REGION : Badulla
DIVISION : Bandarawela
ELECTORATE : Bandarawela
ESTIMATE of the EXPENSE necessary to be incurred for Improvements to Bandarawela - Uvahighlands - Ettampitiya Road (0.0-0.5 km)
SPECIFICATION
QUANTITIES
01 Item
02 Item
03 Item
04 Item
05 Item
06 Item
07 Item
08 Item
09 Item
10 Item
11 Item
12 Item
13 Item
14 Item
Aggregates - 25 km
Asphalt Concrete - 10 km
Gravel - 15 km
Rubble - 25 km
Sand - 85 km
Bitumen - 215 km
ITEMS
Prepared by:
Checked by:
-----------------------------K.G.M.P Rupasinghe
Engineer, CE's Office, Bandarawela
-----------------------------T.K.M Galappaththi
Chief Engineer (Bandarawela) - RDA
-----------------------------D.M Karunatillaka
Engineer, PD's Office (Uva), Bandarawela
-----------------------------D.M Dayaratna
Provincial Director (Uva) - RDA
139931074.xls.ms_office
RATES
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
AMOUNT
(RS.)
TOTAL (RS.)
837,500.00
117,212.67
17,058,507.29
3,879,440.86
1,476,778.37
1,337,701.04
268,999.66
249,428.00
25,225,567.89
5,045,113.58
30,270,681.47 30,270,681.47
3,027,241.27
1,210,827.26
500,000.00
714,464.29
4,286,785.71
9,739,318.53
40,010,000.00 40,010,000.00
-----------------------------Director General
Road Development Authority.
Date:-
-----------------------------Chairman
Road Development Authority.
Date:-
Estimate
Bill of Quantites for the Improvements to Bandarawela - Uvahighlands - Ettampitiya Road (0.0-0.5 km)
Work componants
Unit
Rate (Rs)
Amount
BO-115
BO -004
0.0021
0.0104
day
day
16,948.80
628.96
35.31
6.55
41.86
sq.m
140.30
82.85
71.25
140.30
82.85
71.25
294.40
cu.m
60.90
sq.m
23.53
sq.m
EW1-009
1.000
sq.m
60.90
60.90
B0-003
0.0008
day
673.36
0.55
B0-111
0.0027
day
8,387.36
22.98
2.2.4 Dense Graded aggregate base (37.5 mm) as base failure section and carriageway widening (150mm thk)
ABC
M1-013
1.420
cu.m
3,147.30 4,469.17
Transport 25 km
T1-007A 35.500 cu.m/km
21.70
770.35 5,239.52
Graded 37.5 mm aggreegate base course for overlayer, hard shoulder and camber corrections (150-225 mm thk 2.2.5
compacted volume) including lightly scarifying the existing pavement
ABC
M1-012A
1.42
cu.m
2,676.85 3,801.13
Tansport 25 km
T1-007A
35.50 cu.m/km
21.70
770.35 4,571.48
2.2.6 Prime coat with emulsion (CSS-1) at the rate of 1.0/ltr./sq.m including blinding with sand 250 m/m.
S1-022
1.000
sq.m
83.75
83.75
Prime coat
T1-013
0.004
Nos.
11.00
0.05
Loading of barrels of bitumen
T1-014
0.004
Nos.
4.70
0.02
Unloading of barrels of bitumen
Emulsion transport 215 km
T1-048
2.150 100 lt/km
2.80
6.02
89.84
2.2.7 Tack coat using emulsion (CSS-1) at the rate of 0.50 lts/m.
Tack coat
S1-015
1.00
sq.m
41.60
41.60
T1-013
0.002
Nos.
11.00
0.02
Loading of barrels of bitumen
T1-014
0.002
Nos.
4.70
0.01
Unloading of barrels of bitumen
Emulsion transport 215 km
T1-048
1.08 100 lt/km
2.80
3.01
44.64
2.2.8 Asphalt concrete 50mm thick surfacing course material (19 mm, dense) as wearing course (type 1)
1.00
Asphalt
B0-361A
m.t
6,741.00 6,741.00
Transport -25 km
25.00 m.t/km
15.35
T1-009
383.75
Spread & compacted
1.00
S1-034
m.t
982.70
982.70 8,107.45
cu.m
cu.m
sq.m
sq.m
m.t
E1-014
Exacavation in unsuitable soil
EW1-009
Trimming, Levelling etc
Form work to built-up drains (smooth finish)ST1-112
Fabricate & lay tor steel bars as reinforcement.
ST1-055
Cement concrete Class B, 1:3:6(37.5mm)
Concrete 1:3:6(37.5mm)
ST1-041
Transport agg 25 km
T1-007A
Transport of Sand 85 km
T1-007A
139931074.xls.ms_office
1.00
1.000
0.08
1.00
cu.m
sq.m
sq.m
kg
1.00
cu.m
25.00 cu.m/km
41.40 cu.m/km
Page 2 of 18
624.85
60.90
499.25
150.80
7,238.25
21.70
21.70
624.85
624.85
60.90
60.90
41.60
41.60
150.80 ########
7,238.25
542.50
898.38
8,679.13
cu.m
sq.m
sq.m
mt
cu.m
Rates
Item
Rate for the Item
Work componants
HSR ref. Qty
Unit
Rate (Rs) Amount
No.
Rate (Rs) Unit
2.3.6 Cement Concrete Gr 25 (19mm)
Concrete Gr. 25 (19mm)
ST1-048
1.00
cu.m
9,488.40 9,488.40
Transport agg 25 km
T1-007A
22.50 cu.m/km
21.70
488.25
Transport of Sand 85 km
T1-007A
41.40 cu.m/km
21.70
898.38 10,875.03 cu.m
2.3.7 Casting and placing precast concrete slabs as per the drawings [single mesh, grade 25 (19 mm)]
Cover slabs
ST1-048
0.05
cu.m
9,488.40
474.42
Transport of agg 25 km
T1-007A
1.04 cu.m/km
21.70
22.57
Transport of Sand 85 km
T1-007A
2.33 cu.m/km
21.70
50.56
Curing
ST1-053
2.52 sq.m/day
20.25
51.03
Form work
ST1-065
0.48
sq.m
757.05
363.38
R/F
ST1-055
6.73
kg
150.80 1,014.88
Tractor & Trailer
B0-117
0.02
day
4,180.50
83.61
Labour
B0-004
0.20
day
628.96
125.79
2,186.25
cost per sqm
6,072.91 sqm
2.3.8 Casting and placing precast concrete slabs as per the drawings [double mesh, grade 25 (19 mm)]
Cover slabs
ST1-048
0.05
cu.m
9,488.40
474.42
Transport of agg 20 km
T1-007A
1.04 cu.m/km
21.70
22.57
Transport of Sand 80 km
T1-007A
2.33 cu.m/km
21.70
50.56
Curing
ST1-053
2.52 sq.m/day
20.25
51.03
Form work
ST1-065
0.48
sq.m
757.05
363.38
R/F
ST1-055
9.64
kg
150.80 1,453.71
Tractor & Trailer
B0-117
0.02
day
4,180.50
83.61
Labour
B0-004
0.20
day
628.96
125.792
2,625.08
cost per sqm
7,291.88 sqm
2.4: Construction of Foot walk
2.4.1 Backfilling using borrow material compaction in position (Type I)
Approved soil Type I for embankment
BO-202
1.350 cu.m
Spreading & compaction
EW1-003A 1.350
cu.m
Transport 15 km
T1-007A 20.250 cu.m/km
2.4.2 Laying of precast concrete paving slab
Lay paving slab
ST1-104
1.00
sq.m
paving slab
BO-449
1.00
nos
Transport sand 85 km
T1-007A
0.55 cu.m/km
Transport of precast slab 85 km
T1-046
85.00 sq.m/km
2.4.3 Fixing of kerbs
Lay road kerbs
ST1-101
1.00
l.m
Road kerbs
BO-448
1.12
nos
Transport 85 km
T1-043
94.45 l.m/km
Transport sand 85 km
T1-007A
3.31 cu.m/km
Transport agg 25 km
T1-007A
1.46 cu.m/km
129.30
171.30
21.70
174.56
231.26
439.43
845.24
cu.m
746.75
359.90
21.70
2.95
746.75
359.90
11.94
250.75
1,369.34
sqm
1,090.50
520.00
1.05
21.70
21.70
1,090.50
582.40
99.17
71.83
31.68
1,875.58
l.m
624.85
624.85
cu.m
139931074.xls.ms_office
1.00
cu.m
624.85
1.35
1.000
1.000
1.00
cu.m
sq.m
sq.m
kg
318.35
1,256.55
554.80
150.80
429.77
429.77
1,256.55 1,256.55
554.80
554.80
150.80 ########
cu.m
sq.m
sq.m
mt
7,238.25
21.70
21.70
7,238.25
542.50
1,106.70
cu.m
1.00
cu.m
25.00 cu.m/km
51.00 cu.m/km
Page 3 of 18
8,887.45
Rates
Item
Work componants
No.
2.5.7 Cement concrete Gr. 25 (20mm) for wall
Concrete Gr. 25 (20 mm)
Transport agg 25 km
Transport of Sand 85 km
2.5.8 Clay puddled & laid behind head wall.
2.5.9 Weep holes
ST1-048
T1-007A
T1-007A
ST1-012
ST1-017
Unit
1.00
cu.m
22.50 cu.m/km
41.40 cu.m/km
0.300
cu.m
1.00
l.m
Rate (Rs)
9,488.40
21.70
21.70
840.80
342.55
Amount
9,488.40
488.25
898.38 10,875.03
252.24
252.24
342.55
342.55
cu.m
sq.m
l.m
1,694.95
542.50
2,237.45
cu.m
1,651.93
416.00
434.00
2,501.93
cu.m
734.96
sq.m
985.16
sq.m
3,710.89
nos
4,140.34
nos
2.5.10 Supplying and packing 50-200mm dry stone lining behind head walls.
Agg. Backfill
ST1-113
1.000
cu.m
1,694.95
Transport of material 25 km
T1-007A 25.000 cu.m/km
21.70
2.5.11 Supplying and packing 3" thick 37.5mm aggregate as filter layer behind masonry walls.
37.5mm in filter
B0-310
1
cu.m
1651.93
Packing 37.5mm
ST1-011
1
cu.m
416
Transport all 20km
T1-007A
20 cu.m/km
21.7
2.6: Traffic sign boards & road marking
Road marking continous/broken line in
2.6.1 edges and center , 100 mm width using
thermoplastic paint (white).
Thermo plastic white
Glass beads
2.6.2 Marking standed predestrian crrosing
Thermo plastic yellow
Glass beads
2.6.3 Traffic sing boards fixing
Transport of aggregate 25 km
Transport of sand 85 km
GI pipe 50 mm
M.S bolts & nuts
Painting using anti corrosive
Angle iron
Plate area
Printerd stricker
2.6.4 Traffic sing boards fixing
Transport of aggregate 25 km
Transport of sand 85 km
GI pipe 50 mm
M.S bolts & nuts
Painting using anti corrosive
Angle iron
Plate area
Printerd stricker
139931074.xls.ms_office
RS1-015
1.000
BO-800
BO-802
RS1-016
BO-801
BO-802
RS-001
T1-007A
T1-007A
BO-434
BO-432
ST1-092
BO-641
BO-640
allow
RS-001
T1-007A
T1-007A
BO-434
BO-432
ST1-092
BO-641
BO-640
allow
3.571
0.250
1.000
3.571
0.250
1.000
0.675
1.377
3.000
0.150
0.069
0.500
0.360
kg/sq.m
kg/sq.m
l.m
kg/sq.m
kg/sq.m
no
cu.m/km
cu.m/km
l.m
kg
sqm
l.m
sq.m
1.000
no
0.675 cu.m/km
1.377 cu.m/km
2.000
l.m
0.200
kg
0.090
sqm
1.000
l.m
0.744
sq.m
Page 4 of 18
183.50
183.50
138.00
234.40
433.70
138.00
234.40
654.90
21.70
21.70
642.50
108.45
328.35
447.20
614.70
600.00
654.90
21.70
21.70
642.50
108.45
328.35
447.20
614.70
1,200.00
492.86
58.60
433.70
492.86
58.60
654.90
14.65
29.88
1,927.50
16.27
22.80
223.60
221.29
600.00
654.90
14.65
29.88
1,285.00
21.69
29.69
447.20
457.34
1,200.00
Rates
Description
Unit
Times
Length
Width
Height
Qty
sqm
2
500
2.8
500
2.8
500
2.8
500
2.8
0.150
420.00
500
12.4
0.225
1,395.00
139.50
500
12.4
6,200.00
620.00
500
12.4
6,200.00
620.00
500
12.4
2,800.00
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.2.7
Edge widening
0.5 km
Trimming, levelling and compaction of
exposed ground/subgrade to 100% standard
density.
Edge widening
0.5 km
Dense Graded aggregate base (37.5 mm) for
base failures and carriageway widening (150
mm thk)
Edge widening
0.5 km
Dense Graded aggregate base (37.5 mm) for
overlay, hard shoulder and camber
corrections(150-225 mm thk)
Overlay
0.5 km
add 10% for curve widening & access..
Prime coat with emulsion (CSS-1) at the rate
of 1.0/ltr /sq.m including blinding with sand
250 sq.m /cu.m on the sub base
0.5 km
ABC over lay
add 10% for curve widening & access..
Tack coat using emulsion ( CSS-I) at the rate
of 0.5 lts/sqm
0.5 km
ABC over lay
add 10% for curve widening & access..
Asphalt concrete 50mm thick surfacing
course material (19 mm, dense) as wearing
course (type 1)
0.5 km
ABC over lay
add 10% for curve widening & access..
139931074.xls.ms_office
cum
0.150
420.00
sqm
2,800.00
cum
cum
sqm
sqm
m.t
2.35
Page 5 of 18
0.050
728.50
72.85
Quantities
Item
No.
Description
Unit
Times
Length
Width
Height
Qty
cum
10
0.7
0.800
320.00
7.00
4
4
2
500
2
1
10
10
11
2501
5
51
500
2.15
10
0.85
0.1
0.8
0.600
0.600
0.150
0.25
0.15
1,200.00
0.24
0.24
5.00
1.50
ton
Angle drains
2.3.5 Cement Concrete Class B, 1:3:6 (37.5 mm)
0.5 km
2.3.6 Cement Concrete Class B, 1:2:4 (19 mm)
0.5 km
0.80
sqm
Angle drains
0.5 km
2.3.4
500
sqm
3.39
3.32
0.03
0.03
cum
500
0.80
0.075
30.00
500
500
0.8
0.6
0.150
0.100
60.00
60.00
cum
1
2
Angle drains
0.5 km
10
10
(0.15+0.1)/
2
0.25
0.1
0.6
0.75
0.25
sqm
300
0.45
0.80
108.00
140
0.45
0.80
50.40
350
1.5
350
1.5
350
sqm
139931074.xls.ms_office
Page 6 of 18
0.225
118.13
525.00
350.00
Quantities
Item
No.
Description
Unit
Times
Length
Width
Height
Qty
cum
cum
sqm
20
20
2.200
0.350
0.900
0.500
39.60
3.50
20
4.400
88.00
0.5 km
2
2
20
4.400
(0.15+0.4)/
4.4
2
176.00
2.42
0.5 km
20
2.2
20
20
0.35
0.300
0.300
0.500
0.550
0.500
12.00
1.32
10.00
11.00
0.35
201.0
101.0
8.5
134.3
89.9
115.3
19.0
4
5.9
20
4
6.2
3.6
20
20
0.72
0.53
0.15
0.48
0.50
0.37
0.34
0.04
20
20
1.8
0.4
0.075
0.075
2.70
0.60
20
20
20
(0.15+0.4)/
2
2.2
0.35
4.4
0.3
0.3
24.20
13.20
2.10
20
0.6
12.00
0.3
16.67
15.00
20
0.7
2.60
36.40
20
0.075
1.40
2.10
mt
0.5 km
Y 12
Y 10
139931074.xls.ms_office
cum
sqm
l.m
3
cum
cum
Page 7 of 18
Quantities
Item
No.
Description
Unit
Times
Length
Width
Height
Qty
sqm
2
500
500
0.1
0.1
100.00
50.00
2x6x6
2x2x18
2x7
2x2x3
2.00
0.50
3.50
0.20
0.50
0.20
0.60
0.50
72.00
7.20
29.40
1.20
sqm
nos
nos
139931074.xls.ms_office
Page 8 of 18
8.00
5.00
Quantities
Total Qty
2,800.00
420.00
2,800.00
420.00
1,534.50
6,820.00
6,820.00
801.35
139931074.xls.ms_office
Page 9 of 18
Quantities
Total Qty
320.00
7.00
1,206.98
6.77
30.00
121.00
108.00
50.40
118.13
525.00
350.00
139931074.xls.ms_office
Page 10 of 18
Quantities
Total Qty
43.10
88.00
178.42
34.67
3.11
3.30
39.50
12.00
15.00
36.40
2.10
139931074.xls.ms_office
Page 11 of 18
Quantities
Total Qty
150.00
109.80
8.00
5.00
139931074.xls.ms_office
Page 12 of 18
Quantities
Bill of Quantites for the Improvements to Bandarawela - Uvahighlands - Ettampitiya Road (0.0-0.5 km)
Item
No.
Pay
Item
Description
Quantity
Unit
Rate (Rs.)
Amount
(Rs.)
Item
Allow
LS
300,000.00
1.02
Item
Allow
PS
50,000.00
1.04
Item
Allow
PS
25,000.00
1.05
Item
Allow
LS
200,000.00
1.06
Item
Allow
LS
250,000.00
1.03
0.50
km.
25,000.00
12,500.00
837,500.00
2800.00 sq.m
41.86
117,212.67
117,212.67
2.2.3
2.2.4
2.2.5
2.2.6
2.2.7
2.2.8
420.00 cu.m
294.40
123,648.00
2800.00 sq.m
60.90
170,520.00
3400.00 sq.m
23.53
80,000.84
420.00 cu.m
5,239.52 2,200,596.72
1540.00 cu.m
4,571.48 7,040,074.58
6820.00 sq.m
89.84
612,696.94
6820.00 sq.m
44.64
304,472.97
805.00
mt.
8,107.45 6,526,497.25
17,058,507.29
2.3 Construction of Built up Drains (length - 500m) & Angle Drain (length 10m)
2.3.1
2.3.2
2.3.3
139931074.xls.ms_office
Page 13 of 18
320.00 cu.m
624.85
199,952.00
7.00 sq.m
60.90
426.30
1210.00 sq.m
41.60
50,341.04
BOQ
Item
No.
2.3.4
Pay
Description
Item
1002(1a) Fabricate & lay tor steel bars as reinforcement.
2.3.5
2.3.6
2.3.7
2.3.8
Quantity
Unit
Amount
(Rs.)
150,800.00 1,024,708.38
mt.
30.00 cu.m
121.00 cu.m
10,875.03 1,315,878.63
6.80
Rate (Rs.)
8,679.13
108.00 sq.m
6,072.91
51.00 sq.m
7,291.88
260,373.90
655,874.70
371,885.91
3,879,440.86
2.4.3
120.00 cu.m
845.24
101,423.97
525.00 sq.m
1,369.34
718,900.88
350.00
1,875.58
l.m
656,453.53
1,476,778.37
2.5.5
2.5.6
2.5.7
2.5.4
2.5.8
2.5.9
2.5.10
2.5.11
45.00 cu.m
624.85
28,118.25
90.00 cu.m
180.00 sq.m
429.77
38,679.53
1,256.55
226,179.00
mt.
4.00 cu.m
40.00 cu.m
150,800.00
475,716.69
8,887.45
35,549.80
10,875.03
435,001.20
12.00 sq.m
252.24
3,026.88
15.00
342.55
5,138.25
37.00 cu.m
2,237.45
82,785.65
3.00 cu.m
2,501.93
7,505.79
35.00 sq.m
3.15
l.m
1,337,701.04
2.6.3
139931074.xls.ms_office
Page 14 of 18
150.00 sq.m
734.96
110,243.57
110.00 sq.m
985.16
108,367.29
BOQ
Item
No.
2.6.4
2.6.5
Pay
Description
Quantity Unit
Item
811 (1a) Providing and Erecting Road Sign Boards using
1:3:6 (37.5 mm) Concrete (Single Post, Sign
8.00 nos
Area up to 0.5m2)
811 (3) Providing and Erecting Chevron Road Sign
5.00 nos
Boards
Sub Total carried to Summary
Rate (Rs.)
Amount
(Rs.)
3,710.89
29,687.08
4,140.34
20,701.72
268,999.66
Un-skilled labour
10.00
day
628.96
6,289.60
3.1.2
Semi-skilled labour
10.00
day
673.36
6,733.60
3.1.3
Skilled labour
10.00
day
769.36
7,693.60
3.2: Equipment
3.2.1
1.00
day
36,184.80
36,184.80
3.2.2
4.00
day
4,180.50
16,722.00
3.2.3
3.00
day
4,614.48
13,843.44
3.2.4
2.00
day
8,387.36
16,774.72
3.2.5
20.00
hrs
771.92
15,438.40
3.2.6
Tipper/Lorry (3T)
3.2.7
150.00
km
34.78
5,217.00
1.50
day
16,948.80
25,423.20
3.3: Material
3.3.1
Cement ordinary
10.00 50 kg
676.35
6,763.50
3.3.2
Bitumen 60/70
10.00
ltr
85.00
850.00
3.3.3
Emulsion (CRS-1)
10.00
ltr
68.25
682.50
3.3.4
Emulsion (CSS-1)
10.00
ltr
71.65
716.50
3.3.5
0.20
mt.
101,580.00
20,316.00
3.3.6
0.30
mt.
101,930.00
30,579.00
3.3.7
18,268.40
8.00 cu.m
6.00 cu.m
2,283.55
3.3.8
1,651.93
9,911.58
3.3.9
Timber class II
40.70
162.80
73.00
730.00
4.00 cu.dm
3.3.10 Diesel
10.00
ltr
8.00 cu.m
Sub Total carried to Summary
1,265.92
10,127.36
249,428.00
Prepared by:
Checked by:
-----------------------------K.G.M.P Rupasinghe
Engineer, CE's Office, Bandarawela
-----------------------------D.M Karunatillaka
Engineer, PD's Office (Uva), Bandarawela
139931074.xls.ms_office
Page 15 of 18
BOQ
Description
Bill No
1
Amount
#REF!
117,212.67
0
3,879,440.86
1,476,778.37
1,337,701.04
139931074.xls.ms_office
17,058,507.29
268,999.66
20,716.80
129,603.56
99,107.64
#REF!
summary
249,428.00
139931074.xls.ms_office
summary
Annex A
1. Details of existing and proposed pavement.
Chainage
Existing Carriageway
width (m)
Proposed Carriageway
width(m)
Proposed hard
shoulder width(m)
Proposed earth
shoulder width(m)
0+000 - 0+500 km
6.8
10.4
7.4