Company: Project: Subproject:

Agip KCO KashaganDevelopmentExperimentalProgramme OnshoreProcessingFacility

Construction Assessment Checklist


Checklist No: 17-05 Revision: 0 Activity: DIMENSIONAL CONTROL Discipline: 17 GRE/FRP/HDPE Piping

Site/Location: Contractor: Subcontractor:


Item Action

Report Number: Date: Component:


Results Accepted Yes No

!
1 2 3

Before commencing this surveillance. check the area is safe. If working at height does the scaffold have a green tag Record the Isometric number and spool drawing number Check that acceptable measuring procedures, devices, tools and qualified inspection personnel are being used Check that the dimensional data recorded is correct and legible, plus identified satisfactorily Check that the any tool requiring certification is certified Identify stage of survey ( prepared, bonded, assembled Check that the Spool piece satisfies the drawing Check that the fabricator signs off the dimensional control data form Accepted Rejected Completed by: Witnessed by:
(Contractor or Subcontractor Representative)

4 5 6 7

Date: Date:

(Explain below)

Deficiency Description: (What's wrong and why did it happen?)

Checklist No: 17-05

Activity DIMENSIONAL CONTROL

Page 1 of 1 01-Sept-08