LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Match The Following Question Correct Answer Your Answer Repair Maintenance Course Principles of Equipments Chars & reports Safety course Nature of Accidents Nature of Accidents Computer training Terminology Terminology Staff Development courses Hierarchy in the organisation Hierarchy in the organisation True/False Question In the drawing of machinery both views to be shown. Correct Answer True Your Answer True Select The Blank Question Value analysis applies ________ approach to find out unnecessary cost. Correct Answer Creative Your Answer Knowledge base Multiple Choice Multiple Answer Question Development of subordinates broadly will depend on :Correct Answer The level of education , The level of personal skill , The level of intelligence Your Answer The level of education , The level of personal skill , The level of intelligence Select The Blank Question

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Work order release system is the ________ to start the maintenance activity at the correct frequencies. Correct Answer Trigger Your Answer Trigger True/False Question Electrical energy is the most commonly used form of energy. Correct Answer True Your Answer True Select The Blank Question The maintenance earns profit by________. Correct Answer Zero Faults Your Answer Zero Faults Select The Blank Question There are ________ chemicals which are in common use. Correct Answer 60000 Your Answer 60000 Select The Blank Question In ________ phase the plant is observed for any indications of defects. Correct Answer Post overhaul Your Answer Post overhaul Multiple Choice Multiple Answer Question In Maintenance Control Model following things are very important :Correct Answer Lubrication Schedule , Preventive Maintenance , Inspection Schedule Your Answer Lubrication Schedule , Preventive Maintenance , Inspection Schedule

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Single Answer Question Overtime working of operator make them less alert mentally & physically, this may cause :Correct Answer Accident Your Answer Accident Select The Blank Question A unit called ________ measures illumination. Correct Answer Lux Your Answer Lux LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Preventive maintenance program reduces overall maintenance cost which also include spare cost. Correct Answer True Your Answer True True/False Question Textile oil is nothing but automotive lubricative oil. Correct Answer False Your Answer False True/False Question The time period for budget is taken as one year. Correct Answer True Your Answer True

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

True/False Question Now a days a trend is emerging of employing multi skilled executives who are trained in many disciplines. Correct Answer True Your Answer True True/False Question Maintainability is defined as ease with which product can be serviced or repaired. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which qualities are required for Maintenance Inspector? Correct Answer Sound Judgement ability Your Answer Fault system analysis Match The Following Question Correct Answer Your Answer Control System Feedback of Information Feedback of Information Work Order Release System Trigger to start activities Trigger to start activities Technical Literature Relevant Drawings Relevant Drawings Progress of Work Schedule Board Maintenance Record Multiple Choice Multiple Answer Question The subjective evaluation method characteristics are :Correct Answer Attitude to change , Moral of maintenance staff , Safety consciousness

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Your Answer Objectives of the organization , Attitude to change , Moral of maintenance staff Select The Blank Question Adequate ________ should be provided in the design of the equipment to prevent any mishap. Correct Answer Interlocks, safety alarms Your Answer Interlocks, safety alarms Select The Blank Question ________ is extensively used in testing pressure vessels & steam pipes. Correct Answer Leakage Testing Your Answer Pressure Testing Multiple Choice Single Answer Question How a molecule of fuel fragmented? Correct Answer H+ and OHYour Answer H+ and OHMultiple Choice Single Answer Question Normally Ratio of Unplanned work to planned work is given in :Correct Answer Maintenance Report & Analysis Your Answer Maintenance Report & Analysis True/False Question The steam trap plays a vital role in the performance of the machine. Correct Answer True Your Answer True Multiple Choice Single Answer Question Proper spare part will enhance the life of equipment and will save vital :-

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Capital expenditure Your Answer Time to restore production Multiple Choice Multiple Answer Question Spare part can be categorized by :Correct Answer The speed of use , Its value , Its availability Your Answer Its value , Its availability , Its source of supply Multiple Choice Multiple Answer Question Which are the ways to release work orders? Correct Answer Supervisors himself issues it , To display on work order board , To put it in allotted flaps of workers Your Answer To display on work order board , To put it in allotted flaps of workers , Let workers ask about it Match The Following Question Correct Answer Your Answer Scheduling Necessary As per Plan Down time control Zero Required Inventory level Low Low Preventative maintenance As per Plan Necessary Select The Blank Question Maintenance department falls under ________ department. Correct Answer Service Your Answer Procurement

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Select The Blank Question Lubrication of machines is done________. Correct Answer As per schedule Your Answer As per schedule Multiple Choice Single Answer Question Before starting evaluation of maintenance function, it is better to start with :Correct Answer SWOT analysis of maintenance function Your Answer SWOT analysis of maintenance function Multiple Choice Single Answer Question The maintenance analysis gives total down time and its percentage with respect to :Correct Answer Total available period Your Answer Total available period Select The Blank Question The maintenance earns profit by________. Correct Answer Zero Faults Your Answer Low Breakdown Multiple Choice Single Answer Question The modern management is composed of evaluation, refinement and integration of functional objectives into an :Correct Answer Integrated corporate goal Your Answer Integrated organization goal Multiple Choice Multiple Answer Question The objective inventory control is :Correct Answer To reduce lead time , To reduce finance cost of inventory , To reduce storage cost of

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

material Your Answer To reduce finance cost of inventory , To over stock material to avoid shortages , To reduce storage cost of material Multiple Choice Multiple Answer Question The three major cost associated with inventories are :Correct Answer Inventory carrying cost , Ordering cost , Stock out cost Your Answer Inventory carrying cost , Ordering cost , Stock out cost Multiple Choice Multiple Answer Question The price structure of purchased equipment generally consist of :Correct Answer The basic price of the machine , The nature of taxes and duties , The price of essential spares for sufficient stock, transport, Insurance etc. Your Answer The basic price of the machine , The nature of taxes and duties , The price of essential spares for sufficient stock, transport, Insurance etc. Select The Blank Question In Japan & Western countries equipment discarded after about ________ years. Correct Answer 7 Your Answer 10 Select The Blank Question Moving objects wear out giving rise to ________. Correct Answer Debris Your Answer Viscosity Multiple Choice Single Answer Question Which of the following is process variable which can affect the equipment? Correct Answer Flow rate of process fluid Your Answer Flow rate of process fluid

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

True/False Question Value analysis is one way to attempt for quality simplification. Correct Answer True Your Answer True Select The Blank Question a ________ is the cost of money invested in stocks is usually borrowed from banks as working capital. Correct Answer Financing cost Your Answer Financing cost True/False Question Defect analysis gives us information about commonly faced problems. Correct Answer True Your Answer True Select The Blank Question The progress of work inside the plant can be viewed at glance by putting up a ________ in the control room. Correct Answer Schedule Board Your Answer Job Card Multiple Choice Multiple Answer Question What are the essentials of well planned lubrication system? Correct Answer Frequency of lubrication , Quality of lubricant , Quantity of lubricant Your Answer Frequency of lubrication , Quality of lubricant , Quantity of lubricant True/False Question Technology review is done to check the performance efficiency of plant. Correct Answer True

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Your Answer True Select The Blank Question The manufacturing time for spare parts can vary from________. Correct Answer Zero to one year Your Answer Zero to one year Multiple Choice Single Answer Question Freight & packing/forwarding brought down to 1% from 5% is example of :Correct Answer Cost reduction Your Answer Cost reduction Multiple Choice Multiple Answer Question The following costs can be treated under the heads of Wages and salaries :Correct Answer The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges. Your Answer The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges. True/False Question Too may cooks spoil the broth. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Some of the elements of the ordering cost are :Correct Answer Cost of stationary used for purchase function , Depreciation for the furniture, computer & other equipments , Entertainment of vendors. Your Answer Cost of stationary used for purchase function , Depreciation for the furniture, computer & other equipments , Entertainment of vendors.

10

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Single Answer Question Which two departments are closely related to each other? Correct Answer Production & maintenance Your Answer Production & maintenance Select The Blank Question ________ is the period that elapses between the recognition of the need of spare parts and its fulfillment. Correct Answer Lead time Your Answer Lead time Multiple Choice Single Answer Question The responsibility of maintenance Department is to ensure cost at :Correct Answer Minimum Your Answer Standard Multiple Choice Multiple Answer Question Master list of all the supplier should consist of information such as :Correct Answer Name, address, telephone, fax nos , Financial status , His rating for the year. Your Answer Name, address, telephone, fax nos , Financial status , His rating for the year. Multiple Choice Multiple Answer Question What should be contents of Computer training? Correct Answer Computer Terminology , It's use in Maintenance , How to handle it Your Answer Computer Terminology , It's use in Maintenance , How to handle it Multiple Choice Single Answer Question What can be minimized by detecting an incipient fault? Correct Answer Damage Your Answer

11

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Accident Multiple Choice Multiple Answer Question Some of the elements of inventory carrying cost are :Correct Answer Storage expenses , Insurance charges , Cost of deterioration Your Answer Storage expenses , Insurance charges , Cost of deterioration

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Match The Following Question Correct Answer Your Answer Repair Maintenance Course Principles of Equipments Chars & reports Safety course Nature of Accidents Nature of Accidents Computer training Terminology Terminology Staff Development courses Hierarchy in the organisation Hierarchy in the organisation True/False Question In the drawing of machinery both views to be shown. Correct Answer True Your Answer True True/False Question Efficiency of any machine not exceed 50%. Correct Answer False Your Answer

12

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

False Multiple Choice Single Answer Question It is objective of maintenance to make maximum availability of production plant at :Correct Answer Minimum cost Your Answer Minimum cost Select The Blank Question If the job performed on the purchased equipment is OK in terms of quality & quantity, which was conceived at the beginning is known as ________. Correct Answer Proving Your Answer Proving True/False Question Technology review is done to check the performance efficiency of plant. Correct Answer True Your Answer True True/False Question The value analysis takes into account the used value and esteem value. Correct Answer True Your Answer True True/False Question The supervisor must have good knowledge of his job, he should be able to lead by example. Correct Answer True Your Answer True Multiple Choice Single Answer Question

13

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Cracks developed in machine parts is :Correct Answer Mechanical Variable Your Answer Process variable Multiple Choice Single Answer Question Which is considered as main job of a supervisor? Correct Answer To train subordinate Your Answer To motivate Multiple Choice Multiple Answer Question From the following identify the spares :Correct Answer Fuse , Relay , Nut & bolts Your Answer Fuse , Relay , Nut & bolts Match The Following Question Correct Answer Your Answer Objective of control of spare part Control over the consumption of spare Control over the consumption of spare Reconditioning of the spare part Recycling of lubrication oil reusing waste water Recycling of lubrication oil reusing waste water Standardization Bearing, V belts, flat belts Bearing, V belts, flat belts Codification of spare part Equipment code number to which it belongs Equipment code number to which it belongs Select The Blank Question In the industry major hazards which can occur is ________. Correct Answer Explosions Your Answer Explosions

14

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Select The Blank Question ________ & maintenance department are closely interlinked to each other. Correct Answer Production Your Answer Production Multiple Choice Multiple Answer Question The performance of maintenance is indicated by :Correct Answer Low cost , Low down time , More uptime Your Answer Low cost , Low down time , More uptime Multiple Choice Single Answer Question The responsibility of maintenance Department is to ensure cost at :Correct Answer Minimum Your Answer Minimum True/False Question Technical manual is not a product support document. Correct Answer False Your Answer False True/False Question On line inspection is carried out on machine itself but when it is shut down. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are metal working oils? Correct Answer Soluble cutting oil , Synthetic cutting oil , Srip grinding oil Your Answer Soluble cutting oil , Synthetic cutting oil , Srip grinding oil

15

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Multiple Answer Question The following costs can be treated under the heads of Wages and salaries :Correct Answer The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges. Your Answer The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges. Multiple Choice Single Answer Question What is more important while using components like nut bolts, screws? Correct Answer Standardization Your Answer Standardization Multiple Choice Single Answer Question Name the book in which complete inventory of the buildings and plant is maintained? Correct Answer Assets Register Your Answer Assets Register Multiple Choice Single Answer Question The wear-in period which occurs during initial working period, experiences lot of maintenance problems is also called :Correct Answer Teething problems Your Answer Teething problems Multiple Choice Single Answer Question Negotiation of the price also includes :Correct Answer Variation of the price Your Answer Variation of the price Select The Blank Question

16

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Value analysis applies ________ approach to find out unnecessary cost. Correct Answer Creative Your Answer Knowledge base Multiple Choice Multiple Answer Question Development of subordinates broadly will depend on :Correct Answer The level of education , The level of personal skill , The level of intelligence Your Answer The level of education , The level of personal skill , The level of intelligence Select The Blank Question Work order release system is the ________ to start the maintenance activity at the correct frequencies. Correct Answer Trigger Your Answer Trigger True/False Question Electrical energy is the most commonly used form of energy. Correct Answer True Your Answer True Select The Blank Question The maintenance earns profit by________. Correct Answer Zero Faults Your Answer Zero Faults Select The Blank Question There are ________ chemicals which are in common use. Correct Answer 60000 Your Answer 60000

17

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Select The Blank Question In ________ phase the plant is observed for any indications of defects. Correct Answer Post overhaul Your Answer Post overhaul Multiple Choice Multiple Answer Question In Maintenance Control Model following things are very important :Correct Answer Lubrication Schedule , Preventive Maintenance , Inspection Schedule Your Answer Lubrication Schedule , Preventive Maintenance , Inspection Schedule Multiple Choice Single Answer Question Overtime working of operator make them less alert mentally & physically, this may cause :Correct Answer Accident Your Answer Accident Select The Blank Question A unit called ________ measures illumination. Correct Answer Lux Your Answer Lux Multiple Choice Single Answer Question Team spirit, policy on line of authority help in bringing people together & work in one direction to :Correct Answer Achieve goal Your Answer Achieve goal Select The Blank Question A ________ represents basic event which needs no further investigation as sufficient information is available under fault free analysis. Correct Answer

18

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Circle Your Answer Circle Multiple Choice Single Answer Question It has been found that after initial period of steam pipe laying is over :Correct Answer The pipeline and various fittings like valve, taps starts leaking. Your Answer The pipeline and various fittings like valve, taps becomes leak proof. Multiple Choice Multiple Answer Question The criticality of equipment may change with :Correct Answer Time , Technology Your Answer Time , Technology Multiple Choice Multiple Answer Question Training helps in :Correct Answer Knowledge of plant , Multiskilled purpose , Reduced cost Your Answer Knowledge of plant , Multiskilled purpose , Reduced cost Multiple Choice Multiple Answer Question Which are the major hazards which can occur in Industry? Correct Answer Toxicity , Radioactivity , Poisons Your Answer Toxicity , Radioactivity , Poisons Multiple Choice Single Answer Question Identify the insurance spares from the following :Correct Answer Hydraulic pump of press machine Your Answer Hydraulic pump of press machine Multiple Choice Single Answer Question It is said that a failure never occurs without :-

19

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Warnings Your Answer Warnings True/False Question The operating cost of the equipment is also important factor for the decision making. Correct Answer True Your Answer True Select The Blank Question ________ should be allowed in case of real emergency. Correct Answer Contingency purchasing Your Answer Special purchasing Multiple Choice Multiple Answer Question Which type of lubricating oil & greases is available in market? Correct Answer Automotive lubricating oil , Railroad oils , Industrial lubricating oil Your Answer Automotive lubricating oil , Railroad oils , Industrial lubricating oil Multiple Choice Multiple Answer Question In condition based maintenance which equipments are used? Correct Answer Flexiscope , Radiography , Thermal Tester Your Answer Flexiscope , Radiography , Thermal Tester True/False Question Too may cooks spoil the broth. Correct Answer True Your Answer True

20

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

1. Use of electrical motors 1. Must be close to unity 2. Power factor 2. Minimize of core losses 3. Transformer maintenance 3. Should get maximum attention 4. On load tap changer 4. Should be above unity 5. Reduces input voltage fluctuation 6. Is not an important factor

IST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Value analysis is one way to attempt for quality simplification. Correct Answer True Your Answer False True/False Question The lead time to take the decision is same in private sector companies and government controlled organizations. Correct Answer False Your Answer False Multiple Choice Single Answer Question Installation & commissioning of a new plant is :Correct Answer

21

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Single contract tasks Your Answer Single contract tasks Multiple Choice Single Answer Question Who has to prepare training manuals? Correct Answer Maintenance Manager Your Answer Maintenance Manager Multiple Choice Multiple Answer Question The price of the spare part depends on :Correct Answer Demand and supply position , Urgency of buyer , Level of negotiations Your Answer Demand and supply position , Urgency of buyer , Level of negotiations True/False Question Any equipment can be dismantled easily without the help of special tools. Correct Answer False Your Answer False Match The Following Question Correct Answer Your Answer Time taken As low as possible As low as possible Automation Decrease break down time Decrease break down time Utilization of machine As high as possible As high as possible Equipment selection Purchase dept Purchase dept True/False Question

22

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

The hazardous chemicals are divided into 90 groups in decreasing order of hazard. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question The objective inventory control is :Correct Answer To reduce lead time , To reduce finance cost of inventory , To reduce storage cost of material Your Answer To reduce lead time , To reduce finance cost of inventory , To reduce storage cost of material True/False Question Proper communication with related departments can result in increased cost of spare. Correct Answer False Your Answer False Multiple Choice Single Answer Question The leakage should be monitored by device known as :Correct Answer Leakage detector Your Answer Leakage detector Select The Blank Question It is right of an inspector to get help of ________ at any time. Correct Answer Higher Authorities Your Answer Higher Authorities Multiple Choice Single Answer Question What is the lower limit of the ratio of emergency maintenance to total maintenance time? Correct Answer

23

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Less then 25 % Your Answer Less then 10 % Multiple Choice Multiple Answer Question High quality of workmanship helps maintenance people :Correct Answer For boosting Morale of Maintenance People , In Identification of efficient workers , Rewarding Efficient Workers Your Answer For boosting Morale of Maintenance People , In Identification of efficient workers , Rewarding Efficient Workers Multiple Choice Single Answer Question Proper spare part will enhance the life of equipment and will save vital :Correct Answer Capital expenditure Your Answer Capital expenditure Multiple Choice Multiple Answer Question With "vendor supplies equipments" what Vendor is suppose to supply? Correct Answer Drawings of equipments , Drawings of electrical connection , Views of equipment Your Answer Micro films , Drawings of equipments , Views of equipment Select The Blank Question Availability of ________ equipment is considered while deciding maintenance system. Correct Answer Stand by Your Answer Non-Critical Multiple Choice Multiple Answer Question Which of the following are diagnostics instrument which are used in maintenance management? Correct Answer Time Tester , Safety checker for portable electrical tools , Temperature Sensitive Crayons

24

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Your Answer Safety checker for portable electrical tools , Temperature Sensitive Crayons , Heat Flow sensors True/False Question Computers can be used to predict failures and breakdowns by simulation method well in advance. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Maintenance Control system is used to check following? Correct Answer Correct starting time of Maintenance activities , Maintenance planning , To get correct feedback Your Answer Correct starting time of Maintenance activities , Maintenance planning , To get correct feedback Multiple Choice Multiple Answer Question Following equipment must be tested for correct load bearing capacity :Correct Answer Scaffolding , Ladder , Platform Your Answer Scaffolding , Ladder , Platform Multiple Choice Single Answer Question The modern management is composed of evaluation, refinement and integration of functional objectives into an :Correct Answer Integrated corporate goal Your Answer Integrated corporate goal Multiple Choice Single Answer Question To ensure high efficiency & Productivity in the maintenance work, the most important thing is :Correct Answer Complete Technical Control Your Answer

25

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Equipment Management Multiple Choice Multiple Answer Question The 5 S' are related to :Correct Answer Orderliness , Tideness , Purity Your Answer Orderliness , Tideness , Purity Multiple Choice Single Answer Question If equipment creates noise above permissible level then :Correct Answer It may produce vibration which may affect other equipment. Your Answer It is recommended not to purchase such equipment. Multiple Choice Single Answer Question What is a necessary thing, if management expects workers must do maintenance effectively? Correct Answer Training Your Answer Training Multiple Choice Multiple Answer Question Where CPM can be used? Correct Answer In Construction Business , In Research & Development Projects , Launching new products in Marketing Your Answer In Construction Business , In Research & Development Projects , Launching new products in Marketing True/False Question The schedule of lubrication of equipment is not a part of maintenance plan. Correct Answer False Your Answer False Multiple Choice Single Answer Question

26

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

When the running machine is making sound what is to be done? Correct Answer Locate the noise Your Answer Stop the machine True/False Question Chart when prepared uses ' half split' method of fault diagnosis. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Water as a fire extinguisher can be applied which is in the form of :Correct Answer Solid stream , Fine spray , Foam Your Answer Fine spray , Foam Multiple Choice Single Answer Question Automation of machines is mainly done for :Correct Answer Detecting the failures and save time Your Answer Detecting the failures and save time Select The Blank Question ________ is the period that elapses between the recognition of the need of spare parts and its fulfillment. Correct Answer Lead time Your Answer Lead time Select The Blank Question ________ are used to monitor the conditions of parts subject to strains due to vibrations in operating conditions. Correct Answer Strain Gages Your Answer Strain Gages

27

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Multiple Answer Question What is VEN in VEIN analysis? Correct Answer Time , Technology Your Answer Natural , Time , Technology Select The Blank Question One of the main jobs of ________ is to train the subordinates. Correct Answer Supervisor Your Answer Supervisor Match The Following Question Correct Answer Your Answer Factory building Cross ventilation Cross ventilation Foreign origin equipment Manual translation into English Manual translation into English Non standard spare parts Maximum lead time Maximum lead time Steam piping Proper Insulation Proper Insulation Select The Blank Question Quality should not be ________ at the cost of lower price. Correct Answer Sacrificed Your Answer Sacrificed Multiple Choice Multiple Answer Question What may be the result of too many levels of authority? Correct Answer Overlapping of duties , Confusion , No work done

28

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Your Answer Overlapping of duties , Confusion , No work done True/False Question Some equipments are patented so manufacturing of spares is possible. Correct Answer False Your Answer False True/False Question Oil pump is lubricating equipment. Correct Answer True Your Answer False Select The Blank Question Adequate ________ should be provided in the design of the equipment to prevent any mishap. Correct Answer Interlocks, safety alarms Your Answer Interlocks, safety alarms Select The Blank Question To achieve high reliability we should select ________. Correct Answer Trouble free operation machine Your Answer Trouble free operation machine Select The Blank Question ________ is schedule of overhaul & schedule of calibrating the equipment. Correct Answer Maintenance schedule Your Answer Maintenance schedule Select The Blank Question The wear out portion has ________ failure rates.

29

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Highest Your Answer Highest Select The Blank Question The spark can be generated due to ________ faults. Correct Answer Phase to phase Your Answer Ignitions Multiple Choice Single Answer Question What is necessary under good house keeping to avoid sparks & ignition? Correct Answer Well designed equipments Your Answer Well designed equipments Question Which of the following of the main qualities of lubricant? Answer Viscosity , Antiwear property , Alkalinity Your Answer Alkalinity , Viscosity , Antiwear property Select The Blank Question ________ & maintenance department are closely interlinked to each other. Correct Answer Production Your Answer Production Select The Blank Question Quality should not be ________ at the cost of lower price. Correct Answer Sacrificed Your Answer Sacrificed Multiple Choice Multiple Answer Question In the objective evaluation method, the performance indicators are :Correct Answer

30

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Spare part ratio , Overtime ratio , Availability of plant ratio Your Answer Working capital ratio , Spare part ratio , Overtime ratio True/False Question Shelves, Closets such fittings are consider as costing centers for buildings in the assets register. Correct Answer True Your Answer True Multiple Choice Single Answer Question There could be leakage of air from system due to wrong setting of :Correct Answer Safety valve Your Answer Safety valve Multiple Choice Single Answer Question The planned maintenance is carried out :Correct Answer As per manufacturers recommendations Your Answer As per manufacturers recommendations Select The Blank Question Time required to diagnose is about ________ percent to total down time. Correct Answer 40-80 Your Answer 60-70 Select The Blank Question ________ should be planned so that workers can approach the equipment easily. Correct Answer Gangways Your Answer Subways Multiple Choice Single Answer

31

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Question Which activity is known as great helper for in avoiding unscheduled breakdowns? Correct Answer Inspection activity Your Answer Upgradation of System Multiple Choice Multiple Answer Question Cost control can be achieved by :Correct Answer Establishment of optimum conditions , Measurement of variation from optimum , Taking corrective action Your Answer Establishment of optimum conditions , Measurement of variation from optimum , Taking corrective action True/False Question Spare parts are also stored to cater to emergency events like strike of transporters, strike at the supplier workshop, flood, Heavy rain etc. Correct Answer True Your Answer True True/False Question Chart when prepared uses ' half split' method of fault diagnosis. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which are probable period of annual shut Downs in the Year? Correct Answer Demand for a product is Low , Festival Seasons , Supply of Raw material is nil. Your Answer Demand for a product is High , Festival Seasons , Supply of Raw material is nil. Select The Blank Question

32

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Maintenance department's ________ shows low performance. Correct Answer High cost Your Answer High cost Multiple Choice Multiple Answer Question Fire can be extinguished by? Correct Answer Taking away heat , Stopping oxygen , Chemical extinguishing Your Answer Taking away heat , Stopping oxygen , Chemical extinguishing Multiple Choice Single Answer Question As the frequency of maintenance is stepped up preventive maintenance cost :Correct Answer Shoots up Your Answer Shoots up True/False Question It is said that budgetary process is more a test of implementation skill then anything else. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Maintenance Control system is used to check following? Correct Answer Maintenance planning , To get correct feedback , Correct starting time of Maintenance activities Your Answer Correct starting time of Maintenance activities , Maintenance planning , To get correct feedback True/False Question Some equipments are patented so manufacturing of spares is possible. Correct Answer False

33

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Your Answer True Multiple Choice Multiple Answer Question Where CPM can be used? Correct Answer In Construction Business , In Research & Development Projects , Launching new products in Marketing Your Answer In Construction Business , In Research & Development Projects , Launching new products in Marketing Multiple Choice Single Answer Question Which factor affects the safety of plant & people working in & around it? Correct Answer Accident Your Answer Accident Multiple Choice Single Answer Question What is the requirement of effective & timely maintenance? Correct Answer Organizational Support Your Answer Organizational Support Multiple Choice Multiple Answer Question First aid can be given in following accidents :Correct Answer Steam burns , Chemical spilling Your Answer Steam burns , Chemical spilling , Cold Burning Multiple Choice Multiple Answer Question High quality of workmanship helps maintenance people :Correct Answer For boosting Morale of Maintenance People , In Identification of efficient workers , Rewarding Efficient Workers Your Answer To do Maintenance Planning , For boosting Morale of Maintenance People , Rewarding Efficient Workers

34

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Single Answer Question Negotiation of the price also includes :Correct Answer Variation of the price Your Answer Exchange rates Multiple Choice Multiple Answer Question Following equipment must be tested for correct load bearing capacity :Correct Answer Scaffolding , Ladder , Platform Your Answer Ladder , Platform , Security gate Multiple Choice Single Answer Question Generally insurance spare parts are purchased :Correct Answer Along with original equipment Your Answer Along with original equipment Multiple Choice Single Answer Question In any organization generally called thankless department is :Correct Answer Maintenance Your Answer Maintenance Multiple Choice Multiple Answer Question Which of the following are diagnostic instruments normally used in maintenance engineering? Correct Answer Pocket Thermometer , Ultrasonic Hardness Testing , Static Meter Your Answer Pocket Thermometer , Ultrasonic Hardness Testing , Static Meter True/False Question Use of fine water spray is very wrong way of fire extinguishing. Correct Answer False Your Answer

35

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

False Select The Blank Question In the Start up of plant phase, plant is subjected to ________ where water being used in place of process fluid. Correct Answer Water trial Your Answer Leak trial Multiple Choice Single Answer Question How steam act as cooling agent to extinguishing fire? Correct Answer Absorbs heat from fire Your Answer Create a Foam Select The Blank Question The efforts are made to reduce time/effort required in carrying out maintenance work is ________. Correct Answer Design-in-maintenance Your Answer Maintenance Select The Blank Question Reliability can be expressed as probability between________. Correct Answer 0 to 1 Your Answer 0 to 1 Select The Blank Question It is estimated that during first year the maintenance cost may approximately about ________ more than the normal cost during subsequent years. Correct Answer 0.2 Your Answer 0.2 True/False Question

36

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Calibration is an important function of maintenance manager. Correct Answer True Your Answer True Select The Blank Question The ________ is done to check performance efficiency of a plant. Correct Answer Technological Review Your Answer Control Quality True/False Question The operating cost of the equipment is also important factor for the decision making. Correct Answer True Your Answer True Match The Following Question Correct Answer Your Answer Maintenance schedule Schedule of over Schedule of over Technical data Drawings Drawings Technical specification Technical description Technical description Handling Instruction Transportation Movement data Match The Following Question Correct Answer Your Answer Factory building Cross ventilation Proper Insulation

37

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Foreign origin equipment Manual translation into English Better performance/reliability Non standard spare parts Maximum lead time Installation too costly Steam piping Proper Insulation Cross ventilation True/False Question The budgetary control is planned to assist the management in the allocation of responsibility and authority to aid in making estimates and plans for the future. Correct Answer True Your Answer True Multiple Choice Single Answer Question To avoid accidents & to have proper staff training, supplier must ensure that :Correct Answer Complete technical help is supplied in writing to the plant engineers. Your Answer Complete technical help is supplied in writing to the plant engineers. Multiple Choice Multiple Answer Question Which of the following are metal working oils? Correct Answer Soluble cutting oil , Synthetic cutting oil , Srip grinding oil Your Answer Soluble cutting oil , Synthetic cutting oil , Srip grinding oil Select The Blank Question All ________ requirements by various government authorities must be followed. Correct Answer Recommended Your Answer Statutory True/False Question

38

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Computers can be used to predict failures and breakdowns by simulation method well in advance. Correct Answer True Your Answer False Multiple Choice Single Answer Question As maintenance involves Time & Money, recordings of it is important. These records are known as :Correct Answer Maintenance Record Your Answer System Records

Maintenance Management - 10
Maintenance Management - 10 Question Handling instruction is transportation instructions. Correct Answer True Question The supervisor must have good knowledge of his job, he should be able to lead by example. Correct Answer True Question Which two departments are closely related to each other? Correct Answer Production & maintenance Question Which is considered as main job of a supervisor? Correct Answer To train subordinate Question The progress of work inside the plant can be viewed at glance by putting up a ________ in the control room. Correct Answer Schedule Board Question On What basis time estimates are calculated for every job while preparing schedules of work in overhauling? Correct Answer Standard Time Question The choice of equipment and supplier must be done keeping in mind the ________ in the future. Correct Answer Maintenance cost Question Which of the following are the constituents of fire? Correct Answer Fuel , Heat , Oxygen Question Following equipment must be tested for correct load bearing capacity :Correct Answer Scaffolding , Ladder , Platform Question Maintenance department evaluation can be done by only one method.

39

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer False Question What is required to bring people together & working in one direction to achieve goals? Correct Answer Team spirit Question First aid can be given in following accidents :Correct Answer Steam burns , Chemical spilling Question What is necessary to observe safety precautions in plant particularly relating to worker? Correct Answer Training (safety) Question High quality of workmanship helps maintenance people :Correct Answer For boosting Morale of Maintenance People , In Identification of efficient workers , Rewarding Efficient Workers Question Shelves, Closets such fittings are consider as costing centers for buildings in the assets register. Correct Answer True Question Which type of task is a preparation of policy of procurement? Correct Answer Single contract task Question Work order release system is the ________ to start the maintenance activity at the correct frequencies. Correct Answer Trigger Question Which of the following are diagnostics instrument which are used in maintenance management? Correct Answer Time Tester , Safety checker for portable electrical tools , Temperature Sensitive Crayons Question The efforts are made to reduce time/effort required in carrying out maintenance work is ________. Correct Answer Design-in-maintenance Question It is objective of maintenance to make maximum availability of production plant at :Correct Answer Minimum cost Question Once the budget is prepared then it is necessary to review the same ________. Correct Answer Time to time Match The Following Question -Correct Answer Time taken -As low as possible Automation -Decrease break down time Utilization of machine- As high as possible Equipment selection- Purchase dept Multiple Choice Multiple Answer Question The following costs can be treated under the heads of overhead

40

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

costs :Correct Answer Training and seminar expenses , Traveling expenses , Rent and lease charges for the space and office area. Multiple Choice Single Answer Question Which skill is required to be high where supervision work will be minimal? Correct Answer Technical skill Select The Blank Question In India, most of the industrialist base their decisions to purchase equipment on the ________. Correct Answer Price of the equipment Multiple Choice Single Answer Question The modern management is composed of evaluation, refinement and integration of functional objectives into an :Correct Answer Integrated corporate goal Multiple Choice Multiple Answer Question A Project is defined as :Correct Answer Time Bound , A one Time Activity , Restrained by monetary bindings True/False Question Expenditure records are prepared by accounts officer. Correct Answer True True/False Question Experience shows that no matter how much money & time is spent on preventive maintenance, the breakdown do occur. Correct Answer True Multiple Choice Multiple Answer Question Satisfactory performance of maintenance contractor is :Correct Answer Quality of work , Skills of manpower , Equipment performance Multiple Choice Multiple Answer Question Cost control can be achieved by :Correct Answer Establishment of optimum conditions , Measurement of variation from optimum , Taking corrective action Multiple Choice Multiple Answer

41

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Question What information is given in spare part list? Correct Answer Original supplier name , Item number of spare part , Vendor's part name Select The Blank Question The wear out portion has ________ failure rates. Correct Answer Highest True/False Question The cost of the ordering can be also substantial in case of large organizations. Correct Answer True Select The Blank Question In Japan & Western countries equipment discarded after about ________ years. Correct Answer 7 True/False Question Most of the ordering costs are fixed in nature. Correct Answer True Select The Blank Question ________ is an invisible, yet important cost. Correct Answer Stock out cost Multiple Choice Single Answer Question The spares required to replace the old worn out spares due to frequent breakdowns are known as :Correct Answer Maintenance spares Multiple Choice Multiple Answer Question Following are the part of service installations in the buildings? Correct Answer Asset register , Technical manuals , Suppliers manuals Multiple Choice Single Answer Question The wear-in period which occurs during initial working period, experiences lot of maintenance problems is also called :Correct Answer Teething problems Multiple Choice Multiple Answer Question In which of the following process microprocessor can be used? Correct Answer Fire detection , Theft detection , Energy conservation

42

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Select The Blank Question The contract service is ________. Correct Answer Too expensive Select The Blank Question The fuel having ________ at slight higher cost can save lot of money. Correct Answer Better calorific value True/False Question The spark generation can be due to sudden breaking of load circuit causing a fire. Correct Answer True True/False Question Proper communication with related departments can result in increased cost of spare. Correct Answer False Multiple Choice Single Answer Question The responsibility of maintenance Department is to ensure cost at :Correct Answer Minimum Maintenance Management - 9 True/False Question Maintenance department evaluation can be done by only one method. Correct Answer False Multiple Choice Multiple Answer Question What are the content of initial cost? Correct Answer Taxes , Basic Cost , Installation Charges Multiple Choice Single Answer Question Who, due to fear of losing the maintenance contract, may not reveal enough technical information? Correct Answer Vendor True/False Question Defect analysis gives us information about commonly faced problems. Correct Answer True Select The Blank Question In India, most of the industrialist base their decisions to purchase equipment on the ________.

43

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Price of the equipment Match The Following Question -Correct Answer Time taken- As low as possible Automation Decrease break down time 0.99 Utilization of machine- As high as possible Equipment selection -Purchase dept Multiple Choice Single Answer Question Which document is called horoscope of that particular equipment which can tell a lot about it to experienced engineer? Correct Answer History Card Multiple Choice Multiple Answer Question Which of the following are the constituents of fire? Correct Answer Fuel , Heat , Oxygen Multiple Choice Multiple Answer Question Maintenance Control system is used to check following? Correct Answer Correct starting time of Maintenance activities , Maintenance planning , To get correct feedback Multiple Choice Multiple Answer Question The maintenance department is responsible for :Correct Answer Protection of building and plant , Increasing utilization of plant , Controlling maintenance cost Multiple Choice Single Answer Question Normally Ratio of Unplanned work to planned work is given in :Correct Answer Maintenance Report & Analysis Multiple Choice Single Answer Question Which type of inspection is to be carried when the machine is operating? Correct Answer One-time inspection True/False

44

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Question Reliability is the probability that product will perform its intended functions under desired operating conditions over a specified period of time. Correct Answer True Multiple Choice Single Answer Question The flat part in the bath tub curve is called :Correct Answer Normal Life Time True/False Question Hazardeous chemicals inventory should be kept at minimum level Correct Answer True Multiple Choice Single Answer Question Which of the following is process variable which can affect the equipment? Correct Answer Flow rate of process fluid Multiple Choice Multiple Answer Question Following are the part of service installations in the buildings? Correct Answer Asset register , Technical manuals , Suppliers manuals Multiple Choice Single Answer Question Which analysis gives information about faced problems, and solution to avoid it? Correct Answer Defect Analysis Select The Blank Question Correct quantity of lubricant assures that lubricant will be used in optimum quantity and will result in ________. Correct Answer Economy Multiple Choice Single Answer Question The supplier should be competent enough to estimate & provide means of reducing :Correct Answer Down time as minimum as possible Select The Blank Question In Japan & Western countries equipment discarded after about ________ years. Correct Answer 7 Select The Blank Question The manufacturing time for spare parts can vary from________. Correct Answer Zero to one year

45

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Multiple Answer Question What are the basis on which training programmes are designed? Correct Answer Needs of Organisation , Type of Organisation , Category of Pupils Multiple Choice Multiple Answer Question Some of the elements of inventory carrying cost are :Correct Answer Storage expenses , Insurance charges , Cost of deterioration Select The Blank Question ________ should be allowed in case of real emergency. Correct Answer Contingency purchasing Multiple Choice Multiple Answer Question Which are probable period of annual shut Downs in the Year? Correct Answer Demand for a product is Low , Festival Seasons , Supply of Raw material is nil. Select The Blank Question Reliability can be expressed as probability between________. Correct Answer 0 to 1 True/False Question Animal fats can be used as lubricants. Correct Answer True Multiple Choice Multiple Answer Question Master list of all the supplier should consist of information such as :Correct Answer Name, address, telephone, fax nos , Financial status , His rating for the year. True/False Question Indian Standards Institution is Indian body of standardization. Correct Answer True True/False Question Audio cassettes are the part of tools of training. Correct Answer True Multiple Choice Single Answer Question What is necessary to avoid major breakdowns? Correct Answer Maintenance at right time Multiple Choice Multiple Answer Question What type of details are given in Work order?

46

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Specifications , Drawings , Manuals issued True/False Question Handling instruction is transportation instructions. Correct Answer True Multiple Choice Single Answer Question What type of task it is to repair & maintenance fire fighting system? Correct Answer Repetitive task True/False Question Proper communication with related departments can result in increased cost of spare. Correct Answer False Multiple Choice Multiple Answer Question What type of support equipments are required in Maintenance? Correct Answer Tools , Spare Parts , Test Equipments Match The Following Question -Correct Answer Grease cups lubrication- Every week Gear box sumps lubrication-Every six months Electrical motor bearing lubrication- Every year Oil nipple lubricated parts lubrication- Every day Multiple Choice Multiple Answer Question The performance of maintenance is indicated by :Correct Answer Low cost , Low down time , More uptime Multiple Choice Single Answer Question Lubrication helps in :Correct Answer Increase life of wear and tear parts Select The Blank Question Availability of ________ equipment is considered while deciding maintenance system. Correct Answer Stand by select The Blank Question ________ ratio should be as high as possible. Correct Answer Planned maintenance work Select The Blank

47

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Question The correct procedure is applied there is less chance of any ________. Correct Answer Mistakes Multiple Choice Single Answer Question Who is responsible for the design of proper maintenance system? Correct Answer Maintenance manger Select The Blank Question Spare part lists will be comprehensive for complex equipment with section wise details along with ________. Correct Answer Order code numbers True/False Question Preventive maintenance program reduces overall maintenance cost which also include spare cost. Correct Answer True Select The Blank Question The ________ is done to check performance efficiency of a plant. Correct Answer Technological Review Maintenance Management - 8 Select The Blank Question When a new executive joins the organisation he is usually given________. Correct Answer Induction training Select The Blank Question A unit called ________ measures illumination. Correct Answer Lux True/False Question Value analysis is one way to attempt for quality simplification. Correct Answer True True/False Question A timely corrective action avoids major fault. Correct Answer True Multiple Choice Multiple Answer Question The codification can be done by following methods :Correct Answer Mnemonics method , Decimal method , Field method numerical codes

48

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

method numerical codes Multiple Choice Multiple Answer Question What are the constituents of operating cost? Correct Answer Cost of Equipment , Cost of Modifications , Cost of Tooling Multiple Choice Single Answer Question If equipment creates noise above permissible level then :Correct Answer It may produce vibration which may affect other equipment. Select The Blank Question According to Lubrication Schedule provision of ________ is given for maintenance. Correct Answer Plant Shut Down Match The Following Question -Correct Answer Attention value category -Frequency breakdown equipment Vital category -Critical equipment Essential category- Semi critical equipment Normal category -Non critical equipment Select The Blank Question The spark can be generated due to ________ faults. Correct Answer Phase to phase Multiple Choice Multiple Answer Question Satisfactory performance of maintenance contractor is :Correct Answer Quality of work , Skills of manpower , Equipment performance Select The Blank Question Quality should not be ________ at the cost of lower price. Correct Answer Sacrificed Multiple Choice Single Answer Question How a molecule of fuel fragmented? Correct Answer H+ and OH True/False Question Shelves, Closets such fittings are consider as costing centers for buildings in the assets register. Correct Answer True Multiple Choice Multiple Answer

49

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Question Evaluation of maintenance function can be done by taking following steps :Correct Answer Set the achievable targets for maintenance dept for the expected performance , Check results against set targets , Find out reasons for variance Multiple Choice Multiple Answer Question The energy saving can be achieved by following ways :Correct Answer By avoiding excess use , By avoiding wastage , By increasing efficiency of the equipment Multiple Choice Single Answer Question The responsibility of maintenance Department is to ensure cost at :Correct Answer Minimum True/False Question Demulsibility is separating water from oil when the machine are kept stand still. Correct Answer True Select The Blank Question There are two types of cost involved with any asset, one is the ________ and second is initial cost. Correct Answer Running Cost Multiple Choice Single Answer Question It is objective of maintenance to make maximum availability of production plant at :Correct Answer Minimum cost Multiple Choice Single Answer Question Which type of maintenance is called to the maintenance work initiated as a result knowledge of the condition of an item from routine checking? Correct Answer Condition based maintenance True/False Question On line inspection is carried out on machine itself but when it is shut down. Correct Answer False Multiple Choice Single Answer Question In any organization generally called thankless department is :-

50

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Maintenance Select The Blank Question Spare part lists will be comprehensive for complex equipment with section wise details along with ________. Correct Answer Order code numbers Select The Blank Question The progress of work inside the plant can be viewed at glance by putting up a ________ in the control room. Correct Answer Schedule Board Select The Blank Question Reliability can be expressed as probability between________. Correct Answer 0 to 1 Multiple Choice Single Answer Question Which analysis gives information about faced problems, and solution to avoid it? Correct Answer Defect Analysis Multiple Choice Multiple Answer Question In the objective evaluation method, the performance indicators are :Correct Answer Overtime ratio , Availability of plant ratio , Spare part ratio Multiple Choice Multiple Answer Question The price of the spare part depends on :Correct Answer Demand and supply position , Urgency of buyer , Level of negotiations True/False Question Computers can be used to predict failures and breakdowns by simulation method well in advance. Correct Answer True True/False Question The schedule of lubrication of equipment is not a part of maintenance plan. Correct Answer False Multiple Choice Single Answer Question Preventive maintenance :Correct Answer Anticipates failures and necessary action

51

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Multiple Answer Question Characteristics of spare parts are :Correct Answer The requirement of spares increases with the machine getting older. , The stock out cost is always greater than the cost of spare parts. , There is always possibility of duplication in the storage. Multiple Choice Multiple Answer Question What are the consisitutent of lubricating oil? Correct Answer Mineral oil , Chemical compounds , Vegetables oils True/False Question Maintainability is defined as ease with which product can be serviced or repaired. Correct Answer True True/False Question Reconditioning is bringing the old used part to its original condition by using engineering process. Correct Answer True Multiple Choice Single Answer Question It is said that a failure never occurs without :Correct Answer Warnings Multiple Choice Multiple Answer Question Which utilities require to be planned as a function of maintenance manager? Correct Answer Electricity , Waste disposal , Steam & gas Select The Blank Question The contract service is ________. Correct Answer Too expensive Multiple Choice Single Answer Question One of the desired condition, which is required in a proper coding of the overheads is :Correct Answer The people who operate it should easily remember it. Multiple Choice Single Answer Question As the frequency of maintenance is stepped up preventive maintenance cost Correct Answer Shoots up

52

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Multiple Answer Question In the off line inspection, which parameters can be monitored? Correct Answer Crack detection , Alignment of connecting equipments , Lubricating oils Multiple Choice Multiple Answer Question What information is given in a manual of building? Correct Answer Maintenance of building , Schedule of maintenance , Description of maintenance True/False Question Most of the ordering costs are fixed in nature. Correct Answer True Multiple Choice Single Answer Question Which of the following is one of the causes of fire? Correct Answer Smoking Match The Following Question- Correct Answer Maintenance Record- Recording of Time and Money Asset Register -List of All Assets of Plant Maintenance Schedule Instruction on Doing Maintenance Scheduling on rolling basis Principles of Scheduling Scheduling on rolling basis PERT Select The Blank Question ________ should be planned so that workers can approach the equipment easily. Correct Answer Gangways Maintenance Management - 7 True/False Question Maintenance department evaluation can be done by only one method. Correct Answer False Multiple Choice Multiple Answer Question What are the content of initial cost? Correct Answer Taxes , Basic Cost , Installation Charges Multiple Choice Single Answer

53

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Question Who, due to fear of losing the maintenance contract, may not reveal enough technical information? Correct Answer Vendor True/False Question Defect analysis gives us information about commonly faced problems. Correct Answer True Select The Blank Question In India, most of the industrialist base their decisions to purchase equipment on the ________. Correct Answer Price of the equipment Match The Following Question -Correct Answer Time taken- As low as possible Automation Decrease break down time 0.99 Utilization of machine -As high as possible Equipment selection- Purchase dept Multiple Choice Single Answer Question Which document is called horoscope of that particular equipment which can tell a lot about it to experienced engineer? Correct Answer History Card Multiple Choice Multiple Answer Question Which of the following are the constituents of fire? Correct Answer Fuel , Heat , Oxygen Multiple Choice Multiple Answer Question Maintenance Control system is used to check following? Correct Answer Correct starting time of Maintenance activities , Maintenance planning , To get correct feedback Multiple Choice Multiple Answer Question The maintenance department is responsible for :Correct Answer Protection of building and plant , Increasing utilization of plant , Controlling maintenance cost

54

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Single Answer Question Normally Ratio of Unplanned work to planned work is given in :Correct Answer Maintenance Report & Analysis Multiple Choice Single Answer Question Which type of inspection is to be carried when the machine is operating? Correct Answer One-time inspection True/False Question Reliability is the probability that product will perform its intended functions under desired operating conditions over a specified period of time. Correct Answer True Multiple Choice Single Answer Question The flat part in the bath tub curve is called :Correct Answer Normal Life Time True/False Question Hazardeous chemicals inventory should be kept at minimum level Correct Answer True Multiple Choice Single Answer Question Which of the following is process variable which can affect the equipment? Correct Answer Flow rate of process fluid Multiple Choice Multiple Answer Question Following are the part of service installations in the buildings? Correct Answer Asset register , Technical manuals , Suppliers manuals Multiple Choice Single Answer Question Which analysis gives information about faced problems, and solution to avoid it? Correct Answer Defect Analysis Select The Blank Question Correct quantity of lubricant assures that lubricant will be used in optimum quantity and will result in ________. Correct Answer Economy Multiple Choice Single Answer Question The supplier should be competent enough to estimate & provide means of reducing :Correct Answer Down time as minimum as possible

55

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Select The Blank Question In Japan & Western countries equipment discarded after about ________ years. Correct Answer 7 Select The Blank Question The manufacturing time for spare parts can vary from________. Correct Answer Zero to one year Multiple Choice Multiple Answer Question What are the basis on which training programmes are designed? Correct Answer Needs of Organisation , Type of Organisation , Category of Pupils Multiple Choice Multiple Answer Question Some of the elements of inventory carrying cost are :Correct Answer Storage expenses , Insurance charges , Cost of deterioration Select The Blank Question ________ should be allowed in case of real emergency. Correct Answer Contingency purchasing Multiple Choice Multiple Answer Question Which are probable period of annual shut Downs in the Year? Correct Answer Demand for a product is Low , Festival Seasons , Supply of Raw material is nil. Select The Blank Question Reliability can be expressed as probability between________. Correct Answer 0 to 1 True/False Question Animal fats can be used as lubricants. Correct Answer True Multiple Choice Multiple Answer Question Master list of all the supplier should consist of information such as :Correct Answer Name, address, telephone, fax nos , Financial status , His rating for the year. True/False Question Indian Standards Institution is Indian body of standardization. Correct Answer True

56

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

True/False Question Audio cassettes are the part of tools of training. Correct Answer True Multiple Choice Single Answer Question What is necessary to avoid major breakdowns? Correct Answer Maintenance at right time Multiple Choice Multiple Answer Question What type of details are given in Work order? Correct Answer Specifications , Drawings , Manuals issued True/False Question Handling instruction is transportation instructions. Correct Answer True Multiple Choice Single Answer Question What type of task it is to repair & maintenance fire fighting system? Correct Answer Repetitive task True/False Question Proper communication with related departments can result in increased cost of spare. Correct Answer False Multiple Choice Multiple Answer Question What type of support equipments are required in Maintenance? Correct Answer Tools , Spare Parts , Test Equipments Match The Following Question -Correct Answer Grease cups lubrication -Every week Gear box sumps lubrication -Every six months Electrical motor bearing lubrication-Every year Oil nipple lubricated parts lubrication-Every day Multiple Choice Multiple Answer Question The performance of maintenance is indicated by :Correct Answer Low cost , Low down time , More uptime Multiple Choice Single Answer Question Lubrication helps in :-

57

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Increase life of wear and tear parts Select The Blank Question Availability of ________ equipment is considered while deciding maintenance system. Correct Answer Stand by Select The Blank Question ________ ratio should be as high as possible. Correct Answer Planned maintenance work Select The Blank Question The correct procedure is applied there is less chance of any ________. Correct Answer Mistakes Multiple Choice Single Answer Question Who is responsible for the design of proper maintenance system? Correct Answer Maintenance manger Select The Blank Question Spare part lists will be comprehensive for complex equipment with section wise details along with ________. Correct Answer Order code numbers True/False Question Preventive maintenance program reduces overall maintenance cost which also include spare cost. Correct Answer True Select The Blank Question The ________ is done to check performance efficiency of a plant. Correct Answer Technological Review Maintenance Management - 6 Multiple Choice Single Answer Question It has been found that after initial period of steam pipe laying is over :Correct Answer The pipeline and various fittings like valve, taps starts leaking. Multiple Choice Multiple Answer Question The objectives of designing for maintainability are :-

58

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer To reduce down time of the product , Rapid fault diagnosis & repair , To reduce damage to equipment & personal. True/False Question Expenditure records are prepared by accounts officer. Correct Answer True True/False Question It is said that budgetary process is more a test of implementation skill then anything else. Correct Answer False Multiple Choice Single Answer Question During commissioning of the equipment it is necessary to train the staff & workers can be done with help of :Correct Answer Commissioning manuals & equipment supplier technical team. True/False Question The leakage of the steam from pipe can make substantial loss of steam over the year. Correct Answer True True/False Question Labor cost is basic cost involved with maintenance work. Correct Answer True Multiple Choice Single Answer Question Basic need for improving in maintenance methods requires :Correct Answer

59

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

To safeguard return on investment with minimum down time Select The Blank Question The ________ is done to check performance efficiency of a plant. Correct Answer Technological Review Select The Blank Question ________ is part of lubricating planning process. Correct Answer Survey Multiple Choice Single Answer Question Water seal condition is one of the :Correct Answer Process variable Select The Blank Question Maintenance department's ________ shows low performance. Correct Answer High cost Select The Blank Question A ________ represents basic event which needs no further investigation as sufficient information is available under fault free analysis. Correct Answer Circle Multiple Choice Multiple Answer Question What are the different costs involved with maintenance work? Correct Answer Labour cost , Material Cost Multiple Choice Single Answer Question Planning and scheduling will increase :Correct Answer Coordination and cooperation

60

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Single Answer Question In any organization generally called thankless department is :Correct Answer Maintenance Multiple Choice Single Answer Question Automation of machines is mainly done for :Correct Answer Detecting the failures and save time Multiple Choice Multiple Answer Question Which of the following are metal working oils? Correct Answer Soluble cutting oil , Synthetic cutting oil , Srip grinding oil Multiple Choice Multiple Answer Question What type of support equipments are required in Maintenance? Correct Answer Tools , Spare Parts , Test Equipments Multiple Choice Single Answer Question A complete schedule for inspection, overhauling, lubrication is known as :Correct Answer Maintenance Schedule Multiple Choice Single Answer Question Implementing an effective lubrication systems, which will :Correct Answer Reduce down time & part failure Select The Blank Question ________ have direct impact on life of equipment. Correct Answer User skill

61

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Select The Blank Question Work order release system is the ________ to start the maintenance activity at the correct frequencies. Correct Answer Trigger Multiple Choice Single Answer Question In India, compared to western countries, maintenance awareness is :Correct Answer Lower Match The Following Question Correct Answer Product support Operating assistance to customer Technical specification Area & weight of equipment Operational manual Commissioning Instruction Maintenance manual Fault diagnosis Multiple Choice Multiple Answer Question Spare part can be categorized by :Correct Answer The speed of use , Its value , Its availability True/False Question Calibration is an important function of maintenance manager. Correct Answer True Select The Blank

62

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Question The spark can be generated due to ________ faults. Correct Answer Phase to phase Multiple Choice Single Answer Question The responsibility of maintenance Department is to ensure cost at :Correct Answer Minimum Multiple Choice Multiple Answer Question Which of the following are the constituents of fire? Correct Answer Fuel , Heat , Oxygen Select The Blank Question The correct procedure is applied there is less chance of any ________. Correct Answer Mistakes True/False Question The operating cost of the equipment is also important factor for the decision making. Correct Answer True Match The Following Question Correct Answer Time taken As low as possible Automation Decrease break down time Utilization of machine As high as possible

63

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Equipment selection Purchase dept Multiple Choice Single Answer Question Which activity is known as great helper for in avoiding unscheduled breakdowns? Correct Answer Inspection activity True/False Question Proper communication with related departments can result in increased cost of spare. Correct Answer False Multiple Choice Multiple Answer Question Which of the following are diagnostic instruments normally used in maintenance engineering? Correct Answer Pocket Thermometer , Ultrasonic Hardness Testing , Static Meter Select The Blank Question ________ is carried out when the machine is operating. Correct Answer On line inspection True/False Question To prepare training aids, technical manual to be used. Correct Answer True Multiple Choice Single Answer Question What is necessary to observe safety precautions in plant particularly relating to worker? Correct Answer Training (safety)

64

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Multiple Answer Question What may be the result of too many levels of authority? Correct Answer Overlapping of duties , Confusion , No work done Multiple Choice Multiple Answer Question Which of the following are asphyxiants? Correct Answer Carbon mono oxide , Hydrogen sulphide , Hydrogen cyanide True/False Question Down time is time taken to failure after started using. Correct Answer False Select The Blank Question Availability of plant ratio is ________. Correct Answer Total running hours / total available hours. Multiple Choice Single Answer Question Besides basic functions maintenance department also performs some management functions, one of them is :Correct Answer Value engineering & standardization of spares and procedures. Multiple Choice Multiple Answer Question Satisfactory performance of maintenance contractor is :Correct Answer Quality of work , Skills of manpower , Equipment performance Multiple Choice Multiple Answer Question The price of the spare part depends on :-

65

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Demand and supply position , Urgency of buyer , Level of negotiations True/False Question Value = cost / function. Correct Answer False

Maintenance Management - 11
Maintenance Management - 11 Select The Blank Question Lubrication is said to be the ________ system of equipment. Correct Answer Nervous True/False Question Reports are of no use if no action is taken on them to correct the deficiencies. Correct Answer True Select The Blank Question ________ are involved for moving of store items from store to actual use place. Correct Answer Handling expenses True/False Question Too may cooks spoil the broth. Correct Answer True Multiple Choice Multiple Answer Question Evaluation of maintenance function can be done by taking following steps :Correct Answer Set the achievable targets for maintenance dept for the expected performance , Check results against set targets , Find out reasons for variance True/False

66

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Question Operating information is all relevant data of system & equipment. Correct Answer False Multiple Choice Single Answer Question How a molecule of fuel fragmented? Correct Answer H+ and OHTrue/False Question The cost of the ordering can be also substantial in case of large organizations. Correct Answer True Multiple Choice Single Answer Question During commissioning of the equipment it is necessary to train the staff & workers can be done with help of :Correct Answer Commissioning manuals & equipment supplier technical team. True/False Question PERT is event oriented while CPM is activity oriented. Correct Answer True Multiple Choice Single Answer Question Who is supposed to develop a clear-cut policy on line of authority? Correct Answer Maintenance manager Multiple Choice Single Answer Question Identify the method for coding "MA" :Correct Answer Mnemonics method True/False Question Experience shows that no matter how much money & time is spent on preventive maintenance, the breakdown do occur. Correct Answer True Multiple Choice Single Answer Question What is the requirement of effective & timely maintenance?

67

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Correct Answer Organizational Support Multiple Choice Multiple Answer Question The objective inventory control is :Correct Answer To reduce lead time , To reduce finance cost of inventory , To reduce storage cost of material Multiple Choice Multiple Answer Question What information is given in a manual of building? Correct Answer Maintenance of building , Schedule of maintenance , Description of maintenance Multiple Choice Multiple Answer Question What are the factors on which electrical current severity depends? Correct Answer Time of passage of current , Magnitude of current , Path of current Multiple Choice Multiple Answer Question Which are the major hazards which can occur in Industry? Correct Answer Toxicity , Radioactivity , Poisons Multiple Choice Multiple Answer Question Development of subordinates broadly will depend on :Correct Answer The level of education , The level of personal skill , The level of intelligence Multiple Choice Single Answer Question On what basis success of inspection depends? Correct Answer Dedication of Staff Select The Blank Question Quality should not be ________ at the cost of lower price. Correct Answer Sacrificed True/False Question The steam trap plays a vital role in the performance of the machine. Correct Answer True

68

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Multiple Answer Question The role of maintenance manager in New project is :Correct Answer To study of vendor assistance proposal , Study of operating & maintenance requirement , To study monitoring technique Select The Blank Question There are two types of fault diagnostic charts, ________ & dependency chart. Correct Answer Algorithm Multiple Choice Multiple Answer Question Fire can be extinguished by? Correct Answer Taking away heat , Stopping oxygen , Chemical extinguishing Multiple Choice Single Answer Question Which Network Analysis is used for Time saving in overhauling? Correct Answer CPM Select The Blank Question The contract service is ________. Correct Answer Too expensive True/False Question A proper man for proper job should be a natural choice. Correct Answer True Match The Following Question- Correct Answer Aging schedule -Fast & slow moving items Ordering cost -Advertisement expenses Stock out cost- Effect on worker moral EOQ -Reorder level Multiple Choice Single Answer Question When to do inspection? Correct Answer Running Condition

69

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Multiple Choice Single Answer Question Proper spare part will enhance the life of equipment and will save vital :Correct Answer Capital expenditure Select The Blank Question ________ & maintenance department are closely interlinked to each other. Correct Answer Production Multiple Choice Multiple Answer Question Some of the elements of the ordering cost are :Correct Answer Cost of stationary used for purchase function , Depreciation for the furniture, computer & other equipments , Entertainment of vendors. True/False Question Damage to the work in process material can be considered as indirect cost of an accident. Correct Answer True Select The Blank Question ________ is an invisible, yet important cost. Correct Answer Stock out cost Multiple Choice Multiple Answer Question The following costs can be treated under the heads of Wages and salaries :Correct Answer The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges. Select The Blank Question If the job performed on the purchased equipment is OK in terms of quality & quantity, which was conceived at the beginning is known as ________. Correct Answer Proving True/False Question Audio cassettes are the part of tools of training. Correct Answer True

70

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Match The Following Question -Correct Answer Current voltage -Multi meter Speed -Tachometer Running time- Stop watch Temperature -Thermistors Multiple Choice Multiple Answer Question The price of the spare part depends on :Correct Answer Demand and supply position , Urgency of buyer , Level of negotiations Multiple Choice Single Answer Question What is more important while using components like nut bolts, screws? Correct Answer Standardization Multiple Choice Single Answer Question Maintenance spares are fast moving and are :Correct Answer Repetitive in nature Multiple Choice Single Answer Question With respect to Economy & with comparison to other maintenance, Condition monitoring is :Correct Answer Costly Select The Blank Question Time required to diagnose is about ________ percent to total down time. Correct Answer 40-80 Multiple Choice Multiple Answer Question Where CPM can be used? Correct Answer In Construction Business , In Research & Development Projects , Launching new products in Marketing Select The Blank Question Advanced & complex machinery is normally run at high speed in order to give higher speeds of ________. Correct Answer Production

71

For more solved assignments, Assignment and project help visit www.oqp.in or www.onlinequestionpapers.com

www.oqp.in
SCDL- PGDBA- IV Semester (Operations) Maintenance Management code 143

Select The Blank Question ________ charts prepared by the senior engineers of the organisations for equipments in plant can be of great help. Correct Answer Trouble shooting