobilization Hours MI 2.0 1.5 1.5 1.5 6.5 CO DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

TRAINING MODULE(S) Page No: 34 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-F03 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2:12 1:6 1:6 00.0 00.0 00.0 00.0 00.0 1.0 1.5 2.0 1.5 6.0 CO DM PE1 TE1 Prevent backflow in a water system. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, check valve and fittings, and a pre-installed water system with gate valve Install and repair a check valve with no leaks in accordance with FM 5-420 and to within + 1/8 of construction prints and drawings. Prevent Backflow

Peacetime Hours MI 1.0 1.5 2.0 1.5 Total Hours: 6.0 CO DM PE1 TE1

Mobilization Hours MI 1.0 1.5 2.0 1.5 6.0 CO DM PE1 TE1

Instructor/ Student Ratio 1:12 2:12 1:6 1:6

DL Hours MI 00.0 00.0 00.0 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 35 COURSE: 720-51K10 COURSE TITLE: PLUMBER PHASE: VER:

Title: Purpose:

Plumber Examinations To provide 51K soldiers with an evaluation of skill level 1 knowledge and skills required to perform basic mathematics, identify plumbing materials, maintain plumbing tools, prepare a plumbing materials takeoff list, install a cast iron sewer line, install a waste system, install a water system, install a lavatory, install a water closet with tank, install urinals, install an exposed pipe shower system, install a drinking fountain, winterize a water supply system, maintain an internal water distribution system, clear water stoppages and prevent backflows. Students must achieve a GO on all performance evaluations (TE1s) and a minimum score of 70% on all written examinations (TE2s).

Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 1:12 19.0 4.0 23.0 TE1 TE2 29.5 4.0 33.5 TE1 TE2

Peacetime Hours MI 48.5 8.0 Total Hours: 56.5 TE1 TE2

Mobilization Hours MI 48.5 8.0 56.5 TE1 TE2

Instructor/ Student Ratio 1:6 1:12

DL Hours MI 00.0 00.0 00.0

TEST MODULE Page No: 36 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-B04 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 1.0 1.0 TE2 0.0 0.0 Perform basic mathematical calculations. In a classroom, given mathematical problems, a calculator, a ruler, a scaled drawing, paper and a pencil Perform calculations for addition, subtraction, multiplication, and division of whole numbers, fractions, and decimals; and convert measurements from scaled drawings. Achieve a minimum score of 70% on a written examination. Basic Mathematics Examination

Peacetime Hours MI 1.0 Total Hours: 1.0 TE2

Mobilization Hours MI 1.0 1.0 TE2

Instructor/ Student Ratio 1:12

DL Hours MI 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 37 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-C01 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Identify plumbing materials. In a classroom, given FM 5-420; cast iron, plastic, and galvanized pipe with fittings; copper tubing with compression rings and couplings; plumbing fixtures; waste system components; water supply system components; valves; fixture control devices; faucets; and winterizing materials Identify plumbing materials and their uses, and identify fixture and system components in accordance with FM 5-420. Achieve a minimum score of 70% on a written examination. Identify Plumbing Materials Examination

Standards: Remarks:

Peacetime Hours MI 1.0 Total Hours: 1.0 TE2

Mobilization Hours MI 1.0 1.0 TE2

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 1.0 1.0 0.0 0.0 TE2

Instructor/ Student Ratio 1:12

DL Hours MI 00.0 00.0

TEST MODULE Page No: 38 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-C02 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 1:12 1.0 1.0 2.0 0.0 0.0 0.0 TE1 TE2 Maintain plumbing tools. At a training site, given TM 9-243, SC 5180-90-N13, SC 5180-90-N42, a general and supplementary pipefitters tool kit, an electric grinder, metal files, sandpaper, emery cloth, linseed oil, rags, goggles, gloves, hearing protection, paper, and a pencil Clean, adjust, sharpen, lubricate, and identify the use of plumbing tools in accordance with TM 9-243, SC 5180-90-N13, and SC 5180-90-N42. Achieve a GO on a performance evaluation and achieve a minimum score of 70% on a written examination. Maintain Plumbing Tools Examination

Peacetime Hours MI 1.0 1.0 Total Hours: 2.0 TE1 TE2

Mobilization Hours MI 1.0 1.0 2.0 TE1 TE2

Instructor/ Student Ratio 1:6 1:12

DL Hours MI 00.0 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 39 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-C03 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Prepare a plumbing materials takeoff list. In a classroom or at a training site, given FM 5-420, TM 5-302 (Extract), TM 5-704, a ruler, paper, and a pencil Identify lines, symbols, title block information, general notes and specifications, and prepare a plumbing materials takeoff list including all fittings and fixture components in accordance with construction prints and drawings, FM 5-420, and TM 5-704. Achieve a minimum score of 70% on a written examination. Prepare a Plumbing Materials Takeoff List Examination

Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 2.0 2.0 TE2 0.0 0.0

Peacetime Hours MI 2.0 Total Hours: 2.0 TE2

Mobilization Hours MI 2.0 2.0 TE2

Instructor/ Student Ratio 1:12

DL Hours MI 00.0 00.0

TEST MODULE Page No: 40 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-D01 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a cast iron sewer line. At a training site, given FM 5-420, a general pipefitters tool kit, a carpenters tool kit, construction prints and drawings, a preinstalled main sewer line, an existing building, a shovel, a pick mattock with handle, a sledgehammer, 2 x 4 and 1 x 4 lumber, a mortarboard, a brick trowel, portland cement, sand, a sewer thimble, cast iron pipe, a hub and spigot, a cold chisel, oakum, lead wool or shredded lead, a packing and caulking iron, stainless steel clamps, neoprene sleeves, nails, rags, goggles, and gloves Install a cast iron sewer line with no leaks in accordance with FM 5-420 and to within + 1/8 of construction prints and drawings. Achieve a minimum score of 70% on a written examination. Install a Cast Iron Sewer Line Examination

Standards: Remarks:

Peacetime Hours MI 10.0 Total Hours: 10.0 TE1

Mobilization Hours MI 10.0 10.0 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 TE1 10.0 10.0

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 41 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-D02 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a waste system. At a training site, given FM 5-420, a general pipefitters tool kit, polyvinyl chloride (PVC) pipe, fittings, reducers, a level, nails, screws, pipe hangers, ABS solvent and glue, emery cloth, gate valves, caps and plugs for waste system, source of air pressure, an air pressure gauge, a test plug, a calculator, goggles, gloves, paper, and a pencil Install waste system with no leaks and test a waste system in accordance with FM 5-420 and to within + 1/8 of construction prints and drawings. Achieve a GO on a performance evaluation and a minimum score of 70% on a written examination. Install a Waste System Examination

Standards: Remarks:

Peacetime Hours MI 8.0 2.0 Total Hours: 10.0 TE1 TE2

Mobilization Hours MI 8.0 2.0 10.0 TE1 TE2

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 1:12 0.0 2.0 2.0 TE1 TE2 8.0 0.0 8.0

