Vous êtes sur la page 1sur 23

Item No

Description

Unit

Rate U Shs

B22.00 B2200: DRAINAGE NETWORK B22.01 Concrete Pipes, including excavation and backfilling (a) Diameter 900 mm No

B22.02 Metal pipes, including excavation and backfilling (a) Diameter 900 mm No

B22.03 Box Culverts, including excavation and backfilling (a) (b) B22.04 1,50 x 1,50 m dimension 1,00 x 1,00 m dimension No No

Existing Metal Pipes extension, including retaining, cleaning and repairing (a) (b) (c) (d) (e) (f) (g) (g) Diameter 600 mm Diameter 900 mm Diameter 1200 mm Diameter 1500 mm Diameter 1800 mm Diameter 2000 mm Diameter 2500 mm Diameter 3500 mm No No No No No No No No

B22.05

Existing Concrete Pipes extension, including retaining, cleaning and repairing (a) (b) (c) Diameter 600 mm Diameter 900 mm Diameter 1200 mm No No No

B22.08 Existing Box Culvert extension (a) 1,40 x 0,50 m dimesion No

TOTAL CARRIED FORWARD TO SUMMARY FOR SECTION I BILL no 2200

Item No

Description

Unit

Rate U Shs

31.00

3100: CLEARING, GRUBBING AND REMOVAL OF TOPSOIL

31.01 Clearing, grubbing and removal of topsoil: (a) Clearing and grubbing (b) Removal of topsoil ha m

TOTAL CARRIED FORWARD TO SUMMARY BILL no 3100

Item No

Description

Unit

Rate U Shs

33.00

3300: BREAKING UP EXISTING PAVEMENT LAYERS

Scarification and recompaction of existing B33.04 pavement layers 250 mm depth and compacted to 90% of B.S. Heavy density

km

TOTAL CARRIED FORWARD TO SUMMARY BILL no 3300

Item No

Description

Unit

Rate U Shs

B36.00 B3600: EARTHWORKS B36.01 Excavations: (a1) Common excavation to spoil m

36.02 Fill and improved subgrade layers:

(b)

Improved subgrade layer to require minimum G7 quality material

(c)

Fill to require minimum G3 quality material


(i)

Fill to require minimum G3 quality material from cutting Fill to require minimum G3 quality material from borrow

(ii)

TOTAL CARRIED FORWARD TO SUMMARY BILL no 3600

Item No

Description

Unit

Rate U Shs

38.00 3800: STABILISATION 38.02 Chemical Stabilisation, payment for full cost of providing: Stabilised layer, material class C0.7 (Natural gravels stabilised with lime or line sand)

(c)

TOTAL CARRIED FORWARD TO SUMMARY BILL no 3800

Item No

Description

Unit

Rate U Shs

39.00 3900: CRUSHED AGGREGATE ROAD BASE 39.01 Crushed aggregate for road base (b1) Crushed aggregate class CRR m

TOTAL CARRIED FORWARD TO SUMMARY BILL no 3900

Item No

Description

Unit

Rate U Shs

41.00 4100: PRIME AND CURING MEMBRANES B41.01 Prime Coat (a) MC-30 cut-back bitumen (1l/m2) B41.03 Aggregate for blinding (0,0035m3/m2) m

TOTAL CARRIED FORWARD TO SUMMARY BILL no 4100

Item No

Description

Unit

Rate U Shs

45.00 4500: DOUBLE SURFACE DRESSINGS 45.01 Double surface dressing using (a) using 20 mm and 10 mm aggregate in first and second layer respectively (with bituminous binder of 1,2 l/m2 for layer of 20mm and 0,9 l/m2 for layer of 10mm) 45.02 Bituminous binder variation (b) 80/100 penetration grade bitumen B45.03 Aggregate variation (a) 20 mm nominal size aggregate(16 Kg/m ) (b) 10 mm nominal size aggregate (8 Kg/m) 45.05 Precoating both application of agregate with COLCOTE-S or similar as per specifications t t t m

Addition of approved wetting agent to the precoating 45.06 fluid at a rate of 0.5% of the volume of the precoating fluid

Kg

TOTAL CARRIED FORWARD TO SUMMARY BILL no 4500

Item No

Description

Unit

Rate U Shs

51.00 5100: MARKER AND KILOMETRE POSTS 51.02 Kilometre Posts

(a) New Kilometre posts

No

TOTAL CARRIED FORWARD TO SUMMARY BILL no 5100

Item No

Description

Unit

Rate U Shs

52.00 5200: GUARDRAILS 52.01 Guardrails on steel posts: (a) Galvanized Extra over Items 52.01 and 52.10 for horizontally 52.02 curved guard-rails factory bent to a radius of less than 45 m B52.03 End units End sections including foundation in the (a) ground where single guardrail sections are used (12 metres) km

km

km

52.11

Drilling and blasting holes for guardrail posts, erection and backfilling

km

TOTAL CARRIED FORWARD TO SUMMARY BILL no 5200

Item No

Description

Unit

Rate U Shs

54.00 5400: ROAD SIGNS B54.01 Road Sign (a) (i) (ii) (b) (i) (ii) (c) Warning Principal Axis and Junctions Temporary Diversions Regulatory Principal Axis and Junctions Temporary Diversions Information km km km km km km

54.02 Additional roads signs B54.03 Guidance signs (i) (ii) Principal Axis and Junctions Temporary diversions

km km

TOTAL CARRIED FORWARD TO SUMMARY BILL no 5400

Item No

Description

Unit

Rate U Shs

55.00 5500: ROAD MARKINGS Road marking using Thermo-plastic road-marking material: (a) White lines (i) White lines( unbroken)(100 mm wide) (ii) White lines( broken)(100 mm wide) (iii)White lines( unbroken)(400 mm wide) (iv)White lines( broken)(400 mm wide) (v) Pedestrian crossing lines 500 mm wide white lines (b) Yellow lines (i)Yellow lines( unbroken)(100 mm wide) (ii)Yellow lines( broken)(100 mm wide) (d) White lettering and symbols (f) Traffic-island markings (any colour) Setting out and pre-marking the lines (excluding traffic-island markings, lettering and symbols) km km km km km km km km km

B55.03

55.06

km

55.09 Rumble strips and speed humps (a) Rumble strip (As per typical drawings) (b) Speed hump (As per typical drawings) km km

TOTAL CARRIED FORWARD TO SUMMARY BILL no 5500

Item No

Description

Unit

Rate U Shs

56.00 5600: LANDSCAPING AND GRASSING Included trimming and planting grass, trees and shrubs, with all the preparations needed. km

TOTAL CARRIED FORWARD TO SUMMARY BILL no 5600

Item No 57.00

Description

Unit

Rate U Shs

5700: FINISHING THE ROAD AND ROAD RESERVE AND TREATING OLD ROADS Treatment of old roads and temporary diversions km

57.01

TOTAL CARRIED FORWARD TO SUMMARY BILL no 5700

Item No

Description

Unit

Rate U Shs

61.00 6100: STRUCTURES

Construction of two new bridges: Seretyo B61.01 Bridge and Cheptui Bridge, including removal of these structures: B61.02 Bridges wich require remedial maintenance. A Tabagonyi River (a) Aproach Road Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. (i) (b) Bridge Surface (i) Prepare kerbs and repaint as specified by the Engineer

No

No. m m
3

m2

( c) Railing and Gurad Rails (Steel) (i) Prepare surface and repaint as specified by the Engineer m2

(d) Expansion Joints (i) Remove Debris and vegetation in joints Replace Damaged / Missing joint materials (ii) to a depth of not less than 200mm and not exceeding 300mm B Cipi River (a) Aproach Road Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. (i) Construct Trapezoidal open channels using motor (1:4) mix to design, line with (iv) random rubble on either side of approach of about 20m to drain storm water (v) Unblock deck drains Construct parapet posts to details in RCC (vi) (1:2.4) mix No. m2 m3 m m

No. m3

TOTAL CARRIED FORWARD

TOTAL BROUGHT FORWARD (b) Bridge Surface (i) Hack slightly surface of concrete deck to receive a wearing coat (1:2:4) mix Prepare kerbs and repaint as specified by (ii) the Engineer m3 m2

( c) Railing and Gurad Rails (Steel) (i) Replace Damaged / Missing railings of 2 heavy guage and weld to the existing section. Prepare surface and repaint as specified (ii) by the Engineer m m2

(d) Expansion Joints (i) Remove Debris and vegetation in joints Replace Damaged / Missing joint materials (ii) to a depth of not less than 200mm and not exceeding 300mm C Jesebere River (a) Aproach Road Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. (i) Construct Trapezoidal open channels using motor (1:4) mix to design, line with (iv) random rubble on either side of approach of about 30m to drain storm water v Unblock deck drains Construct parapet posts to details in RCC (vi) (1:2.4) mix (b) Bridge Surface (i) Hack slightly surface of concrete deck to receive a wearing coat (1:2:4) mix Prepare kerbs and repaint as specified by (ii) the Engineer m3 m2 No. m2 m3 m m

No. m3

( c) Railing and Gurad Rails (Steel) (i) Replace Damaged / Missing railings of 2 heavy guage and weld to the existing section. Prepare surface and repaint as specified (ii) by the Engineer m m2

(d) Expansion Joints (i) Remove Debris and vegetation in joints Replace Damaged / Missing joint materials (ii) to a depth of not less than 200mm and not exceeding 300mm m m

TOTAL CARRIED FORWARD

TOTAL BROUGHT FORWARD ( e) Waterway (i) (f) Clear all debris and vegetation in the waterway m2

Underside of Deck (i) Prepare surface and repaint as specified m2

(g) Bearing (i) Remove all dirt and vegetation around bearings No.

(h) Abutments (Concrete) (i) Unblock weep holes Provide new weep holes of 2 Dia steel (ii) pipe and 600mm length (iii) Crack repair (i) River Training Excavate for river training works, protect with stone / boulders pitching's on up stream 30m on either side. Dispose excavate material by the Engineer No. No. m

(i)

(j)

Install illuminated traffic signs for speed reduction and bridge sign on either side of Approach, Standard informatory sign and size (500 x 600) mm

No.

(k) Test materials as directed by the Engineer D Lokali River (a) Aproach Road Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. Construct parapet posts to details in RCC (iv) (1:2.4) mix (i) (b) Bridge Surface (i) Prepare kerbs and repaint as specified by the Engineer

Item

No. m2 m3 m3

m2

( c) Railing and Gurad Rails (Steel) (i) Prepare surface and repaint as specified m2

(d) Expansion Joints (i) Remove Debris and vegetation in joints Replace Damaged / Missing joint materials (ii) to a depth of not less than 200mm and not exceeding 300mm m m

TOTAL CARRIED FORWARD

TOTAL BROUGHT FORWARD ( e) Waterway (i) (f) Clear all debris and vegetation in the waterway m2

Underside of Deck (i) Prepare surface and repaint as specified m2

(g) Bearing (i) Remove all dirt and vegetation around No.

Install illuminated traffic signs for speed reduction and bridge sign on either side of (h) Approach, Standard informatory sign and size (500 x 600) mm (i) E Test materials as directed by the Engineer

Item

Namalera River (a) Aproach Road Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. Construct parapet posts to details in RCC (iv) (1:2.4) mix (i) (b) Bridge Surface (i) Prepare kerbs and repaint as specified by the Engineer m2 No. m2 m3 m3

( c) Railing and Gurad Rails (Steel) (ii) Prepare surface and repaint as specified by the Engineer m2

(d) Expansion Joints (i) Remove Debris and vegetation in joints Replace Damaged / Missing joint materials (ii) to a depth of not less than 200mm and not exceeding 300mm (e) Underside of Deck (i) (f) Prepare surface and repaint as specified m2 m m

Bearing (i) Remove all dirt and vegetation around No.

(g)

Install illuminated traffic signs for speed reduction and bridge sign on either side of Approach, Standard Informatory sign of size (500x600) mm

TOTAL CARRIED FORWARD

TOTAL BROUGHT FORWARD (h) Test materials as directed by the Engineer F Lorengedwat River (a) Aproach Road Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. (i) Construct Trapezoidal open channels using motor (1:4) mix to design, line with (iv) random rubble on either side of approach of about 20m to drain storm water (v) Construct parapet posts to details in RCC (1:2.4) mix No. m2 m3 Item

m3

(b) Bridge Surface (i) Prepare kerbs and repaint as specified by the Engineer m2

(c) Expansion Joints (i) Remove Debris and vegetation in joints Replace Damaged / Missing joint materials (ii) to a depth of not less than 200mm and not exceeding 300mm ( d) Waterway (i) Clear all debris and vegetation in the waterway m2 m m

(e) Underside of Deck (i) (f) Prepare surface and repaint as specified m2

Bearing (i) Remove all dirt and vegetation around bearings No.

(g) Abutments (Concrete) (i) Gabion protection of size (2x0.45x0.45) m, filled with remove debris and vegetation on or against piers (ii) Unblock weep holes (iii) Crack repair m3 No. m

(h) River Training Excavate for river training works, protect with stone / boulders pitching's on up stream 20m on either side. Dispose excavate material by the Engineer

(i)

TOTAL CARRIED FORWARD

TOTAL BROUGHT FORWARD Install illuminated traffic signs for speed reduction and bridge sign on either side of Approach, Standard Informatory sign of size (500 600) (h) Test materials as directed by the Engineer (i) G Gilig River (a) Aproach Road Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. (i) Construct Trapezoidal open channels using motor (1:4) mix to design, line with (iv) random rubble on either side of approach of about 20m to drain storm water (v) Unblock deck drains Construct parapet posts to details in RCC (vi) (1:2.4) mix (b) Bridge Surface (i) Hack slightly surface of concrete deck to receive a wearing coat (1:2:4) mix (ii) Replace loose / Damaged Kerbs Prepare kerbs and repaint as specified by (iii) the Engineer m3 m m2 No. m2 m3

Item

No. m3

( c) Railing and Guard Rails (Steel) (i) Replace Damaged / Missing railings of 2 heavy guage and weld to the existing section. Prepare surface and repaint as specified (ii) by the Engineer m m2

(d) Expansion Joints (i) Remove Debris and vegetation in joints Replace Damaged / Missing joint materials (ii) to a depth of not less than 200mm and not exceeding 300mm ( e) Waterway (i) (f) Clear all debris and vegetation in the m2 m m

Underside of Deck (i) Prepare surface and repaint as specified m2

(g) Bearing (i) Remove all dirt and vegetation around bearings No.

TOTAL CARRIED FORWARD

TOTAL BROUGHT FORWARD (h) Abutments (Concrete) (i) Gabion protection of size (2x0.45x0.45) m, filled with remove debris and vegetation on or against piers (ii) Unblock weep holes Provide new weep holes of 2 Dia steel (iii) pipe and 600mm length (iv) Crack repair River Training Excavate for river training works, protect with stone / boulders pitching's on up stream 20m on either side. Dispose excavate material by the Engineer and realign the river up stream m3 No. No. m

(i)

(i)

(j)

Install illuminated traffic signs for speed reduction and bridge sign on either side of Approach, Standard Informatory sign of size

(h) Test materials as directed by the Engineer H Atari River (a) Aproach Road Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. (i) Construct Trapezoidal open channels using motor (1:4) mix to design, line with (iv) random rubble on either side of approach of about 20m to drain storm water (v) Unblock deck drains Construct parapet posts to details in RCC (vi) (1:2.4) mix (b) Bridge Surface (i) Hack slightly surface of concrete deck to receive a wearing coat (1:2:4) mix (ii) Replace loose / Damaged Kerbs Prepare kerbs and repaint as specified by (iii) the Engineer

Item

No. m2 m3

No. m3

m3 m m2

( c) Railing and Guard Rails (Steel) (i) Replace Damaged / Missing railings of 2 heavy guage and weld to the existing section. Prepare surface and repaint as specified (ii) by the Engineer m m2

(d) Expansion Joints Remove Debris and vegetation in joints Replace Damaged / Missing joint materials to a depth of not less than 200mm and not exceeding 300mm TOTAL CARRIED FORWARD m m

TOTAL BROUGHT FORWARD I Nadunget River (a) Aproach Road (i) Provide road sign at place of work for traffic slow down (ii) Scarcity, water and compact surface Provide, lay and compact approved gravel (iii) as specified to the satisfaction of the Engineer. Construct Trapezoidal open channels using motor (1:4) mix to design, line with (iv) random rubble on either side of approach of about 20m to drain storm water (v) Unblock deck drains Construct parapet posts to details in RCC (vi) (1:2.4) mix (b) Bridge Surface Prepare kerbs and repaint as specified by the Engineer ( c) Railing and Guard Rails (Steel) (i) Replace Damaged / Missing railings of 2 heavy guage and weld to the existing section. Prepare surface and repaint as specified (ii) by the Engineer m m2 m2 No. m2 m3

No. m3

(d) Expansion Joints (i) Remove Debris and vegetation in joints Replace Damaged / Missing joint materials (ii) to a depth of not less than 200mm and not exceeding 300mm ( e) Waterway (i) (f) Clear all debris and vegetation in the waterway m2 m m

Underside of Deck (i) Prepare surface and repaint as specified m2

(g) Bearing (i) Remove all dirt and vegetation around No.

TOTAL CARRIED FORWARD TO SUMMARY BILL no 6100

Item No 71.00

Description

Unit

Rate U Shs

7100: TESTING OF MATERIALS AND WORKMANSHIP

71.01 Special tests requested by the engineer (a) Tests (b) Contractors overhead and profit Prov Sum %

TOTAL CARRIED FORWARD TO SUMMARY FOR BILL no 7100

Vous aimerez peut-être aussi