Académique Documents
Professionnel Documents
Culture Documents
Mehr bewegen.
Industrial Bitumen
Bitumen 20/30 Bitumen 30/45 Bitumen 35/50 Bitumen 50/70 Bitumen 70/100 Bitumen 160/220
Bitumen 10/20
Bitumen 90/10
Starfalt PmB 10/40-65 Starfalt PmB 25/55-65 Starfalt PmB 45/80-65 Starfalt PmB 45/80-75 Starfalt PmB 45 Starfalt PmB 65
Starfalt PmB 10/40 NV Starfalt PmB 25/55 NV Starfalt PmB 45/80 NV Starfalt PmB 45 NV Starfalt PmB 65 NV Starfalt PmB 45/80 RC Starfalt PmB 45 RC Starfalt PmB 45/80 FR
Recycled asphalt
Beginning in 2009, test track in 2010 and with 2012 usage on highways (written in the tenders).
Output of developments
Usage of OMV Starfalt PmB RC:
Higher price of 20 per to BUT: less consumption of the PmB RC (bitumen from the RC) BUT: less consumption of new aggregates (aggregates from the RC) BUT: no costs for dumping ! Additional cost for energy by cold adding (more heating of aggregates)
Output of developments
Calculation with PmB RC (cold adding)
Output of developments
Usage of OMV Bitumen PLUS:
Higher price of 20 per to BUT: less transport costs (distance to aggregate sources) BUT: usage of local aggregates (less time losses at the plant) BUT: less danger of confusion (caused by many different aggregates)
Mandatory USAGE in Thringen (Germany) E.g.: decrease the maintenance costs, drivers safety,
13 |OMV Refining & Marketing, Business Development C&I
Output of developments
Calculation with Bitumen PLUS
transport costs
20.000 to asphalt
Output of developments
Less consumption of Gas (example) AC 11 surf 70/100 NV with Reduction of 30C
- Reduction of the Asphalt temperature:
Output of developments
Less consumption of Gas (example) Calculation for Austria with 9,0 mio. to of asphalt
- Average reduction with -30C:
Projection
- Energy consumption: - Possible reduction (-16%): - Conversion to Gas: