Scour failure of bridges


Brian Maddison CEng, MICE Independent Civil Engineering Consultant, Former Engineering Director of Bridgeway Consulting Limited, Nottingham, UK

In recent years there have been several bridge collapses in the United Kingdom and Republic of Ireland that have been caused by scour. Towns in the north west of England have been cut off and loss of life occurred. Major railway lines have been closed for extended periods. Although scour is basically the removal of bed material due to flowing water, it has a number of different causes and takes different forms. The paper describes the different forms of scour and looks at a number of case studies to illustrate the different ways in which scour has caused structures to collapse or require protection. The case studies are of railway bridges and are drawn from official investigation reports and underwater examinations carried out by the author. The paper concludes by illustrating ways in which failures due to scour could be avoided by the employment of good bridge management systems.

1.

Introduction

Bridge failures are fortunately rare, but every year the pages of New Civil Engineer contain details of a collapse that has occurred somewhere in the world. In many cases these collapses could have been avoided by an adequate bridge management regime that included good inspection, assessment and maintenance procedures. One specific type of failure that from time to time causes sudden catastrophic collapse of bridges is the undermining of foundations due to bed scour. Recent examples of collapse due to bed scour are included in this paper and others can be found in the reference documents listed. Bed scour is the transport of bed material by the flow of water and is present to some degree where the river bed or seabed is formed of granular material. Scour increases as flow rates increase and therefore the actual collapse of structures due to scour often occurs during periods of extreme flow, either due to flooding or exceptional tides. Of course, this is exactly the time that direct observation of the foundations of a structure is not possible and therefore a collapse may be put down to an act of God. A good inspection regime that includes bed measurement and engineering analysis can find indications of developing scour before the situation becomes critical. If this is followed up with well-designed remedial works, undermining of the structure, even in extreme conditions, may be prevented. The basic relationship between flow quantity Q, velocity V and cross-sectional area A is expressed by the equation Q 5 VA. Thus, velocity increases as the flow quantity increases or the available cross-sectional area of the watercourse reduces. The velocity will determine whether bed material of a particular particle size will be transported. This paper essentially deals

with practical aspects of scour that can be observed during examination. For a full understanding of scour, it is recommended that the work of May et al. (2002) is referred to. Further insight can also be gained from the works of Hoffmaans and Verheij (1997), Hamill (1999) and Melville and Coleman (2000). Different types of scour are dealt with and illustrated with actual examples, including recent bridge collapses as well as cases where developing scour problems have been found during inspection. The paper draws on the authors own experience as an engineer/diver in carrying out underwater inspections and developing an underwater inspection regime for British Rail. The cost of one single bridge failure can be immense in terms of disruption to road or rail traffic and even loss of life as well as in purely monetary terms. A small enhancement to the inspection and maintenance regimes for vulnerable bridges can prevent many costly failures.

2.

What is scour?

Bed scour is a very simple concept but takes a number of different forms. It may be a natural occurrence or due to manmade changes to a river.

2.1

Channel instability (also referred to as natural scour)

All scour is the result of the transportation of bed material by the watercourse. Channel instability is a natural phenomenon and is the result of the erosion and deposition of bed material, which occurs gradually under normal conditions or very quickly during floods. Rivers that transport considerable amounts of bed material are most prone to scour and channel instability. These include sand-bed rivers and upland gravel bed rivers. The natural changes that occur will also be affected
39

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

by a large number of other actions that affect river flows: these include the placement or removal of artificial obstructions such as weirs or training walls, exceptional rainfall and increased runoff due to deforestation or urbanisation. The river channel may change both in plan and longitudinal section. Changes in section will occur as bed material is transported along the river. Areas of deposition will change to areas of erosion, either naturally or as a result of artificial actions, and the river bed level will be lowered accordingly, affecting the stability of any structure founded on that bed (see Figures 1 to 3). The effect of channel instability on a bridge or waterside structure may be to undermine foundations and direct flows towards or behind the structure (Figure 4). The same actions that cause changes in the longitudinal section of a river will also cause changes in the plan. In flood plains, erosion will cause a river to become sinuous. The banks of a river on the outside of curves will erode and silt will be deposited on the inside of curves where flows are slower. Thus, the route of the main river will change over years or, occasionally, dramatically in times of flood (Figure 5). Spans of a bridge originally designed to be for flood-relief purposes only may eventually become the main river spans and often the piers involved will be founded at a shallower depth than those of the original river spans (Figure 6).

Local reduction in sediment supply

Bed erosion (scour)

River bed

Figure 2. Natural lowering of the river bed

Depositing phase Eroding phase Stable Channel slope

2.2

Contraction scour

Distance downstream

A local reduction in the width of the river can cause a general lowering of the bed level by decreasing the cross-sectional area of the river and increasing flow velocity, bed shear stress and frequency of bed movement. A similar effect can also be caused when river levels rise to above the soffit of a bridge or other obstruction. Scour may occur in three ways. (a) Channel contraction. The normal channel of the river is reduced at a bridge by the presence of piers, abutments extending into the channel and/or training walls, etc.
Local increase in sediment supply

Figure 3. Longitudinal section of river bed

Bridge pier built in area of deposition Deposition

Deposition of sediment

Erosion River bed

Bridge pier becomes undermined when river bed changes and deposition changes to erosion

Figure 1. Natural raising of the river bed

Figure 4. Bridge pier undermined by natural bed changes

40

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Original course

Meander River meanders due to erosion

Original course

Straightened

Bends are straightened due to deposition

Slow-moving river becomes braded

Figure 5. Changes to rivers in plan

(b)

(Figure 7). The situation can be worsened by the presence of heavy debris in the water. Flood plain and estuary contraction. Typically this will occur when a railway embankment is built across a flood plain. In times of flood, runoff from the flood plain is channelled through a bridge opening with resultant increase in flow velocity as the same quantity of flood water is channelled through a relatively small crosssectional area. In this situation, flood water will seek any opening in the flood bank and, as well as contributing to scour in the main channel, scour may occur at flood-relief arches, road bridges and similar structures. The same effect happens when embankments are constructed across tidal estuaries (Figure 7).

(c)

Surcharging. Where the soffit of a bridge is lower than high water level during a flood period, surcharging will occur. Water will flow though the bridge opening, which has a reduced cross-section not only due to the available width of the river but also limited by the height of the soffit. Using the equation Q 5 VA, the velocity will be greater than if the height of the water was not restrained by the soffit. As the level rises higher above the soffit, the head of water increases the velocity.

When the increase in flow velocity through a bridge opening because of channel contraction becomes sufficient to transport bed material, the result will be an overall lowering of the bed level at the bridge, probably across the full width of the river,
41

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Embankment

Flood plain
River spans

Flood plain

Viaduct at time of construction Training wall Contracted flood plain width Contracted river width

Area of bed lowering

River flow

Foundations exposed and undermined


River spans

Viaduct after change of river position Flood plain

Embankment

Figure 6. Bridge piers at risk due to changes in the course of the river

Flood plain

although this will depend on variations in the bed material. This effect may be increased by the addition of flood plain contraction. Contraction scour may be observed after flooding has ceased or silt may be deposited as the river slows, making the scour difficult to detect.
Figure 7. Contraction scour

2.3

Local scour

occur along the side of the pier that faces the flow. Hamill (1999), Melville and Coleman (2000) and May et al. (2002) all provide more detailed information. In tidal waters, scour may occur on both ebb and flow of the tide, resulting in scour at both ends of a pier. Scour may also occur at downstream ends of river piers when there is significant backflow. Local scour also occurs to weirs and protection inverts that cross a watercourse. Typically, scour will start to develop at the downstream end of an invert and, as the scour develops, the weir effect increases until a deep hole develops. The scour then gets under the invert and the trailing edge of the invert breaks off. This process is progressive and can continue until the invert breaks back to the bridge and the piers become undermined (Figure 9). The rapid movement of water caused by boat propellers and water jet engines can also cause scour. A particular problem for harbour walls can be the use of side-thrusters that are often directed at the walls in close proximity.

Local scour is a consequence of the presence of a structure in a watercourse. The turbulence caused as water flows by a pier will generally cause an uplifting effect at the nose, resulting in erosion of the bed. The material removed from this area will be deposited behind the pier as eddies form and the flow slows. The mechanics of this action have been carefully studied by hydraulics institutions in Britain, America and Europe and the general result is as shown in Figure 8. Details of some of the studies are shown in the literature (Hamill, 1999; Hoffmaans and Verheij, 1997; May et al., 2002; Melville and Coleman, 2000). As the water strikes the nose of the pier, the direction of flow is directed downwards causing material to be removed from the bed at this point. The shape of local scour shown in Figure 8 may be modified by many factors. Most significant among these will be the shape of the nose of the pier and the direction of flow relative to the pier. If the pier is not aligned with the flow, local scour will
42

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

of the accident was published by the railway inspectorate (DfT, 2009). The investigations undertaken included the following.
Pier Nominal bed level Scour hole
Foundations

(a)

Elevation

Scour hole

Pier

Deposition of silt

(b)

Flow

Plain

(c)
Figure 8. Local scour to a pier

2.4

Scour sub-divisions

(d)

All three types of scour may be sub-divided into two types. (a) Clear water scour. This often occurs at piers in relatively low flows and is the simple removal of bed material by flowing water. Upstream of a bridge, the water is not transporting significant amounts of bed material (hence the term clear water). At the bridge, bed material is removed and transported away but no material from upstream is deposited at the same time. Therefore, scour holes formed remain present when flows subside and can be seen during underwater inspection. Live bed scour is the continuous erosion and deposition of bed material during periods of flooding. In its worst case, the bed under a pier foundation will become fluid as material is constantly removed and replaced. This type of scour may be very difficult to detect. By the time a diver is sent down to inspect the pier, the flow will have reduced and the bed stabilised at a much higher level than the maximum scour level during flood.

A detailed underwater survey of the remaining parts of the damaged piers undertaken by a diving team led by a chartered civil engineer. The results of this survey and other investigations concluded that the collapse was caused by scour to the downstream end of pier 3 that undermined the foundations, allowing the pier to settle and eventually break its back (Figure 10). The survey showed that the pier was originally constructed by driving timber piles to form a cofferdam, making a base for the bridge foundations within the cofferdam of cemented river gravel and then placing stone foundation slabs. Many of the timber piles were missing and this had allowed the undermining to progress below the foundation slabs. Evidence taken from Welsh Water Authority staff who stated that the bed levels of the river in the vicinity of the bridge changed from year to year and that a gravel bank near the bridge was an intermittent and changing feature. Evidence taken from British Rail that indicated that the depth and type of construction of the foundations of the bridge were not known and had not been considered when repairs were undertaken to the piers some 7 years previously. A study of the river flow was carried out by Hydraulics Research Limited, some of the conclusions of which were as follows. There was a re-circulating zone or eddy at the downstream end of pier 3. (ii) Up to 17 000 t of sediment may have passed the bridge during the 3 h of peak flows, indicating major live bed scour with both erosion and deposition at the bridge. (iii) The depth of any anticipated scour at pier 3 could have been between 0?75 and 2?2 m. (i)

(b)

Overall, it seems that local scour at the downstream end of pier 3 was the main cause of the collapse, but elements of the report suggest that channel instability may also have been a factor. The results of the investigation into the Glanrhyd collapse was the start of a complete review of scour risk to railway bridges in the UK. The conclusions drawn included the following. (a) The engineers responsible for the safety of the bridge lacked thorough knowledge of the complex behaviours of rivers such as the Towy. Foundation depths were not known. Remedial works previously carried out to defective bridge piers increased the likelihood of scour damage because the piers were widened and the shape of the cutwaters was changed.
43

3.
3.1

Case studies and investigations


Glanrhyd 1987: local scour, channel instability and live bed scour

On 19 October 1987, the bridge carrying the Central Wales line over the River Towy collapsed during a period of heavy rain and flooding. At about 07:15, a passenger train ran on to the bridge and fell into the swollen river. Four people died. The full report

(b) (c)

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Pier Flow Bed level Foundations Stage 1 _ as constructed Invert

Pier Minor scour to upstream face Flow Invert Foundations Stage 2 _ scour development Major scour hole develops at downstream end

Pier Leading edge of invert undermined Flow Invert Foundations Stage 3 _ damage to invert Downstrean edge of invert collapses into scour hole

Pier Leading edge of invert undermined Flow Invert Foundations Stage 4 _ pier undermined Downstream edge of invert collapses and scour undermines pier

Figure 9. Progressive collapse of invert

(d)

The scour was probably live bed scour with the scour hole refilling with sand/gravel as flows subsided. This made it difficult for divers to find it during routine inspections.

Just 2 years later, there was another major railway bridge collapse at Inverness, again due to scour. This did not involve loss of life but severed the only railway that runs north from Inverness for many months. A completely new bridge had to be built.

collapse of the railway bridge (Figure 11). It was found that the pier and arch of one span on the bridge had partially collapsed. Fortunately, arch bridges are inherently strong in compression and even though the arch was severely damaged, trains had been passing over the bridge without incident. However, all rail traffic was diverted onto the track that was not affected by the damage until temporary supports could be installed. Detailed underwater inspections and investigations were undertaken and the following information was ascertained. (a) The incident was reported in the summer months but it is likely that the scour occurred during flooding in the

3.2

Beighton 2003: contraction scour

In 2003, a member of the public, walking along the bank of the River Rother near Beighton (South Yorkshire) reported a
44

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Remains of timber cofferdam Upstream section pier 3

Downstream Water level

Random pier masonry Bed level on pier

Toe level of cofferdam

Undermining beneath pier present

Downstream half of pier part buried in sand deposition

Bed level 1 m from pier edge

Figure 10. Glanrhyd, pier 3

(b)

(c)

previous winter. There is no public footpath under the bridge so visits by the public are rare and the underside of the bridge cannot be seen from the railway line. The bridge was constructed in three parts at different times and with slightly different forms of construction (Figure 12). At the point where the scour occurred, the soffit level of the bridge dropped by about 300 mm. Local information provided by members of the public and railway staff indicated that in times of flood, water levels were seen to rise above the upstream soffit level.

(d)

(e)

(f)

(g)

(h)

There were also some indications on the bank to support this. A detailed survey of the collapsed structure and the surrounding river bed found that the bed of the river under the bridge was composed of a thin layer of clay (approximately 150 mm) overlaying sand and gravel. However, the clay layer had been damaged. From the point where the clay was found to be missing and the gravel was exposed, an extensive scour hole had developed. The scour hole was deepest at the construction joint between upstream and centre parts of the pier. The foundations of the centre part of the pier were about 300 mm higher than the upstream and downstream parts (Figure 13). As a consequence of the shallower foundations, the centre part of the pier was undermined by the scour and had collapsed into the scour hole. The arch above also partially collapsed. Previous underwater reports showed that there was no evidence of a distinct scour hole although the bed was very slightly lower at this location. Side spans of the bridge had become silted up, reducing their use as flood-relief spans and increasing the likelihood of contraction scour.

Figure 11. Upstream face of River Rother bridge

From the above information it was concluded that the most likely cause of the undermining was due to contraction scour during a period when the river was surcharging. At the bridge, the width of the river is reduced by the piers of the bridge and
45

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Flow

Construction joint

Abutment

P i e r

P i e r Scour

P i e r

P i e r

Abutment

Construction joint _ soffit lowers

River Rother

Figure 12. River Rother Bridge plan at river level

the silted-up side spans. During periods of flood when the height of the river is above the level of the arch soffit, the available cross-sectional area A is further constricted when compared with the area of the open channel clear of the bridge. Furthermore, at the point where the scour occurred, the soffit of the bridge dropped, creating a funnelling effect and increasing the head of water. As the same quantity Q of water sought to pass through the restriction, the velocity V increased, resulting in bed scour. Whether or not the clay layer on the bed of the river was natural or installed as an anti-scour measure is unclear, but it had certainly been performing this function prior to the incident. However, once it was breached, the granular material below would quickly scour away and the clay layer would be progressively removed by the flow. The scour hole was sufficiently deep to undermine the centre part of the pier but did not reach the level of the foundations of the upstream or downstream parts of the pier, which remained intact. The collapsed section of pier was eventually capped off and the adjacent arches replaced with concrete beams (Figure 14).

ferries to the Republic of Ireland. British Rail took over the port upon nationalisation and further developments took place. One part of the harbour was known as the cattle dock and, as the name suggests, was used for the import of cattle. By 1990, the trade in live cattle had ceased and the dock was used for the temporary berthing of ferries that were awaiting repair or their next duty. In January 1990 the dock wall collapsed. Following a detailed underwater examination, evidence indicated that the wall, which was constructed of stone masonry, had been built off the granite bed of the harbour. However, at the time of the collapse it was founded on a narrow shelf of rock above bed level (Figure 15). This shelf was showing signs of erosion. Investigations revealed that the bed level of the harbour had been lowered many years prior to the incident to accommodate larger vessels. Anecdotal evidence was provided by one of the divers who had carried out this operation using explosives. The operation had been successful but had left some of the harbour walls founded on a shelf of rock about 500 mm above the bed of the harbour. Furthermore, because explosives had been used, the shelf was somewhat irregular in shape. It would appear that as ships became larger and made more use of bow thrusters, scour occurred at the base of the wall until a section slid off the shelf and into the harbour.

3.3

Holyhead c. 1990: scour caused by bed lowering and ship propellers

Holyhead harbour was developed by the London and North Western railway over many years as their main port for
46

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Approximate water level during flood periods

Collapsing pier

Soffit level of centre and downstream arches

Water level at time of inspection Foundation level of centre arch Granular bed below clay Scour hole Thin clay layer

Foundations of upstream arch

Section through upstream arch

Centre arch

Scour hole

Change in soffit level

Upstream arch

Part plan of affected arch

Figure 13. River Rother Bridge

3.4

Feltham 2009: scour caused by obstruction of the river flow

(a)

On 14 November 2009, a small railway bridge carrying the Windsor to London (Waterloo) line over the River Crane collapsed. The incident was first reported at 22:03 when the driver of a train crossing the bridge reported a dip in the track. The incident was investigated and it was found that the east abutment at the upstream end of the bridge had collapsed into the river (Figure 16), taking with it a part of the arch and leaving the railway track suspended above a void (Figure 17). The investigations revealed that the abutment collapsed due to scour and a number of factors were involved (DfT, 2010).

(b) (c)

The abutment that collapsed was the original abutment constructed in 1848. Foundations of this abutment were shallower than the west abutment, which was constructed later (in 1858). Core drilling carried out in 1991 showed the east abutment to be founded at 0?65 m below river bed level while the west abutment was 1?5 m below bed level. The shape of the river channel directed the flow towards the east abutment, making it vulnerable to scour. In August, a member of the public took a photograph showing the east span of the bridge to be obstructed by floating debris.

On 28 October, an Environmental Agency inspector saw a major blockage of the watercourse (Figure 18).
47

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Figure 16. River Crane bridge; collapsed abutment Figure 14. River Rother bridge; collapsed centre pier removed

At the time of the collapse, 5?5 m (65%) of the abutments length was found to be unsupported where the material below the foundations had been removed by scour. The conclusions of the investigations were that the abutment was already vulnerable to scour because it was on the outside of a bend of the river and had substantially shallower foundations that other parts of the structure. The debris in

Concrete slab

Masonry wall

Figure 17. River Crane bridge; track unsupported

Rubble fill

Possible wash out of fill Original harbour bed level Bed level following blasting Rock bed

Figure 15. Cross-section through Holyhead harbour wall prior to collapse

Figure 18. River Crane bridge; debris blockage prior to collapse

48

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

the river then caused river flow to be channelled directly towards the abutments and the scour occurred during a period of high river flows.

3.5

Cefyn viaduct: local scour

Situated on the Welsh borders near Wrexham, Cefyn viaduct carries the railway across a wide valley and the River Dee. It is a major multi-span masonry arch viaduct. During the course of a three-yearly underwater inspection, it was found that the pier located in the river was severely undermined by local scour. There was no indication of contraction scour and the damage had been caused by a typical form of local scour that had removed bed material from below the upstream foundations and caused the collapse of the cutwater though, fortunately, it had not extended far below the main body of the pier and repairs were able to be made. This viaduct is a major piece of Victorian engineering and a collapse would have been a catastrophe. The scour could have been prevented by the provision of adequate bed protection (Figure 19).

However, when inspected, divers found that the pier of this two-span bridge was in danger of collapse due to deepening of the river bed (Figure 20). One span of the bridge crosses a farm track and is over 1000 mm above the bed of the river in the other span. When inspected, it was found that the foundations of the south abutment and pier were exposed. The bottom of the foundations could be seen but, fortunately, undermining had not taken place. Investigations showed that there was no local scour but that the level of the river bed was consistently low for a significant distance away from the bridge and that there were signs that dredging had taken place. Contacts with the local drainage authority were made and it transpired that a drainage and flood-relief scheme had been undertaken. Although not carried out at the bridge itself, dredging of the watercourse had caused the bed levels at the bridge to be lowered by 1000 mm, putting the bridge at risk. The risk was not only of undermining but of the pier sliding sideways because of lack of horizontal resistance to the forces transmitted from the farm track. Steel sheet piling has now been driven around the pier and abutment to stabilise the structure.

3.6

Ruddington: scour caused by dredging

South of Ruddington in Nottinghamshire, the former Great Central Main line to London crosses a small watercourse known as Fairham brook. The Great Central Line was not built until about 40 years after other main lines in the country; the civil engineering is of the highest standard and the foundations of their structures are generally large and deep.

3.7

Staythorpe: changes to the course of the river

Staythorpe viaduct is a good example of how the exact amount of bed scour can be detected by forensic engineering. This railway viaduct, carrying the Nottingham to Lincoln line over the River Trent near Staythorpe power station, had been rebuilt in 1973 and new piers were constructed, each of which consisted of concrete bored piles that were unlined below ground but extended above bed level within pre-cast concrete rings. The viaduct is located just downstream of a weir and is subject to fast flows during flood periods. Some 15 years later, during the course of routine underwater inspections, it was discovered that the main flow of the river was dividing and that a gravel bank had built up in the centre of the river. The pattern of scour was complex and a full contour plan of the bed was produced in order to fully understand the situation. The worst area of scour was in fact immediately downstream of the bridge on the outside of the bend in the river. The bed at this point was over 4 m lower than the average bed level. Up to 2 m of scour was present at the bridge itself.

Pier 2

Flow Bed level Scour hole

Void Loose stones lying on bed Stones moved

Figure 19. Cefyn viaduct

These results were confirmed by divers who took detailed measurements of the piles. They were able to dive under a layer of concrete that extended between the piles. At first, this was found to be puzzling until it was realised that, below this layer, the concrete of the piles was uneven and contained inclusions of large gravel indicating that they had originally been underground. Above the layer, the piles were cast within concrete rings.
49

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Pier Abutment Farm track Water level Original bed level

Abutment

Foundation

River bed Timber piles

Figure 20. Ruddington Bridge: bed scour due to dredging

Fortunately, the original piling logs had been retained as part of the as-built information for the viaduct and these showed that the piles extended about 9 m below the original bed level so the 2 m of scour could be reviewed in that context (Figure 21). In this case, a thorough investigation proved that there was no need to take emergency action. However, repairs were subsequently carried out both to restrict further scour and to provide protection to the exposed piles. The incident demonstrated the benefit of deep piled foundations for river bridges and the value of retaining as-built information.
Concrete spillage

Steel trestle

Concrete pile cap

Pre-cast concrete rings

3.8

Malahide: failure of causeway and protection apron


2m

Bed level at time of construction Exposed concrete piles

On 21 August 2009, pier number 4 of Malahide viaduct collapsed into the estuary (Figure 22). This viaduct carries the main line between Dublin and Belfast. The collapse was reported by the driver of a train that passed over the damaged viaduct but fortunately crossed immediately before complete collapse occurred. Detailed investigations were able to prove that the masonry piers of the viaduct were built on top of a stone causeway that acted as a weir (RAIU, 2010). This causeway was maintained in a fair condition for over 100 years by a regular regime of replenishment of the stones, although during that period the causeway elongated seaward due to migration of the stones. In 19671968, a major grouting scheme was undertaken to fill voids in the weir. This scheme was reasonably successful but more stones were discharged to fill scour holes on a number of occasions up until 1996. A hydraulic model of the bridge was built to investigate the failure mechanism. The grouted layer, which was about 1500 mm thick, acted as an invert but, as scour occurred at the seaward side of the causeway on the ebb tides, this became undermined. The undermining continued in the manner shown in Figure 9 until the invert between piers 4 and 5 collapsed, at which time the scour began to undermine pier 4 until it failed.
50

Bed level

Concrete piles below bed

Figure 21. Staythorpe Bridge pier

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

engineer has all known information about the bridge available. When all such data was in the form of drawings and paper records it is perhaps understandable that it was not reviewed after every examination. However, computers now make it easy to rectify this problem by taking the following steps. (a) Establish, record and have available to the examining team full details of foundation depths. If these are not available from as-built drawings, core drilling may be required. Once this information is available, ensure that it becomes routine to consider it when looking at underwater reports and scour data. Develop a more sophisticated way of reviewing river bed soundings. These are routinely taken at each underwater inspection but for them to really predict the likelihood of a bridge being affected by scour then the data should be well handled. The results should show changes in time (by comparisons with previous soundings) and geographical changes. The latter will indicate if bed levels at the bridge are lower than might be expected when compared with upstream levels and will also show any migration of the main channel. In the case of Staythorpe, for instance, only by plotting bed contours over a significant length of the river could the pattern of scour be established. Carry out a review of the inspection reports. This task should be done by engineers with particular expertise in scour.

(b)

Figure 22. Malahide viaduct; two spans collapsed

4.

Conclusions

What conclusions can be drawn from the investigations into scour problems? Firstly, it is noticeable that when a bridge collapses due to scour, the causes of the collapse become clear quite quickly to the team carrying out the forensic investigations. Although it is often thought prudent to carry out detailed hydrological investigations, in fact the causes are often almost self-evident. If the same effort could be put into bridge management regimes, collapses could be avoided. Secondly, it is noticeable that on a number of occasions, knowledge of the structures concerned was inadequate. In the case of the Malahide viaduct, for example, the investigation report (RAIU, 2010) states:
The dearth of documents available [to the responsible engineers] meant they were not fully aware of the construction of the Malahide Viaduct, and incorrectly assumed that the structure was founded on bedrock at the time of the accident, [they] were unaware of the routine discharge of stones along the viaduct as this process was not formally recorded, and there was an apparent loss of corporate memory of knowledge.

(c)

Finally, it is important that repairs to scoured river beds and scour protection works are not carried out without proper engineering design. Whilst major anti-scour works such as steel sheet piling will of course be correctly designed, simple tasks such as filling scour holes are sometimes left to local teams to carry out without any design input. This has been seen to result in too small stones being placed and these usually end up some distance downstream after the first flood.
REFERENCES

DfT (Department of Transport) (2009) Report on the Collapse of

Despite this statement, it did not take investigators long to discover a wealth of information about the structure. Their report includes original drawings of the viaduct and details of recent remedial works. Had this information been made available to the railway engineers, the collapse could have been averted. Thirdly, information made available to staff carrying out the examination of underwater structures is often incomplete. Similarly, when reviewing reports, it is essential that the

Glanrhyd Bridge on 19th October 1987 in the Western Region of British Railways. HMSO, London. See www. railwaysarchive.co.uk for further details (accessed 02/09/ 2011). DfT (2010) Failure of Bridge RDG1 48 between Whitton and Feltham. Railway Investigation Branch, DfT, Derby, Report no. 17/2010. See www.raib.gov.uk for further details (accessed 02/09/2011). Hamill L (1999) Bridge Hydraulics. E & FN Spon, London. Hoffmaans GJCM and Verheij HJ (1997) Scour Manual. Balkema, Rotterdam. May RWP, Ackers JC and Kirby AM (2002) Manual on Scour at Bridges and Other Hydraulic Structures. CIRIA, London.
51

Forensic Engineering Volume 165 Issue FE1

Scour failure of bridges Maddison

Melville BW and Coleman SE (2000) Bridge Scour. Water

Resources Publications, Highlands Ranch, CO. RAIU (Railway Accident Investigation Unit) (2010) Malahide

Viaduct Collapse on the Dublin to Belfast Line on the 21st August 2009. RAIU, Blackrock. Report no. R2010-004. See www.raiu.ie for further details (accessed 02/09/2011).

WHAT DO YOU THINK?

To discuss this paper, please email up to 500 words to the editor at journals@ice.org.uk. Your contribution will be forwarded to the author(s) for a reply and, if considered appropriate by the editorial panel, will be published as discussion in a future issue of the journal. Proceedings journals rely entirely on contributions sent in by civil engineering professionals, academics and students. Papers should be 20005000 words long (briefing papers should be 10002000 words long), with adequate illustrations and references. You can submit your paper online via www.icevirtuallibrary.com/content/journals, where you will also find detailed author guidelines.