Instructor/ Student Ratio 1:6 1:12

DL Hours MI 00.0 00.0 00.0

TEST MODULE Page No: 42 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E01 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a water supply system. At a training site, given FM 5-420, construction prints and drawings, an electric water heater with manufacturers instructions, a general and supplementary pipefitters tool kit, galvanized pipe and fittings, copper tubing with compression rings and couplings, gate valves, a level, nails, screws, pipe hangers, joint compound, a wire brush, cutting oil, emery cloth, muriatic acid, soldering flux, solder, a propane torch, goggles, and gloves Install a water supply system and an electric water heater in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Achieve a GO on a performance evaluation and a minimum score of 70% on a written examination. Install a Water Supply System Examination

Standards:

Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 1:12 00.0 00.0 00.0 10.0 1.0 11.0 TE1 TE2

Peacetime Hours MI 10.0 1.0 Total Hours: 11.0 TE1 TE2

Mobilization Hours MI 10.0 1.0 11.0 TE1 TE2

Instructor/ Student Ratio 1:6 1:12

DL Hours MI 00.0 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 43 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E02 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a lavatory. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, a carpenters level, a wall hung type lavatory with manufacturers instructions, an installed water supply lines with gate valves and drain, a P-trap, faucets, copper tubing with compression rings and couplings, a pop-up plug, 2 x 6 lumber, nails, screws, and hanger brackets Install a wall hung type lavatory with no leaks in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Achieve a GO on a performance evaluation. Install a Lavatory Examination

Standards: Remarks:

Peacetime Hours MI 1.5 Total Hours: 1.5 TE1

Mobilization Hours MI 1.5 1.5 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 1.5 1.5 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

TEST MODULE Page No: 44 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E03 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a water closet with tank. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, a carpenters tool kit, a water closet, a water closet tank with components (wall hung or bowl mounted) with manufacturers instructions, a pre-installed polyvinyl chloride (PVC) waste drain, ABS solvent and cement, a pre-installed water supply line, gate valves, a floor flange with bolts, wax or rubber gaskets, copper tubing with compression rings and couplings, goggles, and gloves (For a wall hung water closet tank include: 2 x 6 lumber, nails, screws, and a closet elbow.) Install a water closet with tank (wall or bowl mounted) with no leaks in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Achieve a GO on a performance evaluation. Install a Water Closet with Tank Examination

Standards: Remarks:

Peacetime Hours MI 2.0 Total Hours: 2.0 TE1

Mobilization Hours MI 2.0 2.0 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 2.0 2.0 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 45 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E04 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a wall hung urinal. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, a carpenters tool kit, a spud wrench, a carpenters level, a pre-installed water supply line with gate valve, a pre-installed roughed-in waste drain system, a wall hung type urinal with manufacturers instructions, urinal drain outlet hardware, a P-trap (if required), hanger brackets, a flushometer, joint compound, copper tubing with compression rings and couplings, a gate valve, 2 x 6 lumber, nails, and screws Install a wall hung urinal with no leaks in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Achieve a GO on a performance evaluation. Install Urinals Examination

Standards: Remarks:

Peacetime Hours MI 2.0 Total Hours: 2.0 TE1

Mobilization Hours MI 2.0 2.0 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 2.0 2.0 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

TEST MODULE Page No: 46 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E05 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 2.0 2.0 TE1 Install an exposed pipe shower system. At a training site, given FM 5-420, a general pipefitters tool kit, construction prints and drawings, a shower fixture, mixing or gate valves, a pre-installed water supply line, a pre-installed waste drain, galvanized pipe with fittings, pipe hangers, and screws Install an exposed pipe shower system with no leaks in accordance with FM 5-420 and to within + 1/8 of construction prints and drawings. Achieve a GO on a performance evaluation. Install an Exposed Pipe Shower System Examination

Peacetime Hours MI 2.0 Total Hours: 2.0 TE1

Mobilization Hours MI 2.0 2.0 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 47 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E06 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Install a drinking fountain. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, a carpenters tool kit, a wall hung water fountain with manufacturers instructions, a pre-installed water supply line with gate valve, a pre-installed waste drain, a Ptrap, copper tubing with compression rings and couplings, 2 x 6 lumber, nails, and screws Install a drinking fountain with no leaks in accordance with FM 5-420 and manufacturers instructions, and to within + 1/8 of construction prints and drawings. Achieve a GO on a performance evaluation. Install a Drinking Fountain Examination

Standards: Remarks:

Peacetime Hours MI 1.5 Total Hours: 1.5 TE1

Mobilization Hours MI 1.5 1.5 TE1

*****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 1.5 1.5 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

TEST MODULE Page No: 48 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-E07 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 1.5 1.5 TE1 Winterize a water supply system. At a training site, given FM 5-420, a general pipefitters tool kit, an installed water supply system, wool-felt pipe covering, flexrubber and sponge-felt paper insulation, a utility knife, and duct tape Winterize a water supply system, covering all exposed pipe and valves, in accordance with FM 5-420. Achieve a GO on a performance evaluation. Winterize a Water Supply System Examination

Peacetime Hours MI 1.5 Total Hours: 1.5 TE1

Mobilization Hours MI 1.5 1.5 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 49 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-F01 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 6.0 6.0 TE1 Maintain internal water distribution system. At a training site, given FM 5-420, a pipefitters tool kit, malfunctioning gate and globe valves, flushometers, faucets, and water closet; replacement valves, flushometers, faucet and water closet components, a P-Trap, joint compound and rags Troubleshoot; repair; or replace valves, fixture control devices, faucets, and water closet components in accordance with FM 5-420. Achieve a GO on a performance evaluation. Maintain Internal Water Distribution System Examination

Peacetime Hours MI 6.0 Total Hours: 6.0 TE1

Mobilization Hours MI 6.0 6.0 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

TEST MODULE Page No: 50 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-F02 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 1.5 1.5 TE1 Clear waste system stoppages. At a training site, given FM 5-420, a general pipefitters tool kit, a pre-installed waste system with fixtures and stoppages, a plain or cone plunger, a 1/4 to 1/2 drain snake, a 3/4 heavy duty drain snake, a closet auger, a bucket, drainage chemicals, and rags Clear waste system stoppages in accordance with FM 5-420. Achieve a GO on a performance evaluation. Clear Water System Stoppages Examination

Peacetime Hours MI 1.5 Total Hours: 1.5 TE1

Mobilization Hours MI 1.5 1.5 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

10/15/98 51K1POI

TEST MODULE Page No: 51 COURSE: 720-51K10 COURSE TITLE: PLUMBER PFN: 051-51K1-F03 PHASE: VER:

Security Classification: Unclassified Title: TLO: Action: Conditions: Standards: Remarks: *****ACADEMIC HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:6 00.0 00.0 1.5 1.5 TE1 Prevent backflow in a water system. At a training site, given FM 5-420, construction prints and drawings, a general pipefitters tool kit, check valve and fittings, and a pre-installed water system with gate valve Install and repair a check valve with no leaks in accordance with FM 5-420 and to within + 1/8 of construction prints and drawings. Achieve a GO on a performance evaluation. Prevent Backflow Examination

Peacetime Hours MI 1.5 Total Hours: 1.5 TE1

Mobilization Hours MI 1.5 1.5 TE1

Instructor/ Student Ratio 1:6

DL Hours MI 00.0 00.0

ADMINISTRATIVE MODULE Page No: 52 COURSE: 720-51K10 COURSE TITLE: PLUMBER Title: Purpose: Remarks: Administrative Module This module presents a breakdown of administrative hours for inprocessing, commandants time, and outprocessing. Any time remaining after in and out processing is to be utilized for Commandants Time at the discretion of the school commandant or course manager. *****ADMINISTRATIVE HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 00.0 00.0 00.0 00.0 CO PHASE: VER:

Peacetime Hours MI 28.0 Total Hours: 28.0 CO

Mobilization Hours MI 18.0 18.0 CO

Instructor/ Student Ratio 1:12

DL Hours MI 00.0 00.0

Time projected for administrative functions must be estimated by each respective TASS battalion contingent upon projected student input.

ADMINISTRATIVE MODULE Page No: 53 COURSE: 720 51K10 COURSE TITLE: PLUMBER PFN: Security Classification: Unclassified Title: Remarks: Inprocessing Any time remaining after in and out processing is to be utilized for Commandants Time at the discretion of the school commandant or course manager. Peacetime Hours MI 8.0 Total Hours: PFN: Security Classification: Unclassified Title: Remarks: Outprocessing Any time remaining after in and out processing is to be utilized for Commandants Time at the discretion of the school commandant or course manager. Peacetime Hours MI 8.0 Total Hours: 8.0 CO Mobilization Hours MI 8.0 8.0 CO *****ADMINISTRATIVE HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 00.0 00.0 00.0 00.0 CO Instructor/ Student Ratio 1:12 DL Hours MI 00.0 00.0 8.0 CO Mobilization Hours MI 8.0 8.0 CO *****ADMINISTRATIVE HOURS***** Instructor/ IDT ADT Student Ratio Hours MI Hours MI 1:12 00.0 00.0 00.0 00.0 CO Instructor/ Student Ratio 1:12 DL Hours MI 00.0 00.0 PHASE: VER:

Time projected for administrative functions must be estimated by each respective TASS battalion contingent upon projected student input.

10/15/98 51K1POI

TASK SUMMARY Page No: 54 COURSE: 720-51K10 COURSE TITLE: PLUMBER Proponent Approved Tasks Trained to Standard: Task No. 051-248-1000 051-248-1002 051-248-1002 051-248-1006 051-248-1007 051-248-1007 051-248-1009 051-248-1010 051-248-1011 051-248-1012 051-248-1021 051-248-1022 051-248-1023 051-248-1024 051-248-1025 051-248-1028 051-248-1029 051-248-1033 Module C D E D D E E E F F C E E E E F F F PFN 051-51K1-C02 051-51K1-D02 051-51K1-E01 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E03 051-51K1-E04 051-51K1-F01 051-51K1-F02 051-51K1-C01 051-51K1-E01 051-51K1-E05 051-51K1-E06 051-51K1-E07 051-51K1-F01 051-51K1-F01 051-51K1-F03 Peacetime Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Mobilization Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y IDT N/A Y N/A Y Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A ADT Y N/A Y N/A N/A Y Y Y Y Y Y Y Y Y Y Y Y Y DL N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PHASE: VER:

TASK SUMMARY Page No: 55 COURSE: 720-51K10 COURSE TITLE: PLUMBER Proponent Approved Tasks (continued) Trained to Standard: Task No. 051-248-1040 051-248-1041 051-248-1042 051-248-1043 051-248-1050 051-248-1055 051-246-1056 Module C E D F E D C PFN 051-51K1-C03 051-51K1-E02 051-51K1-D01 051-51K1-F01 051-51K1-E02 051-51K1-D01 051-51K1-C03 Peacetime Y Y Y Y Y Y Y Mobilization Y Y Y Y Y Y Y IDT Y N/A Y N/A N/A Y Y ADT N/A Y N/A Y Y N/A N/A DL N/A N/A N/A N/A N/A N/A N/A PHASE: VER:

10/15/98 51K1POI

AMMUNITION SUMMARY Page No: 56 COURSE: 720-51K10 COURSE TITLE: PLUMBER Live Ammunition ****** Ammunition Requirement ****** Peacetime Per Student Other Mobilization Per Student Other IDT Per Student Other Student ADT Per Other PHASE: VER:

DODIC

Module

PFN

REFER TO THE SKILL LEVEL 1 CET POI.

AMMUNITION SUMMARY Page No: 57 COURSE: 720-51K10 COURSE TITLE: PLUMBER Dummy or Inert Ammunition ****** Ammunition Requirement ****** Peacetime Per Student Other Mobilization Per Student Other IDT Per Student Other Student ADT Per Other PHASE: VER:

DODIC

Module

PFN

REFER TO THE SKILL LEVEL 1 CET POI.

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 58 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 3 6 3 12 6 3 6 3 12 0 0 0 0 0 6 3 6 3 12 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:4 1:2 1:4 1:1 1:2 1:4 1:2 1:4 1:1 0:0 0:0 0:0 0:0 0:0 1:2 1:4 1:2 1:4 1:1 C R I Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 1560-00-011-1263

Module C E

PFN 051-51K1-C01 051-51K1-E07 051-51K1-C01 051-51K1-E07 051-51K1-F02

Nomenclature: Insulation, Sponge-Felt Paper, roll Remarks: 1560-00-011-1264 C E Remarks: 1650-00-443-3183 Remarks: 2925-00-433-5138 Nomenclature: Sleeves, Neoprene D Remarks: 3439-00-009-5449 C E Remarks: 3439-00-542-0531 C E Remarks:
10/15/98 51K1POI

Nomenclature: Insulation, Flex Rubber, roll

Nomenclature: Plunger, Plain or Cone Type C 051-51K1-C01 051-51K1-D01 051-51K1-C01 051-51K1-E01 051-51K1-C01 051-51K1-E01 6 12 6 3 6 6 6 12 6 3 6 6 0 12 0 0 0 0 6 0 6 3 6 6 1:2 1:1 1:2 1:4 1:2 1:2 1:2 1:1 1:2 1:4 1:2 1:2 0:0 1:1 0:0 0:0 0:0 0:0 1:2 0:0 1:2 1:4 1:2 1:2 Y Y Y Y Y Y 0.0 0.0 0.0 0.0 0.0 0.0

Nomenclature: Flux, Soldering, w/Brush, pint

Nomenclature: Torch Set, Propane

EQUIPMENT SUMMARY Page No: 59 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 12 12 6 12 12 0 0 0 6 12 12 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:1 1:1 1:2 1:1 1:1 0:0 0:0 0:0 1:2 1:1 1:1 C R I Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 3439-01-325-9321 Nomenclature: Solder, roll

Module C E

PFN 051-51K1-C01 051-51K1-E01 051-51K1-E06

Remarks: 4110-00-899-0136 Remarks: 4240-00-052-3776 Nomenclature: Goggles, Safety D D E E Remarks: 4420-00-006-1969 Remarks: 4510-00-050-4078 Remarks: E 051-51K1-E02 12 12 0 12 1:1 1:1 0:0 1:1 Y 0.0 Nomenclature: Lavatory, w/Hardware E 051-51K1-E01 12 12 0 12 1:1 1:1 0:0 1:1 Y 0.0 Nomenclature: Heater, Hot Water, w/Fittings 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E03 12 12 12 12 12 12 12 12 12 12 0 0 0 0 12 12 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 0:0 0:0 0:0 0:0 1:1 1:1 Y Y Y Y 0.0 0.0 0.0 0.0 C 051-51K1-C02 12 12 0 12 1:1 1:1 0:0 1:1 Y 0.0 E Nomenclature: Water Fountain, Wall Hung, w/Hardware

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 60 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 12 12 12 12 6 12 12 12 12 0 12 0 0 0 6 0 12 12 12 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:1 1:1 1:1 1:1 1:2 1:1 1:1 1:1 1:1 0:0 1:1 0:0 0:0 0:0 1:2 0:0 1:1 1:1 1:1 C R I Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 4510-00-107-2850

Module C D

PFN 051-51K1-C01 051-51K1-D01 051-51K1-E03 051-51K1-F01 051-51K1-E04

Nomenclature: Hub and Spigot, Cast Iron Remarks: 4510-00-202-7730 E F Remarks: 4510-00-278-9537 Remarks: 4510-00-278-9549 E F Remarks: 4510-00-418-0356 Nomenclature: P-Trap, 1 E E E F Remarks: 051-51K1-E02 051-51K1-E04 051-51K1-E06 051-51K1-F01 24 24 24 24 24 24 24 24 0 0 0 0 24 24 24 24 2:1 2:1 2:1 2:1 2:1 2:1 2:1 2:1 0:0 0:0 0:0 0:0 2:1 2:1 2:1 2:1 Y Y Y Y 0.0 0.0 0.0 0.0 C 051-51K1-C01 6 6 0 6 1:2 1:2 0:0 1:21 Y 0.0 051-51K1-E04 051-51K1-F01 12 12 12 12 0 0 12 12 1:1 1:1 1:1 1:1 0:0 0:0 1:1 1:1 Y Y 0.0 0.0 Nomenclature: Flushometer, w/Fittings E Nomenclature: Urinal, Wall Hung, w/Hardware Nomenclature: Flush Tank Assembly (Douglas Valve), w/ Hardware

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 61 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 12 12 12 12 12 12 12 12 6 12 12 12 12 12 12 12 12 12 12 6 12 12 0 0 0 0 0 0 0 0 0 0 0 12 12 12 12 12 12 12 12 6 12 12 Average Equip/Student Ratio Peace Mob IDT ADT 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:2 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:2 1:1 1:1 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:2 1:1 1:1 C R I Y Y Y Y Y Y Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 4510-00-541-7539

Module E F

PFN 051-51K1-E03 051-51K1-F01 051-51K1-E03 051-51K1-F01 051-51K1-E03 051-51K1-F01 051-51K1-E03 051-51K1-F01 051-51K1-C01 051-51K1-E02 051-51K1-F01

Nomenclature: Flush Tank Assembly, w/Hardware Remarks: 4510-00-781-5441 E F Remarks: 4510-00-807-6825 E F Remarks: 4510-00-890-2399 E F Remarks: 4510-00-922-0229 C E F Remarks: Nomenclature: Faucet, Combination, w/Hardware Nomenclature: Water Closet, w/Hardware Nomenclature: Flange, Water Closet, w/Bolts Nomenclature: Water Closet Tank, Wall or Bowl Mount, w/Hardware

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 62 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 12 12 0 12 Average Equip/Student Ratio Peace Mob IDT ADT 1:1 1:1 0:0 1:1 C R I Y Optempo HRS/MIL 0.0 PHASE: VER:

LIN/NSN 4510-01-084-0574 Remarks: 4710-00-162-1018

Module E

PFN 051-51K1-E05

Nomenclature: Fixture, Shower, w/Hardware C E E Remarks: 4710-00-277-5229 Remarks: 4710-00-277-5527 C E E E E E Remarks: 4710-00-278-3623 Remarks: D 051-51K1-D01 36 36 36 0 3:1 3:1 3:1 0:0 Y 0.0 Nomenclature: Pipe, Cast Iron, 3 x 10 sections 051-51K1-C01 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E06 6 24 24 24 24 24 6 24 24 24 24 24 0 0 0 0 0 0 6 24 24 24 24 24 1:2 2:1 2:1 2:1 2:1 2:1 1:2 2:1 2:1 2:1 2:1 2:1 0:0 0:0 0:0 0:0 0:0 0:0 1:2 2:1 2:1 2:1 2:1 2:1 Y Y Y Y Y Y 0.0 0.0 0.0 0.0 0.0 0.0 Nomenclature: Tubing, Copper, 3/8 x 10 sections E 051-51K1-E01 24 24 0 24 2:1 2:1 0:0 2:1 Y 0.0 Nomenclature: Tubing, Copper, 1/2 x 10 sections 051-51K1-C01 051-51K1-E01 051-51K1-E05 6 24 24 6 24 24 0 0 0 6 24 24 1:2 2:1 2:1 1:2 2:1 2:1 0:0 0:0 0:0 1:2 2:1 2:1 Y Y Y 0.0 0.0 0.0

Nomenclature: Pipe, Galvanized, 1/2 x 10 sections

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 63 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 12 12 12 0 Average Equip/Student Ratio Peace Mob IDT ADT 1:1 1:1 1:1 0:0 C R I Y Optempo HRS/MIL 0.0 PHASE: VER:

LIN/NSN 4710-00-476-5870 Remarks: 4710-00-476-5871 Remarks: 4710-00-476-5877

Module D

PFN 051-51K1-D02

Nomenclature: Pipe, Polyvinyl Chloride, PVC, 3 x 10 sections D 051-51K1-D02 12 12 12 0 1:1 1:1 1:1 0:0 Y 0.0

