Vous êtes sur la page 1sur 3

CAROLINE ASANTESANA MUGHOGHO, IL Word Case UC_IC1A

Submission #1 Score is 54 out of 100

SAM Projects 2010

1. Verify that your name appears in the footer of the document. Times New Roman.
7 2. Select the entire document, change the style to No Spacing, then change the font to 12-point 3. In the first line of the letterhead at the top of the document, format "Green Home" in 30point Arial Black font and then apply the All caps font effect. Format "Green" with the Olive Green, Accent 3, Darker 50% font color. Format "Home" with the Olive Green, Accent 3 font color, then delete the space between the two words. Format "Construction" in 30-point Arial font with the Olive Green, Accent 3, Darker 50% font color, then apply italic.
Should be all caps. Font should be "Arial".

4. Format the next line of the letterhead (the address line) in 10-point Arial font with an Olive Green, Accent 3, Darker 50% font color, then center the two-line letterhead.
Font should be "Arial". Text should be center aligned.

address line paragraph in the letterhead.

5. Add a 2 1/4-point dotted border with Olive Green, Accent 3, Darker 50% color below the 6. With the insertion point in the address line, open the Borders and Shading dialog box, click Options to open the Borders and Shading Options dialog box, change the Bottom setting to 5 points, then click OK twice to adjust the location of the border relative to the line of text.

7. Format the title "Proposal of Renovation" in 14-point Arial Black font, then center the title.

be performed for and at", "Scope of work", "Payment schedule", and "Agreement".
8

8. Format the following headings (including the colons) in 11-point Arial Black: "Date", "Work to 9. Select the 14-line list under "Scope of work" that begins with "Demo of all...", then change the paragraph spacing to be 4 points after each paragraph in the list.
Paragraph should have 4 pt spacing after.

10. With the list selected, set a right tab stop at the 6 1/4" mark, insert tabs before every price in the list, then apply dotted line tab leaders.
Paragraph should have right tab stop 6.25 inches from the margin. Tab not found immediately before price.

List number should be bold. the list.

11. Format the list as a numbered list, then apply bold to the numbers. 12. Apply bold to the two lines, "Total estimated job cost..." and "Approximate job time..." below 13. Replace "Your Name" with Sam Johnson in the signature block, select the signature block ("Respectfully submitted" through "Sam Johnson"), set a left tab stop at the 3 1/4" mark, deselect the text, then insert a tab before each line in the signature block.
Paragraph should have left aligned tab stop at 3.25 inches.

SAM Projects COPYRIGHT 2010 PGS Systems


Ref: 4674431594BFCFCD -- Inference Engine version: IE1.1.80, KB version KB1.1.80

GreenHome Construction
375 West Street, Springfield, IL 62705; Tel: 217-555-3202; www.greenhomeconstruction.com

Proposal of Renovation
Date:

February 11, 2013


Work to be performed for and at:

Lucy Franklin and Alex Thomas 287 Miller Street Springfield, IL 62711
Scope of work:

Renovation of second floor bathroom and bedroom according to architectural plans supplied by the customer. 1. Demo of all partitions, bathroom, and chimney. $4,125 2. Framing and drywall (skim coat), including ceilings and closets. $5,125 3. Finish work: window casings, door casings, ceiling molding. $3,750 4. Floor, wall, and ceiling prep and patch work. $2,500 5. Floor tile installation only (100 sq. ft.). $625 6. Wall tile installation only (100 sq. ft.). $750 7. Cabinet installation in bathroom. $600 8. Bamboo floor: layover in bedroom. (182 sq. ft.). $1,456 9. Shower door and recessed medicine cabinet. $500 10. Blown-in insulation, work area (approx. 800 sq. ft. $2,000 11. Shelving above dryer and closets and poles (2 closets). $800 12. Patching of duct, trim, and offset duct. $937 13. Coordination of patching and boxing of pipes and heading-off joists. ....................................$1,875 14. Permit and inspection services . $500

This file created exclusively for CAROLINE ASANTESANA MUGHOGHO.

D805DEA5C0DF7B3B-0D027CBA378FBD20

Total estimated job cost: $25,543 Approximate job time: Six weeks
Payment schedule:

5 equal payments of $5108.60 First payment is due upon acceptance of this estimate; three payments are due on dates to be specified by the contractor upon acceptance of this agreement (approximately every ten days after commencement of job); and final payment is due upon completion.
Agreement:

Any alteration or deviation from the above specifications involving additional costs will be executed only upon written orders and will become an extra charge over and above the estimate. Pre-existing or unforeseen code violations and/or hazardous materials that need to be corrected will also accrue an additional charge. In signing this agreement the owner warrants the suitability of the architectural plans; any delays or costs resulting from flaws in these plans will be the responsibility of the owner. The contractor will not be held responsible for unforeseen circumstances, such as strikes, accidents, or delays beyond control. The owner is responsible for carrying fire, tornado, and other necessary insurance upon the above work. Workmens Compensation and Public Liability Insurance on above work are the responsibility of the contractor. This offer is valid for thirty days. Respectfully submitted,

Sam Johnson

Accepted by: Date: