FQ FEEDMILL SDN BHD & UNIVERSITI MALAYSIA SABAH

REF. NUMBER
LEAST COST EFFECTIVE FEED FOR GROUPER

PART B : PROJECT MILESTONE AND OUTPUT


Project Commencement
Date:

No

Project Completion Date:

02 January 2010

Milestone

Activity

First Payment
1 Survey & Visitation Activities:
i)
ii)
iii)
iv)

Deliverable/Output

02 January 2012

Completion
Date

Grant
Amount
RM

02 Jan 2010

639,016.00

07 Jan 2010

856,284.00

14 Jan 2010

720,700.00

01 Feb 2010

Duration
(Months)

Logistic Cost
Boarding Cost
Food Allowance
Detailing Design of
Process

v)
vi)
vii)
viii)
ix)
x)
Procurement of
2 Machine &
Building Leasing

Activities:
i)
ii)

Detailing Equipments
Purchase order for
Equipment
iii) Building Leasing
iv) Licensing
v)
vi)
vii)
viii)
ix)
x)
Plant ,Site Office &
3 Quality Control
Activities:
Lab Development
i) Detailing Office,Operation
& Lab Equipments
ii) Detailing Civil: Structure &
Foundation
iii) Detailing Electrical: Wiring
iv) Submission of Quotation by
Suppliers
v) Purchase order for
Equipment/Services
vi)
vii)
viii)
ix)
x)

Machinery
4 Commisioning &
Training

Activities:
i)
ii)

01 Apr 2010

422,080.00

01 May 2010

397,246.00

01 Jun 2010

02 Jan 2012

159,754.00

19

3,195,080.00

24

Construction &
Commisioning
Operation Tools &
Equipment Collection

iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
Testing,
Commissioning,
5
Trial Run &
Optimization

Activities:
i)

Consultancy Local
Contractor
ii) Billing (Electric & Water)
iii) Raw Material Acqusition
iv) Indirect Product Material
v) Transfer Tech (Supplier)
vi)
vii)
viii)
ix)
x)
6 Research Process Activities:
i) Consultancy (UMS)
ii) Research Production
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
Project
7
Activities:
Completion
i) Market Testing
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)

FQ FEEDMILL SDN BHD & UNIVERSITI MALAYSIA SABAH


REF. NUMBER
LEAST COST EFFECTIVE FEED FOR GROUPER

SCHEDULE B (PART 1)
THE GRANT

No.
1

EXPENSES

ITEMS

G01 Pilot Plant


G01.1
G01.2
G01.3
G01.4
G01.5
G01.6
G01.7
G01.8
G01.9
G01.10
G01.11
G01.12
G01.13
G01.14
G01.15
G01.16
G01.17
G01.18
G01.19
G01.20
G01.21
G01.22
G01.23
G01.24
G01.25
G01.26
G01.27
G01.28
G01.29
G01.30
G01.31
G01.32
G01.33
G01.34
G01.35
G01.36
G01.37
G01.38
G01.39
G01.40
G01.41
G01.42
G01.43
G01.44
G01.45
G01.46
G01.47
G01.48
G01.49
G01.50
G01.51
G01.52

Plant Equipment
Intake Grid
Pulse Filter
Fan
Elevator
Drum Cleaning Screen
Tubular magnet
Prebin for Grinder
Level Indicator
Pulverizer
Cyclone
Muffler
Fan
Pulse Filter
Air Lock
Prebin for Mixer
Level Indicator
Outlet Slide
Fan
Pulse Filter
Buffer Hopper
Outlet Slide
Double Shaft Mixer
Buffer bin
Screwing Conveyor
Elevator
Tubular magnet
Prebin for Extruder
Level Indicator
Support
Outlet Slide
Distributing Equipment
Twin Screw Extruder
Fan
Air Lock
Bed Dryer
Fan
Cyclone
Air Lock
Elevator
Rotary Screener
Prebin for fat coater
Level Indicator
Fat coater
Air Lock
Swinging Cooler
Fan
Cyclone
Air Lock
Elevator
Liquid Adding machine
Liquid Adding pipeline
Electric Control System

