$2,645,000
$450,000
Connecting Link
$65,000
Growth Reserve
$350,000
$200,000
$700,000
Funds annually earmarked for sanitary sewer improvements to existing infrastructure Total Revenues
$850,000
$7,410,000
2013 project
2013 project
2013 project
2013 project
2013 project
2013 project
Moneta Drainage
2013 project
2013 project
2013 project
Algonquin Sidewalk
2013 project
Place third lift of surface treatment on 8km of existing rural roads (locations to be determined) Replace 175m of CSP sanitary sewer between Bloor and Golden (in-house design, drafting, tender documents,
inspection, admin)
2013 project
500m of sidewalk between Lamminen and Riverpark (in-house design, drafting, tender documents, inspection,
admin)
asphalt, curb and gutter and street lights (need to build roadway to Lionel Gauthier )
2013 project
2013 project
Request made in 2010. Identified risk for pedestrians. Double surface treatment and sub-base improvements Sandy Falls 1.8 km (in-house design, drafting, tender
documents, inspection, admin)
2013 project
postpone to 2014
Pedestrian crossing, project support, bridge design, asset management review. Hire temporary inspector versus contracting out to consultants
$300,000 $60,000
Total Expenditures
$7,410,000