DESIGN OF POND:

POND DATA INPUT Run-off coefficients (Cr): = Rainfall Intensity I = Metric unit for clay capped area, Catchment area A= Pond Length at Bottom L= Pond Width at Bottom b= Total Depth of Pond D= Pond Free Board FB= Pond side slope 0.75 80.0 0.0028 2.51 49.0 30.5 1.8 600 2 1

mm Ha m m m mm

a=

h= v=

CALCULATION Depth of water in the pond, H= D-FB Total volume of water in the pond, Q= a x Cr x I x A x 3600 Volume of Pond, V= Length of Pond at Grade, Lg= Width of Pond at Grade, Wg= 1.2 1518 2029 56.2 37.7 m cum cum POND OK m m

DESIGN OF DITCH:

DITCH DATA INPUT Roughness coefficients for unpaved ditch (Nd): = 0.022 Rainfall Intensity (10 min concenttration) I = 80.0 Run-off coefficients C: = 0.750 Metric unit for clay capped area, a= 0.0028 Slope of the ditch (0.25% along length) S= 0.0025 Manning's co-efficient for metric unit m= 1.0 Width of Ditch b= 300.0 Depth of Ditch h1= 300 Ditch Free Board FB= 0 h= 3 Ditch side slope v= 1 CALCULATION Depth of water in the ditch = (h1-FB) Area of ditch A= Perimeter of Ditch P= Hydraulic radius R=A/P Velocity of water in the ditch V = (m/Nd)xR0.67xS0.5 < 0.6m/s Flow Rate in Ditch Q= V x A Catchment area covered by ditch A=Q/(a x C x I) 300 0.36 2.20 0.16383 mm mm2 m m

mm /hr

mm mm mm

0.6 m/s 3 0.216 m /s 1.3 Ha

DESIGN OF CULVERT:

CULVERT DATA INPUT Roughness coefficients for corrugated pipe, Nd= Rainfall Intensity (10 min concenttration) I = Run-off coefficients Cr: = Metric unit for clay capped area, a= Slope of the culvert (0.5% along length) S= Manning's co-efficient for metric unit m= Diameter of pipe, D= CALCULATION Area of culvert A= Perimeter of culvert P= Hydraulic radius R=A/P Velocity of water in the ditch V = (m/Nd)xR0.67xS0.5 Flow Rate inculvert Q= V x A Catchment area covered by culvert A=Q/(a x C x I)
2 0.2826 m 1.88 m 0.15 m

0.025 80.0 mm /hr 0.75 0.0028 0.005 1.0 600.0 mm

0.79 m/s 3 0.224 m /s 1.3 Ha

DESIGN OF HORIZONTAL CURVE:

Design Input Angle between the lines, a= Radius of Arc, R= Calculation: Angle between the two lines passing through tangent point, 2b= Tangent Length L= R x tan(b) Shifting of point P, D=SQRT(R2+L2)-R 51 degree 24.788 M 5.6 M 51 degree 52 M

DESIGN OF VERTICAL CURVE:

T2

P2 D S3 90

R3

R1 90 P1 A S1 T1

90 S2 P1 L1

90 R2

90

90 P3 P3A S4 L2 T3

Design Input Elevation of Point P1, E1 = Elevation of Point P2, E2 = Elevation of Point P3, E3 = Horizontal distance between P1 & P2, L1= Horizontal distance between P2 & P3, L2= Radius of Curvature, R1= Radius of Curvature, R2= Radius of Curvature, R3= Design Speed of Car Calculation: Slope between points P1A & P1, S1 Slope between points P1 & P2, S2 = (E2-E1)/L1 Slope between points P2 & P3, S3 = (E2-E3)/L2 Slope between points P3 & P3A, S4 Tangent Length T1= R1 x tan((b-a)/2) Tangent Length T2= R2 x tan((b-c)/2) Tangent Length T3= R3 x tan((d-c)/2) Length of Arc for Sag Curve-1 LC1= R1 x (b-a) Length of Arc for Crest Curve-2 LC2= R2 x (b-c) Length of Arc for Sag Curve-3 LC3= R3 x (d-c) K value calculated for Sag Curve-1 K value calculated for Crest Curve-2 K value calculated for Sag Curve-3 Shifting of crest point P1, D1=SQRT(R12+T12)-R1 Shifting of crest point P2, D2=SQRT(R2 +T2 )-R2 Shifting of crest point P3, D3=SQRT(R32+T32)-R3 New Elevation of the Crest P1, (E1-D1) New Elevation of the Crest P2, (E2-D2) New Elevation of the Crest P3, (E3-D3)
2 2

599.55 603.3 599.82 74.00 69.00 600 525 600 40

M M M M M M M M Km/hr

0.000 5.068 -5.043 0.000 15.193 26.541 15.121 30.379 53.038 30.235 6 5 6 0.192

% % % % m m m m m m

Angle, a = 0.000 Radian Angle, b = 0.051 Radian Angle, c = -0.050 Radian Angle, d = 0 Radian

K Value OK K Value OK K Value OK m

0.670 m 0.191 m 599.358 m 602.630 m 599.629 m