Académique Documents
Professionnel Documents
Culture Documents
S E C TIO N -10
GAS TURBINES
In all there are 31Gas Turbines stations operating under various SEBS / Utilities as on 31.3.2000
comprising 135 units of total capacity 7043.3 MW.
Use of combined cycle operation in the field 74 of Gas Turbines is being promoted for energy
conservation. In addition economic aspects show a high return of investment with combined cycle gas
based plants, 13 Nos. combined cycle power projects are operating as on 31-3-00.
11%
GAS
STEAM
89%
10.1
Sl.
No.
1
1.
2.
Name of Gas
Turbine Station
2
DVB (GT)
(DELHI)
Anta
GT (N.T.P.C)
Unit wise
Derated Cap.
(MW)
3
30 (GT-1)
30 (GT-2)
30 (GT-3)
30 (GT-4)
30 (GT-5)
30 (GT-6)
34 (ST-1)
34 (ST-2)
34 (ST-3)
88 (GT-1)
88 (GT-2)
88 (GT-3)
149 (ST-1)
Station
Cap.
(MW)
4
Make
5
282
ALSTHOM
ALSTHOM
ALSTHOM
ALSTHOM
ALSTHOM
ALSTHOM
BHEL
BHEL
BHEL
413
ABB
ABB
ABB
ABB
France
France
France
France
France
France
Combined
/ open
cycle
8
14-05-86
28-05-86
24-06-86
31-07-86
31-08-86
15-11-86
29-03-95
31-10-95
26-03-96
Natural Gas /
Neptha
Combined
Cycle
Date of
Comm.
20-01-89
06-03-89
04-05-89
05-03-90
Type of fuel
used
Combined
Cycle
Natural Gas /
Neptha
Faridabad
4.
Ramgarh
(Rajasthan)
5.
Pampore
(J & K)
6.
Auriya
(NTPC)
3
143 GT-1
143 GT-2
GT
GT
7.
Dadri GT
(NTPC)
8.
Dhuvaran GT
(Gujrat)
9.
Vatwa GT
(Pvt. Util.)
(AE Co., Gujrat)
10.
Utran Old
(Gujrat)
11.
Utran GT
(Gujrat)
12.
Gandhar (NTPC)
(Gujrat)
13.
Kawas (NTPC)
(Gujrat)
3(GT-1)
35.5(GT-2)
25(GT-1)
25(GT-2)
25(GT-3)
25(GT-4)
25(GT-5)
25(GT-6)
25(GT-7)
112(GT-1)
112(GT-2)
112(GT-3)
112(GT-4)
102(ST-1)
102(ST-2)
131(GT-1)
131(GT-2)
131(GT-3)
131(GT-4)
146.5(ST-1)
146.5(ST-2)
27(GT-1)
27(GT-2)
32.5(GT-1)
32.5(GT-2)
35.0(ST-1)
13.0(GT-1)
13.0(GT-2)
13.0(GT-3)
33.0(GT-1)
33.0(GT-2)
33.0(GT-3)
45.0(ST-1)
131.0(GT-1)
131.0(GT-2)
131.0(GT-3)
255.0(ST-2)
106.0(GT-1A)
106.0(GT-1B)
106.0(GT-2A)
106.0(GT-2B)
110.0(ST-1)
110.0(ST-2)
6
26-09-99
18-10-99
286
Import by HAL
BHEL
GE / BHEL
GE / BHEL
GE / BHEL
BHEL
BHEL
GE / BHEL
GE / BHEL
15-11-94
12-10-96
31-03-89
20-07-89
11-12-89
07-01-94
07-02-94
24-04-94
30-03-95
652
Mitsubishi,(Capital)
Japan
29.03.89
26.07.89
09.08.89
29.09.89
29.12.89
12.06.90
817
SIEMENS
SIEMENS
SIEMENS
SIEMENS
BHEL
BHEL
21-02-92
26-03-92
06-06-92
14-10-92
07-02-94
27-03-94
FIAT, ITALY
FIAT, ITALY
GE / BHEL
GE / BHEL
GE / BHEL
27.05.70
10.08.70
29.12.90
26.06.91
18.10.91
Jan., 92
Mar., 92
Mar., 93
38.5
175
54
100
39
144
GE/BHEL
GE/BHEL
BHEL
BHEL
Jan, 92
Mar, 92
Mar, 93
17.07.93
MARUBENI, JAPAN
& ABB INDIA
17.03.94
03.03.94
07.05.94
30.03.95
648
644
KWC, ALSTHOM
FRANCE
24.03.92
24.05.92
30.06.92
27.08.92
Feb., 93
March,93
Natural
Gas
Open
Cycle
Natural Gas/
HSD
Open
Cycle
Oil based
( HSD)
Natural Gas /
Neptha
Natural
gas/HSD
Natural gas
Natural gas
Natural GAS
Natural
Gas
Natural Gas /
Natural Gas/
Neptha
Open
Cycle
Combined
Cycle
Combined
Cycle
Open
Cycle
Combined
Cycle
Open
Cycle
Combined
Cycle
Combined
Cycle
Combined
Cycle
14.
Uran (MSEB)
(Maharashtra)
(GT+WHRP)
15.
Trombay
(T.E.Co.)
(Maharashtra)
16.
Vijjeswaram
Vijjeswaram
Vijjeswaram
Vijjeswaram
(Capt)
Vijjeswaram
(Capt)
3
60.0(GT-1)
60.0(GT-2)
60.0(GT-3)
60.0(GT-4)
108.0(GT-5)
108.0(GT-6)
108.0(GT-7)
108.0(GT-8)
120.0(ST-1)
121.0(ST-2)
120.0(GT-1)
60.0(ST-1)
33(G.T.-1)
33(G.T.-2)
34(S.T.)
112.5(GT)
59.8 (GT)
912
SIEMENS, WEST
GERMANY
272.3
SIEMENS,
GERMANY BHEL /
SIEMENS (50%)
GE / BHEL
GE / BHEL
GE / BHEL
GE / BHEL
GE / BHEL
10
ALLICOM USA
ALLICOM USA
180
6
20.02.82
29.03.82
26.05.82
21.07.82
10.10.85
02.08.85
17.06.85
15.01.86
16.03.94
10.01.94
29.07.93
09.12.94
31.08.90
02.03.91
17.03.92
01.04.98
01.04.98
Natural
Gas
Natural
Gas
Natural
Gas/
Neptha
Combined
Cycle
Combined
Cycle
Combined
Cycle
(APSEB)
17.
Narimanam
(TNEB)
(TAMIL NADU)
18.
Basin Bridge
(TNEB)
(Tamil Nadu)
30(GT-1)
30(GT-2)
30(GT-3)
30(GT-4)
19.
Maithon (DVC)
(Bihar)
30(GT-1)
30(GT-2)
30(GT-3)
20.
Kayamkulam GT
(NTPC)
Kerala
115.3 (GT-1)
115.3 (GT-2)
119.4 (ST)
22.9 (GT-1)
9.6 (ST)
21.
22.
Karaikal GT
Pondichery
Haldia B
(WBSEB) (WEST
BENGAL)
5(GT-1)
5(GT-2)
20(GT-1)
20(GT-2)
14.01.92
17.01.92
Natural
Gas
Open
Cycle
Neptha
Open
Cycle
Open
Cycle
12-02-96
25-02-96
26-03-96
31-03-96
GE
GE
GE
08.03.89
13.03.89
20.03.89
Oil based
(HSD)
350
BHEL
02.11.98
25.02.99
30.10.99
Naptha
325
BHEL
24.10.98
02.07.99
Natural Gas
John Brown, UK
John Brown, UK
04.10.79
12.12.79
Oil based
(HSD)
120
90
40
Combined
Cycle
Combined
Cycle
Open
Cycle
24.
Kasba
(WBSEB)
25.
Lakwa(GT)
(ASEB)
(Assam)
26.
27.
Mobile GT
(Assam)
KAITHALGURI
GT (ASEB)
(NEEPCO)
(Assam)
20(GT-1)
20(GT-2)
40
John Brown, UK
John Brown, UK
09.07.79
14.09.79
120
Westing Canada
House
,,
Mitsubishi,
Japan, BHEL
,,
BHEL
27.04.81
02.08.81
29.07.83
06.10.86
03.01.94
31.03.94
31.03.95
15(GT-1)
15(GT-2)
15(GT-3)
15(GT-4)
20(GT-5)
20(GT-6)
20(GT-7)
3.0(GT-1)
3.0(GT-2)
3.0(GT-3)
3.0(GT-4)
3.0(GT-5)
3.0(GT-6)
3.0(GT-7)
33.5(GT-1)
33.5(GT-2)
33.5(GT-3)
33.5(GT-4)
33.5(GT-5)
33.5(GT-6)
30.0(ST-1)
30.0(ST-2)
30.0(ST)
23.GT-1)
23(GT-2)
23(GT-3)
22(ST)
12.5(GT-4)
28.
Namrup (ASEB)
(Assam)
29.
Baramura
(Tripura)
5(GT-1)
5(GT-2)
6.5(GT-3)
Rokhia
(Tripura)
8(GT-1)
8(GT-2)
8(GT-3)
8(GT-4)
8(GT-5)
8(GT-6)
30.
21.0
291
103.5
16.5
48.0
Ruston Gas
Turbine, UK
Mitusubishi, Japan
Mitusubishi, Japan
Mitusubishi, Japan
BHEL
BHEL
BHEL
BHEL
BHEL
BHEL
Westing House
USA
BHEL
BHEL
BHEL
BHEL
BHEL
BHEL
BHEL
BHEL
BHEL
22.03.81
22.03.81
May, 81
15.03.82
15.03.82
23.07.82
23.03.82
18.03.95
22.03.95
30.06.95
30.07.95
02.03.95
15.10.96
01.03.98
28.03.98
01-04-65
01-04-65
01-04-65
22.07.85
01-07-76
14.04.86
24.07.86
01.03.90
21.03.90
26.11.90
16.07.95
15.12.95
02.03.97
05.08.97
Oil based
(HSD)
Open
Cycle
Natural
Gas
Open
Cycle
Natural
Gas
Open
Cycle
Natural
Gas
Combined
Cycle
Natural
Gas
Natural
Gas
Natural
Gas
Open/Com
bined
Cycle
GT-4 open
cycle
Open
Cycle
Open
Cycle
31.
Agartala
(NEEPCO)
21(GT-1)
21(GT-2)
21(GT-3)
21(GT4)
10.2
SL.
No.
1.
2.
3.
4.
84
BHEL
BHEL
BHEL
BHEL
05.02.98
25.02.98
29.03.98
26.06.98
8
Natural
Gas
Open
Cycle
Capacity
(MW)
143.0
Date
of
Commissioning
29-06-99
GT
143.0
18-10-99
ST
ST
1
2
119.4
9.6
30.10.99
02.07.99
Station
State/Utility
GT/ST
Unit No.
Faridabad
CCGT
Faridabad
CCGT
Kayamkulam
Karaical
NTPC
GT
NTPC
NTPC
Pondichery
10.3
415 MW
683
0
720
322
746
1066
103.6
331.1
Pampore
Anta
Ramgarh
Auraiya
Dadri
282
286
(131)
175
413
38.5
652
817
%
of
Previous
Year
(1998-99)
109.2
-
6
2926
233
4157
5098
50
2800
250
3900
4100
0
3189
228
5085
5126
113.9
91.2
130.4
125.0
109.0
97.9
122.3
100.5
7722
5922
7799
6274
Utran (Old)
Utran
Gandhar
Dhuvaran
Kawas
Vatwa
Trombay
Uran
V Swaran
39
144
648
54
644
100
180
912
272.3
0
962
2165
130
4354
673
1255
5570
1800
0
850
1400
144
2276
649
1320
4955
1800
0
1057
2282
131
4788
599
1224
3905
2001
124.4
163.0
91.0
210.4
92.3
92.7
78.8
111.2
109.9
105.4
96.3
110.0
89.0
97.5
70.1
111.2
7340
3522
2426
7435
5990
6800
4282
7349
Sl.
No.
Name
of
G.T./ GT+ST
Station
1.
2.
DVB
Faridabad
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Gen.
Cap.
(MW)
Actual
1998-99
Target
1999-00
Actual
1999-00
%
Target
1999-00
Approx.
Kwh/Kw
/Year
2645
8132
Generation (GWH)
112
216
150
1500
174
1249
116.0
83.3
%
of
Previous
Year
(1998-99)
155.4
578.2
200
132
66.0
4385
13
28
20
15
41
21
205.0
140.0
315.4
75.0
4100
233
20
25
12
48.0
0.6
120
379
746
430
1000
340
1098
79.1
109.8
89.7
147.2
2547
3773
141
405
430
413
96.0
102.0
2929
16.5
48
84
7043.3
(6839)
Fig in ( ) is effective Capacity
28
259
193
32411
36
294
250
29886
28
223
363
35521
77.8
75.9
145.2
118.9
100.0
86.1
188.1
109.6
1697
4646
5762
5194
Sl.
No.
Name
of
G.T./ GT+ST
Station
17.
18.
B Bridge
Kayamkulam
19.
Karaikal
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31
Narimanam
Maithon
Siliguri
Haldia
Kasba
Namrup
K Guri
Lakwa
Mobile
Baramura
Rokhia
Agartala
Total
Gen.
Cap.
(MW)
120
350
(280)
32.9
(30.1)
10
90
20
40
40
133.5
291
Actual
1998-99
Target
1999-00
Actual
1999-00
%
Target
1999-00
Approx.
Kwh/Kw/
Year
1450
4455