Vous êtes sur la page 1sur 2

Execution Order - BSS Indosat Project

Date Order Number Regional Manager Site Description Site Name Area Address : 04-Sep-2007 : 1031/MW /UPLS/ IX /RO-2007/2007 : Herman Budi Mobile Phone : 0815 3259 5959

Rawajitu - Bratasena Lampung Site ID LP0325 - LP0473 Rawajitu : Jl. Raya Rawajitu Rt 06/ Suku 06 Penangkis Makmur Kp. Gedung Karya Jitu Kec. Rawajitu Selatan Kab. Tulang Bawang

Site Location Project Name WBS Number Job Description Network Elemet Type PCM Link Type PCM Link Provided RFI Date Work Element Responsible Person

< 100 Km

from Homebase

> 100 Km PO Number E/S BSC MW PDH Sagem

from Homebase 5000013485 MW / 5000013486 RC/OMC-B MW SDH NEC 16-Sep-2007 Indosat

MW PDH RO 2007 34OP-63395.P MW Upgrade / Swap Indoor BTS VSAT Siemens 31-Aug-2007 : Site Check : Mr. Aslan Asri Site Check Doc. Ready Not Available Ericsson TRAU

Alcatel

On Service Target

Site Check Need Layout Drawing Available (1) / Not Available (2) Work Element Responsible Person Equipment Type Delivery Request Date Splitting Date Material Delivery Expected Material On Site Work Element Installation Start Installation Completed Expected Installation Check List and Redline arrival Work Element Integration Date Hardware Acceptance Test Date KPI Acceptance Test Date Expected Acceptance Test Document Arrival Work Element : Installation

: Material Splitting and Delivery : Mr. Mersis Rayzon And Mr. Fatwa Indra Loka SRAL-XD (7/16x2) 04-Sep-2007 05-Sep-2007 05-Sep-2007 07-Sep-2007 Subcontractor 08-Sep-2007 15-Sep-2007 18-Sep-2007 Subcontractor : : PT Intisel

Ant 3.0 m

: Commissioning and Integration

16-Sep-2007 18-Sep-2007 23-Sep-2007 23-Sep-2007

: Standard Drawing and As built Drawing 04-Sep-2007 17-Sep-2007 17-Sep-2007 26-Sep-2007

Responsible Person : Mr. Aslan Asri Standard Drawing Request Date Expected Standard Drawing Completed Redline handover Date As Built Drawing Request Date Expected As Built Drawing Completed WBS Element : Project Object Remuneration Mobilization Subcon I&C Subcon Mobilization Warehouse & Delivery NMS Implementation General

WBS Element 34OP-63395.P.01 34OP-63395.P.02 34OP-63395.P.03 34OP-63395.P.04 34OP-63395.P.06 34OP-63395.P.08 34OP-63395.P.12 (_________________) Sign by Project ,

1-Only for new site 2-if site check need 3-if no site check (Layout from Indosat)

- 2 - WTC

Execution Order - BSS Indosat Project


Date Order Number Regional Manager Site Description Site Name Area Address : 04-Sep-2007 : 1032/MW /COMM/ IX /RO-2007/2007 : Herman Budi Mobile Phone : 0815 3259 5959

Rawajitu - Bratasena Lampung Site ID LP0325 - LP0473 Rawajitu : Jl. Raya Rawajitu Rt 06/ Suku 06 Penangkis Makmur Kp. Gedung Karya Jitu Kec. Rawajitu Selatan Kab. Tulang Bawang

Site Location Project Name WBS Number Job Description Network Elemet Type PCM Link Type PCM Link Provided RFI Date Work Element Responsible Person

< 100 Km

from Homebase

> 100 Km PO Number E/S BSC MW PDH Sagem

from Homebase 5000013485 MW / 5000013486 RC/OMC-B MW SDH NEC 16-Sep-2007 Indosat

MW PDH RO 2007 34OP-63395.P MW Commissioning BTS VSAT Siemens 31-Aug-2007 : Site Check : Mr. Aslan Asri Site Check Doc. Ready Not Available Ericsson TRAU

Alcatel

On Service Target

Site Check Need Layout Drawing Available (1) / Not Available (2) Work Element Responsible Person Equipment Type Delivery Request Date Splitting Date Material Delivery Expected Material On Site Work Element Installation Start Installation Completed Expected Installation Check List and Redline arrival Work Element Integration Date Hardware Acceptance Test Date KPI Acceptance Test Date Expected Acceptance Test Document Arrival Work Element : Installation

: Material Splitting and Delivery : Mr. Mersis Rayzon And Mr. Fatwa Indra Loka SRAL-XD (7/16x2) 04-Sep-2007 05-Sep-2007 05-Sep-2007 07-Sep-2007 Subcontractor 08-Sep-2007 15-Sep-2007 18-Sep-2007 Subcontractor : :

Ant 3.0 m

: Commissioning and Integration

16-Sep-2007 18-Sep-2007 23-Sep-2007 23-Sep-2007

: Standard Drawing and As built Drawing 04-Sep-2007 17-Sep-2007 17-Sep-2007 26-Sep-2007

Responsible Person : Mr. Aslan Asri Standard Drawing Request Date Expected Standard Drawing Completed Redline handover Date As Built Drawing Request Date Expected As Built Drawing Completed WBS Element : Project Object Remuneration Mobilization Subcon I&C Subcon Mobilization Warehouse & Delivery NMS Implementation General

WBS Element 34OP-63395.P.01 34OP-63395.P.02 34OP-63395.P.03 34OP-63395.P.04 34OP-63395.P.06 34OP-63395.P.08 34OP-63395.P.12 (_________________) Sign by Project ,

1-Only for new site 2-if site check need 3-if no site check (Layout from Indosat)

- 2 - WTC