Vous êtes sur la page 1sur 7

Astaldi S.p.

Dualisation of BidBid-Sur Road 40 km Lot A


1 USD = 0.79668 EUR; 1 USD = 0.37842 OMR;

Via G.V. Bona 65 Roma

Archivio[Analisi finale - Anagrafica] Andrea 24/07/2012 17:05

Pag.

Basic Cost Element Summary TOTAL


Id Riga

Codice

Descrizione

U.M.

Quantit

Costo U. (USD)

Costo (USD)

10 Manpower
10.10
10.10.10

Manpower: Local labours


Mpwr: L. labours O/A

00001

O/A Unskilled

HR

1,316,429.821

1.586

2,087,251.98

00005

O/A Semiskilled

HR

1,637,495.547

2.378

3,894,471.73

00010

O/A Skilled

HR

1,584,138.283

5.285

8,372,381.39

00015

O/A High Skilled

HR

164,403.332

7.267

1,194,728.51

00020

O/A Driver Light Vehicle

HR

58,303.040

5.021

292,732.35

00025

O/A Driver Heavy Vehicle

HR

1,461,325.165

6.606

9,654,122.17

00030

O/A Operator Light Equip.

HR

130,217.765

5.549

722,629.11

00035

O/A Operator Heavy Equip.

HR

1,137,825.453

7.267

8,268,643.29

00040

O/A Foreman

10.835

10,006,487.10

10.10.20
00125

HR

923,574.353

TOTALE Mpwr: L. labours O/A HR

8,413,712.757

U/G Driver Heavy Vehicle

10.10.80

44,493,447.62

Mpwr: L. labours U/G


HR

..................

TOTALE Mpwr: L. labours U/G HR

..................

....................

.....................
.....................

Mpwr: L. labours W/S

00301

W/S Unskilled

HR

176,435.616

1.586

279,745.70

00305

W/S Semiskilled Mechanic

HR

169,631.022

2.378

403,435.12

00307

W/S Semiskilled Electrician

HR

6,804.594

2.378

16,183.43

00310

W/S Skilled Mechanic

HR

848,155.110

6.210

5,267,069.68

00313

W/S Skilled Electrician

HR

28,616.077

7.307

209,088.99

00315

W/S High Skilled Mechanic

HR

424,077.555

8.720

3,698,155.31

00317

W/S High Skilled Electrician

HR

27,218.374

9.196

250,303.74

00325

W/S Driver Heavy Vehicle

HR

25,161.429

6.606

166,226.87

00340

W/S Foreman Mechanic

HR

169,631.022

10.042

1,703,392.75

00343

W/S Foreman Electrician

10.835

10.10.90

HR

6,804.594

TOTALE Mpwr: L. labours W/S HR

1,882,535.392

73,724.52
12,067,326.12

Mpwr: L. labours G/S

00201

G/S Unskilled

HR

699,274.000

1.586

1,108,726.81

00205

G/S Semiskilled

HR

309,548.000

2.378

736,201.05

00210

G/S Skilled

HR

106,750.000

5.285

564,187.94

00220

G/S Driver Light Vehicle

HR

219,000.000

5.021

1,099,571.90

00225

G/S Driver Heavy Vehicle

HR

338,000.000

6.606

2,232,968.66

00230

G/S Operator Light Equip.

HR

11,250.000

5.549

62,430.63

00240

G/S Foreman

HR

12.000

10.835

TOTALE Mpwr: L. labours G/S HR

1,683,834.000

5,804,217.01

TOTALE Manpower: Local labours HR

11,980,082.149

62,364,990.74

10.20
10.20.10

130.01

Manpower: Staff
Mpwr: Staff - Local

01050

Mech. W/shop Gen. Foreman O/A

Mh

44.000

2,906.823

127,900.22

01081

Prod. Gen. For. O/A

Mh

67.000

2,906.823

194,757.15

01110

Draftman/CAD Operator

Mh

90.000

1,057.027

95,132.39

01120

Surveyor Responsible

Mh

24.000

3,435.336

82,448.07

01125

Surveyor

Mh

24.000

1,849.797

44,395.12

01127

Surveyor Assistant

Mh

227.000

1,057.027

239,945.03

01137

Laboratory Assistant

Mh

231.000

1,849.797

427,303.00

01197

Technical Staff

Mh

88.000

1,585.540

139,527.51

01207

Cashier

Mh

46.000

1,585.540

72,934.83

01215

Computer Operat./ Programmer

Mh

45.000

1,849.797

83,240.84

01235

Personnel Office Assistant

Mh

83.000

1,849.797

153,533.11

01270

Security Responsible

Mh

47.000

3,435.336

161,460.81

01275

Security Officer

Mh

88.000

1,849.797

162,782.09

01290

Doctor

Mh

48.000

3,963.850

190,264.79

01295

Nurse

Mh

256.000

1,057.027

270,598.81

01320

Telephone Operator

Mh

46.000

1,057.027

48,623.22

01325

Data Entry Operator

Mh

45.000

1,057.027

47,566.20

01330

Clerk

Mh

400.000

1,585.540

634,215.95

01335

Timekeeper

Mh

199.000

924.898

184,054.75

01340

Secretary High Level

Mh

47.000

1,585.540

74,520.37

01345

Secretary

Mh

89.000

1,057.027

94,075.37

01350

Interpreter High Level

Mh

81.000

1,585.540

128,428.73

01365

Engineer

1,981.925

10.20.20
02000
Astaldi Tendering Department

Mh

105.000

TOTALE Mpwr: Staff - Local Mh

2,420.000

Mh

48.000

208,102.11
3,865,810.48

Mpwr: Staff - I
Site Agent

24,351.057

1,168,850.73

Astaldi S.p.A

Dualisation of BidBid-Sur Road 40 km Lot A


1 USD = 0.79668 EUR; 1 USD = 0.37842 OMR;

Via G.V. Bona 65 Roma

Archivio[Analisi finale - Anagrafica] Andrea 24/07/2012 17:05

Pag.

Basic Cost Element Summary TOTAL


Id Riga

Codice

Descrizione

U.M.

Quantit

Costo U. (USD)

Costo (USD)

02005

Production Manager

Mh

48.000

20,008.033

960,385.60

02010

Administrative Manager

Mh

48.000

20,008.033

960,385.60

02020

Plant Manager

Mh

48.000

20,008.033

960,385.60

02040

Plant Section Chief

Mh

47.000

15,727.770

739,205.20

02042

Prod. Section Chief O/A

Mh

68.000

15,727.770

1,069,488.38

02081

Prod. Gen. Foreman O/A

Mh

6.000

14,296.832

85,780.99

02180

Project Control Responsible

Mh

42.000

13,054.175

548,275.34

TOTALE Mpwr: Staff - I Mh

355.000

10.20.30

6,492,757.44

Mpwr: Staff - II

03015

Technical Manager

Mh

48.000

10,100.000

484,800.00

03030

Mech. W/shop Section Chief

Mh

47.000

4,757.000

223,579.00

03035

Electr. W/shop Section Chief

Mh

45.000

4,757.000

214,065.00

03042

Prod. Section Chief O/A

Mh

59.000

4,757.000

280,663.00

03050

Mech. W/shop Gen. For. O/A

Mh

174.000

3,964.000

689,736.00

03070

Plant Gen. Foreman

Mh

223.000

3,964.000

883,972.00

03081

Prod. Gen. Foreman O/A

Mh

..................

3,964.000

.....................

03160

Contract Adm. Responsible

Mh

48.000

13,000.000

624,000.00

03170

Quality Control Responsible

Mh

6.000

5,285.000

31,710.00

03240

Warehouse Responsible

Mh

45.000

5,285.000

237,825.00

03250

Purchasing Responsible

Mh

42.000

5,285.000

221,970.00

03370

Representative Office Responsible

Mh

47.000

5,285.000

TOTALE Mpwr: Staff - II Mh

784.000

10.20.40

248,395.00
4,140,715.00

Mpwr: Staff - III

04050

Mech. W/shop Gen. Foreman O/A

Mh

414.000

3,300.000

04055

Electr. W/shop Gen. Foreman O/A

Mh

85.000

3,300.000

280,500.00

04081

Prod. Gen. For. O/A

Mh

555.000

3,300.000

1,831,500.00

04100

Tech. Office Responsible

Mh

48.000

4,230.000

203,040.00

04105

Tech. Office Assistant

Mh

86.000

2,115.000

181,890.00

04120

Surveyor Responsible

Mh

41.000

4,230.000

173,430.00

04125

Surveyor

Mh

199.000

2,115.000

420,885.00

04130

Laboratory Responsible

Mh

48.000

4,230.000

203,040.00

04135

Laboratory Geologist

Mh

80.000

2,115.000

169,200.00

04140

Qty. Surveyor Responsible

Mh

48.000

4,230.000

203,040.00

04145

Qty. Surveyor Assistant

Mh

46.000

2,115.000

97,290.00

04150

Planning Responsible

Mh

44.000

4,230.000

186,120.00

04165

Contract Adm. Assistant

Mh

46.000

2,640.000

121,440.00

04170

Quality Control Responsible

Mh

44.000

4,230.000

186,120.00

04175

Quality Control Assistant

Mh

84.000

2,115.000

177,660.00

04185

Project Control Assistant

Mh

42.000

2,115.000

88,830.00

04197

Technical Staff

Mh

92.000

1,585.000

145,820.00

04200

Accountant Responsible

Mh

44.000

4,230.000

186,120.00

04205

Accountant

Mh

91.000

2,115.000

192,465.00

04210

EDP Responsible

Mh

44.000

4,230.000

186,120.00

04230

Personnel Office Responsible

Mh

46.000

4,230.000

194,580.00

04245

Storekeepeer

Mh

90.000

1,500.000

135,000.00

04255

Purchaser

Mh

46.000

2,115.000

97,290.00

04260

Safety Responsible

Mh

85.000

4,230.000

359,550.00

04265

Safety Officer

Mh

163.000

2,115.000

344,745.00

04280

Gen. Services Responsible

Mh

43.000

4,230.000

181,890.00

04285

Camp Supervisor

Mh

138.000

2,640.000

364,320.00

04305

Cook

Mh

..................

1,700.000

.....................

04310

Cook Helper

Mh

..................

528.000

.....................

04335

Timekeeper

Mh

44.000

1,500.000

66,000.00

04360

Senior Engineer

Mh

42.000

3,170.000

133,140.00

04375

Representative Office Assistant

Mh

46.000

2,115.000

TOTALE Mpwr: Staff - III Mh

2,924.000

8,574,515.00

6,483.000

23,073,797.92

..................

85,438,788.66

TOTALE Manpower: Staff Mh


TOTALE Manpower

1,366,200.00

97,290.00

20 Materials and Spare parts


20.10

Mat.: Fuels and Lubricant

10110

Diesel oil normal

KG

56,990,244.660

0.396

10140

Lubricants & grease

KG

1,432,808.731

3.700

TOTALE Mat.: Fuels and Lubricant KG

58,423,053.391

20.20

22,590,076.37
5,300,809.21
27,890,885.58

Mat.: Spare P. & Tyres

10200

Plant spare part : imported

LS

1,070,564.022

1.000

1,070,564.02

10210

Plant wearing parts: imported

LS

760,230.490

1.000

760,230.49

Astaldi Tendering Department

Astaldi S.p.A

Dualisation of BidBid-Sur Road 40 km Lot A


1 USD = 0.79668 EUR; 1 USD = 0.37842 OMR;

Via G.V. Bona 65 Roma

Archivio[Analisi finale - Anagrafica] Andrea 24/07/2012 17:05

Pag.

Basic Cost Element Summary TOTAL


Id Riga

Codice

Descrizione

U.M.

Quantit

Costo U. (USD)

Costo (USD)

10220

Equip.spare part : imported

LS

23,411,113.688

1.000

23,411,113.69

10230

G.E.tools : imported

LS

2,493,021.128

1.000

2,493,021.13

10300

Tyres and tubes: imported

LS

2,870,755.236

1.000

TOTALE Mat.: Spare P. & Tyres LS

30,605,684.563

20.30

Mat.: Hydr. Binders

10510

O.P. cement CPJ42.5 (bulk)

TON

178,008.118

57.212

10580

Bentonite (bulk)

TON

1,038.240

150.000

TOTALE Mat.: Hydr. Binders TON

179,046.358

20.40

2,870,755.24
30,605,684.56
10,184,122.83
155,736.00
10,339,858.83

Mat.: Additives/Admix.

11810

Air entrainer Sika AER

KG

398,170.254

1.321

526,095.68

11825

Water reducer

KG

1,652,279.240

1.110

1,833,828.24

11840

Accelerator agent

KG

210,731.293

1.057

222,748.58

11843

Microsilica

KG

358,751.053

0.280

100,490.49

11850

Moulds remover

KG

42,677.350

0.793

33,833.32

11860

Curing compound

KG

21,575.547

3.145

67,847.63

11892

SigunitL50AF

KG

558,057.194

1.057

589,881.29

11910

Antistripping Agent for bitumen

KG

..................

4.488

.....................

TOTALE Mat.: Additives/Admix. KG

3,242,241.931

20.60

3,374,725.23

Mat.: Bitumen & emuls.

13006

Bitumen type 40/50

TON

5,970.156

615.718

3,675,932.33

13010

Bitumen polymer modified

TON

15,367.787

887.902

13,645,094.11

13042

Cut back MC 30

TON

1,906.856

924.898

1,763,647.99

13050

Bituminous emulsion

TON

762.613

666.402

TOTALE Mat.: Bitumen & emuls. TON

24,007.412

20.70

508,207.18
19,592,881.61

Mat.: Steel reinforc.

13220

Re. steel bars H.S. corrugated......

TON

52,845.175

743.882

13320

Wire mesh

TON

618.035

840.750

519,612.93

13430

Prestressing wire 15.2 mm

TON

2,091.760

1,173.078

2,453,798.21

13432

Prestressing materials accessories (sheaths, heads..)

LS

2,738,113.840

1.000

2,738,113.84

13435

Sheath for prestressing cable

..................

0.220

.....................

13437

Head for prestressing cable

NO

..................

13.500

.....................

13510

Binding wire

KG

258,107.374

1.150

296,823.48

13520a

Tiges pour coffrages glissant

..................

16.250

.....................

