CHANGES TO STRUCTURAL REVIT MODEL

Changes between 09.24.2010 and 10.01.2010 1. 2. 3. 4. 5.


Levels 02 Roof - Re-worked the steel supporting the column wraps on grids 4A 5A and 6A from level 02 to the underside of the brow at the roof. Also Re-Detailed these connections for the column wrap supports. Level 01 and 02 - Added steel to support the roof over the coffee shop (Between Grids F and H, and 5 and 7) Level 01 and 02 - Re-located and or Re-sized concrete piers which support the masonry column wraps along grid 8 and at Grids A4 A5 and A6. Level 01 and 02 Added a 12 concrete wall at the interior perimeter of the mechanical room to match the arch model. This wall is designed as a non-bearing wall with 2 clearance between the structure above. Levels 01 thru 04 Shifted slab edges at the landings for the grand stair case to align with the Arch model. (framing member sizes changed at these landings to catch the depth of the stringers) The design of the stair stingers need to be further coordinated and will change in the near future. Roof Level Changed the framing at the roof for the south west stair case to work with the arch model, lowered the deck and provided steel for the parapet wall. Roof level Changed the steel posts at the cooling tower support from square tubes to round tubes. (between grids E and F, and 5 and 7) Roof Level Added framing for the chiller supports between grids A and B, and 5 and 6. (Detailed similar to the cooling tower support frame).

6. 7. 8.

Changes between 09.17.2010 and 09.24.2010 9.


Added steel to support the column wraps on grids 4A 5A and 6A from level 02 to the underside of the brow at the roof. Also detailed these connections for the column wrap supports.

Changes between 09.06.2010 and 09.17.2010 10. 11. 12. 13.


Changed the framing of the entry canopy at level 03 It will change again next week. Adjusted the height of the pop-up roof for the service elevator and slopped the structure there to match the slope of the roof below. Modeled framing under each of the mechanical roof top units. Modeled a cooling tower platform on the roof. And detailed

14. 15.

Modeled (4) penetrations through (2) beams at the roof. (Beams on grid B between 5 and 7 at the roof level). Added (4) braced frames around the penthouse. See sheet (S402)

Changes between 09.02.2010 and 09.10.2010 16.


Changed the framing at the roof and penthouse roof level around the two elevators. Framing changed to add a hoist beam and to allow more clearance for the elevator below. Added Framing for a pop-up roof at the service elevator the height of the pop-up roof at the service elevator will need to be adjusted when the elevator specifications are final. (will need to coordinate with arch dwgs). Re-located the (3) beams running east to west on level 05 and south of grid J to align with the same beams on level 04 below (beams are now 50 south of grid J) I think this pulls out of your wall system now, Arch to verify. Re-located framing members running east to west on levels 04, 05 and roof and north of grid A between grids 4 and 5 I think they should be out of the curtain wall system Arch to verify. (I still need to focus time around the zion room). Moved the framing around the skylight on the Roof level to be 12 for edge of deck around the sky light perimeter. Modified the framing for the screen wall around the cooling towers at the penthouse. Added a note about the perforated aluminum panel and stud wall infill, referred back to the architectural drawings. Modified the size (up-sized) of framing members on level 02 between grids C and E and between grids 5 and 6 for compact shelving per arch.

17.

18.

19. 20. 21.

Changes between 08.20.2010 and 09.02.2010


1. Level 01 - Added foundation walls under exterior walls located north of grid H between grid 1 and 3. 2. Level 01 - Jogged the concrete retaining wall on grid A between grids 4 and 5. (changed level 02 at same area to work with jogged wall, added a steel beam along grid A between grids 4 and 5). 3. Level 02 - Adjusted the location of steel beams supporting grate at the mechanical yard west of grid 1 between grids A and C. Moved to straddle the new locations of the transformers below. (We now need to spec a heaver grate, one than can span 10-0). 4. Level 02 Added a steel beam 2-0 north of grid B between grids 6 and 7. (added to support Ampitheater steps at top of stairs). 5. Level 02 - Added steel beams and slab reinforcing under Brick/Stone Veneer columns located at grids A4, A5 and A6.

