PT KSB INDONESIA

Jl. Timor Blok D2 1 Kawasan Industri MM 2100 CIBITUNG BEKASI 17520. Indonesia Telp : + 6221-89983570 Fax : + 6221-89983571

Check List Pre-Commissioning Pump


Customer Site Date Contact person Pump Type Serial Number Pump Driven Type Serial Number Driver

Phone/Mobile phone

The client activities check list is required to compile the data and to ensure our service personnel spend a minimum amount of time on site for start up and also to be used in conjunction with the manufacturers pre-start check list. This document shall be filled out by customer or the contractor or the end user in advance of actual equipment start-up. Please fill this form as complete as possible. Please send to: ksbwarranty.balikpapan@ksb.com. Note: DONE for comply, NOT DONE for problem or non-compliance, NA for not applicable.
No. 1 2 3 Check List Installed pontoon and ensure good condition ( if any ) Make sure the unit already the position for start up Check and install completed piping discharge for unit, ensure install Y pipe spool and accessories ensure be installed. ( please check for standard unit pipe spool and accessories. List standard unit accessories : Y pipe , reducer and valve ) Installed boom and accessories Installed suction pipe/hose and accessories ( suction strainer + clamp hose ) Installed winch and accessories Filled fuel for engine into skid tank Filled oil for engine till to operation level ( please see recommendation oil for engine to manual instruction from PT KSB Indonesia ) Filled oil for bearing pump with the standard oil KSB Indonesia Check and ensure accessories for standard unit is good condition Working lamp Rotary lamp Vacuum panel Engine panel High and Low sensor Install cable for battery Installed muffler for engine DONE NOT DONE NA

4 5 6 7 8 9 10 10.1 10.2 10.3 10.4 10.5 10.6 11

Note/Comment: If your PIPE not assembly on the discharge line we cant running your pump set as well. . Check and Filled by, ..

(..)