13530

Armatures en acier galvanis

630,451.836

4.600

KG
TOTALE Mat.: Steel reinforc.

20.80

..................

39,310,598.60

2,900,078.45
48,219,025.50

Mat.: Timber & Plywood

13710

Timber low quality

M3

1.062

317.108

336.80

13730

Timber high quality

M3

486.757

369.959

180,080.34

13760

Plywood 10~12 mm.

M2

1,644.465

13.213

21,728.05

13765

Moulds for Facing Retaining Walls

M2

1,312.000

365.000

478,880.00

TOTALE Mat.: Timber & Plywood


20.90

..................

681,025.18

Mat.: Explosives & firing

14040

Gelatine 2/50

KG

726,047.592

2.685

1,949,327.08

14055

A.N.F.O.

KG

6,534,428.327

1.850

12,087,362.79

14080

Profile charge 30mm.

KG

356,654.957

2.246

801,111.76

14108

Detonator el. ordin. 6m

NO

273,860.057

1.586

434,216.04

14150

Blasting caps

NO

24,201.586

0.846

20,465.38

14210

Safety fuse

121,007.932

0.357

43,169.15

14230

Detonating fuse 12g/m

6,505,131.669

0.621

4,039,707.05

TOTALE Mat.: Explosives & firing


20.100

..................

19,375,359.26

Mat.: Drilling & breaking

14413

Drill bit R32 45 mm

NO

50.571

140.000

7,080.00

14420

Drill bit 2.1/2 (T/drill)

NO

7,920.288

325.000

2,574,093.47

14510

Rods 1.1/2 L3m

NO

2,640.096

490.000

1,293,646.97

14610

Coupling sleev.1.1/2 (T/Drill)

NO

3,960.144

170.000

673,224.45

14710

Shanks adapt.1.1/2 (T/drill)

NO

1,980.072

80.000

158,405.75

14910

Rods R32-38 L 4.3m

NO

14.750

585.000

8,628.75

15005

Coupling sleev.R 38

NO

22.125

110.000

2,433.75

15105

Shanks adapt.R 38

NO

8.045

106.000

TOTALE Mat.: Drilling & breaking NO

16,596.091

20.110

(T/drill)

852.82
4,718,365.95

Mat.: Steel prof. plates. str.

15600

Steel profile (average)

TON

14.618

1,700.000

24,851.39

15700

Steel plate (average)

TON

35.937

900.000

32,343.05

16520

Steel carpentry (medium)

TON

11.101

1,415.000

15,707.28

TOTALE Mat.: Steel prof. plates. str. TON

61.656

20.130
Astaldi Tendering Department

Mat.: Anchors, R/bolts,Tendons

72,901.72

Astaldi S.p.A

Dualisation of BidBid-Sur Road 40 km Lot A


1 USD = 0.79668 EUR; 1 USD = 0.37842 OMR;

Via G.V. Bona 65 Roma

Archivio[Analisi finale - Anagrafica] Andrea 24/07/2012 17:05

Pag.

Basic Cost Element Summary TOTAL


Id Riga

Codice

Descrizione

U.M.

Quantit

Costo U. (USD)

Costo (USD)

17043

Rock bolt D.25mm, 6.00m.- 270KN

NO

2,400.000

46.000

110,400.00

17045

Rock bolt D.32mm, 12.00m.- 440KN

NO

300.000

139.000

41,700.00

17410

Anchor Tendons 750 kN

3,000.000

13.150

39,450.00

17500

Resin cartridge

NO

..................

6.400

.....................

17600

Bearing Plate Anchor

NO

150.000

59.480

8,922.00

17605

Wedge Plate Anchor

NO

150.000

50.500

TOTALE Mat.: Anchors, R/bolts,Tendons


20.150

..................

Mat.: Misc. steel mat.

18020

Gabions 2.0 x 1.0 x 1.0 (2.7 mm)

NO

1,000.000

35.000

18040

Signboard-galvanized steel

NO

4.000

2,100.000

TOTALE Mat.: Misc. steel mat. NO

1,004.000

20.200

7,575.00
208,047.00
35,000.00
8,400.00
43,400.00

Mat.: PVC, PEHD, PELD pipes

23150

Unplastized PVC: pipe D.150 mm

1,010.960

11.892

12,021.88

23205

Unplastized PVC: pipe D.250 mm

320.000

31.711

10,147.46

23240

Gully Grate uPVC

NO

230.000

17.177

TOTALE Mat.: PVC, PEHD, PELD pipes


20.220

..................

3,950.64
26,119.97

Mat.: Building mat.

24005

Non woven Geotextile 300 g./m2

M2

150.000

3.171

475.66

24017

Geofoam ESP 18/20 kg/m3

M3

30,600.000

60.000

1,836,000.00

24105

Waterproof membrane 4mm

M2

128,510.762

7.928

1,018,794.69

24318

Bridge Elastomeric bearing 1200kn

NO

104.000

95.000

9,880.00

24319

Bridge Elastomeric bearing 1500kn

NO

168.000

95.000

15,960.00

24320

Bridge Elastomeric bearing 1300kn

NO

680.000

208.000

141,440.00

24321

Bridge Guided Pot Bearing 2800kn

NO

8.000

2,960.000

23,680.00

24322

Bridge Guided Pot Bearing 3260kn

NO

6.000

3,000.000

18,000.00

24323

Bridge Guided Pot Bearing 8522kn

NO

32.000

4,558.000

145,856.00

24324

Bridge Guided Pot Bearing 8525kn

NO

8.000

4,647.000

37,176.00

24325

Bridge Guided Pot Bearing 9400kn

NO

8.000

4,876.000

TOTALE Mat.: Building mat.


20.230
26010

39,008.00
3,286,270.35

Mat.: Insul/protect. paint


Bituminous insulating paint

20.900

..................
KG

50,953.630

TOTALE Mat.: Insul/protect. paint KG

50,953.630

4.000

203,814.52
203,814.52

Mat: Various L. Sum Mat.

39810

Various mat. for O/A earthworks

LS

321,182.480

1.000

39830

Various mat. for drill/grouting

LS

5,700.000

1.000

5,700.00

39840

Various mat. for concrete and fomworks

LS

1,369,536.815

1.000

1,369,536.82

39850

Various mat. for plant

LS

408,299.843

1.000

408,299.84

39870

Various electric material

LS

406,291.786

1.000

406,291.79

39880

Various pipes and fittings

LS

2,314.392

1.000

2,314.39

39990

Miscellaneous materials

LS

1,094,328.563

1.000

1,094,328.56

TOTALE Mat: Various L. Sum Mat. LS

3,607,653.879

3,607,653.88

..................

172,246,019.16

TOTALE Materials and Spare parts

321,182.48

30 Subcontractors
30.10

Sub.: O/A Earthw.

40010

Subc. O/A Earth excav./ transp up to 5 Km

M3

28,100.000

3.303

40110

Subc. Embankment

M3

13,600.000

2.643

35,938.90

40300

Subc. water well excavat.

..................

251.044

.....................

TOTALE Sub.: O/A Earthw.


30.25
41300

LS

1,335,245.093

TOTALE Sub.: Road Signs LS

1,335,245.093
1,625,080.000

2.643

4,294,381.90

..................

100.000

.....................

Pile boring diam. 1200 mm

LS

45116c

Placing steel for piles

TON
TOTALE Sub.: Found. treatm.

46240

1,335,245.09
1,335,245.09

..................

4,294,381.90

Sub.: Instrum., E.M.


Sub. Electrical Works

30.90

1.000

Sub.: Found. treatm.

45116b

30.60

128,759.05

Sub.: Road Signs


Subc.Road Signs

30.50

..................

92,820.15

LS

6,395,059.252

TOTALE Sub.: Instrum., E.M. LS

6,395,059.252

1.000

6,395,059.25
6,395,059.25

Sub.: Civil works

49015

Subc. Camps & Facilities for Engineer

LS

591,783.069

1.000

591,783.07

49017

Subc. Maintenance Road & Traffic protec.

LS

489,778.735

1.000

489,778.74

49020

Subc. Subsurface Investigation Works

LS

292,290.548

1.000

292,290.55

49030

Subc. Demolition, Removal & Disposal Works

LS

415,281.766

1.000

415,281.77

49035

Subc. Stabilization Soil Works

LS

43,229.745

1.000

43,229.74

49037

Subc. Precast Concrete Paving Works

LS

119,888.959

1.000

119,888.96

49040

Subc. Road Barriers Works

LS

7,198,344.763

1.000

7,198,344.76

Astaldi Tendering Department

Astaldi S.p.A

Dualisation of BidBid-Sur Road 40 km Lot A


1 USD = 0.79668 EUR; 1 USD = 0.37842 OMR;

Via G.V. Bona 65 Roma

Archivio[Analisi finale - Anagrafica] Andrea 24/07/2012 17:05

Pag.

Basic Cost Element Summary TOTAL


Id Riga

Codice

Descrizione

U.M.

Quantit

Costo U. (USD)

Costo (USD)

49115

Concrete supply and pouring C300

M3

2,910.000

85.000

247,350.00

49120

Precast concrete deck construction

LS

12,133,940.000

1.255

15,230,632.12

49122

Viaduct Found & Pier construction

LS

11,499,485.272

1.255

14,434,258.76

49125

Subc. Bridge Works

LS

1,431,501.517

1.000

1,431,501.52

49126

Box culvert/drainage pouring Incl.formworks

M3

1,386,630.000

2.643

3,664,261.93

49160

Subc. Postensioning

TON

745.677

2,362.454

1,761,627.92

49165

Subc. Reinf. steel cut bend & installation

LS

..................

1.000

.....................

