Académique Documents
Professionnel Documents
Culture Documents
Record of Release
Version No. 1.0 Modified By Omkar Prayag Reviewed By Ramagiri Srinivasrao Authorized By Sivakumar Kasi Release Date Modifications Done
Table of Contents 1. ICON Details on SAP Screen 1.1 General Information for all transactions 2.0 Quota Arrangement 2.1 Material Master Settings for Quota Arrangement 2.2 Maintaining Quota Arrangement
SAP-MTIVer 1.0/15-Oct-11
Page 2 of 9
1.0 ICON Details on SAP Screen General Information for all Transactions
Icons Quick Reference ICON Details (Short Keys) Description Action Taken on Screen
Go back one screen Cancel the activity Display the Details Continue Run Program Exit the Window Create New Window Display the History Save the records Get Help Delete records Copy records Create New Data Change the Records Select the possible Entries Command Field Data Information Search for records
Overview Save Help Delete Copy Create Change Pick List Command Field
(Ctlr+Shift+F2) (Ctlr+F)
Details Search
SAP-MTIVer 1.0/15-Oct-11
Page 3 of 9
In MRP1 view, maintain the Lot Size type as ZS Lot for Lot order quantity with splitting.
SAP-MTIVer 1.0/15-Oct-11
Page 4 of 9
SAP-MTIVer 1.0/15-Oct-11
Page 5 of 9
2.2 Maintaining Quota Arrangement Type the T-Code MEQ1 in command field and press enter or select from process planning menu.
SAP-MTIVer 1.0/15-Oct-11
Page 6 of 9
Below screen will appear. Enter the material number, for which you want to maintain the quota arrangement.
SAP-MTIVer 1.0/15-Oct-11
Page 7 of 9
Minimum qty Split. - Less than this qty will not go for procurement.
Maintain quota percentage for both procurement types.
Please note in below screen, after running the MRP, total requirement for the material shown below, as on 30.08.2011 is 45 nos. Both the Planned order & Purchase requisition are created, for this material, based on quota percentage.
SAP-MTIVer 1.0/15-Oct-11 Page 8 of 9
SAP-MTIVer 1.0/15-Oct-11
Page 9 of 9