Price per Unit

Quantity

COST (RM)

TOTAL (RM)
1,324,260.00

1,710.00
10,640.00
1,520.00
10,640.00
5,700.00
3,800.00
760.00
570.00
85,500.00
7,600.00
4,560.00
7,980.00
20,900.00
2,850.00
760.00
570.00
1,900.00
1,520.00
5,700.00
570.00
2,280.00
22,800.00
1,140.00
6,080.00
10,640.00
3,800.00
3,800.00
570.00
190.00
1,900.00
9,880.00
258,400.00
1,520.00
3,420.00
121,600.00
2,470.00
3,800.00
7,600.00
2,850.00
10,640.00
17,100.00
760.00
570.00
95,000.00
6,080.00
55,100.00
2,470.00
8,360.00
2,850.00
20,520.00
5,700.00
79,800.00

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1710.00
10640.00
1520.00
10640.00
5700.00
3800.00
760.00
570.00
85500.00
7600.00
4560.00
7980.00
20900.00
2850.00
760.00
570.00
1900.00
1520.00
5700.00
570.00
2280.00
22800.00
1140.00
6080.00
10640.00
3800.00
3800.00
1140.00
190.00
1900.00
9880.00
258400.00
1520.00
3420.00
121600.00
4940.00
3800.00
7600.00
2850.00
10640.00
17100.00
760.00
570.00
95000.00
6080.00
55100.00
2470.00
8360.00
2850.00
20520.00
5700.00
79800.00

FQ FEEDMILL SDN BHD & UNIVERSITI MALAYSIA SABAH


REF. NUMBER
LEAST COST EFFECTIVE FEED FOR GROUPER

SCHEDULE B (PART 1)
THE GRANT

No.

EXPENSES

ITEMS
G01.53
G01.54
G01.55
G01.56
G01.57
G01.58
G01.59
G01.60
G01.61
G01.62
G01.63

G04

0.00

Building Leasing
Plant Equipment
Construction Plant
Wiring

196,000.00
21,500.00
270,000.00
205,000.00

1
1
1
1

196000.00
21500.00
270000.00
205000.00

Site Office Equipment


QC Lab Equipment

0
0
0

79040.00
72200.00
0.00
38,000.00

China

0
0
0

38000.00
0.00
0.00
57,000.00

G05 Market Testing

G05.3

Market Testing
(Transport)
Market Testing (Brochure)
Market Testing
(Allowance Sales)

50,000.00

50000.00

1.00

5000

5000.00

1,000.00

2000.00

Regulatory and
G06 Standards
Compliance

0.00
G06.1
G06.2
G06.3

G07

G08

0
0
0

0.00
0.00
0.00

Contract
Expenditure

147,680.00
G07.1
G07.2
G07.3

51300.00
72960.00
159600.00
31920.00
60000.00

Survey & Detailing


Machinery

G05.2

Expenditure of
Services

TOTAL (RM)

151,240.00

G05.1

1
1
1
1
1

Site Office &


G03 Quality Control
Equipment

G04.1
G04.2
G04.3
5

COST (RM)

692,500.00

G03.1
G03.2
G03.3
4

51,300.00
72,960.00
159,600.00
31,920.00
60,000.00

Quantity

Plant Building &


G02 Operation
Equipment
G02.1
G02.2
G02.3
G02.4

Installation Materials
Plant Commisioning
Steel Structure Frame
Ocean Freight
Local Contractor

Price per Unit

Transfer Tech(Supplier)

147,680.00
-

1
0
0

147680.00
0.00
0.00
596,000.00

FQ FEEDMILL SDN BHD & UNIVERSITI MALAYSIA SABAH


REF. NUMBER
LEAST COST EFFECTIVE FEED FOR GROUPER

SCHEDULE B (PART 1)
THE GRANT

No.