6. Level 02M - Changed the steel framing at the cantilevered ends of the snack bar and library roofs/ceilings. North of grid B along grids 2 and 5. 7. All levels Added grid J 8-6 south of grid H. 8. Levels 03, 04, 05 and Roof aligned steel framing members with the new grid J at cantilevered floor areas on the south side of the building. 9. Level 04 Changed the dimension of step for the outside patio area from 6 below level 04 to 8 below level 04. (changed detail (B3/S603) to work with the new 8 step). 10. Level 04 Added framing to support the pop-out roof/brow roof at the north west corner of the building. (The detail in this area changed again so I will need to re-work this area again). 11. Level 05 changed the hatched area that represents the Heavier loaded floor for the Data Center, changed to match new arch model. 12. Level 05 Added the concrete curb just south of grid J between grids 4 and 7 to match the archs model. (didnt add the curb on level 04 by the Brow roof just yet, waiting to copy it in from the arch model). 12. Penthouse roof This whole area needs to be designed for literal support so there will be changes coming in the future. 13. Level 01 - Added a 24 thick concrete wall along grid 8 between grids B and C to support the concrete stairs on the walls east and west sides. - 8 on both sides of wall stays low for the stair slab to bear on, the middle 8 continues past the steps to support the glass wall on grid B. 14. Showing (2) concrete walls (running east to west) under concrete stairs between grids 7 and 8 and between grids B and C (to match arch model). Used to only show (1) wall.

Changes between 08.11.2010 and 08.20.2010


1. Changed all concrete over metal deck from 6 thick to 6 thick. 2. Added a typical detail requiring 3 of over excavation and compacted structural fill at all footings. 3. Added an S110 sheet for the column load layout for Geopier design and placement. 4. Re-located the tube steel wind girts on levels 02 and 02M to be centered with the window millions. 5. Raised the top of concrete foundation wall along grid 1 between grids A and E.6 to be 2-7 above level 01. 6. Added an S304 sheet for the floor load diagram schedule. 7. Provided a detail for the elevator guide rail support column connection at the floor levels (A1/S602). 8. Changed the bottom of elevator pit elevation at the north east elevator to be at 90-11 (9-1 below level 01). 9. Changed the bottom of elevator pit elevation at the south west elevator to be at 90-2 (9-10 below level 01).

10. Provided a better foundation for the north side entry vestibule area on level 02 between grids 3 and 4 as discussed in yesterdays coordination meeting 11. Provided large concrete pier at grids A4 A5 and A6 for column and veneer bearing as discussed. 12. Added some schematic framing for the cool ceiling structure above the Library and Snack Bar on level 2 as discussed with Alex yesterday. 13. Re-modeled the roof above the Zion Room to match the latest architectural model. 14.

Changes between 08.06.2010 and 08.11.2010


We have been thinking through and working out the details for the roof and the perimeter slab edge condition at the GFRC panel system. No changes reflect in the model or the set from last week.

Changes between 07.30.2010 and 08.06.2010


15. We have started modeling the sloped structure at the roof. Have not finished yet. Were trying to work out some of the details at the roof to penthouse floor transition. 16. Ive started to model in the stair framing members for structure. See new shhet (S171).

Changes between 06.28.2010 and 07.30.2010


17. Now showing (2) locations for electric conduit through the floor slabs on levels 02 05. ((1) Between grids 5-6 and B-C, the other between grids 1-2 and D-E). Added structural steel to support the slab edges at these (2) conduit locations. 18. Made changes to the slab edges on each level to match the archs slab edge. 19. Moved structural framing members on each level, such that the typical distance from slab edge to center line of framing member = 11. (Some areas have been left unchanged around the building perimeter at the upper levels, assuming the GFRC wall panel system will change these areas again soon) 20. Changed the area of raised floor at the Data Center to match the Arch model, matched the new stair and ramp layout as well for the raised floor. 21. Changed the hatched area on sheet (S151) Level 05 where the floor load is to be designed at 300psf to match the Archs current floor plan layout for the Data Center and Power storage. 22. Added some details for the canopy framing on level 03 north of grid A. 23. Added and modified details for the recessed patio area on level 04. 24. Added details for framing the Zion Room on level 05 - floor and roof. 25. Modified the area of concrete over metal floor deck on the roof for the penthouse floor to match the new Archs model. Added the large opening

there between grids 6-7 and D-E. Added structural framing to support this large slab penetration. 26. We are considering a flush framed joist to beam connection at the roof (which could save us on steel used for blocking between joists). See (C6/S703) for detail with bearing seats, then see (A1 and A2/S702) for the flush framed option. Joists will change from a K series to an LH series. Changes will not reflect on the structural set or the model.

Changes between 06.21.2010 and 06.25.2010


27. Level 2M slab edge revised to match the Architect, Floor framing revised to support latest slab edge changes. 28. Revised the concrete stairs by grids B, C and 6, 7 from level 1 up to level 2 to match the architect. 29. Area for the Data Center on Level 5 revised to match arch , second ramp shown for clarity. 30. Concrete Retaining Walls and Site walls west of Grid 1 revised to match Architect plans 31. Cantilevered stair landing at Level 02 between Grids 6 and 7 and south of Grid C slab edge revised per arch, (pulled back over Grid C. Structural framing adjusted to support accordingly.

Changes between 06.14.2010 and 06.018.2010


32. Framing members have been added and some sizes revised around the steel column on Grid C6 to brace that column at each suspended floor framing plan. 33. Steel column sizes on grid H1, H4, H6, D7, E7, and F7 have been revised to allow for a flush connection of glazing system to structure. 34. Framing sizes have been revised at the canopies at level 03and level 04. 35. Framing sizes at the recessed balcony on level 05 have been revised. 36. Framing member sizes have been revised on level 05 and the roof between grids 6 and 8 and A and C.

Changes between 06.07.2010 and 06.011.2010


37. Checked and double checked that the structural levels match the architectural levels. 38. Slab edges at Level 02M revised to match arch model. 39. The slab penetrations for the stair and elevator shafts between grids B-C and 5-6 have been revised to match arch, the structural framing has been revised accordingly.

40. Revised the grand stair case near grid 7 to match arch. Rod hangers and additional slab reinforcing have been added to the structural plans to support the cantilevered stair landings at levels 2 and 2M. 41. The skylight on the roof has been revised to match architectural drawings. 42. Framing for the Grate at level 2 revised Grating sized.

Changes between 06.01.2010 and 06.04.2010


43. Slab edges at all levels revised to match arch model. 44. Slab recess areas shown recess depth still unknown. 45. Braced Frame on Grid F removed from levels 01, 02, and 02M (Removed footings, HSS column, braces and revised framing). 46. Added framing to support the Grate and side walk at the North West corner of level 02. 47. Added HSS columns at Grids 4, 5, and 6 and North of Grid A. 48. Revised all Wind Girt sizes (levels 02 and 02M). 49. Added Rod Hangers hanging from level 03 down to support wind girts below 50. Added Floor framing and slab on metal deck at Bay between Grids F and H and between 5 and 6 at level 02M. 51. Added Floor framing and slab on deck south of Grid C between 2 and 5. 52. Revised framing at south west stair framing to support Cantilevered Sail wall from levels 02M up. 53. Stopped Steel column on Grid B-8 at level 05 (It used to run through level 05 to help support the roof framing) Added some columns and posts and revised roof framing at this area.

Changes between 05.17.2010 and 05.28.2010


54. A 1 layer of Fire Proofing is now visible around all steel columns and all wide flange framing members 55. The floor framing design loads have been updated on each level 56. Additional steel has been added to the model for support of the canopies on floor levels 03, 04, 05, and Roof 57. A steel stud wall has been added in around the skylight on the roof 58. The slab edge has been updated to match the Arch model on each level 59. The tunnel has been modeled and detailed 60. The Footing sizes have been updated as well as many of the column sizes

Changes between 05.07.2010 and 05.14.2010


1. The Braced Frame along Grid F between Grids 5 and 6 It used to be 25-0 wide, now it is only 12-6 wide to fit in architectural wall. 2. The concrete retaining walls that are west of Grid 1 have changed to match the latest Revit model from the Architect dated 05.07.2010. 3. Added a suspended concrete floor west of Grid 1 between grids A and C.

4. 5. 6. 7.

Added the Grate west of Grid 1 between Grids C and D. Shifted locations of moment frame elevations along Grids 1, 6, B, and H. Added kicker angle braces to the moment frames at each level. Removed Cantilevered floor north of Grid A between Grids 4 and 5 at levels 3 and 4. 8. Modified the roof framing at the pop-up between Grids A and B and 7 and 8. 9. Penthouse Roof level changed to match latest Architectural Revit model. 10. Changed some column and framing sizes in all the moment and braced frames.