Vous êtes sur la page 1sur 2

Electric Power eTool: Energized vs. Deenergized Work - Live Line/Ba...

http://www.osha.gov/SLTC/etools/electric_power/energized_liveline_b...

A to Z Index | E n espaol | Contact Us | FA Qs | About OS HA

OSHA

Newsletter

RSS Feeds

Print This Page

Text Size

Was this page helpful?

What's New | Offices Home Workers Regulations Enforcement Data & Statistics Training Publications Newsroom Small Business

eT ools Home : Electric Power

Overview | Scope | SH Topic s Page | Viewing / Printing Instructions | Credits

Electric Power >> Energized vs. Deenergized Work >> Live Line/Bare Hand Work and Tools Energized vs. Deenergized Work

Live Line/Bare Hand Work and Tools


All line work procedures emphasize preventing potentially hazardous vol tage differences across a worker's body. Such prevention usually involves avoiding contact between the worker and energized parts through the use of engi neering controls, administrative controls (including deenergizing), and electrical protective equipment (for example, PPE, IPE). Live Line/Bare Hand Work (LLBHW) is different269-qualified employees [See 1910.269(x)] are in direct contact with energized conductors and must maintain minimum approach distances from the tower and all other grounded surfaces and other lines and circuits. (See 1910.269(q)(3).) This work is frequently performed from an electrically insulated aerial lift (for example, a bucket truck), which has its platform insulated from the ground or earth. (See 1910.269(q)(3)(iii).) The workers on the platform electrically bond, or connect, the platform to the power line and are literally charged to the same voltage as the line. (See 1910.269(q)(3)(vi).) This is the "bird on the wire" concept like birds landing on overhead power lines safely. In addition, PPE for LLBHW consists of conductive rather than i nsulating materials. Workers performing LLBHW wear conductive hooded coveralls and gloves and are bonded to the conductor. When aerial lifts are not used, workers performing LLBHW typically access the energized conductor using insulated ladders or platforms, which insul ate the workers from the tower. See: 1910.269(j) - Live Line Tools Training and Job Briefings Workers performing or supervisi ng the LLBHW must be thoroughly trained in LLBHW 1910.269(j)(2) - Care, testing, procedures and techniques before bei ng assigned to this work. Training and job and cleaning of live line tools briefings must include information about line voltage, mini mum approach distances, and the voltage limitations of any conductive equipment to be used. (See 1910.269(c) 1910.269(l)(2)(i), (l)(3), (l)(7) and 1910.269(q)(3)(i) and (ii)) PPE for live line work Live Line/Bare Hand Tools, Devices, and Weather For LLBHW, the "269" standard requires that: All insulating equi pment, insulating tools, platforms, and aerial devices used in LLBHW must be designed, tested, and intended for LLBHW. These items must be kept clean and dry during use. Automatic reclosing devices on lines being worked on must be set to non-reclosing. No LLBHW can be done during bad weather that includes thunderstorms, high winds [See 1910.269(q)(3)(v)], snowstorms, and ice storms. Only non-conductive hand lines can be used between workers bonded to the energized conductor and personnel on the ground, and no uninsulated items can be passed from a worker on a structure to workers performing LLBHW. Insulated ladders and platforms used in LLBHW must be properly secured, not overloaded, used only for LLBHW, and be capabl e of supporting 2.5 times the intended load. When aerial lifts are used for LLBHW, the equipment must be designed for this type of work. The aerial lift must also have both upper and lower controls in which the lower controls can override the upper controls to bring the unit down in an emergency. The controls must be checked for proper operation prior to work. Prior to use, trucks must be grounded or barricaded and treated as energized. The boom must be tested by raising and placing the bucket in contact with the energized conductor for at least three minutes. The leakage current must be measured and cannot exceed 1 microampere for each 1KV of conductor voltage. Work from an aerial lift must be suspended if a malfunction is indicated. Workers must be connected to conductive bucket liners that are bonded to the energized conductor for the duration of the work. A non-conducti ve plate showing minimum approach distances must be installed on the boom in clear view of the bucket operator, and a non-conductive measuring device must be available for checking the distances. Minimum approach distances must be maintained between the bucket and all grounded objects. The above requirements can be found in 1910.269(h)(2) and (3), (j)(2), and (q). Job Briefings and Best Practices Energized vs. Deenergized Work Minimum Approach Distances Equipotential Zone 1910.269(q) - Operations near energized l ines or equipment Also see: 1910.137 - Electrical protective devices

1 de 2

18/03/2013 21:06

Electric Power eTool: Energized vs. Deenergized Work - Live Line/Ba...

http://www.osha.gov/SLTC/etools/electric_power/energized_liveline_b...

Overhead Line Work Use of Aerial Lifts

eT ools Home : Electric Power

Overview | Scope | SH Topic s Page | Viewing / Printing Instructions | Credits

Freedo m of Information Ac t | Privacy & Security Statement | Disclaimers | Customer Survey | Imp ortant Web Site Notices | International | Contact Us U.S. Departme nt of L abor | Occupational Safety & Health Administration | 200 Constitution Ave., NW, Washington, DC 20210 Telephone: 800-321-OS HA (6742) | TTY: 877-889-5627

www.OSHA.gov

2 de 2

18/03/2013 21:06

Vous aimerez peut-être aussi