4 Dimensions mm
5 Nominal System Voltage KV
6 Highest System Voltage KV
7 Minimum Mechanical Failing Load KN 16
Page 1
Tests:
Type tests:
1 Visual examination
2 Verification of dimensions
3 Wet power-frequency voltage withstand test
4 Temperature cycle test
5 Mechanical failing load test
6 Power-frequency puncture withstand test and
7 Porosity test
Acceptance tests:
1 Verification of dimensions
2 Temperature cycle test
Mechanical failing load test (subject to mutual agreement
3 between the purchaser and the supplier)
5 Porosity test
Page 2
Page 3
6.5
Page 4
Vijai Electricals Ltd.
SCHEME: Projects Division
PROJECT:
CUSTOMER:
CONSULTANT:
CONTRACTOR:
LOA No. :
Page 5
16 Colour of Glaze BROWN
17 Tolerance as per specification(±)
18 Marking details
19 Packing details
a) Type of Packing
b) No. of Insulators in each crate Nos
c) No. of crates in each packing Nos
d) Weight of each packing approx. Kgs
20 Offered material fully meets customer specification Yes
21 Drawing No.
Tests:
Type tests:
1 Visual examination
2 Verification of dimensions
3 Wet power-frequency voltage withstand test
4 Temperature cycle test
5 Mechanical failing load test
6 Power-frequency puncture withstand test and
7 Porosity test
Acceptance tests:
1 Verification of dimensions
2 Temperature cycle test
Mechanical failing load test (subject to mutual agreement
3 between the purchaser and the supplier)
5 Porosity test
Page 6
DRAWING AS PER REC Specification No.4/1971
Page 7
Page 8
Page 9
6.5
Page 10
Vijai Electricals Ltd.
SCHEME: Projects Division
PROJECT:
CUSTOMER:
CONSULTANT:
CONTRACTOR:
LOA No. :
Designation A
Page 11
Tests:
Type tests:
1 Visual examination
2 Verification of dimensions
3 Wet power-frequency voltage withstand test
4 Temperature cycle test
5 Mechanical failing load test
6 Porosity test
REFERENCE DRAWING:
Page 12
Page 13
6.5
Page 14
Vijai Electricals Ltd.
SCHEME: Projects Division
PROJECT:
CUSTOMER:
CONSULTANT:
CONTRACTOR:
LOA No. :
Designation C
Page 15
Tests:
Type tests:
1 Visual examination
2 Verification of dimensions
3 Wet power-frequency voltage withstand test
4 Temperature cycle test
5 Mechanical failing load test
6 Porosity test
REFERENCE DRAWING:
Page 16
Page 17
6.5
Page 18