Nomenclature: Pipe, Polyvinyl Chloride, PVC, 2 x 10 sections C D Remarks: 4730-00-124-4120 C D Remarks: 4730-00-174-0257 C D Remarks: 4730-00-174-8621 C D Remarks: 051-51K1-C01 051-51K1-D02 6 12 6 12 0 12 6 0 1:2 1:1 1:2 1:1 0:0 1:1 1:2 0:0 Y Y 0.0 0.0 Nomenclature: Sanitary Y, Polyvinyl Chloride, PVC, 3 x 3 with a 3 Side Tap 051-51K1-C01 051-51K1-D02 6 12 6 12 0 12 6 0 1:2 1:1 1:2 1:1 0:0 1:1 1:2 0:0 Y Y 0.0 0.0 Nomenclature: Sanitary T, Polyvinyl Chloride, PVC, 3 x 3 with a 3 Side Tap 051-51K1-C01 051-51K1-D02 6 12 6 12 0 12 6 0 1:2 1:1 1:2 1:1 0:0 1:1 1:2 0:0 Y Y 0.0 0.0 Nomenclature: Elbow, Polyvinyl Chloride, PVC, 90, 3 051-51K1-C01 051-51K1-D02 6 12 6 12 0 12 6 0 1:2 1:1 1:2 1:1 0:0 1:1 1:2 0:0 Y Y 0.0 0.0

Nomenclature: Pipe, Polyvinyl Chloride, PVC, 1 1/2 x 10 sections

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 64 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 24 24 6 24 24 6 24 6 24 6 24 6 24 24 6 24 24 6 24 6 24 6 24 0 0 0 0 0 0 0 0 0 0 0 24 6 24 24 6 24 24 6 24 6 24 6 0 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 2:1 2:1 1:2 2:1 2:1 1:2 2:1 1:2 2:1 1:2 2:1 1:2 2:1 2:1 1:2 2:1 2:1 1:2 2:1 1:2 2:1 1:2 2:1 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 2:1 1:2 2:1 2:1 1:2 2:1 2:1 1:2 2:1 1:2 2:1 1:2 0:0 C R I Y Y Y Y Y Y Y Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 4730-00-238-7567

Module C E E

PFN 051-51K1-C01 051-51K1-E01 051-51K1-E05 051-51K1-C01 051-51K1-E01 051-51K1-E05 051-51K1-C01 051-51K1-E01 051-51K1-C01 051-51K1-E01 051-51K1-C01 051-51K1-D02

Nomenclature: Nipple, Closed, Galvanized, 1/2

Remarks: 4730-00-246-9203 C E E 4730-00-254-6449 C E Remarks: 4730-00-254-6462 C E Remarks: 4730-00-256-1384 C D Remarks: Nomenclature: Reducer, Polyvinyl Chloride, PVC, 3 to 2 Nomenclature: Elbow, Copper, 45, 1/2 Nomenclature: Elbow, Copper, 90, 1/2 Nomenclature: Elbow, Galvanized, 45, 1/2

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 65 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 24 6 24 6 24 24 6 24 24 6 24 6 24 6 24 24 6 24 24 0 0 0 0 0 0 0 0 0 0 6 24 6 24 6 24 24 6 24 24 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 2:1 1:2 2:1 1:2 2:1 2:1 1:2 2:1 2:1 1:2 2:1 1:2 2:1 1:2 2:1 2:1 1:2 2:1 2:1 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 1:2 2:1 1:2 2:1 1:2 2:1 2:1 1:2 2:1 2:1 C R I Y Y Y Y Y Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 4730-00-263-6465 Nomenclature: Coupling, T, 1/2

Module C E

PFN 051-51K1-C01 051-51K1-E01 051-51K1-C01 051-51K1-E01 051-51K1-C01 051-51K1-E01 051-51K1-E05 051-51K1-C01 051-51K1-E01 051-51K1-E05

Remarks: 4730-00-264-9154 C E Remarks: 4730-00-277-3212 C E E Remarks: 4730-00-278-4773 C E E Remarks: Nomenclature: Elbow, Galvanized, 90, 1/2 Nomenclature: Tee, Galvanized, 1/2 Nomenclature: Coupling, Copper Tubing, 1/2

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 66 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 36 36 36 36 36 6 24 24 6 36 36 36 36 36 6 24 24 0 0 0 0 0 0 0 24 24 6 36 36 36 36 36 6 0 0 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 3:1 3:1 3:1 3:1 3:1 1:2 2:1 2:1 1:2 3:1 3:1 3:1 3:1 3:1 1:2 2:1 2:1 0:0 0:0 0:0 0:0 0:0 0:0 0:0 2:1 2:1 1:2 3:1 3:1 3:1 3:1 3:1 1:2 0:0 0:0 C R I Y Y Y Y Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 4730-00-287-1537

Module C E E E E E

PFN 051-51K1-C01 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E06 051-51K1-C01 051-51K1-D02 051-51K1-D02

Nomenclature: Nuts, Compression Type, Brass, 3/8

Remarks: 4730-00-472-5067 C D Remarks: 4730-00-478-2635 Remarks: D Nomenclature: Reducer, Polyvinyl Chloride, PVC, 2 to 1 1/2 Nomenclature: Reducer, Galvanized to Copper, 1/2 to 3/8

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 67 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 60 12 12 12 12 24 6 12 12 6 60 12 12 12 12 24 6 12 12 0 60 0 0 0 0 0 0 0 0 6 0 12 12 12 12 24 6 12 12 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 5:1 1:1 1:1 1:1 1:1 2:1 1:2 1:1 1:1 1:2 5:1 1:1 1:1 1:1 1:1 2:1 1:2 1:1 1:1 0:0 5:1 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 1:2 0:0 1:1 1:1 1:1 1:1 2:1 1:2 1:1 1:1 C R I Y Y Y Y Y Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 4820-00-145-4260

Module C D E E E E F

PFN 051-51K1-C01 051-51K1-D02 051-51K1-E01 051-51K1-E03 051-51K1-E04 051-51K1-E05 051-51K1-F01 051-51K1-C01 051-51K1-F03 051-51K1-C02

Nomenclature: Valve, Gate, 1/2

Remarks: 4820-00-585-7019 C F Remarks: 5110-00-006-1557 Nomenclature: Files, Metal Remarks: 5110-00-240-7070 Nomenclature: Knife, Utility Remarks: 5110-00-497-5437 Nomenclature: Chisel, Cold, 2 Remarks: D 051-51K1-D01 12 12 12 0 1:1 1:1 1:1 0:0 Y 0.0 E 051-51K1-E07 12 12 0 12 1:1 1:1 0:0 1:1 Y 0.0 C Nomenclature: Valve, Check, w/Fittings

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 68 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 6 6 0 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:2 1:2 0:0 C R I Y Optempo HRS/MIL 0.0 PHASE: VER:

LIN/NSN 5120-00-224-4141 Remarks: 5120-00-240-7561 Nomenclature: Auger, Closet Remarks: 5120-00-511-1432 Nomenclature: Wrench, Spud Remarks: 5120-00-965-0609 Remarks: 5120-00-965-0613 Remarks: 5120-01-116-0630 Remarks: 5120-01-180-2719 Nomenclature: Wire Brush Remarks:

Module D

PFN 051-51K1-D01

Nomenclature: Hammer, Sledge, 10 lb. F 051-51K1-F02 12 12 0 12 1:1 1:1 0:0 1:1 Y 0.0

051-51K1-E04

12

12

12

1:1

1:1

0:0

1:1

0.0

051-51K1-D01

1:2

1:2

1:2

0:0

0.0

Nomenclature: Shovel, Square End D 051-51K1-D01 6 6 6 0 1:2 1:2 1:2 0:0 Y 0.0

Nomenclature: Pick Mattock, w/Handle D 051-51K1-D01 6 6 6 0 1:2 1:2 1:2 0:0 Y 0.0

Nomenclature: Trowel, Masonry, Block E 051-51K1-E01 12 12 0 12 1:1 1:1 0:0 1:1 Y 0.0

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 69 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 3 3 0 3 Average Equip/Student Ratio Peace Mob IDT ADT 1:4 1:4 0:0 1:4 C R I Y Optempo HRS/MIL 0.0 PHASE: VER:

LIN/NSN 5130-00-293-3465 Nomenclature: Grinder, Electric Remarks: 5180-00-596-1501

Module C

PFN 051-51K1-C02

C D D E E E E E E E F F F

051-51K1-C02 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E05 051-51K1-E06 051-51K1-E07 051-51K1-F01 051-51K1-F02 051-51K1-F03 051-51K1-C02 051-51K1-E01

6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

0 6 6 0 0 0 0 0 0 0 0 0 0 0 0

6 0 0 6 6 6 6 6 6 6 6 6 6 6 6

1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2

1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2

0:0 1:2 1:2 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0 0:0

1:2 0:0 0:0 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Nomenclature: Tool Kit, Pipefitters, General

Remarks: 5180-00-596-1509 C E Remarks: Nomenclature: Tool Kit, Pipefitters, Supplementary

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 70 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 6 12 6 6 12 6 0 0 0 6 12 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:2 1:1 1:2 1:2 1:1 1:2 0:0 0:0 0:0 1:2 1:1 C R I Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 5210-00-239-0892

Module D E

PFN 051-51K1-D02 051-51K1-E01 051-51K1-C02

Nomenclature: Level, Carpenters Remarks: 5240-00-002-2946 Nomenclature: Aural Protector Remarks: 5305-00-901-3106 D E E E E E Remarks: 5315-00-901-3106 D E E E E E Remarks:
10/15/98 51K1POI

051-51K1-D01 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E06 051-51K1-D01 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E06

12 12 12 12 12 12 12 12 12 12 12 12

12 12 12 12 12 12 12 12 12 12 12 12

12 0 0 0 0 0 12 0 0 0 0 0

0 12 12 12 12 12 0 12 12 12 12 12

1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1

1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1

1:1 0:0 0:0 0:0 0:0 0:0 1:1 0:0 0:0 0:0 0:0 0:0

0:0 1:1 1:1 1:1 1:1 1:1 0:0 1:1 1:1 1:1 1:1 1:1

Y Y Y Y Y Y Y Y Y Y Y Y

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Nomenclature: Screws, Wood, 1/2, 25 count box

Nomenclature: Nails, Common, 12d, 1lb

EQUIPMENT SUMMARY Page No: 71 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 6 6 24 6 48 36 24 12 24 36 36 36 6 6 6 24 6 48 36 24 12 24 36 36 36 0 6 0 0 0 48 0 0 0 0 0 36 0 6 0 6 24 6 0 36 24 12 24 36 0 36 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:2 1:2 2:1 1:2 4:1 3:1 2:1 1:1 2:1 3:1 3:1 3:1 1:2 1:2 1:2 2:1 1:2 4:1 3:1 2:1 1:1 2:1 3:1 3:1 3:1 0:0 1:2 0:0 0:0 0:0 4:1 0:0 0:0 0:0 0:0 0:0 3:1 0:0 1:2 0:0 1:2 2:1 1:2 0:0 3:1 2:1 1:1 2:1 3:1 0:0 3:1 C R I Y Y Y Y Y Y Y Y Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 5330-01-023-0199

Module C D

PFN 051-51K1-C01 051-51K1-D01 051-51K1-C01 051-51K1-E03 051-51K1-C01 051-51K1-D02 051-51K1-E01 051-51K1-E02 051-51K1-E04 051-51K1-E05 051-51K1-C02 051-51K1-D02 051-51K1-E01

Nomenclature: Oakum, package Remarks: 5330-01-279-4696 C E Remarks: 5340-00-007-4137 C D E E E E Remarks: 5350-00-584-4654 C D E Remarks: Nomenclature: Cloth, Emery, sheet Nomenclature: Hanger, Pipe, Steel, w/Screws or Nails Nomenclature: Gasket, Wax or Rubber

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 72 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 24 24 0 24 Average Equip/Student Ratio Peace Mob IDT ADT 2:1 2:1 0:0 2:1 C R I Y Optempo HRS/MIL 0.0 PHASE: VER:

LIN/NSN 5350-01-030-7402

Module C

PFN 051-51K1-C02

Nomenclature: Sandpaper, sheet Remarks: 5510-00-220-6192 Nomenclature: Lumber, 2 x 6 x 8 E E E Remarks: Made from lumber material 5510-10-220-6194 Remarks: 5510-08-220-6196 Remarks: 5610-00-242-3792 Remarks: 5610-00-267-2667 Nomenclature: Sand, cubic foot Remarks: D 051-51K1-D01 12 12 12 0 1:1 1:1 1:1 0:0 Y 0.0 D 051-51K1-D01 3 3 3 0 1:4 1:4 1:4 0:0 Y 0.0 Nomenclature: Cement, Portland, bag D 051-51K1-D01 12 12 12 0 1:1 1:1 1:1 0:0 Y 0.0 Nomenclature: Lumber, 1 x 4 x 10 D 051-51K1-D01 12 12 12 0 1:1 1:1 1:1 0:0 Y 0.0 Nomenclature: Lumber, 2 x 4 x 10 051-51K1-E03 051-51K1-E04 051-51K1-E06 12 12 12 12 12 12 0 0 0 12 12 12 1:1 1:1 1:1 1:1 1:1 1:1 0:0 0:0 0:0 1:1 1:1 1:1 Y Y Y 0.0 0.0 0.0 E 051-51K1-E02 12 12 0 12 1:1 1:1 0:0 1:1 Y 0.0

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 73 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 6 6 6 6 12 6 6 6 6 6 12 0 6 0 0 6 0 6 0 6 6 0 12 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:2 1:2 1:2 1:2 1:1 1:2 1:2 1:2 1:2 1:2 1:1 0:0 1:2 0:0 0:0 1:2 0:0 1:2 0:0 1:2 1:2 0:0 1:1 C R I Y Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 5970-01-281-7011

Module C D E

PFN 051-51K1-C01 051-51K1-D02 051-51K1-E03 051-51K1-C01 051-51K1-D02 051-51K1-F02

Nomenclature: PVC Cement, pint

Remarks: 6695-00-394-7786 C D Remarks: 7240-00-023-8570 Remarks: 7420-01-182-8531 Nomenclature: Calculator D Remarks: 7510-00-161-6215 Nomenclature: Ruler, Scale,12 C Remarks: 7510-00-515-0319 Nomenclature: Tape, Duct, roll Remarks:
10/15/98 51K1POI

Nomenclature: Gauge, Air Pressure

Nomenclature: Bucket; Water, 1 gal. B 051-51K1-B04 051-51K1-D02 051-51K1-B04 051-51K1-C03 051-51K1-E07 12 12 12 12 12 12 12 12 12 12 12 12 12 12 0 0 0 0 0 12 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 0:0 0:0 0:0 0:0 0:0 1:1 Y Y Y Y Y 0.0 0.0 0.0 0.0 0.0

EQUIPMENT SUMMARY Page No: 74 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 3 3 3 3 3 3 3 3 3 3 0 3 0 0 0 3 0 3 3 3 Average Equip/Student Ratio Peace Mob IDT ADT 1:4 1:4 1:4 1:4 1:4 1:4 1:4 1:4 1:4 1:4 0:0 1:4 0:0 0:0 0:0 1:4 0:0 1:4 1:4 1:4 C R I Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN 7920-00-205-1711 Nomenclature: Rags, bundle

Module C D F F

PFN 051-51K1-C02 051-51K1-D01 051-51K1-F01 051-51K1-F02 051-51K1-C02

Remarks: 8010-00-152-3245 Nomenclature: Oil, Linseed, pint Remarks: 8030-00-009-8246 C E E F Remarks: 8415-00-634-4658 Nomenclature: Gloves, Leather D D E E Remarks: 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E03 12 12 12 12 12 12 12 12 12 12 0 0 0 0 12 12 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 1:1 0:0 0:0 0:0 0:0 1:1 1:1 Y Y Y Y 0.0 0.0 0.0 0.0 C 051-51K1-C02 12 12 0 12 1:1 1:1 0:0 1:1 Y 0.0 051-51K1-C01 051-51K1-E01 051-51K1-E04 051-51K1-F01 6 6 6 6 6 6 6 6 0 0 0 0 6 6 6 6 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 0:0 0:0 0:0 0:0 1:2 1:2 1:2 1:2 Y Y Y Y 0.0 0.0 0.0 0.0 Nomenclature: Joint Compound, pint C

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 75 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 6 0 6 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:2 0:0 1:2 C R I Y Optempo HRS/MIL 0.0 PHASE: VER:

LIN/NSN 9150-00-825-9161 Nomenclature: Cutting Oil, pint Remarks: W34648

Module E

PFN 051-51K1-E01

D E E E E

051-51K1-D01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E06 051-51K1-C01 051-51K1-E01 051-51K1-D02

6 6 6 6 6 6 3 60

6 6 6 6 6 6 3 60

6 0 0 0 0 0 0 60

0 6 6 6 6 6 3 0

1:2 1:2 1:2 1:2 1:2 1:2 1:4 5:1

1:2 1:2 1:2 1:2 1:2 1:2 1:4 5:1

1:2 0:0 0:0 0:0 0:0 0:0 0:0 5:1

0:0 1:2 1:2 1:2 1:2 1:2 1:4 0:0

Y Y Y Y Y Y Y Y

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Nomenclature: Tool Kit, Carpenters

Remarks: TBD C E Remarks: TBD Remarks: TBD C D Remarks: 051-51K1-C01 051-51K1-D01 6 24 6 24 0 24 6 0 1:2 2:1 1:2 2:1 0:0 2:1 1:2 0:0 Y Y 0.0 0.0 Nomenclature: Clamps, Stainless Steel, w/Nails and Screws D Nomenclature: Cap, Waste System Nomenclature: Acid, Muriatic, w/Brush, pint

10/15/98 51K1POI

EQUIPMENT SUMMARY Page No: 76 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 6 6 12 6 6 6 12 12 6 6 6 6 12 6 6 6 12 12 6 0 0 0 12 0 6 0 12 0 0 6 6 6 0 6 0 6 0 12 6 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:2 1:2 1:1 1:2 1:2 1:2 1:1 1:1 1:2 1:2 1:2 1:2 1:1 1:2 1:2 1:2 1:1 1:1 1:2 0:0 0:0 0:0 1:1 0:0 1:2 0:0 1:1 0:0 0:0 1:2 1:2 1:2 0:0 1:2 0:0 1:2 0:0 1:1 1:2 C R I Y Y Y Y Y Y Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN TBD

Module C E

PFN 051-51K1-C01 051-51K1-E07 051-51K1-C01 051-51K1-D01 051-51K1-C01 051-51K1-D01 051-51K1-C01 051-51K1-D02 051-51K1-E02 051-51K1-F02

Nomenclature: Covering, Pipe, Wool Felt, roll Remarks: TBD C D Remarks: TBD C D Remarks: TBD Nomenclature: Plug, Test D E Remarks: TBD Remarks: TBD Remarks:
10/15/98 51K1POI

Nomenclature: Iron, Packing and Caulking

Nomenclature: Lead, Wool or Shredded, package

Nomenclature: Snake, Drain, 1/4 to 1/2 F 051-51K1-F02 6 6 0 6 1:2 1:2 0:0 1:2 Y 0.0

Nomenclature: Snake, Drain, Heavy Duty, 3/4

EQUIPMENT SUMMARY Page No: 77 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required For Peace Mob IDT ADT 6 6 6 6 6 6 6 6 0 6 0 6 6 0 6 0 Average Equip/Student Ratio Peace Mob IDT ADT 1:2 1:2 1:2 1:2 1:2 1:2 1:2 1:2 0:0 1:2 0:0 1:2 1:2 0:0 1:2 0:0 C R I Y Y Y Y Optempo HRS/MIL 0.0 0.0 0.0 0.0 PHASE: VER:

LIN/NSN TBD

Module C D E

PFN 051-51K1-C01 051-51K1-D02 051-51K1-E03 051-51K1-D02

Nomenclature: Solvent, ABS, pint

Remarks: TBD Nomenclature: Tank, Air Supply Remarks: TBD Nomenclature: Thimble, Sewer D Remarks: Local Remarks: D 051-51K1-D01 12 12 12 0 1:1 1:1 1:1 0:0 Y 0.0 Nomenclature: Mortarboard, Wooden, 2 x 2 051-51K1-D01 12 12 12 0 1:1 1:1 1:1 0:0 Y 0.0 C 051-51K1-C01 6 6 0 6 1:2 1:2 0:0 1:2 Y 0.0 D

10/15/98 51K1POI

TRAINING SUPPORT EQUIPMENT SUMMARY Page No: 78 COURSE: 720-51K10 COURSE TITLE: PLUMBER Qty Required for Single Course Iteration Peacetime Mobilization IDT 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 PHASE: VER:

Support Equipment 12 Passenger Transportation

Module C D D E E E E E E E F F F

PFN 051-51K1-C02 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E05 051-51K1-E06 051-51K1-E07 051-51K1-F01 051-51K1-F02 051-51K1-F03

ADT 1 0 0 1 1 1 1 1 1 1 1 1 1

10/15/98 51K1POI

FACILITIES SUMMARY Page No: 79 COURSE: 721-51K10 COURSE TITLE: PLUMBER Category Code 17120 Module B B B B C C C D D E E E E E E E F F F PFN 051-51H4-B01 051-51K1-B02 051-51K1-B03 051-51K1-B04 051-51K1-C01 051-51K1-C02 051-51K1-C03 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E05 051-51K1-E06 051-51K1-E07 051-51K1-F01 051-51K1-F02 051-51K1-F03 Unit of Measure Code sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. Facility Hours Peacetime Mobilization 1.0 1.0 1.0 7.0 4.5 5.0 14.0 3.0 9.3 11.5 1.5 1.0 1.0 1.0 0.5 1.5 1.3 2.0 1.0 1.0 1.0 1.0 7.0 4.5 5.0 14.0 3.0 9.3 11.5 1.5 1.0 1.0 1.0 0.5 1.5 1.3 2.0 1.0 IDT 1.0 1.0 1.0 7.0 0.0 0.0 14.0 3.0 9.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ADT 0.0 0.0 0.0 0.0 4.5 5.0 0.0 0.0 0.0 11.5 1.5 1.0 1.0 1.0 0.5 1.5 1.3 2.0 1.0 PHASE: VER:

Nomenclature: Classroom, GP, 750 sq. ft., 12 PN

10/15/98 51K1POI

FACILITIES SUMMARY Page No: 80 COURSE: 721-51K10 COURSE TITLE: PLUMBER Category Code Module PFN Unit of Measure Code Facility Hours Peacetime Mobilization IDT ADT PHASE: VER:

17990

C D D E E E E E E E F F F

051-51K1-C02 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E05 051-51K1-E06 051-51K1-E07 051-51K1-F01 051-51K1-F02 051-51K1-F03

each each each each each each each each each each each each each

3.0 25.5 23.5 23.5 7.5 6.0 6.0 6.0 4.5 4.5 16.7 4.5 5.0

3.0 25.5 23.5 23.5 7.5 6.0 6.0 6.0 4.5 4.5 16.7 4.5 5.0

0.0 25.5 23.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

3.0 0.0 0.0 23.5 7.5 6.0 6.0 6.0 4.5 4.5 16.7 4.5 5.0

Nomenclature: Construction Training Area

10/15/98 51K1POI

TRAINING AID, DEVICE, SIMULATION AND SIMULATOR SUMMARY Page No: 81 COURSE: 720-51K10 COURSE TITLE: PLUMBER Substitute Nomenclature NSN/LIN/DEV No. 6730-00-T54-1556 Nomenclature: Overhead Projector B B B C C C D D E E E E E E E F F F 051-51K1-B02 051-51K1-B03 051-51K1-B04 051-51K1-C01 051-51K1-C02 051-51K1-C03 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E05 051-51K1-E06 051-51K1-E07 051-51K1-F01 051-51K1-F02 051-51K1-F03 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Module B PFN 051-51K1-B01 Qty Req For Single Course Iteration Peacetime Mobilization IDT ADT 1 1 1 0 DL 0 Equip Replaced Nomen NSN/LIN PHASE: VER:

TRAINING AID, DEVICE, SIMULATION AND SIMULATOR SUMMARY Page No: 82 COURSE: 720-51K10 COURSE TITLE: PLUMBER Substitute Nomenclature NSN/LIN/DEV No. Module PFN Qty Req For Single Course Iteration Peacetime Mobilization IDT ADT DL Equip Replaced Nomen NSN/LIN PHASE: VER:

S59222 Nomenclature: Screen, Projection, BM-10

B B B B C C C D D E E E E E E E F F F

051-51K1-B01 051-51K1-B02 051-51K1-B03 051-51K1-B04 051-51K1-C01 051-51K1-C02 051-51K1-C03 051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E05 051-51K1-E06 051-51K1-E07 051-51K1-F01 051-51K1-F02 051-51K1-F03

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0

0 0 0 0 1 1 0 0 0 1 1 1 1 1 1 1 1 1 1

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10/15/98 51K1POI

TRAINING AID, DEVICE, SIMULATION AND SIMULATOR SUMMARY Page No: 83 COURSE: 720-51K10 COURSE TITLE: PLUMBER Substitute Nomenclature NSN/LIN/DEV No. Module PFN Qty Req For Single Course Iteration Peacetime Mobilization IDT ADT DL Equip Replaced Nomen NSN/LIN PHASE: VER:

5820-01-054-6484 Nomenclature: Television, Color, 21 inch 1AVTVE-PLR-VC1/2

B B

051-51K1-B03 051-51K1-B03

1 1

1 1

1 1

0 0

0 0

Nomenclature: Player, Videocassette, 1/2 Multi-STD

TRAINING AID, DEVICE, SIMULATION AND SIMULATOR SUMMARY Page No: 84 COURSE: 720-51K10 COURSE TITLE: PLUMBER Substitute Nomenclature NSN/LIN/DEV No. Module PFN Qty Req For Single Course Iteration Peacetime Mobilization IDT ADT DL Equip Replaced Nomen NSN/LIN PHASE: VER:

NO NSN

D D E E E E E E E F F F

051-51K1-D01 051-51K1-D02 051-51K1-E01 051-51K1-E02 051-51K1-E03 051-51K1-E04 051-51K1-E05 051-51K1-E06 051-51K1-E07 051-51K1-F01 051-51K1-F02 051-51K1-F03

12 12 12 12 12 12 12 12 12 12 12 12

12 12 12 12 12 12 12 12 12 12 12 12

12 12 0 0 0 0 0 0 0 0 0 0

0 0 12 12 12 12 12 12 12 12 12 12

0 0 0 0 0 0 0 0 0 0 0 0

Nomenclature: Work Booth, Plumbing, 8 x 8

Remarks: The following is the bill of materials required to construct each booth: Lumber, 2 x 4 x 8 Lumber, 2 x 4 x 10 Lumber, 2 x 4 x 12 Lumber, 2 x 6 x 10 Lumber, 2 x 8 x 8 Lumber, 2 x 8 x 10 Lumber, 2 x 10 x 10 Plywood, 4 x 8 x 1/2 Plywood, 4 x 8 x 3/4 Nails, 8d Nails, 10d Nails, 16d 65 board feet 35 board feet 68 board feet 27 board feet 42 board feet 42 board feet 65 board feet 6 sheets 3 sheets 8 pounds 10 pounds 20 pounds

10/15/98 51K1POI