Project: INPUT
River name : Location : Measured flow for MIP method l/s: Month and day of flow measurement: MIP region (1 -7) : Area of basin below 3000m elevation A3000 km2 : Turbine discharge Qd l/s: Water losses due to evaporation/flushing/seepage % : Downstream water release due to environmental reasons % :
19
OUTPUT
MIP monthly average discharge Month @ river To plant January 170.31 89.64 February 127.73 89.64 March 92.25 89.64 April 70.96 63.87 May 184.50 89.64 June 425.77 89.64 July 1028.94 89.64 August 1774.04 89.64 September 1170.87 89.64 October 567.69 89.64 November 290.94 89.64 December 219.98 89.64 Annual av 510.332 87.488 Hydest Flood Flows Return Period (yrs) 2 20 100
Q as per MGSP =78.413 l/s with 11-month Flood Discharge (m3/s) Daily Instantaneous 11.272 21.133 28.840 68.185 42.548 110.736 As per MGSP 78.413 82.539 4.127 7.096 89.636 11
Discharge (l/s) Designed Qturbine 80.000 Q diverted 84.211 Q losses 4.211 Q release 7.096 Q required @ river 91.307 Q exceedence (month) 11
Long Term Average Annual Hydrograph of Chilli Khola river, Upper Chilli Khola MHP
2000 1800 1600
Column B
Discharge (l/s)
Jan
Feb
Mar
Apr
May
Jun MONTH
Jul
Aug
Sep
Oct
Nov
Dec
A1:
Pushpa Chitrakar: GUIDELINES/STANDARDS *15 years as the economic life span of the project. *Q design = Minimum of Q available - environmental release (~10%)- conveyance losses(~5%) 85% of Q available *Minimum probability of exceedence of Q available at river should be 11months. *At least one spot Q measurement in dry season for all projects. *Q monthly flow using MIP with interpolations. Alternatively, Hydest method may be used if the catchment area is relatively larger (=> 100 square km). *Q flood flow of 20 year return period using Hydest if Qd>100 lps . *Qmeasurement preferable during November to May or else it has to be verified later. *Q measurement methods Bucket collection < Weir >Salt dilution 10lps < Q >30lps +- 10% tolerance on Qd at power verification* Pushpa Chitrakar: BLUE cells are mandatory inputs Pushpa Chitrakar: Q measurement methods Bucket collection < Weir >Salt dilution 10lps < Q >30lps Pushpa Chitrakar: A3000 should be zero if the flood calculation is not needed. Pushpa Chitrakar: Q available = Qdesign + 10% environmental release/weir losses +5% conveyance losses. Pushpa Chitrakar: The design discharge for structures from penstock inlet to tailrace (penstock, turbine, tailrace, valves). This discharge should be =< 85% of Q available durig 11 months. Pushpa Chitrakar: MGSP requires that Q turbine =< 85% of Q11 Pushpa Chitrakar: The design discharge for structures from intake to forebay (intake, headrace, gravel trap, settling basin). Pushpa Chitrakar: The discharge that should be available in the river. This discharge is also used for Q exceedence calculations.
A2: A6: