Vous êtes sur la page 1sur 36

DESIGN PROBLEM

A Diesel Power Plant will be constructed to save the community of Brgy. San Felipe, Naga City. The Power Plant will supply power to be available for 24hrs.

Assumption: 1. Plant Capacity Factor = 60% 2. Fuel Supply in the area = 45 days 3. Electrical connection including distribution will be consulted by a Electrical Engineer Requirements: 1. Determine the no. of customers in the community. 2. Identify the kind and no. residential, commercial and shops. 3. Identify the customers by zone. 4. Determine the time of usage of customers per 24hrs. 5. Determine the total power requirements for the area. 6. Draw the map of the area and indicated the customers in its zone. 7. Design the Power Plant including its auxiliaries. 8. Design the foundation of the engine. 9. Specify the required diesel power units. 10. Provide for space for expansion. 11. Design the Power house building. 12. Prepare the working schedule of the project.

DESIGN SOLUTION
1. Number of customers in Brgy. San Felipe, Naga City. Number of population: 14098 Number of Households: 3873 2. Identifying the kind and no. of residential, commercial and shops. Households: 3873 Business offices and establishments: 13 Park & Recreational center: 4 Satellite market: 6 School: 6 Water Pumping station: 3

3. Identifying the number of customers per zone. Zone 1 2 3 4 5 6 7 No. of Population 722 5246 1200 643 3009 4933 2013 No. of households 155 1212 365 130 618 852 456

4. Time usage of the customers per 24 hours. Households


No. of Appliances 500 30 95 357 285 12 75 10 45 90 79 36 15 24 Schedule of Use 6pm-6am 6am-9am & 2pm-4pm daily 6pm-6am 6pm-6am daily 5am-6am & 6pm-7pm 6am-8am & 2pm-4pm 6pm-12am & 10am-5pm 10am-12nn & 7pm-9pm 8am-1pm 9am-2pm 8am-10pm 9am-11am Schedule hr/day 12hrs 5hrs 24hrs 12hrs 12hrs 24hrs 2hrs 4hrs 12hrs 4hrs 5hrs 5hrs 2hrs 2hrs

Appliances electric fan oven toaster refrigerator fluorescent lamp bulb water dispenser rice cooker vacuum cleaner air conditioning unit dvd player laptop computers printers electric

Wattage 80 1200 850 40 50 300 320 630 3358 13 250 350 18 1800

total Wattage 40000 36000 76000 14280 14250 3600 24000 6300 151110 1170 19750 12600 270 43200

kw-hr 480 180 1824 171.36 171 86.4 48 25.2 1813.32 4.68 98.75 63 0.54 86.4

stove coffee maker charger water pumps television sets washing machines flat iron ceiling fan karaoke stereo

3 300 30 198 78 100 50 180 50

1200 65 2238 110 20 1000 60 180 40

6am-8am 10am-12nn & 5pm-7pm 8am-8pm 9am-9pm 9am-11am 5am-7am & 8pm-10pm 8am-10am & 2pm-5pm 9pm-2am 1pm-6pm

2hrs 4hrs 12hrs 12hrs 2hrs 4hrs 5hrs 5 5hrs

3600 19500 67140 10780 1560 100000 3000 900 2000 TOTAL

7.2 78 805.68 129.36 3.12 400 15 4.5 10 6505.51

Sari- sari stores


Appliances electric fan fluorescent lamp bulb refrigerator television sets radio/karaoke Air conditioning unit dvd player ceiling fan No. of Appliances 84 32 75 36 20 12 3 3 40 Wattage 80 40 18 850 110 180 3358 10 60 Schedule of Use 8am-8pm 6pm-12mn 6pm-6am daily 9am-5pm 8am-10am & 1pm-4pm 2pm-7pm 11am-1pm & 2pm-5pm daily Schedule hr/day 12hrs 6hrs 12hrs 24hrs 8hrs 5hrs 5hrs 5hrs 24hrs total Wattage 6720 1280 1350 30600 2200 2160 10074 30 2400 TOTAL kw-hr 80.64 7.68 16.2 734.4 17.6 10.8 50.37 0.15 5706 6623.84

Resorts
Appliances electric fan fluorescent lamp bulb television sets karaoke refrigerators blender water dispenser Air conditioning unit vacuum cleaner ceiling fan freezer No. of Appliances 10 10 10 3 2 2 4 3 3 4 30 4 Wattage 80 40 18 110 180 850 750 300 3358 630 60 1200 Schedule of Use 8am-11am & 2pm-5pm 6pm-6am daily 9am-2pm 8am-10am & 1pm-4pm daily 10am-12nn &3pm-5pm daily 1pm-6pm 8am-10am & 3pm-5pm daily daily Schedule hr/day 6hrs 12hrs 24hrs 5hrs 5hrs 24hrs 4hrs 24hrs 5hrs 4hrs 24hrs 24hrs total Wattage 800 400 180 330 360 1700 3000 900 100721 2620 1800 4800 TOTAL kW-hr 4.8 4.8 4.32 1.65 1.8 40.8 12 21.6 503.6 10.48 43.2 115.2 764.25

Hotel
Appliances Air conditioning unit ceiling fan computer printer coffee maker television sets fluorescent lamp bulb rice cooker vacuum cleaner dvd player water pump No. of Appliances 10 10 5 1 3 20 15 20 2 5 1 2 Wattage 3358 60 350 18 1200 110 40 18 320 630 13 2238 Schedule of Use 6pm-11pm 2pm-5pm & 8pm-11pm 8am-12nn & 2pm-6pm 10pm-11pm & 3pm-4pm 6am-8am & 3pm-4pm 8am-4pm 6pm-6am 6pm-6am 10am-11am & 5pm-7pm 9am-11am & 3pm-5pm 8am-10am & 2pm-4pm daily Schedule hr/day 5hrs 6hrs 8hrs 3hrs 3hrs 8hrs 12hrs 12hrs 3hrs 4hrs 4hrs 24hrs total Wattage 33580 600 1750 18 3600 2200 600 360 640 3150 13 4476 TOTAL kw-hr 167.9 3.6 14 0.054 10.8 17.6 7.2 4.32 1.92 7.15 0.052 107.42 342.016

Machine Shops
Appliances milling machines welding machines compressor pumps fluorescent lamp bulbs ceiling fan exhaust fan drill press electric fan oven toaster lathe machine No. of Appliances 1 2 1 1 1 5 2 1 1 3 1 1 Wattage 2500 13000 3000 2238 40 18 60 60 750 80 1200 2700 Schedule of Use 9am-12nn & 1pm-3pm 10am-12nn & 1pm-4pm 9am-12nn 10am-12nn & 1pm-5pm 6pm-6am 6pm-6am 9am-12nn & 1pm-4pm 9am-12nn & 1pm-4pm 9am-11am & 2pm-3pm 9am-12nn & 1pm-4pm 9am-12nn 9am-12nn & 1pm-10pm Schedule hr/day 5hrs 5hrs 3hrs 6hrs 12hrs 12hrs 6hrs 6hrs 3hrs 12hrs 3hrs 12hrs total Wattage 2500 26000 3000 2238 40 90 120 60 750 240 1200 2700 TOTAL kw-hr 12.5 130 9 13.428 0.48 1.08 0.72 0.36 2.25 2.88 3.6 32.4 208.698

Vulcanizing Shops
Appliances compressor fluorescent lamp bulbs No. of Appliances 1 3 2 Wattage 3000 40 18 Schedule of Use 9am-11am & 1pm-3pm 6pm-6am 6pm-6am Schedule hr/day 4hrs 8hrs 12hrs total Wattage 3000 120 36 kw-hr 12 0.96 0.432

electric fan drill press refrigerator radio television sets welding machines ceiling fan

3 1 1 1 1 1 1

80 750 380 180 110 13000 60

8am-8pm 9am-11am & 1pm-3pm daily 9am-11am & 1pm-3pm 8am-1pm 9am-12nn & 1pm-3pm 9am-12nn & 1pm-4pm

12hrs 4hrs 24hrs 4hrs 5hrs 5hrs 6hrs

240 380 540 110 350 13000 60 TOTAL

2.88 1.52 12.96 0.44 1.75 65 0.36 98.302

Hardware
Appliances electric fan refrigerator radio/karaoke computer bulb ceiling fan exhaust fan No. of Appliances 3 4 1 2 3 15 15 Wattage 80 380 180 350 50 60 80 Schedule of Use 8am-8pm daily 8am-1pm 8am-5pm 8am-8pm 8am-5pm daily Schedule hr/day 12hrs 24hrs 5hrs 8hrs 12hrs 8hrs 24hrs total Wattage 240 1520 180 760 150 900 1200 TOTAL kw-hr 2.88 36.48 0.9 6.08 1.8 7.2 2808 55.34

Bodegas
Appliances fluorescent lamp radio/karaoke air conditioning unit television sets Computer exhaust fan Printer Bulb coffee maker Christmas lights No. of Appliances 20 3 6 2 6 15 2 20 2 4 Wattage 40 180 3358 110 350 60 18 50 1200 25 Schedule of Use 6pm-6am 8am-1pm 2pm-7pm 9am-2pm 9am-2pm 9am-3pm 10am-11am & 2pm-4pm daily 6am-8am 6pm-6am Schedule hr/day 12hrs 5hrs 5hrs 5hrs 5hrs 6hrs 3hrs 24hrs 2hrs 12hrs total Wattage 800 540 20148 220 2100 900 36 1000 2400 100 TOTAL kw-hr 9.6 2.7 100.74 1.1 10.5 5.4 0.108 24 4.8 1.2 160.148

Bakeries
Appliances electric fan oven toaster Refrigerator fluorescent lamp television sets No. of Appliances 2 2 1 4 1 Wattage 80 1200 380 40 110 Schedule of Use 8am-5pm 8am-2pm daily 8am-5pm 8am-1pm Schedule hr/day 8hrs 6hrs 24hrs 8hrs 5hrs total Wattage 160 2400 380 160 110 TOTAL kw-hr 1.28 14.4 9.12 1.28 0.55 26.63

Gasoline Stations
Appliances fluorescent lamp No. of Appliances 15 Wattage 40 Schedule of Use 5pm-5am Schedule hr/day 12hrs total Wattage 600 kw-hr 7.2

radio/karaoke air conditioning unit television sets Computer Compressor Bulb coffee maker christmas lights

2 4 2 4 2 7 2 4

100 3358 110 350 30000 50 1200 25

8am-11am & 1pm-4pm 8am-8pm 8am-11am & 1pm-4pm 8am-5pm 9am-11am & 1pm-3pm 6pm-6am 5am-9am 6pm-6am

6hrs 12hrs 6hrs 8hrs 4hrs 12hrs 4hrs 12hrs

360 13432 270 1400 6000 350 2400 100 TOTAL

2.16 161.184 1.32 11.2 4 4.2 9.6 1.2 202.064

Barber Shops
Appliances electric fan Karaoke television sets Charger Razor No. of Appliances 7 1 1 3 3 Wattage 80 180 110 65 110 Schedule of Use 8am-8pm 8am-10am & 1pm-4pm 8am-8pm 10am-12nn & 1pm-4pm 8am-6pm Schedule hr/day 12hrs 5hrs 12hrs 5hrs 10hrs total Wattage 560 180 110 195 330 TOTAL kw-hr 6.72 6.9 1.32 0.975 3.3 19.215

5. Determining the total power requirement for the area.


TIME 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Kw-hr CONSUMPTIO N 9544.212 9544.212 9539.712 9539.712 9997.312 10218.112 9296.08 10194.026 10619.416 12484.247 18106.285 18017.097 18450.117 13034.507 12984.341 11067.911 12577.582 13563.946 13208.726 13162.296 12103.692 11969.706 11536.766 11365.212 Average Load LOAD VALUE 397.6755 397.6755 397.488 397.488 416.5546667 425.7546667 387.3366667 424.7510833 442.4756667 520.1769583 754.4285417 750.712375 768.754875 543.1044583 541.0142083 461.1629583 524.0659167 565.1644167 550.3635833 548.429 504.3205 498.73775 480.6985833 473.5505 507.161849

With the table above, we can now tabulate the data to obtain the load curve which would obtain the specific Diesel Engine type, the number of units and the operation time the engine would run to provide power.
900 800 700 600 500 400 300 200 kW consumption 100 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

With the load curve above, we can now propose the type of Diesel Engine by choosing the appropriate unit comparative to the operational peak load in providing power to the community

900 800 700 600 500 400 300 200 kW consumption 100 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

6. Drawing the map of the area and indicating the customers in its zone (Refer to the drawing at the last page)

7. Designing the Power Plant including each auxiliary A. Cooling Water System
1. Required Circulating Cooling Water: Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Cooling System; pages 177 to 178; we are to use a cooling (preferably a forced draft cooling tower) as it is minimal upon consideration cost, bulk, and auxiliary power. This would provide an immediate cooling for the Diesel Engines frame jackets in the heated parts. To obtain the circulating cooling water requirements, we are to use the equation provided by several references. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Cooling System; page 178; using the equation below we are to use the given equation to obtain the required circulating cooling water. W = 674.58 Where: W circulating cooling water; liter per hour Rated Bhp Rated Brake horsepower t1 inlet temperature; C t2 outlet temperature; C Accordingly, we must first obtain the rated brake horsepower as readily provided in the Diesel Engine type F8-138 Specification. Deviating from the law of conservation of energy (simply stated as Energy In = Energy Out) then the rated horsepower of the engine would be equal to the generator output. Losses would be present so the net efficiency would be used to offset the generator output. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table A 16: Normal Efficiencies of Engine type Synchronous Generators; page 675; at a kilowatt rating of 560 kW with 450 rpm, by interpolation we have 94.46%. Deductions upon this efficiency are also given. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table 6 3: Standard Deduction (Engine Generator Efficiency); page 185; at a generator efficiency of 94.1% to 95% with a full load operation we deduct 1.2 so we have a 93.26% Net Generator Efficiency. Therefore the rated break horsepower is equal to the equation below. Rated Bhp = = = 600.47 kW ( Rated Bhp = 805.24 hp )

Assuming that the temperature range would be 10 C, as most of the cooling tower range applied in the industry from the manufacturer ranges from 5.6 C to 16.7 C, then we use an assumed values of 75 C & 65 C for the inlet water temperature and outlet water temperature respectively, we can now obtain the required circulating cooling water for the cooling tower. With the 2 units we have 1610.48 hp. So the required circulating cooling water is... Wc = 674.58 = 674.58 Wc = 108639.76 Liters/hr Based from Marks Standard Handbook for Mechanical Engineers, 9th Edition; Section 6: Materials of Engineering; 6.1 General Properties of Materials; Specific Gravity and Density of Water at Atmospheric Pressure; page 6 10; at 75 C the density of water is 974.86 kg/m3 = 108639.76 L/hr (1hr/60mins) (1m3/1000L) (974.86 kg/m3) Wc = 1765.14 kg/min Therefore, we need 108639.76 Liters/hour or 1765.14 kg/min for the circulating cooling water for the 2 Diesel Engine Genset units. 2. Water Jacket Circulating Pump: Based from Marks Standard Handbook for Mechanical Engineers, 9th Edition; Section 8: Machine Elements; 8.7 Pipe, Pipe Fittings and Valves; Table 8.7.3 Properties of Commercial Steel Pipes; page 8 149; assuming we are to use a nominal pipe size of 3 in outside diameter schedule 40 for the suction line pipe and a nominal pipe size of 2 in outside diameter schedule 40 for the discharge line pipe, the following data is given as follows Suction line pipe: Schedule 40 Outside diameter Inside diameter Discharge line pipe: Schedule 40 Outside diameter Inside diameter

3 in (3.5 in) 3.068in (0.0779 m)

2.5 in (2.875 in) 2.469 in (0.0627 m)

Computing for the specific velocity rate at both the suction and discharge we simply use the given equation below Q = AV Where: Q volume flow rate; m3/min A Cross-sectional area; m2 9

V Velocity of fluid; m/min Also given for the area and deviating from the equation we have A = d2/4 Where: A Cross-sectional area; m2 d Internal diameter; m Thus, V= Computing now for the velocity at the suction we have Vs = = Vs = 379.97 m/min (1min/60secs) Vs = 6.33 m/sec Computing now for the velocity at the discharge we have Vd = = Vd = 586.53 m/min (1min/60secs) Vd = 9.78 m/sec Assuming that the pump is in the datum line, the height of delivery is 2.302 meters, the storage is placed 4.5 meters below, a friction loss of 0.75; then with the given & computing now for the discharge head Discharge head = FL+ZD+V Discharge head = FL+ZD+ Where: FL Friction losses for discharge; 0.75 ZD Elevation from datum to discharge; 2.302 m VD Velocity head at discharge; 9.78 m/sec Discharge head = FL+ZD+ Discharge head = 0.75 + 2.302 m + Discharge head = 3.052 m 10

Computing now for the suction head Suction head = FL + ZS + V Suction head = FL + ZS + Where: FL Friction losses for suction; 0.75 ZS Elevation from datum to suction; 4.5m (negative due to location) VS Velocity head at suction; 6.33 m/sec Suction head = FL + ZS +

Suction head = 0.75 4.5m + Suction head = -1.71 m Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 13: The Gas Loop; 13 10 Water Pumps; pages 545 to 546; we use the equations provided to obtain the required pump. As both the suction and discharge heads are given, we can now obtain the pump operating head. With the given, the pump operating head is Pump operating head = Discharge head Suction head Pump operating head = 3.052 m + 1.71 m Pump operating head = 4.762 m Assuming that the pump efficiency is 70 %, and then we have Pump supply power = Where: Q Volume flow rate; 1811 liters/min dw Density of water; 1000 kg/m3 H Pump operating head; 4.762 m p Pump efficiency; 70%

Pump supply power =

Pump supply power = Pump supply power = 2.74 hp (2.75 hp)

11

Therefore, we are to use 2 hp water pumps for the water jacket transfer for each Diesel Genset units. 3. Required Raw Water for the Cooling Tower: Since most heat exchangers experience a steady state equation and deviating from the energy balance equation [mC (hC1 hC2) = mR (hR1 hR2)] assuming that the continuous flow would nullify the offsetting effects of density and enthalpy, and assuming that temperature difference with 6 C of 34 C at inlet and 28 C at outlet, then we can use the equation below for simplicity QC (tC1 tC2) = QR (tR1 tR2) Where: QR - Quantity of Raw Water circulating the cooling tower, Liter/min QC - Quantity of Circulating Cooling Water; Liter/min tR1 - temperature of raw water at outlet; 34 C tR2 - temperature of raw water at inlet; 28 C tC1 - temperature of jacket cooling water at inlet; 75 C tC2 - temperature of jacket cooling water at outlet; 65 C Using the equation, the quantity of raw water is QR = = = 3018.33 L/min Based from Marks Standard Handbook for Mechanical Engineers, 9th Edition; Section 6: Materials of Engineering; 6.1 General Properties of Materials; Specific Gravity and Density of Water at Atmospheric Pressure; page 6 10; at 28 C the density of water is 996.242 kg/m3 = 3018.33 L/min (1m3/1000L) (996.242 kg/m3) WR = 3007 kg/min 4. Raw Water Pump: Assuming that the parameters for the circulating water jacket pumps are the same with the raw water pump, together with the assumptions, and then the requirements would be close and be useful for the raw water pump computation Computing now for the velocity at the suction we have

12

VS =

VS = VS = 633.29 m/min (1min/60 secs) VS = 10.55 m/sec Computing now for the velocity at the discharge we have VD =

VD = VD = 977.56 m/min (1 min/60 secs) VD = 16.29 m/sec Assuming that the pump is in the datum line, the height of delivery is 5 meters, the storage is placed 4.5 meters below, a friction loss of 0.75; then with the given & computing now for the discharge head Discharge Head = FL + ZD + V Discharge Head = FL + ZD + Where: FL = Friction Losses for Discharge; 0.75 ZD = Elevation from Datum to Discharge; 5 m VD = Velocity Head at Discharge; 16.29 m/sec Discharge Head = FL + ZD +

Discharge Head = 0.75 + 5m + Discharge Head = 19.28 m

Computing now for the suction head Suction Head = FL + ZS + VS Suction Head = FL +ZS + Where: FL = Friction Losses at Suction; 0.75 13

ZS = Elevation from Datum to Suction; 4.5 m (- due to location) VS = Velocity Head at Suction; 10.55 m/sec Suction Head = FL +ZS +

Suction Head = 0.75 4.5 m + Suction Head = 1.92 m Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 13: The Gas Loop; 13 10 Water Pumps; pages 545 to 546; we use the equations provided to obtain the required pump. As both the suction and discharge heads are given, we can now obtain the pump operating head. With the given, the pump operating head is Pump Operating Head = Discharge Head Suction head = 19.28 m - 1.92 m Pump Operating Head = 17.36 m Assuming that the pump efficiency is 70 %, and then we have Pump supply power = Where: Q Volume flow rate; 3018.33 L/min dw Density of water; 1000 kg/m3 H Pump operating head; 17.36 m p Pump efficiency; 70% Pump supply power =

Pump supply power = Pump supply power = 16.63 hp (16.75 hp) Therefore, we are to use 16 hp water pump for the raw water transfer.

5.

Required Quantity of Make-up Water: Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 6: Internal Combustion Engine Power Plant; 6-7 Evaporative Cooling; page 181; using the given mass balance and heat balance equations we can obtain the required make up water for the cooling tower. 14

For mass balance we use 1 kg air + SH1 + WW + W = 1 kg air + SH2 + WW Deviating for simplicity we have W = SH2 SH1 For heat balance we use h1 + WWhfa + Whf = h2 + WWhfb Deviating for simplicity we have WW = Where: SH1 = Humidity Ratio of Entering Air; kg moisture/kg dry air SH2 = Humidity Ratio of Leaving Air; kg moisture/kg dry air WW = Water Circulating per kg of dry air; kg W = Make-up Water per kg of dry air; kg h1 = Enthalpy of Moist Air Leaving; kJ/kg of dry air h2 = Enthalpy of Moist Air Entering; kJ/kg of dry air hfa = Enthalpy of Water in the Spraying Nozzles; kJ/kg hfb = Enthalpy of Water in the Basin; kJ/kg hf = Enthalpy of Make-up Water; kJ/kg Assuming we are given the following relative humidity and temperatures Relative Humidity: Entering Air = 60% Leaving Air = 90% Temperature: Entering = 28 C DB Leaving = 34 C DB WBT = 21 C Based from Marks Standard Handbook for Mechanical Engineers; 9th Edition; Figure 12.4.13: Psychometric Chart in SI Units; page 12 97; the following are given and obtained so we have.. At a R.H. 60% and dry bulb temperature of 28 C at entering point SH1 = 0.01425 kg moisture/kg dry air 15

At a R.H. 90% and dry bulb temperature of 34 C at leaving point SH2 = 0.031 kg moisture/kg dry air Based from Refrigeration & Air Conditioning by W. F. Stoecker & J. W. Jones; Table A-2: Moist Air; pages 418 to 419, with the assumed temperatures the enthalpy are as follows At 28 C, h1 = 89.952 KJ/kg At 34 C, h2 = 122.968 KJ/Kg Using the equation of mass balance we use W = SH2 SH1 = (0.031 0.01425) kg moisture/kg dry air W = 0.01675 kg moisture/kg dry air Based from Refrigeration & Air Conditioning by W. F. Stoecker & J. W. Jones; Table A-1: Water: Properties of Liquid and Saturated Vapor; pages 416 to 417, with the assumed temperatures the enthalpy are as follows At 34 C, hfa = 142.38 KJ/Kg At 28 C, hfb = 117.31 KJ/kg Assuming we have a make-up water temperature of 18 C; based from Refrigeration & Air Conditioning by W. F. Stoecker & J. W. Jones; Table A-1: Water : Properties of Liquid and Saturated Vapor; pages 416 to 417; with the assumed temperature the enthalpy and pressure is hf = 75.50 KJ/kg, p = 2.062 kPa Using the equation of energy balance we have WW =

= WW = 1.27 kJ/kg dry air

Since 3007 kg/min of raw water is given, the air flow is Air flow = Air flow = 2367.72 kg/min Based from Marks Standard Handbook for Mechanical Engineers; 9th Edition; Figure 12.4.13: Psychometric Chart in SI Units; page 12 97; the following are given and obtained so we have DB temperature = 28 C

16

WB temperature = 21 C The specific volume, v, is 0.87 m3/kg dry air Then the air flow would be Air Flow = 2367.72 kg/min (0.87 m3/kg) Air Flow = 2059.92 m3/min The required make-up water then is Make-up Water = 2367.72 kg/min x 0.01675 Make-up Water = Make-up Water = 39.67 L/min 6. Forced Draft Fan: Based from https://my.amca.org/members/documents/catalogs/64_91_Catalog157-B%20NOV99.pdf, we are to choose a fan that would provide a capacity of air flow of 2059.92m3/min or 72745.39ft3/min. We select a fan with the following size Fan Size: 60 TA Direct Drive Tubeaxial Motor hp: 20 hp Rpm: 870 Capacity: 73948ft3/min Static Pressure: 1/4 in SP Size of Cooling Tower: For the total cooling requirements we must first obtain the total cooling water requirements Water Requirements = Circulating Jacket Water + Raw Water = 1811 Liters/min + 3018.33 Liters/min = 4829.33 Liters/min x (1 gallon/3.7854 Liters) Water Requirements = 1275.78 gpm Assuming we have water concentration of 3.0 gpm per ft2, then the area of the cooling tower is Area of Cooling Tower = 1275.78 gpm / (3.0 gpm/ft2) = 425.26 ft2 Assuming we have a square sized cooling tower, then the size of the cooling tower would be Side of the Cooling Tower = 17

7.

Side of the Cooling Tower = 20.62 ft So the dimensions of the cooling tower that would service the diesel engines are 20.62 ft x 20.62 ft or 6.28 m x 6.28 m. B. Fuel System 1. Fuel Oil Consumption: Our design requires 3 units of F8-138 Diesel Engines with 560 kW generator rating; 1 unit is continuous in operation; another unit for 10 am to 3 pm shift; another unit as a reserve; all of which are capable of continuous operation at least for a limited duration of time assuming that maintenance to either one of them is required. A future expansion is also provided. Our plant capacity factor is given at 60%. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table A 16: Normal Efficiencies of Engine type Synchronous Generators; page 675; at a kilowatt rating of 560 kW with 450 rpm, by interpolation we have 94.46 %. Deductions upon this efficiency are also given. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table 6 3: Standard Deduction (Engine Generator Efficiency); page 185; at a generator efficiency of 94.1 % to 95 % with a full load operation we deduct 1.2 so we have a 93.26 % Net Generator Efficiency. From the statement above we can now obtain the fuel consumption for the plant. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Figure 6 15: Range of Variable Load Performance of Diesel Plants; page 164; at 60% rated load the fuel consumption is about 0.1625 kg/kW-hr. With such the maximum rate of fuel usage would be as follows Maximum Rate of Fuel = = 1200.94 kW (0.1625 kg/kW-hr) Maximum Rate of Fuel = 195.15 kg/hr For a 24 hours operation of the 2 units, then maximum rate of fuel usage would be given as follows Maximum Rate of Fuel Use = 195.15 kg/hr x 24 hr/day Maximum Rate of Fuel Use = 4683.6 kg/day Based from Marks Standard Handbook for Mechanical Engineers, 9th Edition, Section 7: Fuels & Furnaces; Table 7.1.9 Analyses and High Heat Values of Crude Petroleum, Typical Distillates, and Fuel Oils; page 7 13; assuming we are using a California grade fuel oil, with a specific gravity of 0.9554 at 60 F, then the fuel consumption in terms of mass would be.. Fuel Consumption = (4683.6 kg/day) / 0.9554 Fuel Consumption = 4902.24 kg/day Based from Marks Standard Handbook for Mechanical Engineers, 9th Edition; Section 6: Materials of Engineering; 6.1 General Properties of Materials; 18

Approximate Specific gravities & Densities; page 6 8; as most industrial oils have an average density of 914 kg/m3 and obtaining for its specific volume then we have 1.094 x 10-3 m3/kg then the fuel consumption in terms of volume would be.. Fuel Consumption = (4902.24 kg/day) (1.094 x 10-3 m3/kg) = (5.363m3/day) (1000 Liters/m3) Fuel Consumption = 5363 Liters/day 2. Required Storage of Fuel Oil: Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Figure 6 15: Range of Variable Load Performance of Diesel Plants; page 164; at 60% plant capacity the kilowatt-hour per liter oil ranges from 2.5 to 3.49 liters. One (1) Diesel Genset unit will operate continuously while another for 5 hours each per day at peak loads. For fuel consumption for within a 45 day supply we have Required Storage = 45 days (5363 Liters/day) Required Storage = 241335 Liters 3. Dimensions of the Fuel Oil Storage Tank: Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table 12 4: Dimension of the Bulk Storage Tank; page 459; with a required storage of 241335 liters then we are to use 3 tanks with a capacity of 109715 liters each, the dimensions of a cylindrical bulk tank is given as follows Diameter: 3.05 m Length: 15.04 m Plate Thickness: 7.94 mm Weight: 10399 kg 4. Required Storage of Day Tank: As the operation in motion, the greatest consumption of each diesel engine will occur at its full load rating. Let the day tank volume be good for a 1 day (24 hours) operation. At full load rating, maximum full load consumption would be 195.15 kg/hr x 24 hrs = 4683.6 kg For a 1 day operation, assume that the day tank will charge 4683.6 kg per day. Since the fuel oil is cooled during the transfer & operation we must obtain the value to compute the volume. Assuming we are using a California grade fuel oil, based from Marks Standard Handbook for Mechanical Engineers, 9th Edition, Section 7: Fuels & Furnaces; Table 7.1.9 Analyses and High Heat Values of Crude Petroleum, Typical Distillates, and Fuel Oils; page 7 13; at 60 F (15.6 C) the specific gravity of it would be 0.9554. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 5: Fuels & Combustion; Internal Combustion Engine Fuel; pages117 to 119; Using API 19

(American Petroleum Institute) standard, assuming an oil temperature of 6 C and the equations 5 3, the API would be API = = 131.5 - 131.5

API = 16.61 API or 17 API The density of oil at 15.6C (60 F) would be equal to the specific gravity at such temperature. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 5: Fuels & Combustion; Internal Combustion Engine Fuel; pages117 to 119; the volumetric coefficient of expansion of oil is 0.0007 per C. The contractions of oil at 6 C we have Contraction from a 6 C cooling = 0.0007 x 6 = 0.0042 The density of fuel oil at 6 C would be Density at 6 C = 0.9554 / 0.9958 = 0.9981 kg/liter The volume would now be equal to V = 4683.6 kg / 0.9981 kg/liter = 4692.52 liters (1m3/1000 Liters) V = 4.69 m3 Assuming a 15 minute charging for the day tank, the volume flow rate would be Q = 4.69 m3 / 15 min = 0.3127 m3/min (1000 Liters/m3) Q = 312.7 Liters/min

5.

Dimensions of the Fuel Oil Day Tank: Given a volume of 4.69 m3 and assuming we have a cylindrical day tank, then using the following equation below we can obtain the dimension required for the day tank

V=

20

Where: V = Volume of the cylinder; m3 d = Diameter of the cylinder; m h = Height or Length of the cylinder; m Assuming we have a 2.5 m length of the day tank, deviating from the dimension and computing for the diameter we have d2 = d2 = d2 = d2 = 2.39 m2 d = 1.55 m Therefore, the dimension of the day tank is 1.55 m diameter by 2.5 m length cylindrical tank per Diesel Engine.

6.

Fuel Oil Transfer Pump: Based from Marks Standard Handbook for Mechanical Engineers, 9th Edition; Section 8: Machine Elements; 8.7 Pipe, Pipe Fittings and Valves; Table 8.7.3 Properties of Commercial Steel Pipes; page 8 148; assuming we are to use a nominal pipe size of 1 in outside diameter schedule 40 for the suction line pipe and a nominal pipe size of 1 in outside diameter schedule 40 for the discharge line pipe, the following data is given as follows Suction Line Pipe: Schedule 40 Outside Diameter 1 in (true size of 1.9 in) Inside Diameter 1.610 in (or 0.0409 m) Discharge Line Pipe: Schedule 40 Outside Diameter 1 in (true size of 1.660 in) Inside Diameter 1.380 in (or 0.0351 m) Computing for the specific velocity rate at both the suction and discharge we simply use the given equation below Q = AV Where: Q = Volume Flow Rate; m3/min A = Cross-Sectional Area; m2 V = Velocity of Fluid; m/min Also given for the area and deviating from the equation we have 21

A = d2/4 Where: A = Cross-sectional Area; m2 d = Internal Diameter; m V= Computing now for the velocity at the suction we have VS =

= VS = 238.24 m/min (1min/60secs) VS = 3.97 m/sec Computing now for the velocity at the discharge we have VD =

= VD = 323.47 m/min (1min/60secs) VD = 5.39 m/sec Assuming that the pump is in the datum line, the height of delivery is 4.5 meters, the storage is placed 2.5 meters below, a friction loss of 0.75; then with the given & computing now for the discharge head Discharge Head = FL + ZD + V Discharge Head = FL + ZD + Where: FL = Friction Losses for Discharge; 0.75 ZD = Elevation from Datum to Discharge; 4.5 m VD = Velocity Head at Discharge; 5.39 m/sec Discharge Head = FL + ZD +

Discharge Head = 0.75 + 4.5 + Discharge Head = 6.73 m 22

Computing now for the suction head Suction Head = FL + ZS + V Suction Head = FL + ZS + Where: FL = Friction Losses at Suction; 0.75 ZS = Elevation from Datum to Suction; 2.5 m (- due to location) VS = Velocity Head at Suction; 3.97 m/sec Suction Head = FL + ZS +

Suction Head = 0.75 2.5 + Suction Head = -0.95 m Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 13: The Gas Loop; 13 10 Water Pumps; pages 545 to 546; we use the equations provided to obtain the required pump. As both the suction and discharge heads are given, we can now obtain the pump operating head. With the given, the pump operating head is Pump Operating Head = Discharge Head Suction head = 6.73 m + 0.95 m Pump Operating Head = 7.68 m Assuming that the pump efficiency is 70 %, and then we have Pump supply power = Where: Q = Volume Flow Rate; 312.7 Liters/min dO = Density of oil; 914 kg/m3 (or 0.914 kg/liters) H = Pump Operating Head; 7.68 m P = Pump Efficiency; 70 % Pump supply power =

= Pump supply power = 0.70 hp 23

Therefore, we are to use 3/4 hp oil pump for the fuel oil transfer. C. Air System 1. Air Intake System: The air intake system usually consists of air intake duct or pipe appropriately supported, a silencer, an air cleaner, and flexible connections as required. This arrangement permits location of area of air intake beyond the immediate vicinity of the engine, provides for the reduction of noise from intake air flow, and protects vital engine parts against airborne impurities. The air intake will be designed to be short and direct and economically sized for minimum friction loss. The air filter will be designed for the expected dust loading, simple maintenance, and low pressure drop. Oil bath or dry filter element air cleaners will be provided. The air filter and silencer may be combined. Based from Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 6: Internal Combustion Engine Power Plant; 6 6: Auxiliary Systems; Intake & Exhaust Passages; pages 174; an engine needs from 0.056 to 0.084 m3 of air per min per hp developed. Assuming we have maximum intake of 0.084 m3/min of air per hp developed during operation, with 560 kW (or 750.97 hp) then the flow rate of the discharge would be Q = (0.084 m3/min-hp) / (750.97 hp) Q = 63.08m3/min Assuming we have a flow velocity of 800 m/min, then the dimensions of the intake pipe would be A = (63.08 m3/min) / (800 m/min) A = 0.07885 m2 Thus, the area of the pipe is A = d2/4 Where: A Area d Diameter d = (4A/)1/2 d = (4*0.07885 m2/)1/2 d = 0.32 m The diameter of the intake pipe would be 0.32 meter or 320 mm. Therefore, we are to use a pipe with such diameter. 2. Exhaust System:

24

The exhaust system consists of a muffler and connecting piping to the atmosphere with suitable expansion joints, insulation, and supports. In cogeneration plants, it also provides for utilization of exhaust heat energy by incorporating a waste heat boiler which can be used for space heating, absorption refrigeration, or other useful purpose. This boiler produces steam in parallel with the vapor phase cooling system. The exhaust silencer attenuates exhaust gas pulsations (noise), arrests sparks, and in some cases recovers waste heat. The muffler design will provide the required sound attenuation with minimum pressure loss. Based from Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 6: Internal Combustion Engine Power Plant; 6 6: Auxiliary Systems; Intake & Exhaust Passages; pages 175 to 76; the exhaust system must carry approximately 0.168 0.224 m3/min of gases per hp developed. Assuming we have a maximum discharge of 0.224 m3/min of gases per hp developed on an average exhaust temperature, with 560 kW (or 750.97 hp) then the flow rate of the discharge would be Q = (0.224 m3/min) (750.97 hp) Q = 168.22 m3/min Assuming we have a flow velocity of 1500 m/min, then the dimensions of the exhaust pipe would be A = (168.22 m3/min) / (1500 m/min) A = 0.112 m2 Thus the area of the pipe is A = d2/4 Where: A Area d Diameter d = (4A/)1/2 d = (4*0.112 m2/)1/2 d = 0.38 m The diameter of the exhaust pipe would be 0.38 meter or 380 mm. Therefore, we are to use a pipe with such diameter. 3. Air Starting System: The vast majority of diesel engines installed in power plants are started with compressed air. Compressed air is directed by a distributor directly into the combustion chamber or is provided to an air motor which rotates the engine. Dedicated compressors typically provide starting air at 250 psig. The system must provide adequate storage to allow multiple attempts to start the engines. The compressed air start system will included two air compressor units, each 25

with diesel engine-electric motor drive, and two main air storage tanks. The compressors will be rated at 250 psig operating pressure, and each will have a capacity capable of restoring any single storage receiver from 150 psig to 250 psig in 30 minutes or less. Each main storage tank will provide adequate air to the individual air start tanks at each diesel engine, supply air to the utility shop air outlets, and provide a second source to air to the instrument air system. Each air start tank will be sized to provide two 30 - second start sequences without recharging and will be rated at 300 psig working pressure. Each main storage tank will have a volume equal to three air start tanks plus a volume equal to one instrument air receiver, and an additional volume to supply the utility shop air requirement. Therefore, we need 4 units of Air Compressors for the 2 Diesel Engines. Both Air Compressors must have a 250 psig operating pressure. This working pressure is uniform regardless of the diesel engine size.

4.

Required Capacity Air Storage Tank: Assuming we are using a two stage air compressor with a 250 psig working pressure and a compressor power of 200 hp. Based from http://www.engineeringtoolbox.com/compressed-air-receivers-d_846.html with the topic Compressed Air Receivers and using the provided tables
Recommended Receiver Volume per HP Compressor Power (hp) kW 125 93.3 200 149.2 350 261.1 Recommended Receiver Volume Ft3 Gal m3 67 500 1.9 107 800 3.0 188 1400 5.3

For the storage tank, assuming the storage volume is twice that of the air receiver and the utility shop requirements consumes half of the receiver, then the air storage volume would be Total Volume = 3 m3 + (3 m3 *2) + (3 m3 *0.5) Total Volume = 10.5 m3 = 370.8 ft3

5.

Dimensions of the Air Storage Tank: Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table 12 4: Dimension of the Bulk Storage Tank; page 459; with a required storage of 10.5 m3 or 10500 liters then we are to use a tank of the next closest value of 11860 liters, the dimensions of a cylindrical bulk tank is given as follows Diameter 2.44 m Length 2.54 m Plate Thickness 6.35 mm Weight 1844 kg 26

D.

LUBRICATION SYSTEM 1. Daily Lubricating Oil Consumption: Lubrication is essential to any machine element; this includes the diesel engines as well as its auxiliaries. Our design requires 3 units of F8-138 Diesel Engines with 560 kW generator rating; 1 unit is continuous in operation; another unit for 10 am to 3 pm shift; another unit as a reserve; all of which are capable of continuous operation at least for a limited duration of time assuming that maintenance to either one of them is required. A future expansion is also provided. Our plant capacity factor is given at 60%. From the discussion above we have a 93.26 % Net Generator Efficiency for each engine during the operation. The brake horsepower would then be the same as the obtained. Therefore, the brake horsepower is equal to

Rated Bhp = = = 600.47 kW For a continuous operation, the generated power would be Generated Power = 600.47 kW * 24 hours Generated Power = 14411.28 kW-hour Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 6: Internal Combustion Engine Power Plant; 6 6: Auxiliary Systems; Lubrication; page 174; most diesel power plants have an average consumption of 1 gallon of Lubricating oil per 1600 kW-Hour generated at full load rating. For both the diesel engines that operates continuously, then the total generated power would be.. Generated Power = 14411.28 kW-hour + (600.47kW *6 hours) Generated Power = 18014.1 kW-hour Since 1 gallon of Lubricating oil per 1600 kW-Hour generated at full load rating is give as an average consumption for lubrication, for one day consumption, we have Oil Consumption = (18014.1 Kw-Hr) x (1 gallons / 1600 kW-Hr) = 11.26 gallons/day Similarly with the fuel oil, assuming that the delivery of lube oil is every 45 days, the oil consumption Oil Consumption = 11.26 gallons/day * 45 days

27

= 506.7 gallons

2.

Dimensions of the Lube Oil Storage Tank: By conversion Volume = 506.7 gallons*(3.7854 Liters/gallons)*(1 x 10-3 m3/1 Liters) Volume = 1.92 m3 Assuming that the tank is filled within 5 minutes as compared for the fuel oil, then Volume Flow Rate = 1.92 m3 / 5 min = 0.384 m3/min Volume Flow Rate = 384 Liters/min Using a cylindrical drum for storage with a 1 meter diameter, the length could be obtained and so is the dimension Volume = ( x d2 / 4) x L Length = (1.92 m3 x 4) / ( x 1 m2) Length = 2.44 m The dimensions of the lube oil tank would be in 1 m diameter by 2.44 m length.

3.

Lube Oil Transfer Pump: Assuming that the fuel oil and the lube oil storage tanks and discharge settings are the same, together with the assumptions, then the requirements would be close and be useful for the lube oil transfer pump computation Computing now for the velocity at the suction we have VS =

= VS = 292.28 m/min (1min/60secs) VS = 4.87 m/sec Computing now for the velocity at the discharge we have VD =

28

VD = 396.85 m/min (1min/60secs) VD = 6.61 m/sec Assuming that the pump is in the datum line, the height of delivery is 4.5 meters, the storage is placed 2.5 meters below, a friction loss of 0.75; then with the given & computing now for the discharge head Discharge Head = 0.75 + 4.5 + Discharge Head = 7.48 m Computing now for the suction head Suction Head = 0.75 2.5 + Suction Head = -0.54 m As both the suction and discharge heads are given, we can now obtain the pump operating head. With the given, the pump operating head is Pump Operating Head = Discharge Head Suction head = 7.48 m + 0.54 m Pump Operating Head = 8.02 m Assuming that the pump efficiency is 70 %, and then we have Pump supply power = Where: Q = Volume Flow Rate; 384 Liters/min dO = Density of oil; 914 kg/m3 (or 0.914 kg/liters) H = Pump Operating Head; 8.02 m P = Pump Efficiency; 70 % Pump supply power =

= Pump supply power = 0.89 hp Therefore, we are to use 1 hp oil pump for the lube oil transfer. 8. Designing the foundation of the engine

29

Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Chapter 4: The Power Plant Building; Foundation; pages 105 to 113; & The PSME Code; we are to use the following equations to design the Diesel Engine Foundations A. Given in the Diesel Engine Specifications: Engine Length: 7.468 m Engine Width: 2.299 m Engine Weight: 29484 kg For the Length of the Machine Foundation, LF: LF = LB + 2c Where: LF = Length of the Machine Foundation; m or ft LB = Length of the Bed plate (given in Machine Specs); m or ft c = Clearance; 1 foot or 10% of the length of the bed plate LF = LB + 2c LF = 7.468 m + (2*0.7468 m) = 7.468 m + 1.494 LF = 8.962 m For the Width of the Machine Foundation, a: a = w + 2c Where: a = Width of the Machine Foundation; m or ft w = Width of the Bed plate (given in Machine Specs); m or ft c = Clearance; 1 foot or 10% of the length of the bed plate a = w + 2c a = 2.299 m + (2 x 0.2299 m) = 2.299 m + 0.4598 m a = 2.759 m For the Weight of the Machine Foundation, WF: Based from The PSME Code of 1993, Chapter 2; Commercial and Industrial Building; Article 2.4 Machinery & Equipment; Section 4.4.1-2, p. 9, the weight of foundation should be 3 to 5 times the weight of the machinery. Using 5 times to maximize the design WF = mass of the machine x desired multiplier = 29484 kg x 5 WF = 147420 kg For the Base Width of the Machine Foundation, b: Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table 4-4. Safe Bearing Power of Soils, page 105 & Marks Standard Handbook for Mechanical Engineers, 9th Edition, Revised by Eugene Avallone & Theodore Baumester III, Design of Structural Members, Table 12.2.6 Safe Bearing of Soils, p. 12 - 21, we must use at least best brick masonry or higher for the safe bearing for our Diesel Engines, Using the Best Brick Masonry with a safe bearing capacity of 145 to 195 Tons/m2 and using the given equation we have 30

B.

C.

D.

E.

Where: SB = Safe Soil Bearing Capacity; tons/m2 (195 tons/m2 or 195000 kg/m2) WM = Weight of the Machine; kg WF = Weight of the Machine Foundation; kg b = Base Width of the Machine Foundation; m LF = Length of the Machine Foundation; m N = Safety Factor; usually a value of 2 Deviating from the equation & computing we have b= b= b = 0.20 m Since the lower width is less than the width of the machine foundation, then let the lower width be equal to the width. Therefore, b = 2.759 m. F. For the Volume of the Machine Foundation, VF: Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table 4-2: Approximate Weights of Building Material; page 90; using reinforced concrete as our base material and using its approximate density we have = 2406 kg/m V F = WF / VF = VF = 61.27 m3 G. For the Depth of the Machine Foundation, HF: Since the width and the lower width are equal, then we have a rectangular block as for our foundation. The width, WF, would be equal to the width of the foundation. V F = L F * WF * H F HF =

31

HF = 2.48 m

H.

Materials for the Machine Foundation: Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Table 4-1: Data on Concrete Mixes to Yield 1 cu. m Concrete; page 90 ; using a mixture of 1:3:5 as it is often used for foundations we have the following data Using a Mixture of 1:3:5 (1 part of cement, 3 parts of sand, and 5 parts of stone) to produced 1 cu. meter of concrete using 1:3:5 mixtures, the ff. are needed: 6.2 sacks of cement 0.52 m3 of sand 0.86 m3 of stone We are given 6.2 sacks of cement per m3 & 3 units of Diesel Engines and computing for the quantity or required numbers of sacks we have = 6.2 sacks x 3 x 61.27 m3 = 1139.62 or 1140 sacks Computing for the quantity or volume of sand for the mixture we have = 0.52 m3 x 1140 sacks = 592.8 m3 Computing for the quantity or volume of gravel or stone for the mixture we have = 0.86 m3 x 1140 sacks = 980.4 m3

I.

Anchor Bolts: Based from The PSME Code of 1993, Anchor Bolts should be embedded in the concrete at least 30 times to the Bolt Diameter. Assuming a diameter of 25 mm of the Anchor Bolts then the length of the Anchor Bolts is LAB = 25 mm x 30 LAB = 750 mm or 0.75 m Length of Sleeves, LS: Based from The PSME Code of 1993, Chapter 2; Commercial and Industrial Building; Article 2.4 Machinery & Equipment; Section 2.4.1.7, page 9; the length of the sleeve should be 18 times that of the bolt diameter. Therefore we have LS = Bolt Diameter x 18 = 25 mm x 18 LS = 450 mm or 0.45 m Internal Diameter of Sleeves, DS:

J.

K.

32

Based from The PSME Code of 1993, Chapter 2; Commercial and Industrial Building; Article 2.4 Machinery & Equipment; Section 2.4.1.7, page 9; the internal diameter of the sleeve should be 3 times that of the bolt diameter. Therefore we have Ds = Bolt Diameter x 3 = 25 x 3 L. Ds = 75 mm or 0.075 m Number of Steel Bars, NSB: Number of Steel Bars, NSB: Based from Marks Standard Handbook for Mechanical Engineers; 9th Edition; Section 6: Materials of Engineering; 6.2 Iron & Steel; Weights of Square & Round Bars; page 6-46; with a 1 in (25.4 mm) round steel bar for our foundation it is given that it has 2.670 lb/in. Converting we have 3.97 kg/m as for its weight. Using the given formula we have NSB = WF x m%/ WSB Where: NSB = Number of Steel Bars WF = Weight of the Machine Foundation m% = percent multiplier; % to 1% WSB = Weight of the Steel Bars; kg Computing for the required number of steel bars as obtained from the data above, we have NSB = WF x m% / WSB = 147420 kg x 0.01 / 3.97 kg NSB = 371.34 or 372 pieces M. Total Length of the Steel Bars, LSB: Since most of the manufactured steel bars in the market have a standard length of 6.1 m, then we simply have LSB = NSB x 6.1 m = 372 x 6.1 m LSB = 2269.2 m 9. Specifying the required diesel power units Diesel Engines are preferable as an internal combustion component in all internal combustion engine type power plants. They are good and reliable substitute as power plants in places where the supply of coal and water is not available in a desired quantity and for operations where it requires continuity and for standby and emergency purposes. Based from Power Plant Engineering by A. J. Raka, A. P. Srivastava, M. Dwivedi; Chapter 8: Diesel Power Plant; 8.4 Advantage of Diesel Power Plant & 8.5 Disadvantage of Diesel Power Plant; the advantages & disadvantages for using Diesel Engines includes the following.. 33

Advantages: 1. Limited cooling water requirement. 2. Standby losses are less as compared to other Power plants. 3. Low fuel cost. 4. Quickly started and put on load. 5. Smaller storage is needed for the fuel. 6. Layout of power plant is quite simple. 7. There is no problem of ash handling. 8. Less supervision required. 9. For small capacity, diesel power plant is more efficient as compared to steam power plant. 10. They can respond to varying loads without any difficulty. Disadvantages: 1. High maintenance and operating cost. 2. The plant cost per kW is comparatively more. 3. The life of diesel power plant is small due to high maintenance. 4. Noise is a serious problem in diesel power plant. 5. Diesel power plant cannot be constructed for large scale. Based from Power Plant Engineering (Adapted to MKS Units) by Frederick T. Morse; Fig. 6-33; Dimensions of Nordberg 4-cycle Unsupercharged & Supercharged Engines; page 186; we are to use 3 units of F8-135 Diesel Engines (1 unit is continuous in operation; another unit for 7 am to 8 pm shift; another unit as a reserve; all of which must be capable of continuous operation at least for a limited duration of time) as based from our load curve. Diesel Engine Specifications: Engine Type: F8-138 Diesel Engine Engine Height: 2.302 m Engine Length: 7.468 m Engine Width: 2.299 m Engine Weight: 29484 kg Generator kW Rating at 450 RPM: 560 kW Units: 3 Units (1 unit operating continuously; 1 unit that operates at 7 am to 8 pm shift; 1 unit reserve; all are capable of continuous operation) 10. Providing space for future expansion (See the drawing) 11. Design the Power house building

34

12. Prepare the working schedule of the project PROPOSED SCHEDULE OF WORK & ESTIMATE TIME OF COMPLETION Assuming we start the project at the month of January of 2010, then we are to follow the proposed schedule given below Time & Month Target Work Output Load Survey for the consumer kilowatt consumption; Gathering & surveying of the environment within the location; Planning & securing necessary permits Computation for the required plant operation which includes the following: Selection of Diesel Engine type, Design of the Generator Set, Design of its Fuel Oil System, Design for its Cooling Water System, Design for its Lubricating System, Design for its Air Handling System, Design for the Engine Dimension, others; Thorough reevaluation of the plant design; Obtaining contracts & advice from various engineering firms Construction of the plant site; Purchase of equipments; Construction of Administration Building & Others; Installation of the equipments Initial operation; Recalibration of equipments Relevance Initial work frame for the project; idealization for the projects continuity

January to March 2013

Initial work frame for the plants construction & operation; Idealization for the plant layout, operation & maintenance

April to June 2013

Idealization of the plant site

July to February 2014

March to April 2014

Testing phase of the project; Checking for flaws & defects

35

May 2014

Turnover of Plant operation to the owner/firm

Final project phase

36

Vous aimerez peut-être aussi