Modeled (4) penetrations through (2) beams at the roof. (Beams on grid B between 5 and 7 at the roof level). Added (4) braced frames around the penthouse. See sheet (S402)
17.
18.
6. Level 02M - Changed the steel framing at the cantilevered ends of the snack bar and library roofs/ceilings. North of grid B along grids 2 and 5. 7. All levels Added grid J 8-6 south of grid H. 8. Levels 03, 04, 05 and Roof aligned steel framing members with the new grid J at cantilevered floor areas on the south side of the building. 9. Level 04 Changed the dimension of step for the outside patio area from 6 below level 04 to 8 below level 04. (changed detail (B3/S603) to work with the new 8 step). 10. Level 04 Added framing to support the pop-out roof/brow roof at the north west corner of the building. (The detail in this area changed again so I will need to re-work this area again). 11. Level 05 changed the hatched area that represents the Heavier loaded floor for the Data Center, changed to match new arch model. 12. Level 05 Added the concrete curb just south of grid J between grids 4 and 7 to match the archs model. (didnt add the curb on level 04 by the Brow roof just yet, waiting to copy it in from the arch model). 12. Penthouse roof This whole area needs to be designed for literal support so there will be changes coming in the future. 13. Level 01 - Added a 24 thick concrete wall along grid 8 between grids B and C to support the concrete stairs on the walls east and west sides. - 8 on both sides of wall stays low for the stair slab to bear on, the middle 8 continues past the steps to support the glass wall on grid B. 14. Showing (2) concrete walls (running east to west) under concrete stairs between grids 7 and 8 and between grids B and C (to match arch model). Used to only show (1) wall.
10. Provided a better foundation for the north side entry vestibule area on level 02 between grids 3 and 4 as discussed in yesterdays coordination meeting 11. Provided large concrete pier at grids A4 A5 and A6 for column and veneer bearing as discussed. 12. Added some schematic framing for the cool ceiling structure above the Library and Snack Bar on level 2 as discussed with Alex yesterday. 13. Re-modeled the roof above the Zion Room to match the latest architectural model. 14.
there between grids 6-7 and D-E. Added structural framing to support this large slab penetration. 26. We are considering a flush framed joist to beam connection at the roof (which could save us on steel used for blocking between joists). See (C6/S703) for detail with bearing seats, then see (A1 and A2/S702) for the flush framed option. Joists will change from a K series to an LH series. Changes will not reflect on the structural set or the model.
40. Revised the grand stair case near grid 7 to match arch. Rod hangers and additional slab reinforcing have been added to the structural plans to support the cantilevered stair landings at levels 2 and 2M. 41. The skylight on the roof has been revised to match architectural drawings. 42. Framing for the Grate at level 2 revised Grating sized.
4. 5. 6. 7.
Added the Grate west of Grid 1 between Grids C and D. Shifted locations of moment frame elevations along Grids 1, 6, B, and H. Added kicker angle braces to the moment frames at each level. Removed Cantilevered floor north of Grid A between Grids 4 and 5 at levels 3 and 4. 8. Modified the roof framing at the pop-up between Grids A and B and 7 and 8. 9. Penthouse Roof level changed to match latest Architectural Revit model. 10. Changed some column and framing sizes in all the moment and braced frames.