49170

Subc. Reinf. steel supply/fixing

TON

212.000

1,200.000

254,400.00

49180

Formworks

M2

2,140.000

22.462

48,068.28

49182

Subc.Formworks

LS

..................

1.000

.....................

49183

Subc.Concrete pouring

LS

..................

1.000

TOTALE Sub.: Civil works


30.100

..................

.....................
46,222,698.13

Sub.: Camps constr.

50005

Senior camp urbanization

M2

4,416.000

35.675

50015

Senior guest house construction

M2

150.000

342.193

51,328.88

50020

Senior bachelors block construction

M2

1,095.000

302.356

331,079.87

50025

Senior canteen,market,store construction

M2

245.000

364.443

89,288.57

50030

Senior club construction

M2

80.000

497.190

39,775.18

50035

Hospital construction

M2

60.000

201.083

12,065.00

50050

Laundry construction

M2

175.000

389.556

68,172.26

50060

Junior camp urbanization

M2

17,655.000

26.426

466,545.11

50070

Junior staff house construction

M2

1,845.000

233.230

430,308.75

50075

Junior workers accomodation construction

M2

3,662.500

251.567

921,364.70

50080

Junior camp Canteen / Club construction

M2

1,500.000

478.493

717,739.21

50205

Site urbanization

M2

20,395.000

39.638

808,427.14

50210

Various shed construction

M2

1,555.000

220.000

342,100.00

50215

Warehouse construction

M2

720.000

369.959

266,370.70

50225

Fuel station construction

M2

30.000

340.000

10,200.00

50230

Workshop Heavy D. construction

M2

925.000

369.959

342,212.36

50235

Workshop Light D. construction

M2

1,015.000

369.959

375,508.69

50240

Offices... construction

M2

1,897.000

324.223

615,050.43

50245

Joinery Construction

M2

250.000

325.000

81,250.00

50920

Demobilization of Site facilities

LS

997,762.810

1.000

997,762.81

50930

Demobilization of Aux. Services and Plant

LS

1,326,579.480

1.000

1,326,579.48

TOTALE Sub.: Camps constr.


30.190
60060

..................

157,539.24

8,450,668.39

Subcontractors: Miscellaneous
Training

LS

..................

TOTALE Subcontractors: Miscellaneous LS

..................

.....................

..................

66,826,811.81

TOTALE Subcontractors

1.000

.....................

35 Plant & equipment freight/ins


51005

Sea freight (Europe/....)

P. U.

51110

Freigth insurance .35% CIF

LS

19,060.000

85.000

200,211.256

1.000

51120

Port charges

51220

Inland transp. road

200,211.26

P. U.

19,060.000

25.000

476,500.00

P. U.

24,670.000

26.426

TOTALE Plant & equipment freight/ins

..................

1,620,100.00

651,921.15
2,948,732.40

40 Depreciation
52000

Deprec. Mobile Equipment

LS

48,998,751.057

1.000

48,998,751.06

52001

Deprec. Electric power plant O/A

LS

750,000.000

1.000

750,000.00

52011

Deprec. Water supply plant O/A

LS

150,000.000

1.000

150,000.00

52012

Deprec.Potable Water supply plant O/A

LS

150,000.000

1.000

150,000.00

52031

Deprec. Compressed air plant O/A

LS

55,000.000

1.000

55,000.00

52050

Deprec. Minor Equipm. for O/A Rock Excav.

LS

100,416.729

1.000

100,416.73

52055

Deprec. Minor Equipm. for O/A earthworks

LS

160,000.000

1.000

160,000.00

52059

Deprec. Minor Equipm. for Road Pavements

LS

50,208.365

1.000

50,208.36

52075

Deprec. Minor Equipm. for Concrete

LS

127,500.000

1.000

127,500.00

52080

Deprec. Minor Equipm. for Formworks

LS

112,500.000

1.000

112,500.00

52120

Deprec. Aggregate cr. Plant

LS

840,000.000

1.000

840,000.00

52125

Deprec.aggregate washing Plant

LS

251,041.824

1.000

251,041.82

52135

Deprec. Premix plant

LS

150,000.000

1.000

150,000.00

52150

Deprec. Asphalt Plant

LS

1,050,000.000

1.000

1,050,000.00

52160

Deprec. Batching plant

LS

1,969,297.585

1.000

1,969,297.58

52200

Deprec. Metallic Formworks - Plane

LS

187,500.000

1.000

187,500.00

52201

Deprec. Metallic Formworks - ditches & channels

LS

187,500.000

1.000

187,500.00

52202

Deprec. Metallic Formw -Rampant Piers

LS

312,000.000

1.000

312,000.00

52204

Deprec. Formworks Cimbing Piers

LS

..................

1.000

.....................

52208

Deprec. Metallic Formworks - Walls

LS

225,000.000

1.000

225,000.00

Astaldi Tendering Department

Astaldi S.p.A

Dualisation of BidBid-Sur Road 40 km Lot A


1 USD = 0.79668 EUR; 1 USD = 0.37842 OMR;

Via G.V. Bona 65 Roma

Archivio[Analisi finale - Anagrafica] Andrea 24/07/2012 17:05

Pag.

Basic Cost Element Summary TOTAL


Id Riga

Codice

Descrizione

U.M.

Quantit

Costo U. (USD)

Costo (USD)

52214

Deprec. Metallic Formworks - Deck in situ

LS

318,750.000

1.000

52216

Deprec. Metallic Formw.box culvert

LS

93,750.000

1.000

318,750.00
93,750.00

52500

Deprec. Steel yard equipment

LS

750,000.000

1.000

750,000.00

52600

Deprec. Precast yard equipm.beams/walls/barriers

LS

1,333,984.787

1.000

1,333,984.79

52640

Deprec: Launching beams

LS

658,984.787

1.000

TOTALE Depreciation LS

58,982,185.133

658,984.79
58,982,185.13

50 Supplies
50.10

Suppl.: Contrac. Logistics

53005

Senior camp family/guest house furniture

M2

..................

92.520

53010

Senior camp bachelor furniture

M2

420.000

72.694

30,531.48

53015

Senior canteen,market,...furniture

M2

..................

72.694

.....................

53020

Senior club furniture

M2

..................

72.694

.....................

53025

Hospital furniture

M2

..................

105.737

.....................

53040

Caravan

NO

1.000

25,452.473

25,452.47

53055

Junior camp workers furniture

M2

962.500

33.043

31,803.89

53060

Junior camp family / staff furniture

M2

160.000

39.651

6,344.16

53065

Junior camp canteen / club furniture

M2

..................

33.043

.....................

53080

Offices / laboratory furniture

M2

110.000

79.303

8,723.33

53085

Laundry furniture

M2

..................

46.260

.....................

53105

Senior camp family/guest house equipment

LS

..................

1.000

.....................

53110

Senior camp bachelor equipment

LS

84,000.000

1.000

84,000.00

53115

Senior canteen,market, equipment

LS

..................

1.000

.....................

53120

Senior club equipment

LS

..................

1.000

.....................

53125

Hospital equipment

LS

..................

1.000

.....................

53140

Laundry Equipment

LS

..................

1.000

.....................

53155

Junior camp workers equipment

LS

96,250.000

1.000

96,250.00

53160

Junior family / staff equipment

LS

15,000.000

1.000

15,000.00

53165

Junior camp canteen / club equipment

LS

..................

1.000

.....................

53205

Warehouse equipment

LS

61,600.000

1.000

61,600.00

53215

Fuel station equipment

LS

88,000.000

1.000

88,000.00

53220

Workshop Heavy D. equipment

LS

..................

1.000

.....................

53225

Workshop Light D. equipment

LS

..................

1.000

.....................

53305

Supply of office general equipment

LS

14,230.000

1.000

14,230.00

53310

Supply of personal computer

LS

..................

1.000

.....................

53315

Supply of Printers ecc, Server&Network, Hardware

LS

92,997.000

2.643

245,750.75

53320

Supply of Printers, Plotters, Scanners

LS

..................

1.000

.....................

53330

Supply of telephone,fax,...

LS

22,600.000

1.000

22,600.00

53335

Supply of radio system

LS

25,100.000

1.000

25,100.00

53340

Supply of surveyor equipment

LS

219,800.000

1.000

219,800.00

53345

Supply of laboratory equipment

LS

75,000.000

2.643

198,192.48

53350

Supply of Software

LS

90,950.000

2.643

TOTALE Suppl.: Contrac. Logistics


50.20
50.20.10

..................

.....................

240,341.42
1,413,719.99

Suppl.: Contrac. Various


Suppl.: Contrac. Miscellaneous

54005

Electric industrial power supply

KW

..................

0.192

.....................

54015

Industrial water supply

M3

942,197.414

3.491

3,289,051.28

54020

Potable water supply

M3

259,350.000

3.673

TOTALE Suppl.: Contrac. Miscellaneous


50.20.20
54040

..................

Suppl.: Contrac. Quarry mat.


Crushed aggregates supply

TON.

..................

TOTALE Suppl.: Contrac. Quarry mat. TON.

..................

.....................

..................

4,241,687.24

TOTALE Suppl.: Contrac. Various


50.30
54395

952,635.96
4,241,687.24

178.875

.....................

Suppl.: To Client
Supply of Electric Power Generator 150 KW, 180 HP

NO

..................

TOTALE Suppl.: To Client NO

..................

.....................

..................

5,655,407.22

TOTALE Supplies

15,140.597

.....................

55 Consultings
55.20
54501

Cons.: Technical assistance


Technical assistance

LS

180,000.000

TOTALE Cons.: Technical assistance LS

180,000.000

1.255

225,937.64
225,937.64

TOTALE Consultings LS

180,000.000

225,937.64

59 Prov. sums / Contingencies


59.10
54900

Astaldi Tendering Department

Provisional Sums
Provisional Sum:

LS

100,000.000

TOTALE Provisional Sums LS

100,000.000

2.643

264,256.65
264,256.65

TOTALE Prov. sums / Contingencies LS

100,000.000

264,256.65

Astaldi S.p.A

Dualisation of BidBid-Sur Road 40 km Lot A


1 USD = 0.79668 EUR; 1 USD = 0.37842 OMR;

Via G.V. Bona 65 Roma

Archivio[Analisi finale - Anagrafica] Andrea 24/07/2012 17:05

Pag.

Basic Cost Element Summary TOTAL


Id Riga

Codice

Descrizione

U.M.

Quantit

Costo U. (USD)

Costo (USD)

60 Rentals
60.10

Rent.:Civil W. Equip.

55030

Rent of Hard Top

DAY

540.000

45.000

24,300.00

55212

Rent of Tower crane R=35m 3t

Mh

110.000

10,669.278

1,173,620.53

TOTALE Rent.:Civil W. Equip.


60.20

..................

1,197,920.53

Rent.: Logistics

55605

Senior Bachelor's house rental

M2.MH

55630

Senior flat running costs

LS

960.000

23.077

1,800.000

1.000

22,153.92
1,800.00

TOTALE Rent.: Logistics

..................

23,953.92

TOTALE Rentals

..................

1,221,874.45

70 Various General Expenses


70.10

Var. exp.: Gen. Serv.

57005

Restaurant local expenses

DAY

2,400.000

25.641

57010

Restaurant international expenses

DAY

220.000

76.923

16,923.06

57015

Hotel local expenses

DAY

2,040.000

51.282

104,615.28

57020

Hotel international expenses

DAY

220.000

192.308

42,307.76

57025

Air passages international

NO

140.000

891.198

124,767.79

57030

Air passages local

NO

440.000

88.000

38,720.00

57035

Local traveling expens.

LS

21,600.000

1.000

21,600.00

57040

Foodstuff local personnel

LS

10,453,743.599

1.000

10,453,743.60

57043

Foodstuff local staff

LS

1,320,657.378

1.000

1,320,657.38

57045

Foodstuff expatriate personnel

LS

566,275.881

1.000

566,275.88

57050

Welfare

LS

26,600.000

1.000

26,600.00

57055

Public relation, intrateinement

LS

26,600.000

1.000

26,600.00

57065

Gen.services various expenses

LS

96,640.000

1.000

96,640.00

57070

Camp expenses

LS

34,200.000

1.000

34,200.00

57080

Medical examinations

LS

95,000.000

1.000

95,000.00

57085

Medicines

LS

95,000.000

1.000

95,000.00

57090

Office expenses

LS

133,830.000

1.000

133,830.00

57100

Tophographic expenses

LS

25,000.000

1.000

25,000.00

57105

Radio expenses

LS

76,000.000

1.000

76,000.00

57107

Fax, phone, internet expenses

LS

406,200.000

1.000

406,200.00

57110

Stationary

LS

114,000.000

1.000

114,000.00

57115

Safety various expenses

LS

76,000.000

1.000

76,000.00

57120

Safety garments

LS

570,000.000

1.000

570,000.00

57125

Security various expenses

LS

3,800.000

1.000

3,800.00

57130

Vehicles tax, licence, insurance

LS

114,000.000

1.000

114,000.00

57135

Film, photo expenses

LS

26,600.000

1.000

26,600.00

57140

Books, magazines subscription expenses

LS

11,400.000

1.000

11,400.00

57150

Computers maintenance: PC ~, printers, network

LS

85,500.000

1.000

85,500.00

TOTALE Var. exp.: Gen. Serv.


70.20

..................

61,538.40

14,767,519.14

Var. exp.: Gen. Exp.

57420

Legal consulting expenses

LS

100,000.000

1.255

57425

Auditing expenses

LS

50,000.000

1.255

62,760.46

57430

Technical consulting expenses

LS

250,000.000

1.255

313,802.28

57440

Home office tech. Assistance

LS

250,000.000

1.255

313,802.28

57445

Other consulting expenses

LS

100,000.000

1.255

125,520.91

57450

Warehouse inventory depreciation

LS

100,000.000

1.255

125,520.91

57555

Overseas integration depreciation

LS

..................

1.255

.....................

57620

Insurances

LS

2,133,740.000

1.255

2,678,289.90

57630

Bonds

LS

3,379,000.000

1.255

4,241,351.61

TOTALE Var. exp.: Gen. Exp. LS

6,362,740.000

7,986,569.26

TOTALE Various General Expenses

..................

22,754,088.41

TOTALE FINALE (USD)

..................

416,564,101.54

Astaldi Tendering Department

125,520.91

Vous aimerez peut-être aussi