EXPENSES

ITEMS
G08.1
G08.2
G08.3

10

G09

Consultancy (UMS)
Local Consultant (TSM)

Price per Unit


500,000.00
96,000.00
-

Quantity
1
1
0

COST (RM)

TOTAL (RM)

500000.00
96000.00
0.00

Direct, Indirect
Materials

34,400.00
G09.1
G09.2
G09.3

Raw Material
Gunny bag

G10.1
G10.2
G10.3

Electrical Supply
Water Supply
Licensing

14,400.00
20,000.00
-

1
1
0

14400.00
20000.00
0.00

120,000.00
24,000.00
10,000.00

1
1
1

120000.00
24000.00
10000.00

G10 Miscellenous Cost

154,000.00

TOTAL
GRANT (RM)

3,195,080.00

FQ FEEDMILL SDN BHD & UNIVERSITI MALAYSIA SABAH


REF. NUMBER
LEAST COST EFFECTIVE FEED FOR GROUPER

CONTOH

SCHEDULE B (PART 2) : PAYMENT SUMMARY BY YEAR


Project Commencement Date :
Project Completion Date:
Total Grant Approved (RM):

02 January 2010
02 January 2012
3,195,080.00

PROPOSAL FOR MILESTONE CLAIMS


Summary of payment to be received from MOSTI based on Major Milestone

Payment Year

Percentage
(%)

2006

0%

2007

0%

2008

0%

2009

0%

2010

95%

2011

0%

2012

5%

2013

0%

100.00%

Payment
(RM)

3,035,326.00
159,754.00
-

3,195,080.00

FQ FEEDMILL SDN BHD & UNIVERSITI MALAYSIA SABAH


REF. NUMBER
LEAST COST EFFECTIVE FEED FOR GROUPER

SCHEDULE B (PART 3) : PAYMENT SUMMARY BY MILESTONE

Project Commencement Date :


Project Completion Date:
Total Grant Approved (RM):

02 January 2010
02 January 2012
3,195,080.00

PROPOSAL FOR MILESTONE CLAIMS


Upfront Payment Based on Incoming Milestone

Summary of payment to be received from MOSTI based on Major Milestone

Payment
Advance
Disbursement
Disbursement
Disbursement
Disbursement
Disbursement
Reimburse
Final Payment

Milestone Date
02 January 2010
07 January 2010
14 January 2010
01 February 2010
01 April 2010
01 May 2010
01 June 2010
02 January 2012

Year

Percentage
(%)

2010
2010
2010
2010
2010
2010
2010
2012

20%
27%
23%
0%
13%
12%
0%
5%

100.00%

Payment
(RM)
639,016.00
856,284.00
720,700.00
422,080.00
397,246.00
159,754.00

3,195,080.00

SCHEDULE B (PART 4) : PROJECT MILESTONE AND OUTPUT


FQ FEEDMILL SDN BHD & UNIVERSITI MALAYSIA SABAH
REF. NUMBER
LEAST COST EFFECTIVE FEED FOR GROUPER

CONTOH

02 January 2010
02 January 2012

Project Commencement Date :


Project Completion Date:

Milestone Achievement Report ended by


No.

Cost
Centre

Activities

RM

Jan-10
week17

1 Survey & Visitation to Machinery Supplier


i)
Logistic Cost
ii)
Boarding Cost
iii)
Food Allowance
iv)
Detailing Design of Process
v)
vi)
vii)
viii)
ix)
x)

2 Procurement of Machine & Building Leasing


i)
Detailing Equipments
ii)
Purchase order for Equipment
iii)
Building Leasing
iv)
Licensing
v)
vi)
vii)
viii)
ix)
x)

0
0
0
0
0
0

G08.1
G08.2
G08.2
G08.2
G08.2
G08.2
G08.2
G08.2

10,000.00
10,000.00
18,000.00
0.00
0.00
0.00
0.00
0.00

G01

1,251,300.00

G02
G10

196,000.00
10,000.00

Feb-10
18

19

20

21

Mar-10
22

23

24

25

Apr-10
26

27

28

29

30

May-10
31

32

33

34

Jun-10
35

36

37

38

Jul-10
39

40

41

42

43

Aug-10
44

45

46

47

Sep-10
48

49

50

51

Oct-10
52

Nov-10
4

Dec-10
9

10

11

12

Jan-11
13

14

15

16

17

Feb-11
18

19

20

21

Mac-11
22

23

24

25

Apr-11
26

27

28

29

30

Mei-11
31

32

33

34

Jun-11
35

36

37

38

39

July-11
40

41

42

43

Aug-11
44

45

46

47

Oct-11
48

49

50

51

52

Nov-11
53

Dec-11
4

Jan-12
8

10

11

12

Feb-12
13

14

15

16

02 Jan 2010

10,000.00
10,000.00
18,000.00
38,000.00
Advance
Fund Balance
Disbursement

0
0
0
0
0
0

G03
G02
G02

172,740.00
270,000.00
205,000.00

0
0
0
0
0

72,960.00
0
0
0
0
0
0
0
0

96,000.00
144,000.00
14,400.00
20,000.00
147,680.00
0
0
0
0
0

02 Jan 2012

96,000.00
144,000.00
14,400.00
20,000.00
147,680.00
422,080.00
(422,080.00)
422,080.00

500,000.00
0
0
0
0
0
0
0
0

G05

01 Jun 2010

72,960.00
72,960.00
72,960.00
-

Fund Balance
Balance
Disbursement
7 Project Completion
i)
Market Testing
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)

01 May 2010

172,740.00
270,000.00
205,000.00
647,740.00
(647,740.00)
720,700.00

Fund Balance
Balance
Disbursement
6 Research Process
i)
Consultancy (UMS)
ii)
Research Production
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)

01 Apr 2010

1,251,300.00
196,000.00
10,000.00
1,457,300.00
601,016.00
(856,284.00)
856,284.00

Fund Balance
Balance
Disbursement
5 Testing, Commissioning, Trial Run & Optimization
i)
Consultancy Local Contractor
ii)
Billing (Electric & Water)
iii)
Raw Material Acqusition
iv)
Indirect Product Material
v)
Transfer Tech (Supplier)
vi)
vii)
viii)
ix)
x)

01 Feb 2010

639,016.00
601,016.00
-

Fund Balance
Balance
Disbursement
4 Machinery Commisioning & Training
i)
Construction & Commisioning
ii)
Operation Tools & Equipment Collection
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)

14 Jan 2010

17

Fund Balance
Balance
Disbursement
3 Plant ,Site Office & Quality Control Lab Development
i)
Detailing Office,Operation & Lab Equipments
ii)
Detailing Civil: Structure & Foundation
iii)
Detailing Electrical: Wiring
iv)
Submission of Quotation by Suppliers
v)
Purchase order for Equipment/Services
vi)
vii)
viii)
ix)
x)

07 Jan 2010

500,000.00
500,000.00
(500,000.00)
397,246.00

57,000.00

0
0
0
0
0
0
0
0
0
Fund Balance
Balance
Reimburse

57,000.00
57,000.00
(102,754.00)
(159,754.00)
Final Payment

159,754.00

3,195,080.00
TOTAL GRANT APPROVED (RM):

Payment
Advance
Disbursement
Disbursement
Disbursement
Disbursement
Disbursement
Reimburse
Final Payment

3,195,080.00

Milestone
Percentage
Date
02 Jan 2010
20%
07 Jan 2010
27%
14 Jan 2010
23%
01 Feb 2010
0%
01 Apr 2010
13%
01 May 2010
12%
01 Jun 2010
0%
02 Jan 2012
5%
GRAND TOTAL (RM) :

Payment
639,016.00
856,284.00
720,700.00
422,080.00
397,246.00
159,754.00
3,195,080.00