P O W E R P L A N T S I M U L A T O R
The PROGENSIM - Power Plant Simulator consists of a comprehensive Model of a fossilfired (coal, oil, gas) power plant. The simulator can be operated in the full dynamic range, including startup from cold condition, load maneuvering, and shutdown. The fully integrated simulator includes an Instructor Console, and operator Stations. The Operator display software can be selected from a list of DCS emulations. The description of the power plant and the training features are summarized below.
CAPACITY
210 MW
FUELS
Coal Oil Natural Gas
STEAM GENERATOR
Drum type Natural Circulation
PROGENSIM
POWER PLANT SIMULATOR
T U R B I N E A N D G E N E R AT O R SYSTEMS
HP/IP/LP Turbines Main Stop Valve with Bypass 4 Turbine Control Valves Reheat Stop/Intercept Valve Turbine Turning Gear 2 Turbine Lube Oil Pumps Turbine Lube Oil Cooler Turbine Lube Oil Cooling Water Pump Bearing Vibration Monitors Rotor Eccentricity Monitor Differential Expansion Monitor Generator with Exciter and Automatic Voltage Regulator
P O W E R P L A N T S I M U L A T O R
Economizer Steam Drum Downcomer Waterwalls Primary Superheater Secondary Superheater Reheater Turbine Bypass line Attemperators for Superheater, Reheater, and Turbine Bypass
PROGENSIM
POWER PLANT SIMULATOR
INSTRUMENTATION
44 Controllers 10 Auto-Manual Control Stations 16 Manual Stations 60 Indicators 130 Switches 40 Alarms Trips and Logic / Interlocks
P O W E R P L A N T S I M U L A T O R
Condenser 2 Air Ejectors 2 Circulating Water Pumps 2 Condensate Pumps Condensate Storage Tank 1 Makeup Pump Air Ejector Steam Condenser Gland Seal Steam Condenser with Exhaust Fan Steam Condenser with Exhaust Fan Condensate Polisher 3 Low Pressure Heaters Deaerator with Storage Tank 2 High Pressure Heaters 3 Boiler Feed Pumps (motor driven)
PROGENSIM
POWER PLANT SIMULATOR
Major controls
Main Steam Temperature Condenser Hotwell Level Deaerator Level Feedwater Flow BFW Pump Speed Pulverizer Exit Temperature Fuel Master Air Master Boiler Master (Main Steam Pressure) Drum Level (three element control) Furnace Pressure Induced Draft Fan Speed Feeder trip Turbine trip Pulveriser trip Exciter trip Generator trip Electrostatic Precipitator malfunction Lube Oil Pump trip Main Fuel trip Tube Leaks Valve malfunctions Instrument malfunctions Heater fouling Soot accumulation False alarms Air Temperature Low Grade Fuel External Load Demand
P O W E R P L A N T S I M U L A T O R
INSTRUCTOR FUNCTIONS
BFW Pump trip Circulating Water Pump trip Makeup Water Pump trip
PROGENSIM
POWER PLANT SIMULATOR
P O W E R P L A N T S I M U L A T O R
Reduction in training time to bring new hires up to speed Increase in plant productivity reduced energy costs, less downtime Trainee evaluation for job classification What if Analysis for operating procedures, control and logic modifications Simulator provides the opportunity of regular rehearsal to maintain operating skills Validation of training skills
Schematics provide much better comprehension of the process. PC based simulator is available 24 hours / 7 days. PC based simulator does not require a special room, but can be placed in a classroom setup. PC based simulator provides high value for training for a very low price. Custom simulator cost may vary from Rs. 60 lakhs to Rs. 1.50 crore. Whereas, Standard PC
based simulator costs a fraction of the Custom simulator.
PROGENSIM
POWER PLANT SIMULATOR
INDUSTRIAL CLIENTS
Eletric Generation Co Inc., Turkey. Chennai Petroleum Corporation Limited
ACADEMIC CLIENTS
Madhav Institute of Technology & Science,Gwalior. Sri Krishna College of Technology, Coimbatore. Adiparasakhi Engineering College Aligarh Muslim University Anna University, Chennai Annamalai University, Chidambaram Bandalkand Institute of Engg & Tech, Jhansi Bapuji Institute of Engg & Technology, Davangere. BMS College of Engineering, Bangalore Calcutta University Dayananda Sagar College of Engg, Bangalore Government Engineering College, Gandhinagar. Government Engineering College, Ujjain Government Polytechnic, Gandhinagar. HBTI, Kanpur. Jadavpur University Maliviya National Institute of Technology, Jaipur Manipal Institute of Technology, Manipal. National Institute of Technology, Warangal Rural Engineering College, Hulkoti. SDM College of Engineering, Karnataka Vivekananda Institute of Technology, Bangalore.
P O W E R P L A N T S I M U L A T O R
Coromandel International Ltd., India ESSAR Power Limited, India Fantoft Process Technologies, Norway HPCL Mittal Energy Limited, India Hazira LNG Private Limited, India Indian Oil Corporation Limited, Guwahati refinery. Jubail Chemical Industries Co, Saudi Arabia. Kuwait Oil Company, Kuwait Madras Fertilizers Limited, Chennai, India Mangalore Chemicals & Fertilizers Limited. OEG India Ltd, Chennai, India Oman Refinery Company, Oman. Omega Simulation CO, Japan. Petroleum Development Oman Qatar Petroleum, Qatar Volta River Authority, Ghana. Sathyam Computer Services Ltd, Chennai, India SCIENSIM Sdn Bhd, Malaysia SVL Engineering P Ltd, Chennai, India Tamilnadu Petroproducts Limited. TATA Power Company, India Technocrat Automation Solution Pvt Ltd. Trident Computer Resources, Inc, USA. Yokogawa Engineering Asia Pte Ltd, Singapore. Yokogawa India Limited, India Yokogawa Middle East B.S.C, Bahrain
Nagarjuna Oil Corporation Limited, Chennai,India. Deenbandhu Chhotu Ram Univ of Science & Tech
For a demo version of ProSimulator and additional Information contact Sim Infosystems today.