TECNOLOGICO DE LA
PAZ
DEPARTAMENTO DE
CIENCIAS DE LA TIERRA
INGENIERIA CIVIL
CIMENTACIONES
CIE - 0507
Unidad 3: Diseo de
cimentaciones corridas
3
P2=50 ton
P1=30 ton
3.20 m
P3=40 ton
3.20 m
0.225
0.225
Datos:
Df = 2.00 m
qa =15 ton/m2
s = 1400 kg/m3
fc = 250 kg/cm2
fy= 4,200 kg/cm2
Cols. de 45 x 45 cm
L 0.45
P
P2 x3.20 P3 x6.40 = 0
2
2
L 0.45
120
160 256 = 0
2
2
60 L 443 = 0
L = 7.38 m
Dimensionamiento preliminar:
Considerando un peso de la cimentacin del 10% de las descargas de las
columnas, se tiene:
120 x 0.10 = 12 ton = 12,000 kg repartidos en 7.38 m x 1.00 m = 7.38 m2,
se tiene:
12 ton
2
=
ton
m
1
.
63
/
7.38 m 2
A=
120
= 11.35 m 2
10.57
L = 8.00 m
Ancho de la zapata:
B=
11.35
= 1.42 m
8.00
Se tomara B = 1.50 m
Las dimensiones finales finales seran:
qc =
Pu (1.4)(120)
=
= 14.00 ton/m 2
A
12.00
Anlisis de la viga:
8.00 m
3.20 m
0.80
3.20 m
0.80
MOMENT MZ LN= 1
0.873
3.47
15.31
15.31
0.73
Maximum=
3.47
-12.42
-12.42
J=5,M=4
qu = 14 x 1.5 =
21 ton/m
MN/ELEM
23.28
MN/ELEM
SHEAR FY LN= 1
34.12
23.63
12.1
-12.1
-23.63
-34.12
J=5,M=4
Maximum=
38.78
P1=42 T
P2=70 T
P3=56 T
P = 168 T
Q1= 45.15 T
Q1= 45.15 T
Q1= 77.70 T
Q = 168 T
0.80
P
3.20
-3.15
3.20
10.85
-7.70
-3.15
-10.85
0.80
0.00
-10.08
-44.80
MC
0.00
+22.40
+44.80
MF
0.00
0.00
+12.32
5.20
0.87
1.35
12.32
5.20
1.35
-10.85
-3.15
Diagramas de diseo:
MOMENT MZ LN= 1
1.74
3.47
26.76
26.76
1.74
Maximum=
3.47
-7.22
-7.22
J=5,M=4
MN/ELEM
23.28
MN/ELEM
SHEAR FY LN= 1
30.97
12.78
12.1
-12.1
-26.78
-44.97
J=5,M=4
Maximum=
38.78
d=
MR
Kub
Mu = 26.76 ton -m
Para:
min = 0.0026
max = 0.75 b = 0.015
si = 0.0026 q =
fy
f c"
= (0.0026)
4,200
= 0.06
170
0.45
(B c)/2
Para:
min = 0.0026
max = 0.75 b = 0.015
si = 0.0026 q =
fy
f c"
= (0.0026)
4,200
= 0.06
170
B = 1.50 m
Mu =
14(0.525)
= 1.93 ton m
2
d=
MR
Kub
1.93x105
d=
= 12.0 cm
(8.90)(150)
VCR = FR bd (0.2 + 20 ) f c*
VCR = (0.8)(150)(50)(0.2 + 20 x0.0026) 200 = 21,383 kg = 21.4 ton
VCR =
105
x 21.4 = 44.948 ton Vu
50
Como losa:
d/2
d/2
d/2
d/2
Pu
VCR = FR
Cols. De 45 x 45
VCR
VCR + P Pu = 0
FR
f c* b0 d + Av qc Pu = 0
f c* b0 d
S=
(150)(2.85)
= 10 cm
40.95
Colocar # 6 @ 10cm
45
d/2
1.50 m
1.50 m
1.50 m
1.50 m
qb =
70,000
= 46,667 kg / cm 2
1.50
Columna central
l 2 (46,667)(0.525) 2
M u = qb =
= 6,421 kg m = 6.42 ton - m
2
2
NV =
40.95
= 14 varillas # 6
2.85
# 6 @ 10 cm
110
cm
150 cm
14 # 6
150 cm
# 6 @ 10 cm
150 cm
14 # 6